COMPANY PROFILE

QTS ENGINEERING SDN BHD E-2-6, No. 1, M-Avenue, Jalan 1/38A, Taman Segambut Bahagia, 51200 Kuala Lumpur. Tel: +603-6250 1991 Fax: +603-6243 4554 Email: [email protected] Website: qtsengineering.com.my

Rev. 05

Page 2: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

1 | P a g e

Company Profile

QTS Engineering Sdn Bhd was established since May 2011. We provide design & build, test &

commission, service and maintenance as well for complete Air-Conditioning and Mechanical

Ventilation (ACMV) and general mechanical & electrical (M&E) engineering works.

Mission and Vision

Our vision is to be a leading Air-Conditioning and M&E Contractor Company, recognised for the

delivery of world-class services in each of our projects. In doing so, we provide best quality of world-

leading technologies and services to meet customer needs.

Completed and Ongoing Projects

Cathay Cineplexes @ eCurve (Renovation Work Completed on April, 2013)

Contract Value: RM 480,000.00

Page 3: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

2 | P a g e

Puffy Buffy @ NU Sentral, KL (Completed on Dec 2014)

Contract Value: RM 50,000.00

Leko-Leko! @ NU Sentral, KL (Completed on Feb 2015)

Contract Value: RM 90,000.00

Page 4: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

3 | P a g e

Malabar Gold & Diamonds @ Jalan Masjid India, KL (Completed on April 2015)

Contract Value: RM 120,000.00

Seri Intan Cinema @ Klang (Completed on October 2015)

Contract Value: RM 420,000.00

Page 5: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

4 | P a g e

Sushi King @ Aeon Mall Klebang, Ipoh (Completed on October 2015)

Contract Value: RM 60,000.00

Nando’s @ Aeon Mall Klebang, Ipoh (Completed on October 2015)

Contract Value: RM 50,000.00

Page 6: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

5 | P a g e

Yoshinoya & Hanamaru @ Aeon Mall Klebang, Ipoh (Completed on October 2015)

Contract Value: RM 100,000.00

Sephora @ Aeon Mall Klebang, Ipoh (Completed on February 2016)

Contract Value: RM 100,000.00

Page 7: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

6 | P a g e

Biscuit Factory @ Taman Bukit Serdang (Completed on July 2016)

Contract Value: RM 120,000.00

Page 8: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

7 | P a g e

Bakery @ Aeon Mall Terbau City, Johor (Completed on November 2016)

Contract Value: RM 80,000.00

AEON MaxValu Prime @ Sunway Velocity Mall (Completed on November 2016)

Contract Value: RM 300,000.00

Page 9: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

8 | P a g e

Daiso @ Sunway Velocity Mall (Completed on November 2016)

Contract Value: RM 50,000.00

Daiso @ MyTown Shopping Centre, KL (Completed on January 2017)

Contract Value: RM 60,000.00

Golden Screen Cinemas @ MyTown Shopping Centre, KL (Ongoing Project since

September 2016)

Contract Value: RM 1,000,000.00

Page 10: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

9 | P a g e

Riway Office Building & Auditorium (Ongoing Project since September 2016)

Contract Value: RM 1,300,000.00

Page 11: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

10 | P a g e

Board of Directors

YONG LOI JOO

Yong Loi Joo is the founder of QTS Engineering Sdn Bhd and appointed as Managing Director on 22

July 2015. He was Former Project Manager of a well-known air-conditioning contractor company from

2007 to 2015. Plenty of precious knowledge and personal experiences gained during past few years

have encouraged Mr. Yong to start building up his own company.

PERSONAL EXPERIENCES IN PREVIOUS COMPANY PROJECTS

Universiti Teknologi MARA (UiTM), Meru

o Phase 1: Satellite A [2007 - 2008]

AC System: Air-Cooled Chillers, FCU

MV System: Kitchen Exhaust System

Experiences:

Involved in construction of underground chilled water (CHW) pipes, flushing of CHW

pipes, site coordination & installation, testing & commissioning (T&C) and Bomba

Testing of ACMV systems.

o Phase 2: Satellite B [2008 - 2009]

AC System: Heat Exchanger (HEX), CHW Pumps, AHU

Experiences:

Involved in flushing of CHW pipes, testing & commissioning (T&C) and Bomba Test

of AC systems.

Page 12: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

11 | P a g e

Jusco Melaka Shopping Centre, Melaka [2009 – 2010]

o AC System: Water-Cooled Chillers, Cooling Towers, AHU, FCU

MV System: Kitchen Exhaust, Fresh Air, Smoke Spill, Staircase & Lift Lobby

Pressurisation Systems, Smoke Curtains

BMS: Building Management System

Experiences:

Involved in flushing of CHW pipes, site coordination & installation (including chillers),

T&C and Bomba Test for ACMV Systems.

Giant Hypermarket, Setia Alam, Klang [2010 – 2010]

o AC System: Water-Cooled Packaged Units, Cooling Towers, AHU, FCU

MV System: Kitchen Exhaust, Fresh Air Systems.

Experiences:

Involved in flushing of condenser water pipes, T&C and Bomba Test for ACMV

Systems.

Page 13: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

12 | P a g e

Golden Screen Cinema (GSC), Jusco Melaka [2010 – 2011]

o AC System: Air-Cooled Chillers, AHU

Experiences:

Involved in flushing of CHW pipes, site coordination & installation (including chillers),

T&C and Bomba Test for AC Systems.

Giant Hypermarket, Banting [2011 – 2012]

o AC System: Water-Cooled Packaged Units, Cooling Towers, AHU, FCU

MV System: Kitchen Exhaust, Fresh Air Systems.

Experiences:

Involved in flushing of condenser water pipes, site coordination & installation, T&C

and Bomba Test for ACMV Systems.

Page 14: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

13 | P a g e

1F3 Office Building, Klang [2012 – 2012]

o AC System: VRF System

Experiences:

Involved in purging copper pipes, site coordination & installation, T&C and Bomba

Test for AC Systems.

Icon Residence, Mont' Kiara [2012 – 2015]

o AC System: VRF System

MV System: Smoke Spill, Staircase & Lift Lobby Pressurisation System

Experiences:

Involved in purging copper pipes, site coordination & installation, T&C and Bomba

Test for ACMV Systems.

Page 15: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

14 | P a g e

Golden Screen Cinema (GSC), Setia City Mall, Shah Alam [2010 – 2011]

o AC System: AHU Duct Works

MV System: Ventilation Duct Works

Experiences:

Involved in T&C and Bomba Test for ACMV Systems.

Giant Hypermarket, Kuala Pilah [2011 – 2012]

o AC System: Water-Cooled Packaged Units, Cooling Towers, AHU, FCU

MV System: Kitchen Exhaust, Fresh Air Systems.

Experiences:

Involved in flushing of condenser water pipes, T&C and Bomba Test for ACMV

Systems.

Page 16: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

15 | P a g e

Lot 348 High-Rise Office Green Building, KL Sentral [2013 – 2013]

o AC System: HEX, Pre-cooled AHU, AHU, FCU, Underfloor Air-Conditioning System

MV System: Kitchen Exhaust, Fresh Air, Smoke Spill, Staircase & Lift Lobby

Pressurisation Systems

BMS: Building Management System

Experiences:

Involved in flushing of CHW pipes, Indoor Air Quality (IAQ) Test, T&C and Bomba

Test for ACMV Systems.

Shell Long House (Green Building), Menara Shell, KL Sentral [2013 – 2013]

o AC System: HEX, CHW System, Precision Air-Conditioning, AHU, FCU, Underfloor

Air-Conditioning System

MV System: Exhaust Air System

Experiences:

Involved in flushing of CHW pipes, site coordination & installation, Indoor Air Quality

(IAQ) Test, T&C and Bomba Test for ACMV Systems.

Page 17: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

16 | P a g e

Dataran Pahlawan Melaka Megamall, Melaka (Renovation) [2013 – 2013]

o AC System: Water-Cooled Chillers, AHU, FCU

MV System: Kitchen Exhaust, Fresh Air, Smoke Curtain, Smoke Spill Systems

Experiences:

Involved in flushing of CHW pipes, T&C, Bomba Test and Final Handover for AC

Systems.

The Ascent, The Paradigm, Petaling Jaya [2013 – 2015]

o AC System: VRF System, FCU

MV System: Fresh Air, Smoke Spill, Staircase & Lift Lobby Pressurisation Systems

BMS: Building Management System

Experiences:

Involved in purging copper pipes, site coordination & installation, T&C and Bomba

Test for ACMV Systems.

Page 18: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

17 | P a g e

Golden Screen Cinema (GSC), Nu Sentral. [2014 – 2014]

o AC System: AHU Duct Works

MV System: Ventilation Duct Works

Experiences:

Involved in site coordination & installation, T&C and Bomba Test for ACMV Systems.

KDU University College (Green Building), Utropolis Glenmarie [2014 – 2015]

o AC System: Water-Cooled Chillers, AHU, FCU, Air-Cooled Split Units

MV System: Kitchen Exhaust, Fresh Air, Smoke Spill, Staircase & Lift Lobby

Pressurisation Systems

BMS: Building Management System, Chiller Management System

Experiences:

Involved in flushing of CHW and condenser pipes, site coordination & installation

(including chillers), Indoor Air Quality (IAQ) Test, T&C and Bomba Test for ACMV

Systems.

Page 19: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

18 | P a g e

KL Eco City, Jalan Bangsar [2015 – 2015]

o AC System: VRF System

MV System: Fresh Air, Smoke Spill, Staircase & Lift Lobby Pressurisation Systems

Experiences:

Involved in site coordination and installation of ACMV equipment.

The Azure Residence, Paradigm, Petaling Jaya [2015 – 2015]

o AC System: VRF System

MV System: Fresh Air, Smoke Spill, Staircase & Lift Lobby Pressurisation Systems

Experiences:

Involved in installation of ACMV equipment.

Page 20: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

19 | P a g e

LEE YEOW HUI

Lee Yeow Hui was appointed as Project Director on 22 July 2015. He was a Senior Project Engineer of

a well-known air-conditioning contractor company from 2013 to 2015. He is a graduate of University

Tenaga Nasional (UNITEN) College of Engineering in Bachelor of Electrical and Electronics

Engineering. After gaining plentiful of site experiences in ACMV during past few years, Mr. Lee

decided to be a business partner of Mr. Yong as one of the shareholder of QTS Engineering Sdn Bhd.

PERSONAL EXPERIENCES IN PREVIOUS COMPANY PROJECTS

Lot 348 High-Rise Office Green Building, KL Sentral [2013 – 2013]

o AC System: HEX, Pre-cooled AHU, AHU, FCU, Underfloor Air-Conditioning System

MV System: Kitchen Exhaust, Fresh Air, Smoke Spill, Staircase & Lift Lobby

Pressurisation Systems

BMS: Building Management System

Experiences:

Involved in flushing of CHW pipes, Indoor Air Quality (IAQ) Test, T&C and Bomba

Test for ACMV Systems.

Page 21: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

20 | P a g e

Shell Long House (Green Building), Menara Shell, KL Sentral [2013 – 2013]

o AC System: HEX, CHW System, Precision Air-Conditioning, AHU, FCU, Underfloor

Air-Conditioning System

MV System: Exhaust Air System

Experiences:

Involved in flushing of CHW pipes, site coordination & installation, Indoor Air Quality

(IAQ) Test, T&C and Bomba Test for ACMV Systems.

KDU University College (Green Building), Utropolis Glenmarie [2013 – 2015]

o AC System: Water-Cooled Chillers, AHU, FCU, Air-Cooled Split Units

MV System: Kitchen Exhaust, Fresh Air, Smoke Spill, Staircase & Lift Lobby

Pressurisation Systems

BMS: Building Management System, Chiller Management System

Experiences:

Involved in flushing of CHW and condenser pipes, site coordination & installation

(including chillers), Indoor Air Quality (IAQ) Test, T&C and Bomba Test for ACMV

Systems.

Page 22: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

21 | P a g e

KL Eco City, Jalan Bangsar [2015 – 2015]

o AC System: VRF System

MV System: Fresh Air, Smoke Spill, Staircase & Lift Lobby Pressurisation Systems

Experiences:

Involved in site coordination and installation of ACMV equipment.

Page 23: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

22 | P a g e

Maintenance and Services Team

QTS Services is a team under QTS Engineering which

specialises in maintenance and servicing of air conditioning

system. We provide maintenance services throughout whole

Peninsular Malaysia.

We provide services include but not limited to the following:

Filter Cleaning

System Overhaul

Chemical Cleaning

Troubleshooting and Repairing

Refrigerant Top-up

Cooling Tower Cleaning

Chiller Maintenance

Page 24: COMPANY PROFILE - qtsengineering.com.my fileBMS: Building Management System Experiences: Involved in flushing of CHW pipes, site coordination & installation (including chillers), T&C

Contact Information

Head Office

QTS Engineering Sdn Bhd.

E-2-6, No. 1, M-Avenue,

Jalan 1/38A, Taman Segambut Bahagia,

51200 Kuala Lumpur, Malaysia.

Tel: 603-6250 1991

Fax: 603-6243 4554

Email: [email protected]

Website: qtsengineering.com.my