Kampung Melayu Tanah Abang
Sudirman fly over, Jakarta (1992)
Technical Data
Total length 165 mSpans: 31 m - 33 m - 37 m - 33 m - 31 mRadius in vertical 1.683,373 m Deck width 2 x 8.5 mSingle-cell-box girder high 1.90 mLaunching nose L= 23 m
Sudirman FO
Sudirman FO
Rencana Special Span Melintasi Jl. Sudirman
3130033300372603330031300JL. JEND. SUDIRMANSudirman FO
Sudirman FO
Metode Pelaksanaan Balance Cantilever
Banyumanik-1
Banyumanik-2
Gedawang
Musi Banyu Asin
Tukad Bangkung
Metode Pelaksanaan Segmental Span by Span Underslung
Metode Pelaksanaan Segmental Span by Span Over Head
Reference Projects Segmental Span by Span
BRIDGE 3 : NIPAH - SETOKOBridge elevation
BRIDGE 3 : NIPAH - SETOKODiaphragm segment cross section
BRIDGE 3 : NIPAH - SETOKOTypical segment cross section
BRIDGE 3 : NIPAH - SETOKODeviator segment cross section
BRIDGE 3 : NIPAH - SETOKOSegment reinforcement
BRIDGE 3 : NIPAH - SETOKOSegment production
BRIDGE 3 : NIPAH - SETOKOPier
BRIDGE 3 : NIPAH - SETOKOLaunching truss
- Fly Over Pasar Pagi- Jabotabek Rail Viaduct
**Progress Report per 15 Feb 2010*Progress Report per 15 Feb 2010*Progress Report per 15 Feb 2010*********