No. KODE KOEF SAT. HARGA SAT. JUMLAH Rp Rp 1 2 3 4 6 8 = ( 4 X 7 ) URAIAN PAKERJAAN 5 II B PEKERJAAN TANAH B.1 1M3 Galian Tanah Biasa Sedalam 1 m 13,800.00 0.400 OH Pekerja 34,500.00 13,800.00 B.2 1M3 Galian Tanah Keras Sedalam 1 m 34,500.00 1.000 OH Pekerja 34,500.00 34,500.00 B.3 1M3 Galian Tanah Cadas Sedalam 1 m 51,750.00 1.500 OH Pekerja 34,500.00 51,750.00 B.4 1M3 Galian Tanah Lumpur Sedalam 1 m 41,400.00 1.200 OH Pekerja 34,500.00 41,400.00 B.5 1M2 Pekerjaan Striping Setinggi 1 m 1,725.00 0.050 OH Pekerja 34,500.00 1,725.00 B.6 1M3 Membuang Tanah Sejauh 30 m' 11,385.00 0.330 OH Pekerja 34,500.00 11,385.00 Suppl. B 6 1 M3 PEK. PEMBUANGAN LEBIH DARI RADIUS 30 M Keterangan : a K = Biaya 275 a = Upah Pekerja L = Jarak pembuangan B.7 1M3 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian) B.8 1M3 Pemadatan Tanah 17,250.00 0.500 OH Pekerja 34,500.00 17,250.00 B.9 1M3 Urugan Pasir 84,690.00 1.200 m3 Pasir Urug 61,950.00 74,340.00 0.300 OH Pekerja 34,500.00 10,350.00 B.9a 1M3 Urugan Tanah Biasa (Tanah Tersedia) 10,350.00 0.300 OH Pekerja 34,500.00 10,350.00 B.10 1M3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL 152,600.00 0.400 m3 Pasir Urug 61,950.00 24,780.00 0.135 m3 Kapur Padam 196,000.00 26,460.00 0.948 m3 Tanah Liat 55,000.00 52,140.00 0.800 OH Pekerja 34,500.00 27,600.00 0.400 OH Tukang Batu 48,875.00 19,550.00 0.040 OH Kepala Tukang 51,750.00 2,070.00 B.11 1M2 Pemasangan Lapisan Ijuk tebal 10 cm 87,375.00 6.000 kg Ijuk 13,700.00 82,200.00 0.150 OH Pekerja 34,500.00 5,175.00 B.12 1M3 Urugan Sirtu 136,545.00 1.200 m3 Sirtu 106,600.00 127,920.00 0.250 OH Pekerja 34,500.00 8,625.00 B.13 1 M3 Galian Tanah Biasa Sedalam 2 meter 18,147.00 0.526 OH Pekerja 34,500.00 18,147.00 B.14 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 3 M' TENAGA MANUSIA 26,045.00 0.735 org Pekerja 34,500.00 25,357.50 0.050 lot Alat bantu 13,750.00 687.50 B.15 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 4 M' TENAGA MANUSIA 33,255.50 0.944 org Pekerja 34,500.00 32,568.00 0.050 lot Alat bantu 13,750.00 687.50 B.16 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 5 M' TENAGA MANUSIA 40,466.00 1.153 org Pekerja 34,500.00 39,778.50 0.050 lot Alat bantu 13,750.00 687.50 MENGGUNAKAN RUMUS = K : ( L + 75 ) C:\Users\COMPAQ\Downloads\analisa swakelola - mandor 3

description

analisa swakelola - mandor3

Transcript of analisa swakelola - mandor3

Page 1: analisa swakelola - mandor3

No. KODE KOEF SAT. HARGA SAT. JUMLAH Rp Rp

1 2 3 4 6 8 = ( 4 X 7 )

URAIAN PAKERJAAN

5

II B PEKERJAAN TANAH

B.1 1M3 Galian Tanah Biasa Sedalam 1 m 13,800.00 0.400 OH Pekerja 34,500.00 13,800.00

B.2 1M3 Galian Tanah Keras Sedalam 1 m 34,500.00 1.000 OH Pekerja 34,500.00 34,500.00

B.3 1M3 Galian Tanah Cadas Sedalam 1 m 51,750.00 1.500 OH Pekerja 34,500.00 51,750.00

B.4 1M3 Galian Tanah Lumpur Sedalam 1 m 41,400.00 1.200 OH Pekerja 34,500.00 41,400.00

B.5 1M2 Pekerjaan Striping Setinggi 1 m 1,725.00 0.050 OH Pekerja 34,500.00 1,725.00

B.6 1M3 Membuang Tanah Sejauh 30 m' 11,385.00 0.330 OH Pekerja 34,500.00 11,385.00

Suppl. B 6 1 M3 PEK. PEMBUANGAN LEBIH DARI RADIUS 30 MKeterangan :

a K = Biaya

275 a = Upah PekerjaL = Jarak pembuangan

B.7 1M3 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)B.8 1M3 Pemadatan Tanah 17,250.00

0.500 OH Pekerja 34,500.00 17,250.00

B.9 1M3 Urugan Pasir 84,690.00 1.200 m3 Pasir Urug 61,950.00 74,340.00

0.300 OH Pekerja 34,500.00 10,350.00

B.9a 1M3 Urugan Tanah Biasa (Tanah Tersedia) 10,350.00 0.300 OH Pekerja 34,500.00 10,350.00

B.10 1M3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL 152,600.00 0.400 m3 Pasir Urug 61,950.00 24,780.00 0.135 m3 Kapur Padam 196,000.00 26,460.00 0.948 m3 Tanah Liat 55,000.00 52,140.00

0.800 OH Pekerja 34,500.00 27,600.00 0.400 OH Tukang Batu 48,875.00 19,550.00 0.040 OH Kepala Tukang 51,750.00 2,070.00

B.11 1M2 Pemasangan Lapisan Ijuk tebal 10 cm 87,375.00 6.000 kg Ijuk 13,700.00 82,200.00

0.150 OH Pekerja 34,500.00 5,175.00

B.12 1M3 Urugan Sirtu 136,545.00 1.200 m3 Sirtu 106,600.00 127,920.00

0.250 OH Pekerja 34,500.00 8,625.00

B.13 1 M3 Galian Tanah Biasa Sedalam 2 meter 18,147.00 0.526 OH Pekerja 34,500.00 18,147.00

B.14 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 3 M' TENAGA MANUSIA 26,045.00 0.735 org Pekerja 34,500.00 25,357.50 0.050 lot Alat bantu 13,750.00 687.50

B.15 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 4 M' TENAGA MANUSIA 33,255.50 0.944 org Pekerja 34,500.00 32,568.00 0.050 lot Alat bantu 13,750.00 687.50

B.16 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 5 M' TENAGA MANUSIA 40,466.00 1.153 org Pekerja 34,500.00 39,778.50 0.050 lot Alat bantu 13,750.00 687.50

MENGGUNAKAN RUMUS = K : ( L + 75 )