Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The...

126
JUBM Sdn Bhd (27638-X) Arcadis Projeks Sdn Bhd (233819-K) Arcadis (Malaysia) Sdn Bhd (520443-H) (formerly known as Langdon & Seah Sdn Bhd) Arcadis Consultancy Sdn Bhd (492788-H) (formerly known as EC Harris (Malaysia) Sdn Bhd) KDN PP10466/05/2013(032500) JUBM & Arcadis Construction Cost Handbook MALAYSIA 2017

Transcript of Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The...

Page 1: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

JUBM Sdn Bhd (27638-X)Arcadis Projeks Sdn Bhd (233819-K)Arcadis (Malaysia) Sdn Bhd (520443-H) (formerly known as Langdon & Seah Sdn Bhd)

Arcadis Consultancy Sdn Bhd (492788-H) (formerly known as EC Harris (Malaysia) Sdn Bhd)KDN PP10466/05/2013(032500)

JUBM & ArcadisConstruction Cost Handbook

MALAYSIA2017

Page 2: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

The following handbook of information relating to the Malaysian construction industry has been compiled by:

JUBM Sdn Bhd, Arcadis Projeks Sdn Bhd,Arcadis (Malaysia) Sdn Bhd (formerly known as Langdon & Seah Sdn Bhd) & Arcadis Consultancy Sdn Bhd (formerly known as EC Harris (Malaysia) Sdn Bhd)

Level 5, Menara TSR12 Jalan PJU 7/3, Mutiara Damansara47810 Petaling JayaSelangor

Telephone : (6 03) 2106 8000/ 2106 9000Fax : (6 03) 2106 9090Email : [email protected] : http://www.arcadis.com © Arcadis (Malaysia) Sdn Bhd

All rights reserved. No part of this publication may be reproduced or copied in any form without prior written permission from Arcadis (Malaysia) Sdn Bhd.

The information contained herein should be regarded as indicative and for general guidance only. Whilst every effort has been made to ensure accuracy, no responsi-bility can be accepted for errors and omissions, however caused.

Unless otherwise stated, costs reflected in this handbook are Malaysian costs at 4th Quarter 2016.

KDN : PP10466/05/2013 (032500)For private circulation to staff and business associates only.

Printed: January 2017by

Spiral Ecoprint Sdn Bhd (KDN: PQ1780/4606)No.44, Jalan PBS 14/11,

Taman Perindustrian Bukit Serdang, 43300 Seri Kembangan, Selangor Darul Ehsan

1

JUBM Sdn Bhd (27638-X)

Arcadis Consultancy Sdn Bhd (492788-H) Arcadis Projeks Sdn Bhd (233819-K)

Arcadis (Malaysia) Sdn Bhd (520443-H)

Page 3: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

Page No.Table of Contents 2About Us 4Calendars 10

1. CONSTRUCTION COST DATAConstruction Cost Specification 12Kuala Lumpur Construction Cost Trend 14Construction Costs for Kuala Lumpur 16Construction Costs for Johor Bahru 18Construction Costs for Penang 20Construction Costs for Kota Kinabalu 22Construction Costs for Kuching 24Construction Costs for Selected Asian Cities 26Major Rates for Malaysia 32Major Rates for Selected Asian Cities 34ACMV Costs for Various Designs & Developments in Kuala Lumpur 40M&E Costs for Selected Asian Cities 42Unit Costs for Ancillary Facilities for Kuala Lumpur 48Fit-Out Costs for Kuala Lumpur 50

2. GENERAL CONSTRUCTION DATAJUBM - Langdon & Seah Building Works Composite Tender Price Index (BWCTPI) 52JKR Tender Price Index 53Value of Construction Work Done 54 Performance of Construction Sector 55Estimating Rules of Thumb 56Technical Specifications 58Average Unit Prices 60Unit Price Index 62Construction Sector Indicators 63Commodities Price Trend (Jan to Nov 2016) 64Malaysia Construction Sector - Employment & GDP 66Progress Payments 67

3. PROPERTYResidential 70Hotel 72Office 74Shopping Complex 76Shop 78Industrial 79

TABLE OF CONTENTS2

TABLE OF CONTENTS

Page 4: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

Page No.

4. FINANCIALFinancial Definitions & Formulae 82Mortgage Repayment Table 83Malaysia Balance of Trade 84Consumer Price Index 85Prime Rates & Base Lending Rates 86Interest Rates : Banking Institutions 87Currency Chart 88Exchange Rates 89

5. OTHER INFORMATIONUtility Costs for Selected Asian Cities 92Weight & Measures 96Conversion Guide 98Public Holidays 100Arcadis Asia Leadership Team 106Arcadis Asia Sectors 108Arcadis Asia Services 111Directory of Offices 114Telephone Directory (Malaysia) 124

TABLE OF CONTENTS 3

Page 5: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

Arcadis is the leading global Design & Consultancy firm for natural and built assets. Applying our deep market sector insights and collective design, consultancy, engineering, project and management services we work in partnership with our clients to deliver exceptional and sustainable outcomes throughout the lifecycle of their natural and built assets.

We are 27,000 people active in over 40 countries; within Asia we can call upon the skills and resource of almost 5000 professionals based through the region. We support UN-Habitat with knowledge and expertise to improve the quality of life in rapidly growing cities around the world (Log on to www.arcadis.com for more details.) .

As Arcadis (Malaysia) Sdn Bhd, we are one of the largest and longest established Quantity Surveying practices in the country. Together with our collaborative partner, JUBM Sdn Bhd, we offer a multi-disciplinary construction cost consultancy service and provides integrated solutions to our clientele throughout Malaysia working from five offices in Kuala Lumpur, Penang, Johor Bahru, Kota Kinabalu and Kuching.

We provide our specialist services to nearly all market segments in the construction industry from religious buildings to residential homes, hospitality to corporate headquarters, mixed use developments to master planning.

The diverse range of project experience provides us with a rich and extensive construction cost database which enables the company to handle the simplest to the most complex projects entrusted by clients who recognized our value and dynamism.

ABOUT US4

ABOUT US

Page 6: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

ABOUT US 5

Our Core Values

Integrity

We perform business in an honest and reliable way, working to the highest possible standards.

Client Focus

We are entrepreneurial and agile, passionate about creating value for our clients and achieving high performance.

Collaboration

We believe in diversity, the power of global teamwork and that by working as one we can deliver exceptional outcomes.

Sustainability

We own the responsibility to sustain our world and society in a balanced way, with the health, safety and well-being of people and stakeholders central to all we do.

Arcadis. Improving quality of life.

(Cont’d)

Page 7: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

ABOUT US6

ABOUT US

21

Legoland Malaysia, Johor 2012

Calvary Convention Centre, Bukit Jalil 2013

St. Regis, Kuala Lumpur 2017

Four Seasons Hotel 2017

Penang Indoor Stadium & Aquatic Centre 1997

Equestrian Park, Putrajaya 2006

18.19.20.21.22.23.

Iringan Hijau, Kuala Lumpur 2010

The Pearl Stonor, Kuala Lumpur 2010

2 Hampshire Condominiums,Kuala Lumpur 2008

Seri Hening Residence, Kuala Lumpur 2007

Palazzio Sunway Condominiums,Kuala Lumpur 2011

Setia Sky Residences 2016

Le Nouvel Condominium, Kuala Lumpur 2016

11.12.13.

14.15.

16.17.

Sunway Putra Mall & Hotel 2015

The Strand Mall, Selangor 2014

KLP Fashion Avenue, Kuala Lumpur 2012

Sunway Pyramid (Phase 2), Selangor 2007

Louis Vuitton, Kuala Lumpur 2006

Setia Walk, Selangor 2014

5.6.7.8.9.10.

5

Menara Telekom, Kuala Lumpur 2002

The Pinnacle Sunway, Selangor 2014

Ilham Baru Tower, Kuala Lumpur 2014

Menara Maybank, Kuala Lumpur 1989

1.2.3.4.

1

Hospitality, Sports & Leisure

Retail

Residential

Commercial

A Selection of Our Projects

(Cont’d)

13

17

2

Page 8: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

ABOUT US 7

22

18

15 14

12

11

9

8

7

23

3

16

4

6

Source: http://www.spsetia.com.my/

10

(Cont’d)

19

Source: http://www.calvary.org.my

20

Page 9: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

ABOUT US8

ABOUT US

47

Johor State Assembly Building, Johor 2007

Bangunan UMNO (Pekan), Pahang 2007

Citizenship and Immigration Canada (CIC)Annexe of Canadian High Commission,Kuala Lumpur 2004

Federal Government Administrative Centre,Putrajaya 2010

IBS Housing, Putrajaya 2011

43.44.45.

46.

47.

42Masjid Besar Sandakan, Sabah 1988

Lutheran Bible Training Institute, Selangor 2010

41.42.

41

39

PML Production Facility, Selangor 2011

Giant Distribution Centre (Sepang),Selangor 2009

Star Publications Office & NewspaperPrinting Factory, Selangor 2000

Perodua - Second National Car Plant,Selangor 1994

37.38.

39.

40.

34

Electrified Double Track-Padang Besar to Ipoh (Station Building) 2014

6 Stations for Kelana Jaya LRT Line Extension, Kuala Lumpur 2014

KVMRT Sungai Buloh - Kajang Line 2017

Semangar Water Treatment Plant Integrated Water Supply, Kuala Lumpur 2008

Bus Rapid Transit (BRT) Sunway 2015

31.

32.

33.34.35.36.

29

28Universiti Teknologi Petronas, Perak 2003

Sunway Monash University, Selangor 2007

Tropicana International School, Selangor 2016

Asia Pacific University Campus, Selangor 2016

2728.29.30.

Kajang Specialist Centre, Selangor 2005

Sunway Medical Centre, Selangor 1998

Pantai Hospital (Extension), Kuala Lumpur 2015

24.25.26.

24

Source: http://www.kpjhealth.com.my/

Public

Religious Buildings

Industrial

Transport & Infrastructure

Private Educational

Private Healthcare

A Selection of Our Projects (Cont’d)

(Cont’d)

Page 10: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

ABOUT US 9

46

40

37

35

33

32

31

27

25

44

45

43

38

30

Source: http://www.pantai.com.my/

26

36

Page 11: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

CALENDARS

CALENDARS10

CALENDARS

JAN FEB MAR

APR MAY JUN

JUL AUG SEP

OCT NOV DEC

JAN FEB MAR

APR MAY JUN

JUL AUG SEP

OCT NOV DEC

2017

2018

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

S M T W T F S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

S M T W T F S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

S M T W T F S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

S M T W T F S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

S M T W T F S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

S M T W T F S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

S M T W T F S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

S M T W T F S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

S M T W T F S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

S M T W T F S

30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

S M T W T F S

30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

S M T W T F S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

S M T W T F S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

S M T W T F S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

S M T W T F S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

S M T W T F S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

S M T W T F S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

S M T W T F S

30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

S M T W T F S

30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

S M T W T F S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

S M T W T F S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

S M T W T F S 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

S M T W T F S

Page 12: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

1CONSTRUCTION COST DATA

Construction Cost Specification

Kuala Lumpur Construction Cost Trend

Construction Costs for Kuala Lumpur

Construction Costs for Johor Bahru

Construction Costs for Penang

Construction Costs for Kota Kinabalu

Construction Costs for Kuching

Construction Costs for SelectedAsian Cities

Major Rates for Malaysia

Major Rates for Selected Asian Cities

ACMV Costs for Various Designs &Developments in Kuala Lumpur

M&E Costs for Selected Asian Cities

Unit Costs for Ancillary Facilitiesfor Kuala Lumpur

Fit-Out Costs for Kuala Lumpur

Page 13: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

CONSTRUCTION COST SPECIFICATIONDOMESTIC INDUSTRIALHOTELSOFFICE /

COMMERCIALAp

artm

ent, h

igh ris

e, av

erag

e stan

dard

Apar

tmen

t, high

rise,

high e

nd

Terra

ced h

ouse

s, av

erag

e stan

dard

Detac

hed h

ouse

s, hig

h end

Mediu

m/hig

h rise

offic

es, a

vera

ge st

anda

rdHi

gh ris

e offic

es, p

resti

ge qu

ality

Out-o

f-tow

n sho

pping

centr

e, av

erag

e stan

dard

Retai

l mall

s, hig

h end

Budg

et ho

tels -

3-sta

r, mi

d mar

ket

Busin

ess h

otels

- 4/5

-star

Luxu

ry ho

tels -

5-sta

rInd

ustria

l unit

s, sh

ell on

ly (C

onve

ntion

al sin

gle st

orey

fra

med u

nits)

Owne

r ope

rated

facto

ries,

low ris

e, lig

ht we

ight in

dustr

y

Apar

tmen

t unit

s with

fit-o

ut, in

cludin

g air-

cond

itionin

g, kit

chen

cabin

ets an

d hom

e ap

plian

ces,

but e

xclu

ding

deco

rativ

e ligh

t fittin

gs an

d loo

se fu

rnitu

re.

(Mal

aysi

a on

ly) 6

-12 u

nits p

er flo

or, 4

6m2 -

83m2 p

er un

it exc

luding

air-c

ondit

ioning

.Ap

artm

ent u

nits w

ith go

od qu

ality

fit-ou

t, inc

luding

air-c

ondit

ioning

, kitc

hen c

abine

ts an

d ho

me ap

plian

ces,

but e

xclu

ding

deco

rativ

e ligh

t fittin

gs an

d loo

se fu

rnitu

re.

Hous

es w

ith fit

-out,

inclu

ding a

ir-co

nditio

ning,

kitch

en ca

binets

and h

ome a

pplia

nces

, bu

t exc

ludi

ng de

cora

tive l

ight fi

ttings

, loos

e fur

nitur

e, ga

rden

and p

arkin

g.(M

alay

sia

only

) Exc

ludi

ng ai

r-con

dition

ing, k

itche

n cab

inets

and h

ome a

pplia

nces

.Ho

uses

with

good

quali

ty fit-

out, i

nclud

ing ai

r-con

dition

ing, k

itche

n cab

inets

and h

ome

appli

ance

s, bu

t exc

ludi

ng de

cora

tive l

ight fi

ttings

, loos

e fur

nitur

e, ga

rden

and p

arkin

g.RC

stru

cture

, cur

tain w

all, in

cludin

g pub

lic ar

ea fit

-out,

tena

nt ar

ea w

ith ra

ised f

loor/

carp

et, pa

inted

wall

and f

alse c

eiling

.(M

alay

sia

only

) Ave

rage

stan

dard

offic

es ex

clude

tena

nt fito

ut.

Includ

ing pu

blic a

rea f

it-out

and M

&E, b

ut ex

clud

ing

shop

fit-o

ut.

1) In

terior

deco

ratio

n2)

Fur

nitur

e (fix

ed an

d mov

able)

3) S

pecia

l ligh

t fittin

gs (c

hand

elier

s, etc

.)4)

Ope

ratin

g Sup

plies

and E

quipm

ent (

OS&E

) exc

lude

d.RC

stru

cture

with

stee

l roof

and M

&E to

main

distr

ibutio

n, bu

t exc

ludi

ng

air-co

nditio

ning,

heati

ng an

d ligh

ting.

RC st

ructu

re, in

cludin

g sma

ll offic

e with

simp

le fit-

out a

nd M

&E, b

ut ex

clud

ing

air-co

nditio

ning a

nd he

ating

.

BU

ILD

ING

TYP

EO

UTL

INE

SPEC

IFIC

ATI

ON

1. CONSTRUCTION COST DATA

CONSTRUCTION COST DATA12

CONSTRUCTION COST DATA1

Page 14: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

RC st

ructu

reRC

stru

cture

, natu

ral v

entila

tion,

no fa

cade

enclo

sure

.Inc

luding

fit-o

ut an

d air-

cond

itionin

g, bu

t exc

luding

educ

ation

al eq

uipme

nt.(M

alay

sia

only

) Sch

ools

with

stand

ard g

over

nmen

t pro

vision

s.

Includ

ing fit

-out,

loos

e fur

nitur

e and

air-c

ondit

ioning

.(M

alay

sia

only

) Stud

ent h

ostel

s to u

niver

sity s

tanda

rd.

Dry s

ports

(no s

wimm

ing po

ol) an

d are

for ‘l

eisur

e cen

tre’ ty

pe sc

heme

s inc

luding

ma

in sp

orts

hall,

ancil

lary s

ports

facil

ities,

chan

ging a

nd sh

ower

s, re

staur

ant/c

afe,

bar,

etc. C

osts

includ

e a/c,

Fur

nitur

e, Fit

tings

and E

quipm

ent (

FF&E

).Ex

cludin

g med

ical a

nd op

erati

ng eq

uipme

nt.

Unde

rgro

und/b

asem

ent c

ar pa

rks (<

3 lev

els)

Multi

store

y car

parks

, abo

ve gr

ound

(<4 l

evels

)

Scho

ols (p

rimar

y and

seco

ndar

y)

Stud

ents’

resid

ence

s

Spor

ts clu

bs, m

ulti p

urpo

se sp

orts/

leisu

re ce

ntres

(dry

spor

ts)

Gene

ral h

ospit

als -

publi

c sec

tor

OTHERS

CONSTRUCTION COST DATA 13

Not

es:

1. Th

e cos

ts for

the r

espe

ctive

categ

ories

give

n abo

ve ar

e ave

rage

s bas

ed on

fixed

price

comp

etitiv

e ten

ders.

It mu

st be

unde

rstoo

d tha

t the a

ctual

cost

of a b

uildin

g will

depe

nd up

on th

e des

ign an

d man

y othe

r fac

tors a

nd m

ay va

ry fro

m the

figur

es sh

own.

2. Th

e co

sts p

er s

quar

e me

tre a

re b

ased

on

Cons

tructi

on F

loor A

reas

(CFA

) mea

sure

d to

the o

utside

face

of t

he e

xtern

al wa

lls/ e

xtern

al pe

rimete

r inc

luding

lift s

hafts

, stai

rwell

s, ba

lconie

s, pla

nt ro

oms,

water

tank

s and

the l

ike.

3. Al

l buil

dings

are a

ssum

ed to

have

no ba

seme

nts (e

xcep

t othe

rwise

state

d) an

d are

built

on fla

t gro

und,

with

norm

al so

il and

site

cond

ition.

Th

e cos

t exc

ludes

site

forma

tion w

orks

, exte

rnal

works

, land

cost,

profe

ssion

al fee

s, fin

ance

and l

egal

expe

nses

.4.

The s

tanda

rd fo

r eac

h cate

gory

of bu

ilding

varie

s fro

m re

gion t

o reg

ion an

d do n

ot ne

cess

ary f

ollow

that

of ea

ch ot

her.

5. Al

l cos

ts ar

e in U

S$/m

2 CFA

unles

s othe

rwise

state

d. Flu

ctuati

on in

exch

ange

rates

may

lead

to ch

ange

s in c

onstr

uctio

n cos

ts ex

pres

sed i

n U.S

. doll

ars.

Page 15: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 16: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 17: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

DO

MES

TIC

De

tache

d hou

ses (

mass

hous

ing)

Detac

hed h

ouse

s (hig

h end

)Te

rrace

d hou

ses

Aver

age s

tanda

rd ap

artm

ents,

high

rise

Luxu

ry ap

artm

ents,

high

rise

Low

cost

hous

ingLo

w co

st fla

ts, lo

w ris

e (<6

leve

ls)Lo

w co

st fla

ts, hi

gh ris

e (<1

5 lev

els)

OFF

ICE

/ CO

MM

ERC

IAL

Aver

age s

tanda

rd of

fices

, high

rise

Pres

tige o

ffices

, high

rise

Shop

ping c

entre

s

HO

TELS

Reso

rt ho

tels,

inclus

ive of

F.F

.&E.

3-sta

r bud

get h

otels,

ditto

5-sta

r luxu

ry ho

tels,

ditto

RM

/m2

1,500

2,260 72

51,2

152,3

50 425

565

620

1,595

2,165

1,945

3,210

3,345

6,040

- - - - - - - - - - - - - -

BU

ILD

ING 2,0

602,8

051,0

251,5

452,8

60 470

635

755

1,790

3,235

2,405

3,445

4,300

7,235

SER

VIC

ES

888

795

190

290

795

105

155

210

875

1,395 81

5

1,255 77

51,8

90

- - - - - - - - - - - - - -

986

985

285

555

900

145

215

270

1,080

1,605

1,110

1,570

1,445

2,010

TOTA

L

2,390

3,055 91

51,5

053,1

45 530

720

830

2,470

3,560

2,760

4,465

4,120

7,930

- - - - - - - - - - - - - -

3,045

3,790

1,310

2,100

3,760 61

585

01,0

25

2,870

4,840

3,515

5,015

5,745

9,245

CONSTRUCTION COST DATA16

CONSTRUCTION COST DATA1CONSTRUCTION COSTS FOR KUALA LUMPUR

Page 18: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

IND

UST

RIA

LLig

ht du

ty fla

tted f

actor

iesHe

avy d

uty fla

tted f

actor

ies an

d war

ehou

ses

Sing

le sto

rey c

onve

ntion

al fac

tory o

f s

tructu

ral s

teelw

ork

Owne

r ope

rated

facto

ries,

low ris

e

OTH

ERS

Base

ment

car p

arks

(<3 l

evels

)El

evate

d car

parks

(<4 l

evels

)Pr

imar

y and

Sec

onda

ry sc

hools

Stud

ent h

ostel

sSp

orts

clubs

inclu

sive o

f F.F

.&E.

890

1,150 975

1,290

1,110 730

830

965

1,845

- - - - - - - - -

915

1,210

1,175

1,415

1,420 840

955

1,035

2,080

520

580

345

485

365

205

200

250

545

- - - - - - - - -

675

730

485

595

610

285

230

305

670

1,410

1,730

1,320

1,775

1,475 935

1,030

1,215

2,390

- - - - - - - - -

1,590

1,940

1,660

2,010

2,030

1,125

1,185

1,340

2,750

The

abov

e co

sts

are

at 4

th Q

uarte

r 201

6 le

vels

, inc

lusi

ve o

f pre

limin

arie

s (1

0%) b

ut e

xclu

sive

of c

ontin

genc

ies.

CONSTRUCTION COST DATA 17

Page 19: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

DO

MES

TIC

De

tache

d hou

ses (

mass

hous

ing)

Detac

hed h

ouse

s (hig

h end

)Te

rrace

d hou

ses

Aver

age s

tanda

rd ap

artm

ents,

high

rise

Luxu

ry ap

artm

ents,

high

rise

Low

cost

hous

ingLo

w co

st fla

ts, lo

w ris

e (<6

leve

ls)Lo

w co

st fla

ts, hi

gh ris

e (<1

5 lev

els)

OFF

ICE

/ CO

MM

ERC

IAL

Aver

age s

tanda

rd of

fices

, high

rise

Pres

tige o

ffices

, high

rise

Shop

ping c

entre

s

HO

TELS

Reso

rt ho

tels,

inclus

ive of

F.F

.&E.

3-sta

r bud

get h

otels,

ditto

5-sta

r luxu

ry ho

tels,

ditto

RM

/m2

1,900

2,025

1,050

1,185

2,435 430

570

620

1,550

2,215

1,935

3,305

3,440

6,230

- - - - - - - - - - - - - -

BU

ILD

ING 2,5

052,5

301,5

751,7

403,0

50 470

620

725

1,735

3,285

2,430

3,495

4,365

7,360

SER

VIC

ES

600

675

200

250

575

105

155

205

775

1,445 855

1,290 795

1,930

- - - - - - - - - - - - - -

800

845

345

450

875

135

205

260

1,100

1,650

1,190

1,610

1,490

2,060

TOTA

L

2,500

2,700

1,250

1,435

3,010 535

725

825

2,325

3,660

2,790

4,595

4,235

8,160

- - - - - - - - - - - - - -

3,305

3,375

1,920

2,190

3,925 605

825

985

2,835

4,935

3,620

5,105

5,855

9,420

CONSTRUCTION COSTS FOR JOHOR BAHRU

CONSTRUCTION COST DATA18

CONSTRUCTION COST DATA1

Page 20: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

IND

UST

RIA

LLig

ht du

ty fla

tted f

actor

iesHe

avy d

uty fla

tted f

actor

ies an

d war

ehou

ses

Sing

le sto

rey c

onve

ntion

al fac

tory o

f s

tructu

ral s

teelw

ork

Owne

r ope

rated

facto

ries,

low ris

e

OTH

ERS

Base

ment

car p

arks

(<3 l

evels

)El

evate

d car

parks

(<4 l

evels

)Pr

imar

y and

Sec

onda

ry sc

hools

Stud

ent h

ostel

sSp

orts

clubs

inclu

sive o

f F.F

.&E.

920

1,195 99

01,3

20

1,115 67

073

594

51,9

00

- - - - - - - - -

940

1,245

1,175

1,430

1,430 85

584

01,0

502,1

05

545

615

375

500

280

200

195

250

560

- - - - - - - - -

715

775

535

600

305

250

215

300

660

1,465

1,810

1,365

1,820

1,395 870

930

1,195

2,460

- - - - - - - - -

1,655

2,020

1,710

2,030

1,735

1,105

1,055

1,350

2,765

The

abov

e co

sts

are

at 4

th Q

uarte

r 201

6 le

vels

, inc

lusi

ve o

f pre

limin

arie

s (1

0%) b

ut e

xclu

sive

of c

ontin

genc

ies.

CONSTRUCTION COST DATA 19

Page 21: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

DO

MES

TIC

De

tache

d hou

ses (

mass

hous

ing)

Detac

hed h

ouse

s (hig

h end

)Te

rrace

d hou

ses

Aver

age s

tanda

rd ap

artm

ents,

high

rise

Luxu

ry ap

artm

ents,

high

rise

Low

cost

hous

ingLo

w co

st fla

ts, lo

w ris

e (<6

leve

ls)Lo

w co

st fla

ts, hi

gh ris

e (<1

5 lev

els)

OFF

ICE

/ CO

MM

ERC

IAL

Aver

age s

tanda

rd of

fices

, high

rise

Pres

tige o

ffices

, high

rise

Shop

ping c

entre

s

HO

TELS

Reso

rt ho

tels,

inclus

ive of

F.F

.&E.

3-sta

r bud

get h

otels,

ditto

5-sta

r luxu

ry ho

tels,

ditto

RM

/m2

1,425

1,197

1,184 920

1,600 450

550

766

1,405

1,950

1,375

2,850

2,700

5,600

- - - - - - - - - - - - - -

BU

ILD

ING 1,7

501,3

161,3

031,3

202,2

50 470

600

842

1,650

2,750

1,675

3,125

4,025

6,650

SER

VIC

ES

900 59 59 275

740 85 142

119

850

1,350 745

1,125 950

1,885

- - - - - - - - - - - - - -

950 65 65 400

850

110

185

130

1,100

1,585 945

1,535

1,450

1,965

TOTA

L

2,325

1,256

1,243

1,195

2,340 535

692

884

2,255

3,300

2,120

3,975

3,650

7,485

- - - - - - - - - - - - - -

2,700

1,381

1,368

1,720

3,100 580

785

973

2,750

4,335

2,620

4,660

5,475

8,615

CONSTRUCTION COST DATA1

CONSTRUCTION COST DATA20

CONSTRUCTION COSTS FOR PENANG

Page 22: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

IND

UST

RIA

LLig

ht du

ty fla

tted f

actor

iesHe

avy d

uty fla

tted f

actor

ies an

d war

ehou

ses

Sing

le sto

rey c

onve

ntion

al fac

tory o

f s

tructu

ral s

teelw

ork

Owne

r ope

rated

facto

ries,

low ris

e

OTH

ERS

Base

ment

car p

arks

(<3 l

evels

)El

evate

d car

parks

(<4 l

evels

)Pr

imar

y and

Sec

onda

ry sc

hools

Stud

ent h

ostel

sSp

orts

clubs

inclu

sive o

f F.F

.&E.

760

905

770

1,000 825

530

1,723 850

1,550

- - - - - - - - -

900

1,100 930

1,240

1,360 825

1,895 965

1,765

520

585

485

500

320

188

699

210

530

- - - - - - - - -

700

745

560

600

550

320

769

275

700

1,280

1,490

1,255

1,500

1,145 718

2,422

1,060

2,080

- - - - - - - - -

1,600

1,845

1,490

1,840

1,910

1,145

2,664

1,240

2,465

The

abov

e co

sts

are

at 4

th Q

uarte

r 201

6 le

vels

, inc

lusi

ve o

f pre

limin

arie

s (1

0%) b

ut e

xclu

sive

of c

ontin

genc

ies.

CONSTRUCTION COST DATA 21

Page 23: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

DO

MES

TIC

De

tache

d hou

ses (

mass

hous

ing)

Detac

hed h

ouse

s (hig

h end

)Te

rrace

d hou

ses

Aver

age s

tanda

rd ap

artm

ents,

high

rise

Luxu

ry ap

artm

ents,

high

rise

Low

cost

hous

ingLo

w co

st fla

ts, lo

w ris

e (<6

leve

ls)Lo

w co

st fla

ts, hi

gh ris

e (<1

5 lev

els)

OFF

ICE

/ CO

MM

ERC

IAL

Aver

age s

tanda

rd of

fices

, high

rise

Pres

tige o

ffices

, high

rise

Shop

ping c

entre

s

HO

TELS

Reso

rt ho

tels,

inclus

ive of

F.F

.&E.

3-sta

r bud

get h

otels,

ditto

5-sta

r luxu

ry ho

tels,

ditto

RM

/m2

1,490

2,260 760

1,020

2,370 410

520

590

1,520

2,160

1,550

3,220

3,930

6,080

- - - - - - - - - - - - - -

BU

ILD

ING 1,5

902,7

601,0

201,5

202,8

80 440

570

650

1,720

3,190

2,100

3,420

4,380

7,180

SER

VIC

ES

415

975

275

345

910

115

160

205

845

1,410 84

5

1,145

1,395

2,245

- - - - - - - - - - - - - -

520

1,205 330

415

1,030 160

180

215

975

1,610 975

1,395

1,540

2,395

TOTA

L

1,905

3,235

1,035

1,365

3,280 52

568

079

5

2,365

3,570

2,395

4,365

5,325

8,325

- - - - - - - - - - - - - -

2,110

3,965

1,350

1,935

3,910 60

075

086

5

2,695

4,800

3,075

4,815

5,920

9,575

CONSTRUCTION COSTS FOR KOTA KINABALU

CONSTRUCTION COST DATA22

CONSTRUCTION COST DATA1

Page 24: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

IND

UST

RIA

LLig

ht du

ty fla

tted f

actor

iesHe

avy d

uty fla

tted f

actor

ies an

d war

ehou

ses

Sing

le sto

rey c

onve

ntion

al fac

tory o

f s

tructu

ral s

teelw

ork

Owne

r ope

rated

facto

ries,

low ris

e

OTH

ERS

Base

ment

car p

arks

(<3 l

evels

)El

evate

d car

parks

(<4 l

evels

)Pr

imar

y and

Sec

onda

ry sc

hools

Stud

ent h

ostel

sSp

orts

clubs

inclu

sive o

f F.F

.&E.

900

1,150 960

1,290 970

650

700

930

1,840

- - - - - - - - -

960

1,220

1,200

1,450

1,150 83

082

01,0

001,9

70

415

485

345

415

240

180

225

250

695

- - - - - - - - -

510

550

415

495

275

215

360

275

845

1,315

1,635

1,305

1,705

1,210 83

092

51,1

802,5

35

- - - - - - - - -

1,470

1,770

1,615

1,945

1,425

1,045

1,180

1,275

2,815

The

abov

e co

sts

are

at 4

th Q

uarte

r 201

6 le

vels

, inc

lusi

ve o

f pre

limin

arie

s (1

0%) b

ut e

xclu

sive

of c

ontin

genc

ies.

CONSTRUCTION COST DATA 23

Page 25: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

DO

MES

TIC

De

tache

d hou

ses (

mass

hous

ing)

Detac

hed h

ouse

s (hig

h end

)Te

rrace

d hou

ses

Aver

age s

tanda

rd ap

artm

ents,

high

rise

Luxu

ry ap

artm

ents,

high

rise

Low

cost

hous

ingLo

w co

st fla

ts, lo

w ris

e (<6

leve

ls)Lo

w co

st fla

ts, hi

gh ris

e (<1

5 lev

els)

OFF

ICE

/ CO

MM

ERC

IAL

Aver

age s

tanda

rd of

fices

, high

rise

Pres

tige o

ffices

, high

rise

Shop

ping c

entre

s

HO

TELS

Reso

rt ho

tels,

inclus

ive of

F.F

.&E.

3-sta

r bud

get h

otels,

ditto

5-sta

r luxu

ry ho

tels,

ditto

1,175

1,785

1,030

1,215

1,815 57

580

084

5

1,570

1,864

1,766

2,815

3,010

4,805

- - - - - - - - - - - - - -

BU

ILD

ING 1,2

752,8

551,0

501,2

901,9

45 625

815

905

1,815

2,943

1,825

3,285

3,285

6,865

SER

VIC

ES

480

830

170

310

945

115

160

165

932

1,570 80

9

1,405

1,590

2,435

- - - - - - - - - - - - - -

610

970

205

410

1,180 14

519

024

0

1,079

1,668 98

1

1,670

1,735

2,500

TOTA

L

1,655

2,615

1,200

1,525

2,760 69

096

01,0

10

2,502

3,434

2,575

4,220

4,600

7,240

- - - - - - - - - - - - - -

1,885

3,825

1,255

1,700

3,125 77

01,0

051,1

45

2,894

4,611

2,806

4,955

5,020

9,365

RM

/m2

CONSTRUCTION COSTS FOR KUCHING

CONSTRUCTION COST DATA24

CONSTRUCTION COST DATA1

Page 26: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

IND

UST

RIA

LLig

ht du

ty fla

tted f

actor

iesHe

avy d

uty fla

tted f

actor

ies an

d war

ehou

ses

Sing

le sto

rey c

onve

ntion

al fac

tory o

f s

tructu

ral s

teelw

ork

Owne

r ope

rated

facto

ries,

low ris

e

OTH

ERS

Base

ment

car p

arks

(<3 l

evels

)El

evate

d car

parks

(<4 l

evels

)Pr

imar

y and

Sec

onda

ry sc

hools

Stud

ent h

ostel

sSp

orts

clubs

inclu

sive o

f F.F

.&E.

1,040

1,120 915

1,130

1,070 835

980

1,155

1,815

- - - - - - - - -

1,245

1,275

1,010

1,275

1,305 92

51,0

551,2

951,9

60

360

415

310

440

365

220

210

240

720

- - - - - - - - -

390

490

445

520

385

240

335

310

865

1,400

1,535

1,225

1,570

1,435

1,055

1,190

1,395

2,535

- - - - - - - - -

1,635

1,765

1,455

1,795

1,690

1,165

1,390

1,605

2,825

The

abov

e co

sts

are

at 4

th Q

uarte

r 201

6 le

vels

, inc

lusi

ve o

f pre

limin

arie

s (1

0%) b

ut e

xclu

sive

of c

ontin

genc

ies

CONSTRUCTION COST DATA 25

Page 27: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

DO

MES

TIC

Apar

tmen

ts, hi

gh ris

e, av

erag

e stan

dard

Apar

tmen

ts, hi

gh ris

e, hig

h end

Terra

ced h

ouse

s, av

erag

e stan

dard

Detac

hed h

ouse

s, hig

h end

OFF

ICE

/ CO

MM

ERC

IAL

Mediu

m/hig

h rise

offic

es, a

vera

ge st

anda

rdHi

gh ris

e offic

es, p

resti

ge qu

ality

Out-o

f-tow

n sho

pping

centr

e, a

vera

ge st

anda

rdRe

tail m

alls,

high e

nd

HO

TELS

Budg

et ho

tels -

3 sta

r, mi

d mar

ket

Busin

ess h

otels

- 4/5

star

Luxu

ry ho

tels -

5 sta

r

SING

APO

RE^

MA

NIL

A@

JAK

AR

TA#

BR

UN

EIB

AN

GK

OK

*

US$

/m2

++

340

-

475

715

-

855

205

-

295

695

-

860

560

-

650

805

- 1,

100

495

-

595

625

-

795

935

- 1,3

051,

615

- 1,8

901,

800

- 2,0

95

KU

ALA

LUM

PUR

614

-

742

913

- 1,

085

428

-

514

742

-

899

599

-

742

785

-

999

585

-

756

785

-

813

1,07

1 - 1

,184

1,37

0 - 1

,570

1,59

8 - 1

,712

805

- 1,

105

994

- 1,

294

520

-

821

792

- 1,

092

805

- 1,

105

1,13

8 -

1,43

878

1 -

1,08

1

1,03

0 -

1,33

0

1,52

1 - 1

,821

2,14

6 - 2

,446

2,20

3 - 2

,503

692

-

784

954

- 1,

077

367

-

477

998

- 1,

116

683

-

756

1,00

7 -

1,12

458

7 -

65

0

648

-

700

1,18

6 - 1

,402

1,62

0 - 1

,750

1,72

3 - 1

,943

880

-

990

1,20

0 -

1,49

078

0 -

92

51,

500

- 1,

950

840

-

890

1,28

0 -

1,39

075

0 -

88

0

1,10

0 -

1,25

0

1,20

0 -

1,37

01,

350

- 1,

685

1,60

0 -

2,02

0

1,32

0 - 1

,500

2,03

5 - 3

,035

1,71

5 - 1

,930

2,18

0 - 2

,895

1,71

5 - 1

,930

1,93

0 - 2

,110

1,93

0 - 2

,035

2,03

5 - 2

,250

2,14

5 - 2

,360

2,75

0 - 3

,110

2,75

0 - 3

,110

CONSTRUCTION COSTS FOR SELECTED ASIAN CITIES

CONSTRUCTION COST DATA26

CONSTRUCTION COST DATA1

Page 28: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

The

abov

e co

sts

are

at 4

th Q

uarte

r 201

6 le

vels

, inc

lusi

ve o

f pre

limin

arie

s bu

t exc

lusi

ve o

f con

tinge

ncie

s.*

Rat

es e

xclu

de V

AT a

nd c

ontig

enci

es.

# R

ates

are

net

t of V

AT.

@ R

ates

are

exc

lusi

ve o

f con

tigen

cies

& in

clud

e 12

% V

AT.

^ R

ates

are

net

t of G

ST

and

excl

usiv

e of

con

tigen

cies

.+

Incl

udes

rais

ed fl

oor a

nd c

eilin

g to

tena

nted

are

as b

ut e

xclu

des

offic

e ca

rpet

s (n

orm

ally

und

er te

nant

’s fi

t-out

).$

Ope

n on

all

side

s w

ith p

arap

et.

(Cont’d)

CONSTRUCTION COST DATA 27

IND

UST

RIA

LInd

ustria

l unit

s, sh

ell on

ly. (C

onve

ntion

al s

ingle

store

y fra

med u

nits).

Ow

ner o

pera

ted fa

ctorie

s, low

rise,

light

weig

ht ind

ustry

OTH

ERS

Unde

rgro

und/b

asem

ent c

ar pa

rks (<

3 lev

els)

Multi

store

y car

parks

, abo

ve gr

ound

(<4 l

evels

)Sc

hools

(prim

ary &

seco

ndar

y)St

uden

ts’ re

siden

ces

Spor

ts clu

bs, m

ulti p

urpo

se sp

orts/

leisu

re c

entre

s (dr

y spo

rts)

Gene

ral h

ospit

als -

publi

c sec

tor

Exch

ange

Rate

Use

d : U

S$1 =

300

- 3

75

400 -

45

5

335 -

46

021

0 -

255

235 -

27

027

5 -

305

540 -

62

5

805 -

1,00

0

RM 4.

41

457

- 5

71

N/A

514 -

67

117

1 -

274

N/A

N/A

N/A

N/A

BAHT

35.04

371

- 6

72

505 -

80

6

N/A

412 -

71

360

3 -

904

706 -

1,00

61,6

23 -

1,924

1,824

- 2,1

25

B$ 1.

36

316

- 3

43

342 -

37

7

486 -

59

731

6 -

343

N/A

N/A

1,064

- 1,5

95

N/A

IDR

13,05

5

450

- 4

60

560 -

65

0

510 -

56

046

0 -

600

690 -

76

070

0 -

800

1,200

- 1,4

50

1,350

- 1,5

00

PHP

48.60

715 -

93

0

N/A

930 -

1,25

064

5 -

930

N/A

1,570

- 1,7

151,9

65 -

2,110

2,750

- 2,8

95

S$ 1.

40

$

Page 29: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

CONSTRUCTION COSTS FOR SELECTED ASIA CITIES

(Cont’d)

CONSTRUCTION COST DATA28

CONSTRUCTION COST DATA1

DO

MES

TIC

Apar

tmen

ts, hi

gh ris

e, av

erag

e stan

dard

Apar

tmen

ts, hi

gh ris

e, hig

h end

Terra

ced h

ouse

s, av

erag

e stan

dard

Detac

hed h

ouse

s, hig

h end

OFF

ICE

/ CO

MM

ERC

IAL

Mediu

m/hig

h rise

offic

es, a

vera

ge st

anda

rdHi

gh ris

e offic

es, p

resti

ge qu

ality

Out-o

f-tow

n sho

pping

centr

e, a

vera

ge st

anda

rdRe

tail m

alls,

high e

nd

HO

TELS

Budg

et ho

tels -

3 sta

r, mi

d mar

ket

Busin

ess h

otels

- 4/5

star

Luxu

ry ho

tels -

5 sta

r

MAC

AU$

HO

NG

KO

NG

^H

O C

HI M

INH

#SE

OU

L@

525

-

600

795

-

955

360

-

385

475

-

500

395

-

430

495

-

525

385

-

420

540

-

585

745

- 8

251,

160

- 1,3

751,

465

- 1,6

05

US$

/m2

1,31

6 - 1

,598

1,58

1 - 1

,966

N/A

2,14

5 - 3

,282

1,17

1 - 1

,368

1,35

0 - 1

,709

1,10

3 - 1

,752

1,28

2 - 2

,137

1,59

8 - 2

,026

2,

239

- 3,8

682,

487

- 3,9

74

610

-

760

775

-

895

410

-

480

470

-

570

710

-

825

820

- 1,

120

N/A

665

-

870

1,33

0 - 1

,620

N/A

1,

725

- 2,0

00

3,14

0 - 3

,690

4,24

0 - 4

,940

4,31

0 - 5

,030

5,58

0 - 6

,350

3,08

0 - 3

,650

3,82

0 - 4

,710

3,14

0 - 3

,690

4,18

0 - 4

,960

4,01

0 - 4

,330

4,21

0 - 4

,970

4,92

0 - 5

,710

2,14

3 - 2

,632

3,00

8 - 4

,586

3,67

2 - 4

,373

4,46

1 - 5

,802

2,48

1 - 3

,195

3,19

5 - 3

,496

2,33

1 - 3

,496

3,67

2 - 4

,398

3,25

8 - 3

,684

4,42

4 - 5

,288

5,28

8 - 6

,253

IND

IA*

Page 30: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

The

abov

e co

sts

are

at 4

th Q

uarte

r 201

6 le

vels

, inc

lusi

ve o

f pre

limin

arie

s bu

t exc

lusi

ve o

f con

tinge

ncie

s.*

Rat

es a

re b

ased

on

proj

ects

in B

anga

lore

and

are

net

t of V

AT a

nd S

ervi

ce T

ax. M

umba

i cos

ts a

re g

ener

ally

8%

hig

her.

@ R

ates

are

net

t of V

AT a

nd e

xclu

sive

of c

ontin

genc

ies.

# R

ates

are

net

t of V

AT a

nd c

ontin

genc

ies.

$ R

ates

are

exc

lusi

ve o

f any

man

agem

ent c

ontra

ct fe

e.^

Offi

ces

of a

vera

ge s

tand

ard

are

built

to th

e fo

llow

ing

prov

isio

ns:

(i)

Cur

tain

wal

l/win

dow

wal

l fac

ade

(ii

) Ten

ant a

re w

ith s

cree

ded

floor

, pai

nted

wal

l and

cei

ling

Sch

ools

(prim

ary

and

seco

ndar

y) a

re o

f pub

lic a

utho

rity

stan

dard

, no

a/c

and

com

plet

e w

ith b

asic

ext

erna

l wor

ks.

(Cont’d)

CONSTRUCTION COST DATA 29

IND

UST

RIA

LInd

ustria

l unit

s, sh

ell on

ly. (C

onve

ntion

al s

ingle

store

y fra

med u

nits).

Ow

ner o

pera

ted fa

ctorie

s, low

rise,

light

weig

ht ind

ustry

OTH

ERS

Unde

rgro

und/b

asem

ent c

ar pa

rks (<

3 lev

els)

Multi

store

y car

parks

, abo

ve gr

ound

(<4 l

evels

)Sc

hools

(prim

ary &

seco

ndar

y)St

uden

ts’ re

siden

ces

Spor

ts clu

bs, m

ulti p

urpo

se sp

orts/

leisu

re c

entre

s (dr

y spo

rts)

Gene

ral h

ospit

als -

publi

c sec

torEx

chan

ge R

ate U

sed :

US$

1 =

310

- 3

65

330 -

38

5

260 -

28

020

0 -

220

250 -

28

028

0 -

310

550 -

57

5

600 -

66

0

INR

66.00

641

- 8

21

N/A

915 -

1,09

456

4 -

774

1,28

2 - 1,

538

1,3

42 -

1,462

N/A

N/A

KRW

1,17

0

305

- 3

80

360 -

47

5

605 -

72

538

5 -

425

505 -

55

550

5 -

655

755 -

80

5

N/A

VND

22,60

0

N/A

2,410

- 3,0

60

2,370

- 2,9

501,4

70 -

1,730

2,590

- 2,8

102,5

40 -

2,950

3,970

- 4,4

90

5,130

- 5,8

30

HK$ 7

.80

N/A

N/A

1,930

- 2,8

451,0

65 -

1,404

2,130

- 2,4

811,7

04 -

1,967

N/A

N/A

MOP

7.98

Page 31: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

CONSTRUCTION COSTS FOR SELECTEDASIAN CITIES

(Cont’d)

CONSTRUCTION COST DATA30

CONSTRUCTION COST DATA1

DO

MES

TIC

Apar

tmen

ts, hi

gh ris

e, av

erag

e stan

dard

Apar

tmen

ts, hi

gh ris

e, hig

h end

Terra

ced h

ouse

s, av

erag

e stan

dard

Detac

hed h

ouse

s, hig

h end

OFF

ICE

/ CO

MM

ERC

IAL

Mediu

m/hig

h rise

offic

es, a

vera

ge st

anda

rdHi

gh ris

e offic

es, p

resti

ge qu

ality

Out-o

f-tow

n sho

pping

centr

e, a

vera

ge st

anda

rdRe

tail m

alls,

high e

nd

HO

TELS

Budg

et ho

tels -

3 sta

r, mi

d mar

ket

Busin

ess h

otels

- 4/5

star

Luxu

ry ho

tels -

5 sta

r

BEIJ

ING

*SH

ENZH

EN/

GU

AN

GZH

OU

*C

HO

NG

QIN

G/

CH

ENG

DU

*

634

-

704

1,55

0 -

1,69

342

5 -

45

463

7 -

70

8

845

- 1,1

271,

127

- 1,4

09N/

A

1,19

8 - 1

,549

916

- 1,1

271,

549

- 2,1

122,

112

- 2,5

35

US$

/m2

445

-

593

786

- 1,

022

373

-

522

506

-

596

742

-

889

963

- 1,

335

596

-

789

963

- 1,

364

885

- 1,1

061,

549

- 1,9

91N/

A

491

-

541

816

-

898

370

-

410

507

-

559

712

-

789

982

- 1,

086

683

-

752

1,00

3 -

1,10

8

923

- 1,0

191,

491

- 1,6

472,

034

- 2,2

46

593

- 6

521,

482

- 1,6

9043

2 -

506

655

- 7

30

845

- 1,1

421,

142

- 1,8

8265

5 -

879

1,17

1 - 1

,615

948

- 1,1

711,

615

- 2,0

602,

060

- 2,6

53

SHA

NG

HA

I*

Page 32: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

The

abov

e co

sts

are

at 4

th Q

uarte

r 201

6 le

vels

, inc

lusi

ve o

f pre

limin

arie

s bu

t exc

lusi

ve o

f con

tinge

ncie

s.*

Hou

ses

are

built

to s

hell

and

core

sta

ndar

d on

ly, w

here

all

tena

nt o

r occ

upan

t are

as a

re u

nfur

nish

ed.

* S

choo

ls (p

rimar

y an

d se

cond

ary)

are

of p

ublic

aut

horit

y st

anda

rd, n

o a/

c an

d co

mpl

ete

with

bas

ic e

xter

nal w

orks

.

CONSTRUCTION COST DATA 31

IND

UST

RIA

LInd

ustria

l unit

s, sh

ell on

ly. (C

onve

ntion

al s

ingle

store

y fra

med u

nits).

Ow

ner o

pera

ted fa

ctorie

s, low

rise,

light

weig

ht ind

ustry

OTH

ERS

Unde

rgro

und/b

asem

ent c

ar pa

rks (<

3 lev

els)

Multi

store

y car

parks

, abo

ve gr

ound

(<4 l

evels

)Sc

hools

(prim

ary &

seco

ndar

y)St

uden

ts’ re

siden

ces

Spor

ts clu

bs, m

ulti p

urpo

se sp

orts/

leisu

re c

entre

s (dr

y spo

rts)

Gene

ral h

ospit

als -

publi

c sec

torEx

chan

ge R

ate U

sed :

US$

1 =

491

- 5

60

N/A

708 -

99

335

3 -

496

496 -

63

735

3 -

496

916 -

1,12

7

1,409

- 1,8

30

RMB

6.78

417

- 5

52

N/A

N/A

268 -

34

2N/

AN/

AN/

A

N/A

RMB

6.78

466

- 5

13

N/A

471 -

75

433

6 -

370

373 -

41

323

9 -

264

695 -

76

8

N/A

RMB

6.78

506

- 5

81

N/A

730 -

80

443

2 -

506

506 -

65

535

7 -

506

875 -

1,17

1

1,171

- 1,4

68

RMB

6.78

Page 33: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

RM

1. E

xcav

ating

base

ment ≤

2m de

ep 2

. Exc

avati

ng fo

r foo

tings

≤ 1.

5m de

ep 3

. Rem

ove e

xcav

ated m

ateria

ls off

site

4. H

ardc

ore b

ed bl

inded

with

fine m

ateria

ls 5

. Mas

s con

crete

grad

e 15

6. R

einfor

ced c

oncre

te gr

ade 3

0 7

. Mild

stee

l rod r

einfor

ceme

nt 8

. High

tens

ile ro

d rein

force

ment

9. S

awn f

ormw

ork t

o soff

its of

susp

ende

d

slab

s10

. Saw

n for

mwor

k to c

olumn

s and

wall

s11

. 112

.5mm

thick

brick

wall

s12

. “Kl

iplok

Colo

rbon

d” 0.

64mm

profi

led st

eel

s

heeti

ng13

. Alum

inium

case

ment

wind

ows,

single

g

lazed

m3 m3 m3 m3 m3 m3 kg kg m2 m2 m2 m2 m2

MAJOR RATES FOR MALAYSIA

CONSTRUCTION COST DATA32

CONSTRUCTION COST DATA1K

UA

LA

LUM

PUR

15.0

- 2

2.0 1

5.0 -

22.0

20.0

- 2

5.0 6

0.0 -

70.0

240.0

- 28

0.026

0.0 -

320.0

2.9

- 3

.0 2.

9 -

3.0

38.0

- 4

5.0 3

8.0 -

45.0

45.0

- 5

2.0

55.0

- 6

0.0

350.0

- 50

0.0

PEN

AN

G 18

.0 -

30.0

18.0

- 3

2.0 18

.0 -

30.0

44

.0 -

97.0

220.0

- 27

5.023

0.0 -

300.0

2.7 -

3.

52.8

-

3.5

35.0

- 4

5.035

.0 -

45.0

42.0

- 6

6.0

65.0

- 9

2.0

220.0

- 42

0.0

JOH

OR

BA

HR

U

15.0

- 4

5.0 13

.0 -

26.5

18.5

- 2

8.580

.0 -

130.0

265.0

295.0

3

.6

3.6

4

0.0

4

0.046

.0 -

60.0

60.0

305.0

- 38

0.0

KO

TA

KIN

AB

ALU

14.0

20.0

22.0

100.0

340.0

395.0 3

.7 3.7 42.0

42.0

48.0

96.0*

250.0

- 3

50.0

KU

CH

ING

20.0

20.0

20.0

100.0

345.0

400

.0 4.0

4.0

48

.0

48.0

50.0

100.0

360

.0

Page 34: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

14. S

tructu

ral s

teelw

ork -

beam

s, sta

nchio

ns

and

the l

ike15

. Stee

lwor

k - an

gles,

chan

nels,

flats

and

th

e like

16. 2

5mm

ceme

nt an

d san

d (1:3

) pav

ing17

. 20m

m ce

ment

and s

and (

1:4) p

laster

to

wall

s18

. Cer

amic

tiles b

edde

d to f

loor s

creed

(

meas

ured

sepa

ratel

y)19

. 12m

m fib

rous

plas

terbo

ard c

eiling

lining

20. T

wo co

ats of

emuls

ion pa

int to

p

laster

ed su

rface

s

Aver

age e

xpec

ted pr

elimi

narie

s

kg kg m2 m2 m2 m2 m2 %

6.5

-

9.6

6.5 -

9.

618

.0 -

28.0

18.0

- 2

7.0 56

.0 -

75.0

22

.0 -

35.0

3.5 -

8.

5 3.

0 -

6.0

9.5

0

9.50

15.0

- 3

0.0

28.0

- 3

5.0 55

.0 -

80.0

40

.0 -

55.0

4.0 -

6.

5 7

.0 -

14.0

10.0

10.0

25.0

25.0

100.0 60.0

12.0

1

0.0

6.5

- 8

.0

6.5

- 8

.0 1

5.0 -

22.0

15.0

- 2

2.0 5

0.0 -

70.0

35.0

- 45

.0

3.5

- 4

.5 6

.0 -

12.0

7.0

-

7.5

6.5

-

7.0

25.0

25.0

78.0

45.0

8.00

5

.0 -

7

.0 Th

e ab

ove

cost

s ar

e at

4th

Qua

rter 2

016

leve

ls, e

xclu

sive

of c

ontin

genc

ies

and

prel

imin

arie

s.*

Rat

es is

for “

Klip

lok

Col

orbo

nd” 0

.54m

m p

rofil

ed s

teel

she

etin

g.

CONSTRUCTION COST DATA 33

Page 35: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

m3 m3 m3 m3 m3 m3 kg

kg

m2 m2 m2 m2 m2 kg kg m2

1. E

xcav

ating

base

ment ≤

2m de

ep 2

. Exc

avati

ng fo

r foo

tings

≤ 1.

5m de

ep 3

. Rem

ove e

xcav

ated m

ateria

ls off

site

4. H

ardc

ore b

ed bl

inded

with

fine m

ateria

ls 5

. Mas

s con

crete

grad

e 15

6. R

einfor

ced c

oncre

te gr

ade 3

0 7

. Mild

stee

l rod r

einfor

ceme

nt 8

. High

tens

ile ro

d rein

force

ment

9. S

awn f

ormw

ork t

o soff

its of

susp

ende

d slab

s10

. Saw

n for

mwor

k to c

olumn

s and

wall

s11

. 112

.5mm

thick

brick

wall

s12

. “Kl

iplok

Colo

rbon

d” 0.

64mm

profi

led st

eel

s

heeti

ng13

. Alum

inium

case

ment

wind

ows,

single

glaz

ed14

. Stru

ctura

l stee

lwor

k - be

ams,

stanc

hions

a

nd th

e like

15. S

teelw

ork -

angle

s, ch

anne

ls, fla

ts an

d the

like

16. 2

5mm

ceme

nt an

d san

d (1:3

) pav

ing

15

- 22

15

- 2

2

20

- 25

60

- 70

240

- 280

260

- 320

2.90

-3.0

2.90

-3.0

38

- 45

38

- 45

45 -

50

55 -

60

350

- 500

6.50

- 8.00

6.50

- 8.

0015

-

22

KU

ALA

LUM

PUR

RM

140

160

120

650

2,200

2,400 23 22 42

042

045

0

1,200

7,000 55 55 20

0

BANG

KOK*

BAHT

BR

UN

EIB

$

3.50 3 3 43 115

130

0.90

0.90 15 15 16 58

160 -

210

3.10

3.10 8

35 60 25 400

1,000 98

0 8

.50 8

.50 190

170

200

250

1,500 21 21 80

JAK

AR

TA*

IDR

’000

250

280

145

850

2,800

3,600 41 42

1,000 95

0N/

A

1,100

10,50

0#

125

125

400

MA

NIL

APH

PMAJOR RATES FOR SELECTED ASIAN CITIES

CONSTRUCTION COST DATA34

CONSTRUCTION COST DATA1

Page 36: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

m2 m2 m2 m2

%

17. 2

0mm

ceme

nt an

d san

d (1:4

) plas

ter to

wall

s18

. Cer

amic

tiles b

edde

d to f

loor s

creed

(me

asur

ed se

para

tely)

19. 1

2mm

fibro

us pl

aster

boar

d ceil

ing lin

ing20

. Two

coats

of em

ulsion

paint

to p

laster

ed

sur

faces

Aver

age e

xpec

ted pr

elimi

narie

s

15

-

22 5

0 -

70

35 -

45

3.50

- 4.

50

6 -

12

220

1,200 550

120

12

- 1

8

8

33

28 5

5 -

8

90 160

180$

25

8

- 10

360

1,600

1,090

370

12

- 18

The

abov

e co

st a

re b

ased

on

lum

p su

m fi

xed

pric

e co

ntra

ct ra

te e

xclu

sive

of p

relim

inar

ies

and

cont

inge

ncie

s un

less

oth

erw

ise

stat

ed.

* R

ates

are

net

t of V

AT.

@ R

ates

are

net

t of G

ST.

$ 9

mm

gyp

sum

boa

rd.

# A

lum

iniu

m w

ith a

nodi

zed

finis

h; 6

mm

thic

k.

(Cont’d)

CONSTRUCTION COST DATA 35

Page 37: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

m3 m3 m3 m3 m3 m3 kg

kg

m2 m2 m2 m2 m2 kg kg m2

1. E

xcav

ating

base

ment ≤

2m de

ep 2

. Exc

avati

ng fo

r foo

tings

≤ 1.

5m de

ep 3

. Rem

ove e

xcav

ated m

ateria

ls off

site

4. H

ardc

ore b

ed bl

inded

with

fine m

ateria

ls 5

. Mas

s con

crete

grad

e 15

6. R

einfor

ced c

oncre

te gr

ade 3

0 7

. Mild

stee

l rod r

einfor

ceme

nt 8

. High

tens

ile ro

d rein

force

ment

9. S

awn f

ormw

ork t

o soff

its of

susp

ende

d slab

s10

. Saw

n for

mwor

k to c

olumn

s and

wall

s11

. 112

.5mm

thick

brick

wall

s12

. “Kl

iplok

Colo

rbon

d” 0.

64mm

profi

led st

eel

s

heeti

ng13

. Alum

inium

case

ment

wind

ows,

single

glaz

ed14

. Stru

ctura

l stee

lwor

k - be

ams,

stanc

hions

a

nd th

e like

15. S

teelw

ork -

angle

s, ch

anne

ls, fla

ts an

d the

like

16. 2

5mm

ceme

nt an

d san

d (1:3

) pav

ing

185

21

0

N/A

4,35

05,8

507,1

50 66

68

650 700

1,050

1,650

5,750 110

110

450

IND

IA*

INR

1,990

1,990

10,10

030

,000

66,00

080

,000

1,280

1,310

30,00

030

,000

46,00

0

40,00

033

0,000

1,710

1,710

3,200

SEO

UL#

KRW

HO C

HI M

INH^

VND

92,40

0

92

,400

84,70

0

28

0,900

1,6

96,40

0

1,9

55,80

0

16

,800

16,00

0

20

1,800

19

8,900

31

2,780

401,1

10 -

597,6

006,3

15,00

0

52,65

0

52

,650

73,20

0

26 31 37 170

433

430

4.10

4.10 85 73 72 N/A

815+

9.35

8.50 27

BEI

JIN

GR

MB

MAJOR RATES FOR SELECTED ASIAN CITIES(Cont’d)

CONSTRUCTION COST DATA36

CONSTRUCTION COST DATA120 20

15 -

20

5019

0 - 20

0$12

5 - 13

01.0

0 - 1.

201.0

0 - 1.

2042 42

35 -

40

43 290

4.50 -

5.50

4.50 -

5.50

21

SING

APO

RE@

S$

Page 38: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

m2 m2 m2 m2

%

17. 2

0mm

ceme

nt an

d san

d (1:4

) plas

ter to

wall

s18

. Cer

amic

tiles b

edde

d to f

loor s

creed

(me

asur

ed se

para

tely)

19. 1

2mm

fibro

us pl

aster

boar

d ceil

ing lin

ing20

. Two

coats

of em

ulsion

paint

to p

laster

ed

sur

faces

Aver

age e

xpec

ted pr

elimi

narie

s

38

01,6

50 1,3

00 230

8

- 12

9,500

66,00

0

27,00

0

8,100

6

- 11

144,0

0067

4,180

205,9

20

88,90

0 8

- 1

2

28 140

162 32

7

- 10

The

abov

e co

sts

are

base

d on

lum

p su

m fi

xed

pric

e co

ntra

ct ra

te e

xclu

sive

of p

relim

inar

ies

and

cont

inge

ncie

s un

less

oth

erw

ise

stat

ed.

* R

ates

are

sup

ply

& fi

x ba

sed

on p

roje

cts

in B

anga

lore

and

are

net

t of V

AT a

nd s

ervi

ce T

ax. M

umba

i cos

ts a

re g

ener

ally

8%

hig

her.

# R

ates

incl

ude

labo

ur c

osts

and

are

net

t of V

AT.

^ R

ates

are

net

t of V

AT.

+ R

ate

for d

oubl

e gl

azed

win

dow

.@

Rat

es a

re n

ett o

f GS

T$

Rat

e fo

r lea

n co

ncre

te b

lindi

ng.

(Cont’d)

CONSTRUCTION COST DATA 37

22

74

30

3.50

- 4.0

0

13 -

17

Page 39: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

m3 m3 m3 m3 m3 m3 kg

kg

m2 m2 m2 m2 m2 kg kg m2

1. E

xcav

ating

base

ment ≤

2m de

ep 2

. Exc

avati

ng fo

r foo

tings

≤ 1.

5m de

ep 3

. Rem

ove e

xcav

ated m

ateria

ls off

site

4. H

ardc

ore b

ed bl

inded

with

fine m

ateria

ls 5

. Mas

s con

crete

grad

e 15

6. R

einfor

ced c

oncre

te gr

ade 3

0 7

. Mild

stee

l rod r

einfor

ceme

nt 8

. High

tens

ile ro

d rein

force

ment

9. S

awn f

ormw

ork t

o soff

its of

susp

ende

d slab

s10

. Saw

n for

mwor

k to c

olumn

s and

wall

s11

. 112

.5mm

thick

brick

wall

s12

. “Kl

iplok

Colo

rbon

d” 0.

64mm

profi

led st

eel

s

heeti

ng13

. Alum

inium

case

ment

wind

ows,

single

glaz

ed14

. Stru

ctura

l stee

lwor

k - be

ams,

stanc

hions

a

nd th

e like

15. S

teelw

ork -

angle

s, ch

anne

ls, fla

ts an

d the

like

16. 2

5mm

ceme

nt an

d san

d (1:3

) pav

ing

30

30

10

0 - 18

016

5

320

42

0

3.80

3.8

0

85

85

85*

N/A

70

0

8.50

7.5

0

30

SHAN

GHA

IRM

B

18 25 58 160

300

320

3.70

3.70 50 50 65 N/A

600+

8.30

8.30 22

CHO

NGQ

ING

/CH

ENG

DURM

B

SHEN

ZHEN

/G

UANG

ZHO

URM

B 30 25 65 180

460

498

5.30

5.30 80 80 60 N/A

525

12.20 8.4

0 30

MAJOR RATES FOR SELECTED ASIAN CITIES(Cont’d)

CONSTRUCTION COST DATA38

CONSTRUCTION COST DATA113

015

010

01,2

001,3

501,2

50 7 725

025

045

0

N/A

4,000 35 40 120

MAC

AUM

OP

225

205

280$

950

1,150

1,350 9.20

9.20

420

420

420

880

3,500 34 38 140

HONG

KO

NGHK

$

Page 40: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

m2 m2 m2 m2

%

17. 2

0mm

ceme

nt an

d san

d (1:4

) plas

ter to

wall

s18

. Cer

amic

tiles b

edde

d to f

loor s

creed

(me

asur

ed se

para

tely)

19. 1

2mm

fibro

us pl

aster

boar

d ceil

ing lin

ing20

. Two

coats

of em

ulsion

paint

to p

laster

ed

sur

faces

Aver

age e

xpec

ted pr

elimi

narie

s

30 155

150 40

5

- 1

0

32 120

120 35

5

- 10

25 150

180 30

5 -

10

150

450

650

200 10

The

abov

e co

sts

are

base

d on

lum

p su

m fi

xed

pric

e co

ntra

ct ra

te e

xclu

sive

of p

relim

inar

ies

and

cont

inge

ncie

s un

less

oth

erw

ise

stat

ed.

$ R

ate

incl

udin

g du

mpi

ng c

harg

es.

* R

ate

for 1

20m

m th

ick

conc

rete

blo

ck w

alls

.+

Rat

e fo

r dou

ble

glaz

ed w

indo

w.

CONSTRUCTION COST DATA 39

150

380

570 65

10

- 1

5

Page 41: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

ACMV COSTS FOR VARIOUS DESIGNS & DEVELOPMENTS IN KUALA LUMPURACMV : Air Conditioning & Mechanical Ventilation System

310

100

350

200

60

280 278

391

190

450

280

90

450

400

0

100

200

300

400

500

Hos

pita

l

Aca

dem

icIn

stitu

tion

Offi

ce

Res

iden

tial

Fact

ory

Hot

el

Com

mer

cial

Com

plex

RM/m2 of Construction Floor Area

210

260

360

250

350

400

0

100

200

300

400

500

Central Variable Air Volume

Central Constant Air Volume

Central VariableRefrigerant Volume

RM/m2 of Construction Floor Area

CONSTRUCTION COST DATA40

CONSTRUCTION COST DATA1

Page 42: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

RM/Tonne of Refrigeration

4000

5200

6650

4500

6000

7400

0

2000

4000

6000

8000

Central Variable Air Volume

Central Constant Air Volume

Central VariableRefrigerant Volume

RM/Tonne of Refrigeration

62006600

1200

4600

1300

65007500

7500

8500

2000

5000

2000

76008400

0

2500

5000

7500

10000

Hos

pita

l

Aca

dem

icIn

stitu

tion

Offi

ce

Res

iden

tial

Fact

ory

Hot

el

Com

mer

cial

Com

plex

CONSTRUCTION COST DATA 41

Page 43: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

MEC

HA

NIC

AL

SER

VIC

ESOf

fices

Indus

trial*

Hotel

sSh

oppin

g Cen

tres

Apar

tmen

tsEL

ECTR

ICA

L SE

RVI

CES

Offic

esInd

ustria

l**Ho

tels

Shop

ping C

entre

sAp

artm

ents

HYD

RA

ULI

C S

ERVI

CES

Offic

esInd

ustria

lHo

tels

Shop

ping C

entre

sAp

artm

ents

360

- 52

0

85 -

190

300

- 5

85 3

20 -

510

195

- 28

5

310

- 51

5 14

4 -

190

285

- 60

031

0 -

500

105

- 2

20 26

-

60 37

-

4618

0 -

250

26 -

35

20 -

50

KU

ALA

LUM

PUR

RM

/m2

4,400

- 4

,800

1,550

- 1

,600

4,6

00 -

5,10

04,4

00 -

4,80

04,4

00 -

4,50

0

3,400

- 3

,800

1,950

- 2

,200

3,800

- 4

,500

2,800

- 3

,200

2,800

- 3

,350

790

-

910

750

-

790

1,400

- 1

,650

790

-

950

1,200

- 1

,400

BANG

KOK@

BAHT

/m2

179

- 22

4

23 -

39

289

- 33

3 20

5 -

244

212

- 24

4

231

- 28

9 19

2 -

231

289

- 37

737

7 -

314

249

- 3

14 16

-

39 11

-

1960

-

8312

-

4138

-

59

BR

UN

EIB

$/m

2

995

- 1,13

0 29

5 -

695

990

- 1,28

584

0 - 1

,015

935

- 1,

100

770

- 1,03

5 44

0 -

685

800

- 1,11

067

5 -

850

880

- 1,

030

185

- 2

85 11

0 -

200

935

- 1,10

018

5 -

285

935

- 1,

110

JAK

AR

TA#

IDR

’000

/m2

3,000

- 5

,000

700

- 1

,500

3,0

00 -

6,50

02,5

00 -

4,50

070

0 -

3,00

0

3,300

- 6

,500

2,000

- 3

,500

4,700

- 9

,200

3,600

- 6

,000

3,600

- 6

,300

900

- 2,

200

700

- 1,

300

1,950

- 4

,000

700

- 1,

600

1,400

- 2

,700

MA

NIL

A$

PHP/

m2

M&E COSTS FOR SELECTED ASIAN CITIES

CONSTRUCTION COST DATA42

CONSTRUCTION COST DATA1

Page 44: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

FIR

E SE

RVI

CES

Offic

esInd

ustria

lHo

tels

Shop

ping C

entre

sAp

artm

ents

LIFT

S / E

SCA

LATO

RS

Offic

esInd

ustria

lHo

tels

Shop

ping C

entre

sAp

artm

ents

60 -

80

45

-

65 6

5 -

95

65

- 8

520

-

30

95 -

400

55 -

190

85 -

370

85 -

110

63 -

105

780

-

850

730

-

750

78

0 -

89

078

0 -

82

072

0 -

85

0

1,100

- 1

,350

N/A

1,100

- 1

,400

250

-

450

500

-

580

32 -

39

12

-

19 26

-

49 32

-

6526

-

51

9 -

32

4

- 1

9 12

-

45 12

-

3611

-

26

255

- 3

85 11

0 -

200

310

- 3

8526

0 -

305

285

-

310

410

- 1,11

0 N

/A 66

0 - 1

,030

305

- 8

20 6

60 -

82

5

700

- 1,

300

650

-

900

70

0 -

1,20

070

0 -

1,30

065

0 -

1,30

0

1,600

- 3

,500

N/A

1,800

- 3

,300

700

- 2,

000

800

- 2,

100

The

abov

e co

sts

are

at 4

th Q

uarte

r 201

6 le

vels

, exc

lusi

ve o

f con

tinge

ncie

s un

less

oth

erw

ise

stat

ed.

* G

ener

ally

with

out a

ir co

nditi

on.

** E

xclu

des

spec

ial p

ower

sup

ply.

@ B

ased

upo

n ne

tt en

clos

ed a

rea

and

nett

of V

AT.

#

All

rate

s ar

e ne

tt of

VAT

. Rat

es fo

r Ele

ctric

al S

ervi

ces

are

excl

udin

g ge

nset

. Rat

es fo

r Hyd

raul

ic S

ervi

ces

are

exc

ludi

ng S

TP.

R

ates

for M

echa

nica

l Ser

vice

s re

fers

to A

CM

V R

ates

onl

y.$

Tra

nsfo

rmer

incl

uded

in E

lect

rical

Ser

vice

s.

(Cont’d)

CONSTRUCTION COST DATA 43

Page 45: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

MEC

HA

NIC

AL

SER

VIC

ESOf

fices

Indus

trial*

Hotel

sSh

oppin

g Cen

tres

Apar

tmen

tsEL

ECTR

ICA

L SE

RVI

CES

Offic

esInd

ustria

l**Ho

tels

Shop

ping C

entre

sAp

artm

ents

HYD

RA

ULI

C S

ERVI

CES

Offic

esInd

ustria

lHo

tels

Shop

ping C

entre

sAp

artm

ents

247

- 32

0

102

- 17

7 2

39 -

375

166

- 2

7310

6 -

193

210

- 39

5 13

0 -

190

300

- 49

018

0 -

262

140

- 1

89 39

-

64 25

-

3680

- 1

2332

-

6455

-

84

SEO

UL@

KR

W(’0

00)/m

2

4,450

- 6

,300

2,050

- 3

,650

5,4

50 -

5,95

04,2

50 -

5,56

52,4

30 -

3,00

0

3,915

- 5

,405

2,315

- 3

,850

4,375

- 5

,955

3,755

- 5

,020

1,900

- 2

,600

690

- 1,

045

470

-

825

3,585

- 5

,400

1,020

- 1

,845

1,615

- 2

,235

INDI

A#IN

R/m

2

1,729

- 2

,465

N/A

N/A

N/A

1,382

- 1

,893

2,034

- 2

,426

N/A

N/A

N/A

1,794

- 2

,266

281

- 5

35 N

/A N

/A N

/A54

7 -

648

HO

CH

I MIN

HVN

D(’0

00)/m

2

760

- 1,0

50 17

0 -

280

910

- 1,1

5079

0 -

950

140

-

410

460

- 7

03 32

0 -

450

705

- 9

4348

1 -

676

253

- 3

98 95

-

140

95 -

14

0 37

0 -

480

140

- 2

00 1

70 -

23

0

BEI

JIN

GR

MB

/m2

160

- 26

2

35 -

123

135

- 2

92 1

54 -

258

94 -

178

166

- 26

9 55

- 1

4219

0 -

372

167

- 31

9 1

02 -

238

28 -

57

19 -

38

95 -

181

48 -

85

76 -

148

SING

APO

RE^

S$/m

2

M&E COSTS FOR SELECTED ASIAN CITIES(Cont’d)

CONSTRUCTION COST DATA44

CONSTRUCTION COST DATA1

Page 46: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

FIR

E SE

RVI

CES

Offic

esInd

ustria

lHo

tels

Shop

ping C

entre

sAp

artm

ents

LIFT

S / E

SCA

LATO

RS

Offic

esInd

ustria

lHo

tels

Shop

ping C

entre

sAp

artm

ents

36 -

70

27

-

42 4

1 -

91

28

- 7

639

-

74

42 -

67

16 -

26

100

- 17

548

-

84 29

-

41

1,095

- 1

,430

525

-

690

1,2

75 -

1,63

01,0

50 -

1,21

058

0 -

69

5

910

- 1,

160

590

-

760

1,325

- 1

,925

1,545

- 1

,990

825

- 1,

050

632

- 1,0

49 N

/A N

/A N

/A43

4 -

545

605

- 1,1

54 N

/A N

/A1,2

31 -

1,74

368

7 -

994

180

- 2

6515

0 -

225

220

- 3

7522

0 -

375

70

- 1

35

294

- 5

77 1

45 -

40

0 23

2 -

520

327

- 5

20 1

75 -

28

9

34 -

58

24

-

53 2

9 -

58

38 -

58

25 -

52

66 -

171

43 -

109

52 -

114

58 -

95

43

- 11

9 Th

e ab

ove

cost

s ar

e at

4th

Qua

rter 2

016

leve

ls, e

xclu

sive

of c

ontin

genc

ies

unle

ss o

ther

wis

e st

ated

.*

Gen

eral

ly w

ithou

t air

cond

ition

.**

Exc

lude

s sp

ecia

l pow

er s

uppl

y.^

Rat

es a

re n

ett o

f GS

T an

d ex

clud

ing

BA

S.

@ R

ates

are

net

t of V

AT.

# R

ates

are

bas

ed o

n pr

ojec

ts in

Ban

galo

re a

nd a

re n

ett o

f VAT

and

Ser

vice

Tax

. Mum

bai c

osts

are

gen

eral

ly 8

% h

ighe

r.

(Cont’d)

CONSTRUCTION COST DATA 45

Page 47: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

MEC

HA

NIC

AL

SER

VIC

ESOf

fices

Indus

trial*

Hotel

sSh

oppin

g Cen

tres

Apar

tmen

tsEL

ECTR

ICA

L SE

RVI

CES

Offic

esInd

ustria

l**Ho

tels

Shop

ping C

entre

sAp

artm

ents

HYD

RA

ULI

C S

ERVI

CES

Offic

esInd

ustria

lHo

tels

Shop

ping C

entre

sAp

artm

ents

761

- 9

66

173

- 2

89 9

71 -

1,26

5 1

,050

- 1,10

331

0 -

410

593

- 6

51 30

5 -

431

651

- 8

3052

0 -

651

252

-

368

110

- 1

63 89

-

131

368

- 4

8813

7 -

184

168

- 2

26

SHA

NG

HA

IR

MB

/m2

765

- 1,04

0

150

- 2

68 1

,071 -

1,33

9 7

07 -

95

412

2 -

380

530

- 7

65 30

6 -

445

680

- 9

1648

3 -

653

278

-

445

122

- 1

66 86

-

112

391

- 4

9311

2 -

150

145

- 2

57

SHEN

ZHEN

/G

UA

NG

ZHO

URM

B/m

2

680

- 9

80

130

- 2

20 7

20 -

1,15

0 5

80 -

98

090

-

280

420

- 6

50 25

0 -

350

500

- 7

5040

0 -

650

220

-

330

60 -

12

0 60

-

120

280

- 3

5060

-

120

100

- 1

80

CH

ON

GQ

ING

/C

HEN

GD

UR

MB

/m2

2,000

- 2,

800

20

0 -

300

2,20

0 - 2

,750

2,30

0 - 2

,850

850

- 1,75

0

1,750

- 2,

500

650

- 9

001,9

00 -

2,60

01,9

00 -

2,50

0 1

,100

- 1,75

0 70

0 -

900

500

- 7

002,0

00 -

3,00

070

0 -

900

1,500

- 2,

400

HO

NG

KO

NG

HK

$/m

2

N/A

N/A

2,60

0 - 3

,000

2,20

0 - 2

,800

900

- 1,10

0

N/A

N/A

2,600

- 3

,100

2,600

- 2

,800

1,000

- 1,

300

N/A

N/A

1,800

- 2,2

0060

0 - 80

01,5

00 -

2,00

0

MA

CA

UM

OP/

m2

M&E COSTS FOR SELECTED ASIAN CITIES(Cont’d)

CONSTRUCTION COST DATA46

CONSTRUCTION COST DATA1

Page 48: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

FIR

E SE

RVI

CES

Offic

esInd

ustria

lHo

tels

Shop

ping C

entre

sAp

artm

ents

LIFT

S / E

SCA

LATO

RS

Offic

esInd

ustria

lHo

tels

Shop

ping C

entre

sAp

artm

ents

220

- 3

00 15

0 -

250

280

- 3

8025

0 -

380

50

- 1

00 28

0 -

550

135

- 3

9022

0 -

495

325

- 4

9516

5 -

325

224

- 3

48 13

9 -

267

278

- 4

1324

7 -

370

64

- 1

22 29

4 -

481

150

- 4

3424

1 -

465

326

- 4

6012

2 -

268

160

- 2

30 13

0 -

230

180

- 3

0020

0 -

300

45

-

90 33

0 -

580

140

- 3

4028

0 -

480

280

- 4

3013

0 -

230

550

-

700

400

-

500

60

0 -

85

055

0 -

70

020

0 -

45

0

700

- 1,

200

550

-

750

550

-

850

850

- 1,

000

450

-

850

N/A

N/A

900

- 1,1

00 6

00 -

800

250 -

30

0

N/A

N/A

600 -

80

0 4

50 -

700

450 -

60

0Th

e ab

ove

cost

s ar

e at

4th

Qua

rter 2

016

leve

ls, e

xclu

sive

of c

ontin

genc

ies

unle

ss o

ther

wis

e st

ated

.*

Gen

eral

ly w

ithou

t air

cond

ition

.

** E

xclu

des

spec

ial p

ower

sup

ply.

CONSTRUCTION COST DATA 47

Page 49: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

UNIT RM

per set 46,600

per room 15,200

per room 18,000

per hole 2,552,000

per set 275,000

DESCRIPTION PLAYGROUND EQUIPMENTOutdoor playground equipment comprising various activities and safety matAge group: 4 to 12Child Capacity: 15 - 20* Price varies according to equipment and design.

SAUNASSauna room complete with timber finishes (Finland Spruce), stainless steel heater with built-in control panel and all accessoriesSize: 8’ x 8’ x 7’6”

STEAM BATHSSteam bath complete with steam generator, aluminium framed glass door, ceramic wall tiles, water proofing system, lighting and all accessoriesSize: 8’ x 8’ x 7’6”

GOLF COURSES(Based on “Average Cost Model” of an 18 hole golf course in Asia). Including fairway construction and rough hydro seeding.

GOLF SIMULATORComplete golf simulation system complete with projector, high impact projection screen, artificial grass putting turf, putting green

UNIT COSTS FOR ANCILLARY FACILITIESFOR KUALA LUMPUR

CONSTRUCTION COST DATA48

CONSTRUCTION COST DATA1

Page 50: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

UNIT RM

per court 59,300

per court 60,000

per pool 822,300

per pool 172,500

per pool 241,500

per pool 1,201,800

per pool 287,500

per pool 345,000

DESCRIPTION SQUASH COURTSSingle court with glass back wall including associated mechanical and electrical services but excluding any public facilities (enclosing structure not included)

TENNIS COURTSSingle court on grade with acrylic surfacing complete excluding chain link fence

SWIMMING POOLSSize: 25m x 10.5mDepth: approx. 1.2m to 1.8mOutdoor swimming pool built on ground, fully tiled, completed with 5m wide deck and associated equipment

Extra for heating equipment (solar)

Extra for ozone system

Size: 25m x 10.5mDepth: approx. 1.8m to 3.0mIndoor swimming pool built with suspended structure (enclosing structure not included) fully tiled and completed with 5m wide deck, including mechanical ventilation and associated equipment

Extra for heating equipment (solar)

Extra for ozone system

CONSTRUCTION COST DATA 49

Page 51: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

RM/m2

2,390 - 3,3803,160 - 4,1104,050 - above

1,190 - 1,7601,640 - 2,7102,580 - above

460 - 640620 - 1,060

1,040 - above

2,400 - 3,7605,460 - above

DESCRIPTION

HOTELSPublic Area (Front of House):3 - star Hotel4 - star Hotel5 - star HotelGuest Rooms:3 - star Hotel4 - star Hotel5 - star HotelNotes:1. Includes furniture, floor, wall and ceiling finishes, drapery,

sanitary fittings and light fittings.2. Excludes partitioning, M&E works, chandelier, building shell,

operational items and equipment (e.g. bed, cutlery, crockery, linen, television, refrigerator etc.), opening expenses, stage equipment and computer systems.

OFFICESGeneral OfficeExecutive OfficePrestige OfficeNotes:1. Local furniture allowed for general offices.2. Includes furniture, partitioning, minor alteration to fire services,

air-conditioning and suspended ceiling to suit layout.3. Excludes telephones, Local Area Network, office equipment

(e.g. computers, photocopies, fax machines,UPS, etc).

RESTAURANTSGeneral dining restaurantFine dining restaurantNotes:1. Includes furniture, floor, wall and ceiling finishes, minor

alteration to air-conditioning and fire services installation to suit layout, exhaust for kitchen but excludes exhaust flue, operational items (e.g. cutlery, crockery, linen, utensils, etc.).

FIT-OUT COSTS FOR KUALA LUMPUR

CONSTRUCTION COST DATA50

CONSTRUCTION COST DATA1

Page 52: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

2GENERAL CONSTRUCTION DATA

JUBM & Arcadis Building WorksComposite Tender Price Index (BWCTPI)

JKR Tender Price Index

Value of Construction Work Done

Performance of Construction Sector

Estimating Rules of Thumb

Technical Specifications

Average Unit Prices

Unit Price Index

Construction Sector Indicators

Commodities Price Trend (Jan to Dec 2015)

Malaysia Construction Sector - Employment & GDP

Progress Payments

Page 53: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 54: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 55: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

VALUE OF CONSTRUCTION WORK DONE BYTYPE OF CONSTRUCTION ACTIVITY

Qua

rter

/ Y

ear

RM

mill

ion

(%)

Res

iden

tial

Bui

ldin

gsN

on-r

esid

entia

lB

uild

ings

Civ

ilEn

gine

erin

g(%

)(%

)

Spec

ial T

rade (%

)

Tota

l

(%)

RM

mill

ion

RM

mill

ion

RM

mill

ion

RM

mill

ion

Q1/20

12Q2

/2012

Q3/20

12Q4

/2012

Q1/20

13Q2

/2013

Q3/20

13Q4

/2013

Q1/20

14Q2

/2014

Q3/20

14Q4

/2014

Q1/20

15Q2

/2015

Q3/20

15Q4

/2015

Q1/20

16Q2

/2016

Q3/20

16

4,885

5,162

5,061

5,760

5,413

6,484

6,253

6,813

7,202

7,657

7,598

8,059

8,606

8,253

8,227

8,760

9,331

9,283

9,579

27.6

25.4

24.8

26.0

26.3

28.5

27.4

27.6

28.8

30.4

30.0

29.7

29.9

30.3

28.5

29.1

29.2

30.5

30.0

6,807

7,086

7,158

6,431

6,714

7,123

7,869

7,598

8,052

8,157

8,724

9,382

10,00

69,4

189,9

379,7

19

10,38

29,6

159,8

01

38.4

34.8

35.1

29.0

32.6

31.4

34.4

30.8

32.2

32.4

34.5

34.6

34.8

34.6

34.5

32.3

32.5

31.6

30.7

5,119

7,050

7,201

8,835

7,603

8,025

7,667

9,006

8,399

8,167

7,838

8,285

8,753

8,288

9,330

10,21

7

10,61

510

,075

11,13

3

28.9

34.6

35.3

39.8

36.9

35.3

33.6

36.5

33.6

32.4

31.0

30.6

30.5

30.4

32.4

33.9

33.2

33.1

34.9

915

1,052 98

21,1

65 884

1,086

1,062

1,275

1,320

1,192

1,141

1,373

1,376

1,280

1,340

1,433

1,613

1,453

1,397

5.2 5.2 4.8 5.2 4.3 4.8 4.6 5.1 5.3 4.7 4.5 5.1 4.8 4.7 4.6 4.8 5.1 4.8 4.4

17,72

620

,349

20,40

122

,191

20,61

322

,717

22,85

224

,692

24,97

325

,173

25,30

127

,099

28,74

127

,239

28,83

430

,129

31,94

130

,427

31,91

0

100.0

100.0

100.0

100.0

100.0

100.0

100.0

100.0

100.0

100.0

100.0

100.0

100.0

100.0

100.0

100.0

100.0

100.0

100.0

Sou

rce:

Qua

rterly

Con

stru

ctio

n S

tatis

tics,

Dep

artm

ent o

f Sta

tistic

s M

alay

sia

GENERAL CONSTRUCTION DATA54

GENERAL CONSTRUCTION DATA2

Page 56: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 57: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

ESTIMATING RULES OF THUMB

Composition of Concrete (per m3)

Mix Cement Sand Aggregate 1:3:6 216kg 0.45m3 0.90m3

1:2:4 308kg 0.43m3 0.86m3

1:1:2 540kg 0.38m3 0.75m3

Weight of Concrete Items

Item WeightConcrete 2,400 kg/m3

Cement 1,441 kg/m3

Sand 1,600 kg/m3

Aggregate 1,350 kg/m3

Steel 7,843 kg/m3

Average Loads VolumeLorry 10.0 m3

Concrete truck (24 ton) 5.5 m3

Barge 200 - 1,450 m3

Dimensions for Standard Parking Space, Loading/Unloading Bays and Lay-bys

Minimum Length Width HeadroomPrivate Cars, Taxis 5 m 2.5 m 2.4 mand Light VansCoaches and Buses 12 m 3.0 m 3.8 mLorries 11 m 3.5 m 4.1 mContainer Vehicles 16 m 3.5 m 4.5 m

Minimum headroom means the clearance between thefloor and the lower most projection from the ceilingincluding any lighting units, ventilation duct, conduitsor similar.

GENERAL CONSTRUCTION DATA56

GENERAL CONSTRUCTION DATA2

Page 58: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

Structure Design - Concrete Ratios

The following is a range of concrete ratios for buildingsuperstructure design:

Concrete/floor area 0.3 m3/m2 to 0.6 m3/m2

Formwork/floor area 2.2 m2/m2 to 3.0 m2/m2

Reinforcement/concrete vol. 160 kg/m3 to 250 kg/m3

Average External Wall/Floor Ratio

Residential Apartments 1.0 m2/m2

Office, Hotel 0.4 m2/m2

Industrial 0.4 m2/m2

Average Internal Wall/Floor Ratio

Residential Apartments 1.0 m2/m2

Office 0.5 m2/m2

Hotel 1.5 m2/m2

Air - Conditioning

Average 0.05 tonne/m2 of floor area

The above ratios are indicative and for reference purposesonly. They do not account for buildings with special shapes,configurations or particular small foot prints.

Indicative Dimensions for Sports Grounds

Length Width Tennis Court 40 m 20 m Squash Court 13 m 6 m Basketball Court 38 m 23 m Volleyball Court 30 m 20 m Badminton Court 20 m 10 m Rink 61 m 26 m Soccer Playing Feld 110 - 120 m 70 - 80 mFutsal 25 - 42 m 15 - 25 m

The above dimensions are for a single court with appropriateclearance. No spectator seating or support area has beenallowed.

GENERAL CONSTRUCTION DATA 57

Page 59: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

TECHNICAL SPECIFICATIONS Table for Standard BRC Fabrics

A 10

A 9

A 8

A 7

A 6/5

A 5

A 4

BR

CR

ef.

No.

BS

4483

or S

S-32

Ref

No.

Size

mm

Spac

ing

mm

Size

mm

Spac

ing

mm

Mai

nm

m2 /m

Cro

ssm

m2 /m

Mas

s Pe

rU

nit A

rea

Kg/

m2

Mai

n W

ireC

ross

Wire

Cro

ss-S

ectio

nal A

rea

A 39

3

- A

252

A 19

3

-A

142

A 98

-

10.0 9.0 8.0 7.0 6.5 6.0 5.0 4.0

200

200

200

200

200

200

200

200

10.0 9.0 8.0 7.0 6.5 6.0 5.0 4.0

200

200

200

200

200

200

200

200

393

318

252

193

166

142 98 63

393

318

252

193

166

142 98 63

6.16

4.99

3.95

3.02

2.61

2.22

1.54

0.99

SQU

AR

E M

ESH

ES

B 12

B 10

B 9

B 8

B 7

B 6

B 5

C 10

C 9

C 8

C 7

C 6

C 5

B 11

31B

385

-

B 50

3B

385

B 28

3B

196

C 78

5C

636

C 50

3C

385

C 28

3

-

12.0

10.0 9.0 8.0 7.0 6.0 5.0 10.0 9.0 8.0 7.0 6.0 5.0

100

100

100

100

100

100

100

100

100

100

100

100

100

8.0 8.0 8.0 8.0 7.0 7.0 7.0 6.0 6.0 5.0 5.0 5.0 5.0

200

200

200

200

200

200

200

400

400

400

400

400

400

1,131 78

563

650

338

528

319

6

785

636

503

385

283

196

252

252

252

252

193

193

193 71 71 49 49 49 49

10.90 8.1

46.9

75.9

34.5

33.7

33.0

5

6.72

5.55

4.34

3.41

2.61

1.93

REC

TAN

GU

LAR

MES

HES

STA

ND

AR

D S

IZES

Shee

ts

(all R

ef. N

o’s)

Leng

th : 6

.0 me

tres

Widt

h : 2

.2 me

tres

Rol

ls

(Ref.

No’s

: A4,

A5, A

6, A6

/5 on

ly)Le

ngth

: 40.0

metr

esW

idth

: 2.0

metre

s

GENERAL CONSTRUCTION DATA58

GENERAL CONSTRUCTION DATA2

Page 60: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

Weight Tables for Mild Steel Round Bar & High Tensile Deformed Bar

* High Yield Deformed Bar Standard Length : 12 metres straight.* Mild Steel Round Bar Standard Length : 12 metres straight or 12 metres once folded.* Special cut length can be produced from 6m to 15m on a certain min. quality per size per order upon request.

No. of Pcs.12m LengthPer Bundle

WeightPer Bundle

(MT)High YieldDeformed

Mild SteelRound

Std. Size (mm)

3762101681389654342822181412109

1.0020.9951.0061.0201.0231.0231.0061.0031.0171.0441.0611.0881.0681.065

D 6D 8D 9D 10D 12D 16D 20D 22D 25D 28D 32D 35D 38D 40

Ø 6Ø 8Ø 9Ø 10Ø 12Ø 16Ø 20Ø 22Ø 25Ø 28Ø 32Ø 35Ø 38 -

28.350.363.678.5

113.1201.1314.2380.1490.9615.8804.2962.1

1,134.11,256.6

CrossSectional Area (mm2)

UnitWeight(kg/m)

0.2220.3950.4990.6160.8881.5792.4662.9843.8544.8346.3137.5538.9039.864

GENERAL CONSTRUCTION DATA 59

Page 61: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

AVERAGE UNIT PRICES

Regio

n: A

= Ce

ntral

Penin

sular

Mala

ysia;

B =

Kota

Kina

balu;

C =

Kuc

hing

Dece

mber

rates

are n

ot av

ailab

le at

time o

f prin

ting.

Sour

ce: S

pecia

l Rele

ase 1

, For

Civi

l Eng

ineer

ing W

orks

, Dep

artm

ent o

f Stat

istics

, Mala

ysia.

2016 Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

2.17

2.17

2.17

2.17

2.17

2.17

2.17

2.17

2.17

2.17

2.17

2.31

2.31

2.31

2.31

2.31

2.31

2.31

2.31

2.31

2.31

2.31

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

AC

B

80/1

00 P

enet

ratio

n

AC

BA

CB

Riv

er S

and

AC

B

Ord

inar

y Po

rtla

nd

AC

B

Cem

ent

RM

/50

kg B

ag

Regio

n

Sand

RM

/Met

ric T

onA

utom

ativ

e G

as O

ilR

M/L

itre

Bitu

men

RM

/Met

ric T

onFu

el O

ilR

M/L

itre

Die

sel R

etai

l Pric

eM

ediu

m

1,690

.001,7

50.00

1,750

.001,7

50.00

1,750

.001,7

50.00

1,750

.001,7

50.00

1,750

.001,7

50.00

1,750

.00

2,380

.002,3

70.00

2,370

.00N/

AN/

AN/

AN/

AN/

AN/

AN/

AN/

A

2,200

.002,1

80.00

2,180

.002,1

80.00

2,180

.002,1

80.00

2,180

.002,1

80.00

2,180

.002,1

80.00

2,180

.00

1.60

1.35

1.35

1.55

1.55

1.55

1.60

1.70

1.70

1.75

1.90

1.60

1.35

1.35

1.55

1.55

1.55

1.60

1.70

1.70

1.75

1.90

1.60

1.35

1.35

1.35

1.55

1.55

1.60

1.70

1.70

1.75

1.90

48.74

49.22

49.22

48.69

48.69

48.69

48.28

48.28

48.28

48.28

48.28

36.51

36.51

36.51

36.66

36.66

36.66

36.66

36.66

36.66

36.66

36.66

39.00

39.00

39.00

39.00

39.00

39.00

39.00

39.00

39.00

39.00

39.00

19.46

19.46

19.40

19.35

19.28

19.13

19.03

19.07

19.03

19.05

19.05

18.89

18.89

18.89

18.89

18.89

18.89

18.89

18.89

18.89

18.89

18.89

19.55

19.81

19.81

19.98

19.98

20.06

20.06

20.06

20.06

20.06

20.06

GENERAL CONSTRUCTION DATA60

GENERAL CONSTRUCTION DATA2

Page 62: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

Regio

n: A

= Ce

ntral

Penin

sular

Mala

ysia;

B =

Kota

Kina

balu;

C =

Kuc

hing

Dece

mber

rates

are n

ot av

ailab

le at

time o

f prin

ting.

Sour

ce: S

pecia

l Rele

ase 1

, For

Civi

l Eng

ineer

ing W

orks

, Dep

artm

ent o

f Stat

istics

, Mala

ysia.

GENERAL CONSTRUCTION DATA 61

2016 Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Agg

rega

tes

Gra

nite

10m

m (3

/ 8” )

RM

/Met

ric T

on

AC

B

Gra

nite

20m

m (3

/ 4” )

AC

B

Gra

nite

40m

m (1

1 /2” )

AC

B

Cru

sher

run

AC

BRe

gion

41.65

41.65

41.65

41.65

41.65

41.65

41.65

41.65

41.65

41.65

41.65

29.23

29.23

29.97

31.74

29.97

29.97

29.97

29.97

29.97

29.97

29.97

33.33

33.57

33.73

34.12

34.12

34.12

34.01

34.06

34.00

33.89

33.89

62.83

62.83

62.83

62.83

62.83

62.83

62.83

62.83

62.83

62.83

62.83

36.00

36.00

36.00

33.63

33.63

33.63

32.20

32.20

32.20

32.20

32.20

32.04

32.04

32.04

32.04

32.04

32.04

31.93

31.93

31.33

31.33

31.33

54.62

54.62

54.62

47.70

47.70

47.70

47.70

47.70

47.70

48.70

48.70

25.40

25.40

25.40

25.40

26.40

26.40

26.40

30.15

30.15

31.15

31.15

24.87

24.87

24.79

24.79

24.79

24.79

24.83

24.89

24.86

24.86

24.86

42.41

42.41

42.41

42.41

42.41

42.41

42.41

39.13

39.13

39.13

39.13

25.57

23.92

23.92

23.92

24.92

24.92

23.79

23.79

23.79

24.79

24.79

32.31

32.31

32.25

32.25

32.25

32.25

32.19

32.19

31.84

31.84

31.84

Page 63: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

UNIT PRICE INDEX

Note:

July

2012

= 10

0

U

nit P

rice I

ndex

abov

e are

appli

cable

for W

ilaya

h Per

seku

tuan K

uala

Lump

ur, M

elaka

, Neg

eri S

embil

an an

d Sela

ngor

Reg

ion.

Dec

embe

r rate

s are

not a

vaila

ble at

time o

f prin

ting.

Sour

ce: S

pecia

l Rele

ase 2

, For

Buil

ding a

nd S

tructu

ral W

orks

, Dep

artm

ent o

f Stat

istics

, Mala

ysia.

2016

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Bricks & Wall

CeilingMaterials

Glass

Roofing Materials

Plywood

Timber

SanitaryFittings

Plumbing Materials

Floor & Wall Tiles

Steel & Metal Sections

Paints

107.2

107.2

107.2

107.2

106.9

106.8

105.5

104.0

104.0

104.0

104.0

113.5

112.8

114.7

114.7

115.7

115.7

115.7

115.7

115.7

115.7

115.7

108.8

108.8

108.8

108.8

108.8

108.8

108.8

108.8

108.8

108.4

108.4

109.2

109.2

109.1

109.1

108.8

108.8

108.2

108.2

108.2

107.5

107.4

113.7

114.8

114.8

117.5

117.5

117.5

119.2

119.3

120.9

122.2

122.2

83.0

83.0

83.0

85.5

85.6

85.6

85.6

85.6

85.6

85.6

85.6

113.3

115.1

114.8

114.8

114.8

114.8

114.8

114.8

114.8

114.8

114.8

112.3

113.3

114.3

114.3

114.3

114.3

114.5

114.7

114.7

114.7

114.7

104.6

104.6

104.6

104.6

104.6

104.6

104.6

104.6

104.6

104.6

104.5

95.8

95.2

94.8

95.6

96.6

96.2

95.0

94.7

94.4

94.3

94.5

110.5

110.5

110.5

110.5

111.0

111.3

111.4

111.4

111.4

111.4

111.4

GENERAL CONSTRUCTION DATA62

GENERAL CONSTRUCTION DATA2

Page 64: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 65: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 66: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 67: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 68: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

PROGRESS PAYMENTSTh

e fo

llow

ing

grap

h an

d ta

ble

are

an in

dica

tion

of th

e ra

te o

f exp

endi

ture

for c

onst

ruct

ion

proj

ects

.

The

rate

of e

xpen

ditu

re is

an

aver

age

rate

and

will

var

y fro

m p

roje

ct to

pr

ojec

t whe

n sp

ecifi

c pr

ojec

t circ

umst

ance

s ar

e ta

ken

into

acc

ount

.

No

acco

unt h

as b

een

mad

e fo

r ret

entio

n.

Pro

gres

s C

laim

s (%

)

Con

tract

Per

iod

(%)

100

80 60 40 20 00

2

0

40

6

0

80

100

Con

trac

t Pe

riod

5% 10%

15%

20%

25%

30%

35%

Cum

ulat

ive

Prog

ress

Cla

ims

2% 5% 8% 13%

18%

24%

30%

Con

trac

t Pe

riod

40%

45%

50%

55%

60%

65%

70%

Cum

ulat

ive

Prog

ress

Cla

ims

36%

43%

50%

57%

64%

70%

76%

Con

trac

t Pe

riod

75%

80%

85%

90%

95%

100%

Cum

ulat

ive

Prog

ress

Cla

ims

82%

87%

92%

95%

98%

100%

GENERAL CONSTRUCTION DATA 67

Page 69: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

GENERAL CONSTRUCTION DATA68

GENERAL CONSTRUCTION DATA2

Page 70: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

3PROPERTY

Residential

Hotel

Office

Shopping Complex

Shop

Industrial

Page 71: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 72: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 73: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

Hot

elQ

2 20

16p

WP

Kuala

Lump

urW

P Pu

trajay

aW

P La

buan

Selan

gor

Joho

rPu

lau P

inang

Pera

kNe

geri S

embil

anMe

laka

Keda

hPa

hang

Tere

ngga

nuKe

lantan

Perlis

Saba

hSa

rawa

kM

ALA

YSIA

Exis

ting

Stoc

k (R

oom

)

36,73

81,0

411,7

0217

,119

23,48

416

,239

13,76

06,9

8711

,853

12,49

921

,484

8,241

4,056 97

017

,009

17,43

421

0,61

6

4,754 24

365

61,9

353,1

053,7

88 901

1,526

3,422 97

614

050

9 17 193

1,071

1,402

24,6

38

Inco

min

g Su

pply

(Roo

m)

p =

prel

imin

ary

Sou

rce:

Lei

sure

Pro

perty

Sto

ck R

epor

t, 2n

d Q

uarte

r

Sou

rce:

Mal

aysi

a In

stitu

te o

f Eco

nom

ic R

esea

rch

201

6, b

y V

alua

tion

& P

rope

rty S

ervi

ces

Dep

artm

ent

Tour

ism

Mar

ket I

ndex

Tour

ism

Mar

ket I

ndex

- up

Th

resh

old

Leve

l

60.0

70

.0

80.0

90

.0

100.

0 11

0.0

120.

0 13

0.0

140.

0 15

0.0

160.

0

1Q14

2Q14

3Q14

4Q14

1Q15

2Q15

3Q15

4Q15

1Q16

2Q16

3Q16

poin

ts

HOTEL

PROPERTY72

PROPERTY3

Page 74: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 75: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 76: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 77: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 78: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 79: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 80: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 81: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

PROPERTY80

PROPERTY3

Page 82: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

4FINANCIAL

Financial Definitions & Formulae

Mortgage Repayment Table

Malaysia Balance of Trade

Consumer Price Index

Prime Rates & Base Lending Rates

Interest Rates : Banking Institutions

Currency Chart

Exchange Rates

Page 83: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

Discount Rate

The rate of return a developer expects when investing in a project. i.e. opportunity cost

Internal Rate of Return (IRR)

The IRR may be defined as the interest rate that equates the present value of expected future cash flows to the cost of the investment.

The IRR can be compared to the Discount Rate.

Net Present Value (NPV)

The NPV is the present value of all future cash flows, discounted back to today’s values at the Discount Rate.

The NPV indicates in today’s dollars the profit or loss a developer makes above or below his required profit (based on a nominated Discount Rate).

72 Rule

The approximate number of years required to double your capital can be calculated by dividing the interest rate into 72.

e.g. If interest rate = 10% p.a. Then 72 ÷ 10 = 7.2 years It will take approximately 7.2 years to double your capital if it is invested at 10% p.a.

Future value of $1Future value of $1 per periodSinking fund (the amount required to be put away periodically to realise some future sum)Present value of $1Present value of $1 per periodAnnuity with a PV of $1 (Mortgage bond formula)

FV = PV (1+i)n

FV = PMT [((1+i)n – 1) ÷ i]

PMT = FV [i ÷ ((1+i)n – 1)]

PV = FV [1÷ (1+i)n]PV = PMT [((1+i)n – 1) ÷ (i(1+i)n)]

PMT = PV[(i(1+i)n) ÷ ((1+i)n - 1)]

PV = present valueFV = future valuePMT = payment amountn = period (e.g. 10 years with monthly payments, n = 10 x 12 = 120)i = interest rate per period (e.g. 12% p.a. compounded monthly; i = 12% ÷ 12 month = 1% per period)

FINANCIAL DEFINITIONS

FINANCIAL FORMULAE

FINANCIAL82

FINANCIAL4

Page 84: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

Based on:* 1,000 units of currency* Interest compounded monthly* Equal monthly repayments

Example

Borrow $1,000,000 to be repaid monthly at 10% p.a. over 10 years.

Repayments = 1,000,000 / 1,000 x $13.22 = $13,220 per month

MORTGAGE REPAYMENT TABLE

REPAYMENT (years) Interest p.a. 5 10 15 20 5% 18.87 10.61 7.91 6.60 6% 19.33 11.10 8.44 7.16 7% 19.80 11.61 8.99 7.75 8% 20.28 12.13 9.56 8.36 9% 20.76 12.67 10.14 9.00 10% 21.25 13.22 10.75 9.65 11% 21.74 13.78 11.37 10.32 12% 22.24 14.35 12.00 11.01 13% 22.75 14.93 12.65 11.72 14% 23.27 15.53 13.32 12.44 15% 23.79 16.13 14.00 13.17 16% 24.32 16.75 14.69 13.91 17% 24.85 17.38 15.39 14.67 18% 25.39 18.02 16.10 15.43 19% 25.94 18.67 16.83 16.21 20% 26.49 19.33 17.56 16.99 21% 27.05 19.99 18.31 17.78 22% 27.62 20.67 19.06 18.57 23% 28.19 21.35 19.82 19.37 24% 28.77 22.05 20.58 20.17 25% 29.35 22.75 21.36 20.98

FINANCIAL 83

Page 85: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 86: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 87: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 88: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 89: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index
Page 90: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

Country Currency RM1 US $1 Australia dollar 0.3091 1.3876 Bahrain dinar 0.0833 0.3737 Brunei dollar 0.3178 1.4262 China rmb 1.5470 6.9437 Egypt pound 4.0317 18.096 European Currency Unit ecu 0.2117 0.9501 Hong Kong dollar 1.7276 7.7543 India rupees 15.1071 67.8080 Indonesia rupiah 3,010.69 13,513.5 Japan yen 26.0600 116.97 Kenya shillings 22.6067 101.47 Lebanon pound 328.662 1,475.2 Malaysia ringgit 1.0000 4.4835 New Zealand dollar 0.3211 1.4414 Pakistan rupee 22.9943 103.21 Philippines peso 11.0339 49.526 Qatar riyal 0.8108 3.6394 Singapore dollar 0.3221 1.4459 South Africa rand 3.0523 13.700 South Korea won 268.49 1,205.11 Sri Lanka rupee 32.746 146.980 Thailand baht 7.9462 35.666 United Arab Emirates dirham 0.8181 3.6719 United Kingdom pound 0.1805 0.8100 United States of America dollar 0.2228 1.0000 Vietnam dong 5,005.7 22,468.0

Source: www.oanda.com/convert/classic

EXCHANGE RATESas at 1 January 2017

FINANCIAL 89

Page 91: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

FINANCIAL92

FINANCIAL4

FINANCIAL90

FINANCIAL4

Page 92: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

5OTHER INFORMATION

Utility Costs for Selected Asian Cities

Weight & Measures

Conversion Guide

Public Holidays

Arcadis Asia Leadership Team

Arcadis Asia Sectors

Arcadis Asia Services

Directory of Offices

Telephone Directory (Malaysia)

Page 93: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

CO

UN

TRY

Exch

ange

R

ate

US

$1 =

Dom

estic

Com

mer

cial

/ In

dust

riaI

Dom

estic

Com

mer

cial

/ In

dust

rial

Die

sel

Lead

edU

nlea

ded

ELEC

TRIC

ITY

(US$

/kw

h)

WA

TER

(US$

/m3 )

FU

EL (U

S$/li

tre)

HO

NG

KO

NG

HK$ 7

.80

0.110

0.130

0.830

0.590

1.44

N/A

1.87

ELEC

TRIC

ITY:

Bas

ed on

tariff

sche

me of

CLP

Hold

ing Li

mited

and i

s cha

rged

on bi

-mon

thly c

onsu

mptio

n. (D

omes

tic):

0 - 40

0 kW

h = U

S$0.1

1; 40

0 - 1,

000k

Wh =

US$

0.12;

1,00

0 - 1,

800k

Wh =

US$

0.14;

1,800

- 2,6

00kW

h = U

S$0.1

8; 2,6

00 -

3,400

kWh -

US$

0.21;

3,400

- 4,2

00kW

h = U

S$0.2

3; Ab

ove 4

,200 k

Wh =

US$

0.23.

WAT

ER: (

Dome

stic):

0 - 1

2 m3 =

F.O

.C; 1

2 - 43

m3 = U

S$0.5

4/m3 ;

43 -

62m3 =

US$

0.83/m

3 ; Ab

ove 6

2m3 =

US$

1.17/m

3 .

GU

AN

GZH

OU

RMB

6.78

0.100

0.160

/ 0.11

00.3

100.5

400.8

50N/

A0.9

9UN

LEAD

ED F

UEL:

Unlea

ded g

asoli

ne 97

BEI

JIN

GRM

B 6.7

80.0

700.7

30 -

1.330

1.200

0.86

0N/

A0.

920

UNLE

ADED

FUE

L: Un

leade

d gas

oline

97

KU

ALA

LU

MPU

RRM

4.41

0.049

- 0.1

300.0

86 -

0.100

0.2

34 -

0.454

0.4

69 -

0.517

0.4

31N/

A0.4

42UN

LEAD

ED F

UEL:

Unlea

ded p

etrol

Ron 9

5

0.240

(pea

k)0.1

30(n

orma

l)

UTILITY COSTS FOR SELECTED ASIAN CITIESas at 4th Quarter 2016

OTHER INFORMATION92

OTHER INFORMATION5

Page 94: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

CO

UN

TRY

Exch

ange

R

ate

US

$1 =

Dom

estic

Com

mer

cial

/ In

dust

riaI

Dom

estic

Com

mer

cial

/ In

dust

rial

Die

sel

Lead

edU

nlea

ded

ELEC

TRIC

ITY

(US$

/kw

h)

WA

TER

(US$

/m3 )

FU

EL (U

S$/li

tre)

CH

ON

GQ

ING

RMB

6.78

0.120

0.410

0.680

0.850

N/A

0.910

/ 0.96

00.0

90

SHA

NG

HA

IRM

B 6.7

80.1

62(p

eak)

0.080

(nor

mal)

0.510

- 0.8

60.7

300.8

50N/

A0.9

700.0

91(p

eak)

0.045

(nor

mal)

UNLE

ADED

FUE

L: Un

leade

d 93#

= U

S$0.9

1/litre

; 97#

= U

S$0.9

6/litre

BA

NG

ALO

RE

INR

66.00

0.042

- 0.0

98

0.117

- 0.12

20.3

94- 0

.682

1.338

0.915

N/A

1.101

ELEC

TRIC

ITY:

(Dom

estic

): 0 -

3,12

0 kW

h = U

S$0.0

91 (p

eak)

/ US$

0.045

(nor

mal);

3,120

- 4,80

0kW

h = U

S$0.1

(pea

k) / U

S$0.0

49 (n

orma

l); Ab

ove 4

,800 k

Wh =

US$

0.144

(pea

k) /

US$0

.072 (

norm

al);(C

harg

ed on

year

ly co

nsum

ption

). Ch

arge

d on c

onsu

mptio

n les

s tha

n 1,00

0kW

h per

mon

th for

summ

er pe

riod o

nly. R

efer t

o www

.shdr

c.gov

.cn

for de

tailed

char

ges f

or di

ffere

nt tie

rs an

d cha

rges

for n

on-su

mmer

perio

d.W

ATER

: (Do

mesti

c): 0-

220m

3 = U

S$0.5

1/m3 ;

220 -

300m

3 = U

S$0.7

1/m3 ;

Abov

e 300

m3 = U

S$0.8

6/m3.

UNLE

ADED

FUE

L: Un

leade

d 95.

MOP

7.98

0.160

0.560

- 0.91

00.7

601.3

50 N

/A1.2

10EL

ECTR

ICIT

Y: E

lectric

ity ta

riff ar

e com

posit

ion of

dema

nd ch

arge

s, co

nsum

ption

char

ges,

fuel c

lause

adjus

tmen

t and

gove

rnme

nt tax

.W

ATER

: (Dom

estic

) Con

sump

tion:

US$0

.56/m

3 for

28m3 o

r belo

w, U

S$0.6

5/m3 f

or 29

- 60

m3 , US$

0.76/m

3 for

61 -

79m3 a

nd U

S$0.9

1/m3 f

or 80

m3 or a

bove

; Othe

r cha

rges

(dep

endin

g

on

mete

r size

15mm

- 200

mm); M

eter r

ental

= US

$0.34

-58.0

0/mth;

(Co

mmer

cial/In

dustr

ial) C

harg

es fo

r ord

inary

user

s (e.g

. Bus

iness

, gov

ernm

ent b

uildin

gs, s

choo

ls, as

socia

tions

,

ho

spita

ls an

d othe

rs) on

ly. S

pecia

l use

rs (e

.g. ga

ming

indu

stries

, hote

ls, sa

unas

, golf

cour

ses,

cons

tructi

on, p

ublic

infra

struc

tures

and o

ther t

empo

rary

cons

umpti

on) a

re ex

clude

d.

0.160

MA

CA

U

93OTHER INFORMATION

Page 95: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

UTILITY COSTS FOR SELECTED ASIAN CITIES(Cont’d)

JAK

AR

TAID

R 13

,055

0.112

0.112

0.522

- 1.1

220.0

80 -

0.571

0.517

N/A

0.563

HO

CH

I MIN

HVN

D 22

,600

0.760

/ 0.43

00.1

10 0.

010 -

0.17

0 0

.06 -

0.11

0.230

- 0.5

10

All ra

tes ar

e VAT

inclu

sive

ELEC

TRIC

ITY:

Dom

estic

elec

tricity

rates

are a

pplie

d to t

he 30

1th K

W ab

ove w

ards

.FU

EL: D

iesel:

D.O

- 0.0

5%; 9

2 Unle

aded

Petr

ol an

d 95 U

nlead

ed P

etrol

as at

Octo

ber 2

012.

0.560

0.730

- 0.7

70N/

A

Dome

stic g

roup

in In

done

sia w

ill co

ver r

eside

nce,

relig

ion bu

ilding

, non

-pro

fit or

ganiz

ation

build

ing an

d gov

ernm

ent h

ospit

alCo

mmer

cial g

roup

in In

done

sia w

ill co

ver lu

xury

resid

ence

, apa

rtmen

t, offic

es, h

otel, c

omme

rcial

build

ing, a

nd fa

ctorie

s

INR

66.00

NEW

DEL

HI

0.061

- 0.12

8 0.

137-

0.15

80.2

84- 1

.021

1.298

- 5.79

70.8

561.0

26N/

A

BR

UN

EIB$

1.39

0.009

- 0.1

300.0

65 -

0.182

0.343

0.461

0.479

0.09

9 - 0.

398

0.55

2 - 0.

596

BA

NG

KO

KBA

HT 35

.040.

243-

0.41

20.6

850.7

210.0

53- 0

.112

0.076

- 0.07

80.2

71- 0

.451

N/A

UNLE

ADED

FUE

L: Ga

soho

l 95

ELEC

TRIC

ITY:

(Dom

estic

) For

norm

al tar

iff wi

th co

nsum

ption

not e

xcee

ding 1

50kW

h/mon

th.

ELEC

TRIC

ITY

(Dom

estic

): Ta

riff ef

fectiv

e fro

m 1s

t Jan

2012

. 1-1

0kW

h 10c

, 11-

60kW

h 8c,

61-1

00kW

h 12c

, abo

ve 10

0kW

h 15c

.

OTHER INFORMATION94

OTHER INFORMATION5

Page 96: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

SIN

GA

POR

ES$

1.40

0.140

0.140

1.49

1.29

0.86

N/A

1.60

SEO

UL

0.050

- 0.1

60KR

W 1,

170

0.060

- 0.09

00.3

10 -

0.670

0.6

70 -

1.080

1.0

40N/

A1.2

2EL

ECTR

ICIT

Y: P

lus el

ectric

ity ba

sic ra

tes; d

omes

tic: U

S$1.3

7/mon

th (b

asic

rate)

+ U

S$0.0

5/Kwh

~ 0.

16/kw

h (30

0kwh

below

in us

e) an

d com

merci

al: U

S$5.2

7/mon

th (b

asic

rate)

+

US$

0.06/K

wh ~

0.09

/kwh (

300k

wh be

low in

use)

WAT

ER: P

lus w

ater b

asic

rates

; dom

estic

: US$

0.95

/mon

th (b

asic

rate,

the u

sage

of 15

mm ca

liber

) + U

S$0.3

2/m3 +

Tax

(with

in 30

m3 usa

ge) a

nd co

mmer

cial: U

S$77

.92/m

onth

(bas

ic ra

te, th

e usa

ge of

100m

m ca

liber

) + U

S$0.6

9/m3 +

Tax

(with

in 10

0m3 u

sage

)

MA

NIL

A 0

.210 -

0.22

0 PH

P 48

.60 0

.210

0.480

- 0.8

00

1.470

0.600

N/A

ELEC

TRIC

ITY

& W

ATER

: Actu

al Bi

lling:

Includ

e misc

. cha

rges

such

as E

nviro

nmen

tal C

harg

e, Cu

rrenc

y Exc

hang

e Rate

Adju

stmen

t (CE

RA),

VAT,

etc.

Elec

tricity

- (D

omes

tic):

190 k

Wh -

860 k

Wh;

(Com

merci

al/ In

dustr

ial):

150,0

00 kW

h;

W

ater -

(Dom

estic

): 29

m3 - 41

m3 ; (C

omme

rcial/

Indu

strial

): 4,0

30m3

0.900

All ra

tes ar

e nett

of G

ST.

ELEC

TRIC

ITY:

Tar

iff is

base

d on l

ow te

nsion

powe

r sup

ply.

WAT

ER: D

om &

Non

-dom

wate

r rate

incld

. con

serva

tion t

ax &

wate

r-bor

ne fe

e, ex

cld. s

anita

ry ap

plian

ce fe

e. Do

mesti

c wate

r rate

is an

avg f

or th

e 1st

40m3 .

FUEL

: 98 U

nlead

ed pe

trol a

s at 7

Nov

embe

r 201

5.

95OTHER INFORMATION

Page 97: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

OTHER INFORMATION96

LENGTH 1 millimetre (mm) = 0.0394 in 1 centimetre (cm) = 10 mm = 0.3937 in 1 metre (m) = 100 cm = 1.0936 yd 1 kilometre (km) = 1,000 m = 0.6214 mile AREA 1 sq cm (cm2) = 100 mm2 = 0.1550 in2

1 sq metre (m2) = 10,000 cm2 = 1.1960 yd2 1 hectare (ha) = 10,000 m2 = 2.4710 acres 1 sq km (km2) = 100 ha = 0.3861 mile2 VOLUME / CAPACITY 1 cu cm (cm3) = 0.0610 in3 1 cu decimetre (dm3) = 1,000 cm3 = 0.0353 ft3 1 cu metre (m3) = 1,000 dm3 = 1.3080 yd3 1 litre (l ) = 1 dm3 = 1.76 pt 1 hectolitre (hl ) = 100 l = 21.997 gal MASS (WEIGHT) 1 milligram (mg) = 0.0154 grain 1 gram (g) = 1,000 mg = 0.0353 oz 1 kilogram (kg) = 1,000 g = 2.2046 lb 1 tonne (t) = 1,000 kg = 0.9842 ton USA MEASURES AND EQUIVALENTS USA Dry Measure Equivalents 1 pint = 0.9689 UK pint = 0.5506 l USA Liquid Measure Equivalents 1 fluid ounce = 1.0408 UK fl oz = 29.574 ml 1 pint (16 fl oz) = 0.8327 UK pt = 0.4723 l 1 gallon = 0.8327 UK gal = 3.7854 l

WEIGHT AND MEASURES

Metric Measures and Equivalents

OTHER INFORMATION5

Page 98: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

LENGTH 1 inch (in) = 2.54 cm 1 foot (ft) = 12 in = 0.3048 m 1 yard (yd) = 3 ft = 0.9144 m 1 mile = 1,760 yd = 1.6093 km 1 int. nautical mile = 2,025.4 yd = 1.853 km AREA 1 sq inch (in2) = 6.4516 cm2 1 sq foot (ft2) = 144 in2 = 0.0929 m2 1 sq yard (yd2) = 9 ft2 = 0.8361 m2 1 acre = 4,840 yd2 = 4,046.9 m2 1 sq mile (mile2) = 640 acres = 2.59 km2 VOLUME / CAPACITY 1 cu inch (in3) = 16.387 cm3 1 cu foot (ft3) = 1,728 in3 = 0.0283 m3 1 fluid ounce (fl oz) = 28.413 ml 1 pint (pt) = 20 fl oz = 0.5683 l 1 gallon (gal) = 8 pt = 4.5461 l MASS (WEIGHT) 1 ounce (oz) = 437.5 grains = 28.35 g 1 pound (lb) = 16 oz = 0.4536 kg 1 stone = 14 lb = 6.3503 kg 1 hundredweight (cwt) = 112 lb = 50.802 kg 1 ton = 20 cwt = 1.016 t Temperature Conversion oC = 5/9 (oF - 32) oF = (9/5 oC) + 32

Temperature ConversionoC = 5/9 (oF - 32) oF = (9/5 oC) + 32

oC

oF

Imperial Measures and Equivalents

97OTHER INFORMATION

Page 99: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

LENGTHTo Convert Multiply bymili-inches into micrometres 25.4inches into milimetres 25.4inches into centimetres 2.54inches into metres 0.0254

feet into centimetresfeet into milimetres 304.8

30.48feet into metres 0.3048yards into metres 0.9144fathoms into metres 1.8288chains into metres 20.1168furlongs into metres 201.168miles, statute into kilometres 1.609344miles, nautical into kilometres 1.852

VOLUME & CAPACITY

To Convert Multiply bycubic inches into cubic centimetres 16.387064cubic inches into litres 0.016387cubic feet into cubic metres 0.0283168cubic feet into litres 28.316847

UK quarts into litresUK pints into litres 0.5682613

1.1365225cubic yards into cubic metres 0.7645549UK gallons into litres 4.54609UK gallons into cubic metres 0.0045461UK fluid ounces into cubic centimetres 28.413063

Conversion Formulae

To use the conversion formulae simply multiply the Imperial measurement by the factor beside the conver-sion you wish to make. For example 6 inches into milimetres. 6 inches multiplied by 25.4 equals 152.4 milimetres. Conversely if you wish to convert Metric measure into Imperial measure simply divide by the same factor.

CONVERSION GUIDE

OTHER INFORMATION5

OTHER INFORMATION98

Page 100: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

POWER

To Convert Multiply byfoot pounds-force per second into watts 1.35582horsepower into watts 745.7foot pounds-force per second into kilowatts 0.001356horsepower into kilowatts 0.7457horsepower into metric horsepower 1.01387

AREATo Convert Multiply bysquare inches into square milimetres 645.16square inches into square centimetres 6.4516square feet into square centimetres 929.0304square feet into square metres 0.092903

square yards into (0.01 hectare)square yards into square metres 0.836127

0.0083613acres into square metres 4046.8564acres into hectares 0.4046856square miles into square kilometres 2.589988

MASS

To Convert Multiply bygrains into miligrams 64.79891grains into metric carats 0.323995grains into grams 0.064799pennyweights into grams 1.555174

ounces troy into gramsounces into grams 28.349523

31.103477ounces into kilograms 0.0283495pounds into kilograms 0.4535924stones into kilograms 6.35023932hundredweights into kilograms 50.802345tons into kilograms 1016.0469tons into metric tonnes 1.01605tahils into grams 37.799kati into kilograms 0.60479

99OTHER INFORMATION

Page 101: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

2017MALAYSIANew Year’s Day**Chinese New YearLabour DayWesak DayKing/Agong’s BirthdayHari Raya Aidilfitri*National DayHari Raya Qurban*Malaysia DayAwal Muharam (Maal Hijrah)Deepavali*Prophet Muhammad’s BirthdayChristmas Day

* Subject to change** Except Johor, Kelantan, Kedah, Perlis & Terengganu# The following day will be an additional Public Holiday

01 28 - 29

011003

25 - 2631011621180125

Jan#

JanMayMayJunJunAugSepSepSepOctDecDec

BRUNEINew Year’s Day ^Chinese New Year National DayIsrak MirajFirst Day of Ramadhan*Royal Brunei Armed Forces Ann.Ann. Revelation of the Holy Koran*Hari Raya Aidilfitri*Hari Raya Aidilfitri* Hari Raya Aidilfitri*HM The Sultan’s Birthday Hari Raya Aidil Adha* ^Christmas Day

01282324273112262728150125

JanJanFebAprMayMayJunJunJunJunJulSepDec

PUBLIC HOLIDAYS

OTHER INFORMATION5

OTHER INFORMATION100

Page 102: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

2017

(Cont’d)

HONG KONGThe day following the First day of JanuaryLunar New Year’s DayThe 3rd day of Lunar New YearThe 4th day of Lunar New YearChing Ming festivalGood FridayThe day following Good FridayEaster MondayLabour DayBuddha’s BirthdayTuen Ng FestivalHKSAR Establishment DayThe day following National DayThe day Following Chinese Mid-Autumn FestivalChung Yeung FestivalChristmas DayThe 1st weekday after Christmas Day

02 28

303104141517010330010205282526

Jan*JanJanJanAprAprAprAprMayMayMayJulOct*OctOctDecDec

CHINANew Year’s Day^

Chinese New Year’s EveChinese New Year$

Tomb-Sweeping Day@

Labour Day^Dragon-Boat Festival*National Day#Mid Autumn Festival

0127

28 - 29040130

01 - 0304

JanJanJanJanAprAprAprApr

^ 2 January, 2-3 May are holidays.$ 30 January, 1-2 February are holidays. 22 January and 4 February are working days.@2 - 3 April are holidays. 1 April is working day.* 28 and 29 May are holidays. 27 May is working day.# 5-8 October are holiday. 30 September is working day.

* As both the first day of January and National Day in 2017 fall on a Sunday, the day following them is designated as a general holiday in substitution. In addition, since the second day of Lunar New year in 2017 falls on a Sunday, the fourth day of Lunar New Year is designated as a general holiday in substitution.

101OTHER INFORMATION

Page 103: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

2017

New Year’s Day*The first working day after New Year’s Day@#

Lunar New Year’s Eve (Afternoon)@

Lunar New Year’s Day*The 2nd day of Lunar New Year*The 3rd day of Lunar New Year*#

The 4th day of Lunar New Year@#

The 5th day of Lunar New Year@

Ching Ming Festival*#

Good Friday#

The day before EasterThe first working day after the Day before Easter@#

Labour Day*#

The Buddha’s Birthday#

Tung Ng Frestival (Dragon Boat Festival)#

National Day*The day following National Day#

The first working day after National Day@

The day following Mid-Autumn Festival*#

Chung Yeung Festival*The first working day after Chung Yeung Festival@#

All Soul’s Day#

Feast of the Immaculate Conception#

Macau SAR Establishment Day*Winter Solstice#

Christmas EveChristmas Day#

The first working day after Christmas Day@#

# Bank’s Holiday * Obligatory Holiday@ Special Holiday granted by Chief Executive for staff in Public Administration.

01022728293031010414151701033001020305283002082022242526

JanJanJanJanJanJanJanFebAprAprAprAprMayMayMayOctOctOctOctOctOctNovDecDecDecDecDecDec

MACAU

(Cont’d)

PUBLIC HOLIDAYS

OTHER INFORMATION5

OTHER INFORMATION102

Page 104: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

(Cont’d)

103OTHER INFORMATION

2017INDIANew Year’s DayRepublic DayGood FridayUgadiRamnavamiIndependence DayGanesh ChaturthiDussheraKarnataka Formation Day

01 26 25

081515051201

JanJanMarAprAprAugSepOctNov

INDONESIANew Year’s DayChinese New Year (Imlek)Election Day (Region)Hindu Day of Quiet (Nyepi)Good FridayAscension of Prophet MohammadInternational Labour DayWaisak DayAscension Day of Jesus ChristPancasila Day*Idul FitriNational Independence DayIdul Adha DayHijriyah New YearProphet Muhammad’s BirthdayChristmas Day* Subject to changes

01281528142401112501

25 - 261701211225

JanJanFebMarAprAprMayMayMayJunJunAugSepSepDecDec

KOREANew Year’s DayLunar New Year (Seol)Independent Movement DayBuddha’s BirthdayChildren’s DayMemorial DayLiberation DayNational Foundation DayFull Moon Day (Chuseok)Hangul Proclamation DayNational DayChristmas Day

01 28

0103050615

0304092025

JanJanMarMayMayJunAugOctOctOctDecDec

Page 105: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

2017PHILIPPINES

Regular HolidaysNew Year’s Day*Chinese New Year#

EDSA People Power Revolution Anniversary#

Araw ng Kagitingan*Maundy Thursday*Good Friday*Black Saturday#

Labour Day*Independence Day*Ninoy Aqyuino Day#

National Heroes Day*Additional special non-working day#

All Saints Day#

Bonifacio Day*Christmas Day*Rizal Day*Last day of the year#

* Regular Holidays# Special Non-Working Day

0128250913141501122128310130253031

JanJanFebAprAprAprAprMayJunAugAugOctNovNovDecDecDec

SINGAPORENew Year’s DayChinese New YearGood FridayLabour DayVesak DayHari Raya Puasa#

National DayHari Raya HajiDeepavali*Christmas Day

* Subject to changes# The following Monday will be a public holiday

01 28 - 29

1401102509011825

JanJanAprMayMayJunAugSepOctDec

(Cont’d)

PUBLIC HOLIDAYS

OTHER INFORMATION5

OTHER INFORMATION104

Page 106: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

2017THAILANDNew Year*Makha Bucha Day*Chakri Memorial daySongkran FestivalLabour DayCoronation DayWisakha Bucha DayAsarnha Bucha Day*H.M. The Queen’s Birthday*Chulalongkorn dayH.M. The King’s BirthdayConstitution Day*

011106

13 - 140105100812230510

JanFebAprAprMayMayMayJulAugOctDecDec

VIETNAM (Normal Scheduled Holidays)New Year’s Day*Lunar New Year**

Hung Vuong King CelebrationLiberation Day of SaigonInternational Labour Day***National Day****Christmas Day

* Substitute for 1st January (Sun)** Substitute for 28,29 (Saturday & Sunday)*** Substitute for 30 April (Sunday)**** Substitute for 2nd September (Saturday)

01 - 02 27 - 31 01 - 02

0630

01 - 02 02 - 04

25

JanJanFebAprAprMaySepDec

* As both the New Year Day and Constitution Day in 2017 fall on Sunday, the day following them is designated as a general holiday in substitution; and as Makha Bucha Day, Asarnha Bucha Day, H.M. the Queen's Birthday in 2017 falls on Saturday, the weekday after is designated as a general holiday in substitution.

105OTHER INFORMATION

Page 107: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

Matt Bennion

[email protected]

Eric de Kruif

[email protected]

Graham KeanRegional Client Development [email protected]

Lai Pak Hung

[email protected] Head, Greater China

Chief Financial Officer, Asia

Rupert Leung

[email protected]

Managing DirectorDesign & Engineering

Chief Executive Officer, Asia

ARCADIS ASIA LEADERSHIP TEAM

OTHER INFORMATION5

OTHER INFORMATION106

Page 108: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

107OTHER INFORMATION

Loo Ming Chee

[email protected]

Alan Hearn

[email protected]

Ken ButlerRegional Head of Health, Safety, Environment and [email protected]

Regional Head, East Asia & India

Adam Sutton

[email protected]

Regional HR and ChangeDirector and RegionalLeader for Business Advisory

Regional Head, Southeast Asia

Page 109: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

ARCADIS ASIA SECTORS

OTHER INFORMATION5

OTHER INFORMATION108

AUTOMOTIVE

AVIATION

At the present time we are witnessing a massive shift in the automotive sector. Electric vehicles are rapidly establishing themselves as a credible alternative as their range and performance meets (and exceeds) customer expectation. We are seeing more and more brands developing their own models across the region. In addition, the race for autonomous vehicles is leading to the development of new technologies at a pace that is unprecedented in the sector. We are helping our clients to restructure their manufacturing bases to meet shifting global demand, to remodel production lines for the new models demanded by customers, and to invest in the new supply chain technology.

Automotive retail continues to be fiercely competitive, with digital technology entering this space creating a more immersive buying experience. The race to roll out new retail formats around the globe requires lean and efficient delivery models and global standardization, supply chains and logistics.

The recent successful launches of new airframe technologies has caused airports to rethink how they can service larger passenger planes, and, with the prospect of new routes being enabled by longer range and new airframe formats, we expect to see further expansion and development of airports around the globe.

Domestic air travel and cargo hubs are also among popular areas of investment in aviation sector. Invest-ment in domestic air travel is essential, as passengers demand an experience comparable with the best international airports. New cargo hubs are planned to meet ‘same day’ delivery expectations from on line retailers and logistics firms. We expect to see continued investment and demand for high quality design and engineering solutions in the aviation sector for many years to come.

Page 110: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

(Cont’d)

109OTHER INFORMATION

CHEMICALS & PHARMACEUTICALS

The chemical and pharmaceutical industry faces a diverse range of challenges across globe. Growing and ageing populations have created rising demands for medication and more effective cures for diseases. Asia is no exception, despite Asia having a relatively younger population compared the other regions. It is also important to take note that approximately two thirds of total global demand growth for chemicals is expected to be generated in Asia.

In order to stay ahead of the competition, we work with our clients across Asia to improve their supply chain and secure their pipelines. The chemicals and pharmaceuti-cals industry will continue to be ‘on the move’ to Asia with rapid development in the future to fulfill demand coming from Asia and beyond.

Commercial developers are a significant proportion of our market in Asia, especially in those countries where the economy is driven by investment in property. In the last 10 years China, for example, has been fuelled by demand for properties as a result of rapid urbanization, and this is also now the case in countries such as Vietnam and the Philippines.

All building types, including commercial offices, residen-tial, leisure, hospitality and retail, are confronted with ever increasing challenges in terms of efficiency of land use, planning compliance, product positioning, cost, quality, impact on communities, sustainability and also market competitiveness. The commercial developer sector will continue to play a key role in all economies across Asia.

COMMERCIAL DEVELOPERS

Page 111: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

(Cont’d)

ARCADIS ASIA SECTORS

OTHER INFORMATION5

OTHER INFORMATION110

FINANCIAL INSTITUTIONSDriving better investment and asset performance and improving sustainable returns in current challenging markets is the key focus of our sector specialists.

Through utilizing unique market insight, such as our global asset performance benchmarks, our deep techni-cal knowledge, and an unrivalled global track record in working with financial institutions, we are able to define solutions to meet client needs and to enhance their business outcomes.

Rising production costs and unpredictable prices put oil & gas clients under more pressure than ever. Growing complexities of shifting environmental legislation combined with an increased need for asset decommis-sioning, oil & gas has become a complex and rapidly evolving sector.

We partner with global oil & gas clients to maximize returns on our clients’ investments, through better management of project risks and costs, and improve-ment of opex performance. We work across the asset lifecycle from concept through to decommissioning. We bring together upstream & downstream expertise and understanding from a broad base of capabilities includ-ing cost & risk management, environmental manage-ment, project management and maintenance strategy.

OIL AND GAS

Rapid large scale urbanization, tight budgets and environmental sensitivity require innovative approaches to deliver advanced infrastructure. With our expertise in rail, and our transformational thinking, clients rely on us to improve performance and connect communities cross countries and regions.

In Asia, we have been involved in providing engineering design, cost management, contract administration, risk management, business advisory and mobility oriented design for numerous metro and high speed rail projects in Hong Kong, Mainland China, Taiwan, Singapore and Malaysia.

RAIL

Page 112: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

111OTHER INFORMATION

ARCADIS ASIA SERVICES

PORTS AND WATERWAYS

RETAIL & CONGLOMERATES

Ports are at the heart of globalization, facilitating the spread of trade and prosperity. The rapid growth of Asia has seen a substantial investment in port and logistics infrastructure, but also increasing competition between ports, and a focus on raising productivity and service quality. At the same time, it is increasingly necessary to respond to public concerns about environmental and safety issues.

Delivering sustainable growth is a great challenge and requires know-how and expertise across a broad range of disciplines. We offer governments, port institutions, private terminal operators, investors and shipping lines all the disciplines necessary for an integrated approach and the delivery of successful outcomes, whether in the technical, operational, nautical, environmental, risk, financial or economic arena.

As the world of retails faces the fiercest competition yet due to the change of traditional retail landscape and the rapid development of online retail industry, we work with our retail clients to gain a competitive advantage in their market expansion or re-branding. It is essential for us to tailor our services to fit client strengths and needs, to minimize spend and achieve the best solution for each individual company.

With unrivaled experience across all facets of retail development, from luxury and sports fashion to cosmet-ics, supermarkets and restaurant chains, we help our clients successfully navigate through complex challenges in retail development.

(Cont’d)

Page 113: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

ARCADIS ASIA SERVICES

OTHER INFORMATION5

OTHER INFORMATION112

BUSINESS ADVISORY

COST MANAGEMENT

From rapid urbanization and pressure on natural resources, to tighter regulation and market consolida-tion, we live in an increasingly complex world. In Arcadis you have a partner that understands your business challenges and has first-hand experience of the assets you own and operate. We bring unique insights which support you in getting better results with more certainty.

Be it a high-rise office building, a state-of-the-art rail station or a large scale industrial development, the need to achieve value for money is central to every investment strategy.

Our people understand the need to accurately advise on costs and procurement at planning stage, ensuring a development or program is both economically and environmentally viable for many years to come.

ENVIRONMENT

We all deserve a clean, safe environment in which to live. Now more than ever, businesses and governments recognize the need to incorporate environmental concerns into their decision making. Arcadis is a global leader in inventive technical and financial approaches, helping some of the world’s leading corporates and governments understand their impact on the natural world.

(Cont’d)

Page 114: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

113OTHER INFORMATION

PROJECT & PROGRAMME MANAGEMENT

Organizing the creation of the world’s largest, most com-plex and iconic programs of work in the built and natural environment today is no easy task. Budgets, supply chains, health and safety, timeframes and the large num-ber of parties involved can be daunting.

At Arcadis, we work alongside our clients to create the right strategy, manage and mitigate risk, and assure the outcomes to meet our clients’ business objectives and create exceptional value.

WATER

From source to tap and then back to nature, the planet’s most precious resource should be cherished.

Thanks to our centuries of experience in the water sector, Arcadis’ specialist teams around the globe are uniquely positioned to provide safe and secure water technology that is built to withstand the demands of a rapidly chang-ing world.

Page 115: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

MALAYSIASELANGORARCADIS (MALAYSIA) SDN BHDARCADIS PROJEKS SDN BHDARCADIS CONSULTANCY SDN BHDJUBM SDN BHDLevel 5, Menara TSR12 Jalan PJU 7/3, Mutiara Damansara47810 Petaling JayaSelangor Darul Ehsan, MalaysiaGPS : 3.1616, 101.6129Tel/Fax : (60 3) 2106 8000 / (60 3) 2106 9090Email : [email protected] : Loo Ming Chee / Justin Teoh / Syed Mahadzir Syed Ahmad / Mohamad Faiz Awang / Nur Aziz Abu Bakar / Mohd Ali Abd Karim (Non-Executive Chairman)

JOHOR47, Jalan Setia Tropika 1/30Taman Setia Tropika81200 Johor BahruJohor Darul Takzim, MalaysiaGPS : 1.5422, 103.7111Tel/Fax : (60 7) 232 8300 / (60 7) 232 8232Email : [email protected] : Syed Mahadzir Syed Ahmad

PENANGSuite 3A-3, Level 3AWisma Great EasternNo.25, Lebuh Light10200 Penang, MalaysiaGPS : 5.4201, 100.3408Tel : (60 4) 264 2071 / 264 2072 / 264 2073Fax : (60 4) 264 2068Email : [email protected] : Nur Aziz Abu Bakar

SABAHSuite 8A, 8th FloorWisma Pendidikan, Jalan PadangP.O.Box 11598, 88817 Kota KinabaluSabah, MalaysiaGPS : 5.9783, 116.0761Tel/Fax : (60 88) 223 369 / (60 88) 216 537Email : [email protected] : Ang Kun Eng

SARAWAKJUBM SDN BHDNo.2 (3rd Floor)Jalan Song Thian Cheok93100 KuchingSarawak, MalaysiaGPS : 1.5532, 110.3532Tel/Fax : (60 82) 232 212 / (60 82) 232 198Email : [email protected] : Nor Azman Bin Baharum

DIRECTORY OF OFFICES

OTHER INFORMATION5

OTHER INFORMATION114

Page 116: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

BRUNEI

BANDAR SERI BEGAWANARCADIS (B) SDN BHDUTAMACON (B) SDN BHDUnit 25, BT ComplexKg. Jaya Setia, Mukim Berakas ‘A’ BB2713P.O.Box 313, Bandar Seri Begawan BS8670Negara Brunei DarussalamGPS : 4.9394, 114.9377Tel/Fax : (673) 233 2833 / (673) 233 2933Email : [email protected] : Shafie Yusof / Justin Teoh / Shahril Othman

KUALA BELAITUnit 1, 1st Floor, Tang Ching Ying (TCY) BuildingLot 118, Jalan SungaiKuala Belait, KA 2331Negara Brunei DarussalamTel/Fax : (673) 334 7641Email : [email protected] : Shafie Yusof / Shahril Othman

KUALA BELAITLot 7219, Jalan Jaya Negara, Kg. PandanP.O.Box 811, Kuala Belait KA1189Negara Brunei DarussalamGPS : 4.5843, 114.2087Tel/Fax : (673) 334 7878 / (673) 334 7788Email : [email protected] : Shafie Yusof

CHINA

HONG KONGARCADIS ASIA LIMITEDARCADIS HONG KONG LIMITEDARCADIS INVESTMENT SERVICES HK LIMITED38/F, AIA Kowloon TowerLandmark East, 100 How Ming StreetKwun Tong, Kowloon, Hong KongGPS : 22.3125, 114.2223Tel/Fax : (852) 2830 3500 / (852) 2576 0416Email : [email protected] : Au Kai Ming, Francis

(Cont’d)

115OTHER INFORMATION

Page 117: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

BEIJINGLANGDON & SEAH (BEIJING) CONSTRUCTIONCONSULTANTS CO. LTD.Suite 1225 - 1242, South WingCentral Tower, Junefield Plaza10 Xuan Wu Men Wai StreetBeijing 100052, ChinaGPS : 39.8967, 116.3757Tel/Fax : (86 10) 6310 1136 / (86 10) 6310 1143Email : [email protected] : Chan Chi Keung, Andrew

CHANGSHALANGDON & SEAH CONSULTANCY (SHANGHAI) CO. LTD.CHANGSHA BRANCHRoom 11051, Zhong Tian Plaza766 Wu Yi Avenue, Furong DistrictChangsha, Hunan Province, 410005, ChinaGPS : 28.1952, 112.9831Tel/Fax : (86 731) 8971 1860 / (86 731) 8971 6736Email : [email protected] : Lu Mei Hua / Chen Yong

CHENGDULANGDON & SEAH CONSULTANCY (CHENGDU) CO. LTD.Room 807, Block A, Times Plaza 2 Zongfu Road, ChengduSichuan Province, 610016, ChinaGPS : 30.6567, 104.0806Tel/Fax : (86 28) 8671 8373 / (86 28) 8671 8535Email : [email protected] : Lin Wai Yip, Gary

CHONGQINGLANGDON & SEAH CONSULTANCY (CHENGDU) CO. LTD.CHONGQING BRANCHRoom 3408, International Trade Centre 38 Qing Nian Road, Central DistrictChongqing 400010, ChinaGPS : 29.5563, 106.5743Tel/Fax : (86 23) 8655 1333 / (86 23) 8655 1616Email : [email protected] : Lin Wai Yip, Gary

DALIANLANGDON & SEAH (BEIJING) CONSTRUCTIONCONSULTANTS CO. LTD. DALIAN BRANCHUnit 07, 32F, Xiwang Tower136 Zhongshan Road, Zhongshan DistrictDalian, Liaoning Province, 116001, ChinaGPS : 38.9149, 121.6312Tel/Fax : (86 411) 8800 8018 / (86 411) 8800 8823Email : [email protected] : Ng Hin Kan, Kenn

(Cont’d)

DIRECTORY OF OFFICES

OTHER INFORMATION5

OTHER INFORMATION116

Page 118: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

FOSHANLANGDON & SEAH CONSULTANCY (SHENZHEN) CO. LTD. FOSHAN BRANCH3/F, Foshan Ling Nan Tian DiZu Miao Road Shop Nos. Z01-Z11Zu Miao Road, FoshanGuangdong Province, 528000, ChinaGPS : 23.0312, 113.1128Tel/Fax : (86 757) 8203 0028 / (86 757) 8203 0029Email : [email protected] : Lee Kwok Wing, Dickey

GUANGZHOULANGDON & SEAH CONSULTANCY (SHENZHEN) CO. LTD. GUANGZHOU BRANCH3A10-18 Unit, 3A/F, Bank of America Plaza555 Ren Min Zhong Road, GuangzhouGuangdong Province, 510145, ChinaGPS : 23.1231, 113.2536Tel/Fax : (86 20) 8130 3813 / (86 20) 8130 3812Email : [email protected] : Xu Wei Bin

HAIKOULANGDON & SEAH CONSULTANCY (SHENZHEN) CO.LTD. HAIKOU BRANCHUnit C 10/F Times Square2 Guomao Road, HaikouHainan Province, 570100, ChinaGPS : 20.0295, 110.3262Tel/Fax : (86 898) 6652 7818 / (86 898) 6652 7809Email : [email protected] : Lo Kwok Chu, Kenneth / Yi Zheng Gang

HANGZHOULANGDON & SEAH CONSULTANCY (SHANGHAI) CO.LTD. HANGZHOU BRANCHRoom 2305 WinNing International100 Min Xin Road, HangzhouZhejiang Province, 310016, ChinaGPS : 30.2518, 120.2189Tel/Fax : (86 571) 2829 7766 / (86 571) 2829 7622Email : [email protected] : Zou Chun Ming, Alex / Zhou Yuan

HENGQINLANGDON & SEAH CONSULTANCY (ZHUHAI HENGQIN) CO.LTD. HENGQIN BRANCH7/F, 156 Nan Shan Ju Road, HengqinZhuhai, Guangdong Province, 519031, ChinaGPS : 22.1428, 113.5444Tel/Fax : (86 756) 868 8986 / (86 756) 868 8969Email : [email protected] : Chan Yuk Sim, Katherine / Wan Chi Shing, Stanley

(Cont’d)

117OTHER INFORMATION

Page 119: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

MACAUARCADIS MACAU LIMITEDAvenida da Praia Grande, No. 594Edificio BCM, 12th Floor, MacauGPS : 22.1922, 113.5413Tel/Fax : (853) 2833 1710 / (853) 2833 1532Email : [email protected] : Chan Yuk Sim, Katherine

NANJINGLANGDON & SEAH CONSULTANCY (SHANGHAI) CO. LTD. NANJING BRANCH1104 South Tower Jinmao Plaza,201 Zhong Yang Road, NanjingJiangsu Province 210009, ChinaGPS : 32.0719, 118.7834Tel/Fax : (86 25) 5791 1860 / (86 25) 6698 1860Email : [email protected] : Choy Kai Shing, David / Chen Taofen

QINGDAOLANGDON & SEAH CONSULTANCY (SHANGHAI) CO. LTD. QINGDAO BRANCHRoom 2008, 20F, HNA Center234 Yan An San Road, Shinan DistrictQingdao, Shangdong Province, 266071, ChinaGPS : 36.0609, 120.3754Tel/Fax : (86 532) 8280 1818 / (86 532) 8280 1881Email : [email protected] : Lu Mei Hua / Feng Shi En, Andy

SHANGHAILANGDON & SEAH CONSULTANCY (SHANGHAI) CO. LTD.11th Floor, Building C, The Place,No.150 Zunyi Road, Changning DistrictShanghai 200051, China.GPS : 31.2073, 121.4079Tel/Fax : (86 21) 6026 1300 / (86 21) 6026 1800Email : [email protected] : Chan Hoi Or, Joe

SHENYANGLANGDON & SEAH (BEIJING) CONSTRUCTIONCONSULTANTS CO. LTD. SHENYANG BRANCHRoom 3013 - 3015, Office Tower 1,Forum66, 1-1 Qingnian Avenue,Shenhe District, ShenyangLiaoning 110063, ChinaGPS : 41.7996, 123.4338Tel/Fax : (86 24) 3195 8880 / (86 24) 3128 6983Email : [email protected] : Ng Hin Kan, Kenn / Chow Hau Ming, Simon

(Cont’d)DIRECTORY OF OFFICES

OTHER INFORMATION5

OTHER INFORMATION118

Page 120: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

SHENZHENLANGDON & SEAH CONSULTANCY (SHENZHEN) CO. LTD.Room 1001, AVIC Centre1018 Huafu Road, ShenzhenGuangdong Province 518031, ChinaGPS : 22.5432, 114.0821Tel/Fax : (86 755) 2598 1841 / (86 755) 2598 1854Email : [email protected] : Lo Kwok Chu, Kenneth

SUZHOULANGDON & SEAH CONSULTANCY (SHANGHAI) CO. LTD. SUZHOU BRANCHRoom 906 Century Financial Tower 1 Suzhou Avenue West, SuzhouJiangsu Province, 215021 ChinaGPS : 31.3159, 120.6749Tel/Fax : (86 512) 8777 5599 / (86 512) 8777 5600Email : [email protected] : Choy Kai Shing, David / Zhang Rui

TIANJINLANGDON & SEAH CONSULTANCY CO. LTD. TIANJIN BRANCH4002, 40/F, Tianjin World Financial Centre Office Tower2 Dagubei Road, He Ping DistrictTianjin, 300020, ChinaGPS : 39.1296, 117.2028Tel/Fax : (86 22) 2329 8611 / (86 22) 2319 3186Email : [email protected] : Wong Chin Ying

WUHANLANGDON & SEAH CONSULTANCY (SHANGHAI) CO. LTD. WUHAN BRANCHRoom 1008, 10/F, Corporate Centre 5Wuhan Tiandi, 1628 Zhongshan RoadWuhan, Hubei Province 430010, ChinaGPS : 30.6082, 114.3103Tel/Fax : (86 27) 5920 9299 / (86 27) 5920 9298Email : [email protected] : Chan Hoi Or, Joe / Guang Rong

XI’ANLANGDON & SEAH CONSULTANCY (SHENZHEN) CO. LTD. XI’AN BRANCHUnit 06-07, 16/F, CapitaMall Office Building64 South Second Ring WesternXi’an, Shaanxi Province, 710065, ChinaGPS : 34.2304, 108.9349Tel/Fax : (86 29) 8866 9711 / (86 29) 8866 9760Email : [email protected] : Lin Wai Yip, Gary / Wang Zhu Zhu

(Cont’d)

119OTHER INFORMATION

Page 121: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

INDIA

BANGALOREARCADIS INDIA PRIVATE LIMITED2nd Floor, Esquire CenterNo.9, M G RoadBangalore 560008, IndiaGPS : 12.974, 77.617Tel/Fax : (91 80) 4123 9141 / (91 80) 4123 8922Email : [email protected] : Biju AK

DELHIThe Elements, 2nd Floor, Unit No.465, Udyog ViharPhase-V, GurgaonHaryana 122016 IndiaGPS : 28.5012, 77.085Tel/Fax : (91 124) 430 8790 / (91 124) 430 8793Email : [email protected] : Arun Basu

PUNECity Survey No 804/B, Bhandarkar Institute RoadLane No-14, Pune 411004 (Near Skoda Show Room)Maharashtra, IndiaGPS : 18.5204, 73.8567Tel/Fax : (91 20) 2565 0417 / (91 22) 3933 5556Email : [email protected] : Darshan Joshi

MUMBAI10th Floor, Vishwaroop IT Park,Opposite Vashi Railway Station,Sector 30A, Vashi,Navi Mumbai, 400703 IndiaGPS : 19.0645, 72.9968Tel/Fax : (91 22) 4125 6060 / (91 22) 4125 6050Email : [email protected] : Darshan Joshi

KOLKATAMatrix Tower 1st Floor, Room No. 102,DN - 24, Sector V, Salt LakeKolkata, 700091 IndiaGPS : 22.3435, 88.2605Tel/Fax : (91 33) 2367 8070 / (91 33) 2367 8071Email : [email protected] : Arun Basu

(Cont’d)DIRECTORY OF OFFICES

OTHER INFORMATION5

OTHER INFORMATION120

Page 122: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

INDONESIABALIP.T. ARCADIS INDONESIALevel 2, Alamanda Office, Jalan By Pass Ngurah Rai No.67,Banjar Pengenderan, KedongananBali 80361, IndonesiaGPS : 8.7893, 115.2106Tel/Fax : (62 361) 472 5353 / (62 361) 472 5354Email : [email protected] : Ir. Putu Arya Canti

JAKARTAP.T. ARCADIS INDONESIALevel 18, Ratu Plaza Office TowerJalan Jenderal Sudirman 9Jakarta 10270, IndonesiaGPS : 6.2271, 106.8008Tel/Fax : (62 21) 739 7550 / (62 21) 739 7846Email : [email protected] : Peter Robinson

P.T. ARCADIS PROJECT MANAGEMENTLevel 15, Ratu Plaza Office TowerJalan Jenderal Sudirman 9Jakarta 10270, IndonesiaGPS : 6.2271, 106.8008Tel/Fax : (62 21) 7278 4668 / (62 21) 7278 4669Email : [email protected] : Martin Hurd

KOREASEOULARCADIS KOREA CO. LTD#429, 27, Seochojungang-ro 24-gilSeocho-Gu, Seoul 137-882Korea GPS : 37.4953, 127.0164Tel/Fax : (82 2) 543 3888 / (82 2) 543 3898Email : [email protected] : Aaron Page

PHILIPPINESMANILAARCADIS PHILIPINES INCARCADIS PHILIPINES INTERNATIONAL INC4th & 7th Floor, Kings Court 12129 Chino Roces AvenueMakati City 1231, PhilippinesGPS : 14.5576, 121.0135Tel/Fax : (63 2) 811 2971 / (63 2) 811 2071Email : [email protected] : Darneil Perez

CEBU12F, 2Quad Building, Cardinal Rosales AvenueCebu Business ParkCebu City 6000, PhilippinesGPS : 10.3143, 123.9054Tel/Fax : (63 32) 2322 200 / (63 32) 2603 699Email : [email protected] : Darneil Perez (Cont’d)

121OTHER INFORMATION

Page 123: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

SINGAPOREARCADIS SINGAPORE PTE LTDARCADIS CONTRACT ADVISORY PTE LTDARCADIS CONSULTANCY PTE LTD1 Magazine Road, #05-01 Central MallSingapore 059567GPS : 1.288526, 103.842085Tel/Fax : (65) 6222 3888 / (65) 6224 7089Email : [email protected] : Tim Risbridger / Khoo Sze Boon / Lorimer A. Doig

ARCADIS PROJECT MANAGEMENT PTE LTD1 Magazine Road, #03-12 Central MallSingapore 059567GPS : 1.288526, 103.842085Tel/Fax : (65) 6222 3888 / (65) 6224 7089Email : [email protected] : Tim Risbridger / Teoh Wooi Sin

THAILANDBANGKOKARCADIS (THAILAND) LTD10th Floor, Kian Gwan II Building140/1 Wireless Road, LumpiniPratumwanBangkok 10330, ThailandGPS : 13.734969, 100.545448Tel/Fax : (66 2) 253 1438-9 / (66 2) 253 4977Email : [email protected] : Ang Yen Kooi / Wong Soon Bin

VIETNAMHANOIARCADIS VIETNAM CO LTDLevel 2, Hoa Binh Tower Building106 Hoang Quoc Viet StreetCau Giay DistrictHanoi, VietnamGPS : 21.046818, 105.795193Tel/Fax : (844) 3942 7525 / (844) 3942 7526Email : [email protected] : Mark Olive

HO CHI MINH CITYL12-03, Level 12, Vincom Building72 Le Thanh Ton Street, District 1Ho Chi Minh City, VietnamGPS : 10.777936, 106.702265Tel/Fax : (848) 3823 8297 / (848) 3823 8197Email : [email protected] : Mark Olive

(Cont’d)DIRECTORY OF OFFICES

OTHER INFORMATION5

OTHER INFORMATION122

Page 124: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

ARCADIS ASIA HEADQUARTERSHONG KONGARCADIS ASIA LIMITEDARCADIS ASIA REGIONAL HEADQUARTERS LIMITED38/F, AIA Kowloon Tower, Landmark East100 How Ming StreetKwun Tong, Kowloon, Hong KongGPS : 22.3125, 114.2223Tel/Fax : (852) 2830 3500 / (852) 2576 0416Email : [email protected] : Matt Bennion, CEO, Asia

ARCADIS HEADQUARTERSAMSTERDAMARCADIS NV“Symphony”Gustav Mahlerplein 97-1031082 MS AmsterdamP.O.Box 78951008 AB AmsterdamThe NetherlandsTel/Fax : (31 20) 201 1011 / (31 20) 201 1002Email : [email protected] : www.arcadis.comContact : Stephanie Hottenhuis, Executive Board Member

123OTHER INFORMATION

Page 125: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

Ministries/DepartmentsDepartment of Statistics MalaysiaDepartment of Town and Country PlanningMinistry of Domestic Trade, Co-operatives & ConsumerismMinistry of Housing and Local GovernmentMinistry of Works MalaysiaKuala Lumpur City Hall (DBKL)Perbadanan PutrajayaPetaling Jaya City Council (MBPJ)Shah Alam City Council (MBSA)Subang Jaya Municipal Council (MPSJ)Kajang Municipal Council (MPK)Selayang Municipal Council (MPS)Ampang Jaya Municipal Council (MPAJ)Penang Island Municipal CouncilSIRIM BerhadThe Malaysia Highway AuthorityContractor’s AssociationMaster Builders Association MalaysiaContractor’s Registration BoardConstruction Industry Development Board (CIDB)Professional Registration BoardsBoard of Architects MalaysiaBoard of Engineers MalaysiaBoard of Quantity Surveyors MalaysiaProfessional BodiesAssoc. of Consulting Engineers Malaysia (ACEM)Malaysia Institute of Architects (PAM)Malaysia Institute of Planners (MIP)The Institution of Engineers Malaysia (IEM)Royal Institution of Surveyors Malaysia (RISM)Other Important NumbersAmbulance & PoliceCivil Defence (Rescue)Fire FighterGeneral Hospital KLSYABAS Sdn BhdTenaga Nasional (KL)

03-8885 700003-2265 0600

03-8000 800003-8000 800003-8000 800003-2617 900003-8000 800003-7956 354403-5510 513303-8024 770003-8737 789903-6126 580003-4296 805004- 259 202003-5544 600003-8738 3000

03-7984 8636

03-4047 7000

03-2698 287803-2610 709503-2610 8140

03-2095 003103-2202 286603-7877 063603-7968 400103-7955 1773

999999999

03-2615 55551800 88 525203-2296 5566

TELEPHONE DIRECTORY (MALAYSIA)

OTHER INFORMATION5

OTHER INFORMATION124

Page 126: Construction Cost Handbook MALAYSIA 2017 - ArcadisD0E40065-620F-480B-88F4...MALAYSIA 2017. The following ... Major Rates for Malaysia 32 Major Rates for ... JKR Tender Price Index

JUBM SDN BHDARCADIS PROJEKS SDN BHDARCADIS (MALAYSIA) SDN BHD (formerly known as Langdon & Seah Sdn Bhd)

ARCADIS CONSULTANCY SDN BHD(formerly known as EC Harris (Malaysia) Sdn Bhd)

Level 5, Menara TSR, 12 Jalan PJU 7/3Mutiara Damansara, 47810 Petaling JayaSelangor, MalaysiaTel: (603) 2106 8000 / 2106 9000Fax: (603) 2106 9090Email: [email protected]

FOLLOW US@Arcadis_Asia

JOIN USLinkedln Arcadis

www.arcadis.com