Post on 07-Mar-2021
RUJ.
FAIL
RUJUKAN
OSCPTJ TAJUK KERJA SEKSYEN STATUS
TINDAKAN
(PPPA/PTJ)JURUTERA PEN.JURUTERA
TARIKH
KEPUTUSAN
TARIKH TAMAT
TEMPOH SAH
KELULUSAN
CATATAN BIL. MINIT
1 2014/732 KOLEJ 10
KERJA- KERJA MEMBEKAL DAN
MEMASANG WAYAR ELEKTRIK
25MM DARIPADA WAIN DB 'BOARD'
KE TEMPAT LOKASI DAN SIDE DB.
TERMASUK MEMASANG MAIN SUIS
MCB CIRCUIT 2 UNIT DAN CIRCUIT 6
ELEKTRIKTIDAK
LULUS
EN.
ASRIDUAN
RAMLI
EN. MOHAMMAD
NASRUL ABD
TALIB
13/8/2014
TIDAK LULUS KERANA
PENDAWAIAN TIDAK MENGIKUT
SPESIFIKASI
01/2014
2 2014/748 KOLEJ 17
MENUKAR PENGHAWA DINGIN
SEDIADA KEPADA 3 HP (2 UNIT
SAHAJA)
MEKANIKAL LULUS PTJ
HJ. MOHD
NIZAN
JAFFAR
PN. NORZIRA
NORDIN13/8/2014 01/2014
3 2014/749 KOLEJ 1OMEMBINA TEMBOK DI DALAM
DEWAN KOLEJ 10AWAM
LULUS
BERSYARATPTJ
EN.SHAHRIL
SALLEH
PN. ROHAIZI
RAHMAT13/8/2014
HARGA SEMAKAN PPPA AKAN
DINYATAKAN DIDALAM SURAT
MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI
TUJUAN URUSAN TAWARAN
KERJA KEPADA KONTRAKTOR.
01/2014
4 2014/760 PPPA
KERJA-KERJA MEMBAIKI PAIP AIR
UTAMA BOCOR DI JALAN ALPHA
BERSEBELAHAN PADANG KAWAD,
UNIVERSITI PUTRA MALAYSIA
AWAM LULUS PPPAEN.SHAHRIL
SALLEH
MUHAMMAD
MUKMIN
OTHMAN
20/8/2014 02/2014
5 2014/770
KOLEJ
TUN DR.
ISMAIL
MENAIKTARAF TANDAS LELAKI DAN
PEREMPUANAWAM
LULUS
BERSYARATPTJ
EN.SHAHRIL
SALLEH
PN. ROHAIZI
RAHMAT20/8/2014
PTJ PERLU MENGADAKAN
MESYUARAT KOORDINASI
BERSAMA PPPA (BAGI
PENYEDIAAN PDA)
02/2014
6 2014/780KOLEJ
KELIMA
MEMBEKAL DAN MEMASANG
PENYAMAN UDARA DI DEWAN
HARMONI
MEKANIKAL LULUS PTJ
HJ. MOHD
NIZAN
JAFFAR
EN.MOHD
FAZRUL MOHD
NASIR
20/8/2014LULUS. HARGA TIDAK MELEBIHI
RM 6050.0002/2014
7 2014/783 PPPA
ADUAN KEROSAKAN LAMPU JALAN
DI PADANG RAGBI BERHADAPAN
FAKULTI EKOLOGI MANUSIA
ELEKTRIK LULUS PPPA
EN.
ASRIDUAN
RAMLI
PN.ISMA ISMAIL 20/8/2014TERMASUK DIDALAM KONTRAK
LAMPU JALAN02/2014
MINIT JAWATAN KUASA KELULUSAN KERJA BULAN OGOS 2014
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65