PEMBENTANGAN PINDAAN
AKTA LEMBAGA
PEMBANGUNAN INDUSTRI
PEMBINAAN 1994
(AKTA 520)
KANDUNGAN
STATUS
STRATEGI
STRUKTUR
ISU DAN KESAN
KESIMPULAN
STATUS
RUU telah diluluskan oleh Pejabat Peguam
Negara pada 16 Mac 2011.
Disasarkan RUU dibentangkan untuk Bacaan
Pertama di Parliament pada sesi June 2011.
LATARBELAKANG
Pertama kali dipinda sejak dari tarikh kuatkuasa (Disember 1994)
Pindaan adalah hasil dari siri perbincangan bersama industri dan agensi kerajaan
Mengambilkira keperluan industri semasa dan saranan YB Menteri Kerja Raya
Pindaan adalah hasil kajian yang dibuat mengenai perlaksanaan di negara-negara luar seperti Singapura dan Australia.
Mengandungi 33 Fasal pindaan.
OBJEKTIF PINDAAN
“Peningkatan KUALITI Pembinaan”
STRATEGI
PENETAPAN DAN PEMATUHAN STANDARD
PENINGKATAN KUALITI KERJA PERSONEL BINAAN MELALUI PENDAFTARAN AKREDITASI DAN PERSIJILAN
PELETAKKAN TANGGUNGJAWAB KEATAS KONTRAKTOR DAN PENGURUS TAPAK BINA
MEMPERKEMASKAN FUNGSI DAN KUASA CIDB MELALUI PENAMBAHBAIKAN PERUNTUKAN SEDIAADA
STRUKTUR PINDAAN
Pindaan Tambahan
(Baru)
1. Pematuhan
Standard
2. Personel Binaan
3. Pengurusan &
Kawalselia tapak
bina
Pindaan
Penambahbaikan
1. Levi
2. Kompaun
3. Pewakilan Kuasa
(Delegation of
powers)
4. Penguatkuasaan
PINDAAN BARU- PEMATUHAN STANDARD
ISU STATUS KINI KESAN PINDAAN AKTA
1. WTO Layanan berbeza
diantara bahan
import dan tempatan
Kepatuhan Malaysia terhadap WTO
2. Jaminan
Kualiti
Kualiti bahan binaan
dan mutu kerja tidak
dapat dijamin
Menetap dan mewajibkan standard
bahan binaan dan standard
kemahiran
3. Kebanyakan
pematuhan
standard
adalah
voluntary.
Tiada agensi
kerajaan yang diberi
kuasa untuk
menjadikan
pematuhan standard
mandatori dalam
industri pembinaan.
CIDB dapat menguatkuasakan
pematuhan keatas barangan/produk
binaan.
CADANGAN PENYELESAIAN
PERUNTUKAN BARU SEKSYEN 4(1)(g) dan BAHAGIAN VIIA
CIDB mengawalselia pematuhan ke atas standard bagi mutu kerja
binaan dan bahan binaan. Penalti dikenakan pada yang ingkar.
PINDAAN BARU- PERSONEL BINAAN
ISU STATUS KINI KESAN PINDAAN
1. Kualiti Tahap kualiti pembinaan
dan produktiviti kerja yang
rendah
Sijil Kemahiran diwajibkan untuk
tred-tred pembinaan tertentu.
2. Tiada data yang
komprehensif utk
perancangan
sumber manusia
Tidak semua personal
binaan di Malaysia
berdaftar dengan CIDB
Mewajibkan pendaftaran bagi
perancangan keperluan dan
pembangunan sumber manusia
3. Kerjaya dalam
pembinaan tidak
menarik belia
tempatan
Pandangan masyarakat
terhadap kerjaya
Menaikkan dan memberi imej baru
personal binaan melalui
perancangan kerjaya dan struktur
penggajian
CADANGAN PENYELESAIAN
PERUNTUKAN BARU SEKSYEN 4(1)(k) dan BAHAGIAN VII
CIDB mendaftar, mengakredit dan memperaku personel binaan dan membatalkan, mengkensel, menggantung dan memasukkan semula akreditasi, pendaftaran dan pemerakuan personel binaan itu.
PENGURUSAN DAN KAWALSELIA
TAPAK BINA
DOSH
(Akta 514 dan
Akta 139)
PBT
Akta 133 dan
UBBL
CIDB
Akta 520
(Pindaan)
Seksyen 15
Tanggungjawab
majikan-pekerja
Seksyen 17
Tanggungjawab
occupier-pihak ketiga
Orang yang
Mengemukakan/
Submitting Person di
bawah Perakuan Siap
dan Pematuhan/ CCC
Seksyen 34B
Duty of Contractor
Seksyen 34C
Breach of Duty of
Contractor
DOSH
(Akta 514 dan
Akta 139)
PBT
Akta 133 dan
UBBL
CIDB
Akta 520
(Pindaan)
Seksyen 34D
Death Caused by Breach
of Duty of Contractor
Seksyen 34E
Duty of Person who
manages or controls
construction site
Seksyen 34BPART VIIIA
DUTY OF CONTRACTOR
34B (1)
A contractor undertaking any construction works shall-
(a) notify and submit to the Lembaga any information and documents, including any supporting documents relating to construction works, whether new or otherwise, in accordance with this Act;
(b) ensure the construction works are carried out in accordance with the provisions of this Act, any regulations, terms and conditions imposed by the Lembaga and any other written law; and
( c) ensure the safety of the building and the construction works whether during or post construction works.
34B (2)
For the purpose of this Section, “shall ensure the safety of building and the construction works” means
ensuring that any building or construction works being carried out and have been carried out in such
manner as-
(a) not to causing, or threatening to cause a risk of injury to any person or damage to any property; or
(b) not to causing, or threatening to cause total or partial collapse of –
(i) the building in respect of which the construction works are being carried out or have been
carried out; or
(ii) any other building, road or natural formation which is opposite, parallel adjacent, or in
close proximity to any part of the building or construction works.
SECTION 34D
Death caused by breach of duty of contractor
34D.(1)
Any contractor who breaches his duty under paragraph 34B(1)(c), and which breach results in death,
shall be guilty of an offence and shall, on conviction, be liable to a fine not exceeding five hundred
thousand ringgit or to imprisonment for a term not exceeding two years or to both.
34D(2)
Section 34C shall apply to this section except paragraph 34C(1)(c).
34D(3)
An offence under this section shall be a seizable offence for the purpose of the Criminal
Procedure Code [Act 593].
Seksyen 34E
Duty of person who manages or controls construction site
34E (1)
Any person having the right and power to manage or control any construction site shall have the
duty to ensure, so far as is reasonably practicable, that the construction site and the means of
entering and leaving such construction site are safe and not harmful to health.
34E( 2)
The duty under subsection (1) shall apply only in relation to matters over which the person has the
right and power to manage or control.
34E (3)
Any person who contravenes subsection (1) shall be guilty of an offence and shall, on conviction,
be liable to a fine not exceeding fifty thousand ringgit or two years imprisonment or to both.”.
Seksyen 35A
Power of investigation
35A (1)
An authorized officer shall have all the powers necessary to carry out an investigation under this
Act.
35A(2)
Upon completion of his investigation, the authorized officer shall immediately give all information
relating to the commission of any offence to an officer in charge of a police station and a police
officer may by warrant, arrest any person who may have committed an offence under this Act or
any regulation made thereunder.
PINDAAN
PENAMBAHBAIKAN
ISU STATUS KINI KESAN PINDAAN AKTA
1. LEVI
(Seksyen 34)
Tiada kewajipan
untuk isytihar projek
Definisi kerja
pembinaan tidak
cukup luas
Kontraktor wajib isytihar projek
Definisi kerja pembinaan kini
merangkumi pemerolehan bahan
binaan , kelengkapan atau
pekerja
2. PEWAKILAN FUNGSI
(DELEGATION OF
POWER)
(Seksyen 24)
Tiada pewakilan
kuasa
CIDB boleh mewakilkan kuasa
kepada pihak-pihak yang
berkenaan untuk menjalankan
fungsi dan kuasa CIDB
3. PENGUATKUASAAN
(Seksyen 35)
Kuasa Pegawai
Penguatkuasa terhad
Seragam dengan agensi
penguatkuasaan yang lain
3. KOMPAUN
(Seksyen 38C)
Tiada Penawaran untuk
menyelesaikan kes tanpa
membawa ke mahkamah
Dengan keizinan DPP
KESIMPULAN
Dengan adanya pindaan-pindaan ini, CIDB
berpandangan ia dapat meningkatkan kualiti
industri pembinaan Malaysia di samping
berupaya memperkemaskan operasinya.
Terima Kasih.