Cv mohd syahril awth

17
A highly motivated and imaginative of Independent inspector with over than 7 Years experiences in fabrication/ vendor inspection of Oil & Gas equipment at Various of Country for Vessel ( Filter, Separator, Coalescor etc), coulomb, heat exchanger, tank, air cooler, metering skid & piping package, structure and valve. Seeking for On-Call/long term contract job of inspection in Mechanical, welding or quality control inspection as current position is Freelance Inspector and had good knowledge, Experiences in Vendor and Welding Inspection. Had a wide experiences in collaborate and joining Inspection with various country of people at any level, well adapted and good communication. Excellent interpersonal and cross-cultural skill, able to build relationship with people at any level, detailed and result oriented, thrives under pressure and able to meet tight deadlines, meticulous and posses’ excellent analytical thinking. SEMINAR / COURSE ATTAND NO DESCRIPTION LOCATION 1 In-house Seminar of Understanding of Fabrication process, Pressure Vessel Fabrication Process and inspection, Fabrication work flow (Heavy Wall SS Pressure Vessel), Fabrication sequence of activities and inspection points by Mr. Ronnie A Villareal ( QC MANAGER KNM/KPS ) KNM, Kuantan Port 2 NATIONAL INSTITUTE OF OCCUPATION & HEALTH (NIOSH) COURSE and EXAMINATION 1. NIOSH oil and Gas Safety Passport (OGSP) 2. NIOSH TNB NIOSH, Bangi 3 DOMI Course – Understanding of Boiler system, HRSG, Fire Tube etc. Jutasama, Shah Alam 1 MOHD SYAHRIL AWANG TIH YEAR : 2014 UPDATE DATE : 19/01/15 POSITION of : MECHANICAL, WELDING INSPECTOR ADDRESS A209, PANGSAPURI SRI WIRA, JALAN UKAY PERDANA 2, TAMAN UKAY PERDANA, 68000 AMPANG SELANGOR, MALAYSIA. PHONE NO +6 0199855467 D.O.B : 19 July 1986 SKYPE :msyahrilawth EMAIL ADDRESS / Linkedin profile [email protected] / my.linkedin.com/pub/mohd-syahril-awth/50/6b1/605/ W O R K I N G O B J E C T I V E S C O U R S E & P R O F F E S S I O N A L Q U A L I F I C A T I O N

Transcript of Cv mohd syahril awth

Page 1: Cv mohd syahril awth

A highly motivated and imaginative of Independent inspector with over than 7 Years experiences in fabrication/ vendor inspection of Oil & Gas equipment at Various of Country for Vessel ( Filter, Separator, Coalescor etc), coulomb, heat exchanger, tank, air cooler, metering skid & piping package, structure and valve.

Seeking for On-Call/long term contract job of inspection in Mechanical, welding or quality control inspection as current position is Freelance Inspector and had good knowledge, Experiences in Vendor and Welding Inspection.

Had a wide experiences in collaborate and joining Inspection with various country of people at any level, well adapted and good communication.

Excellent interpersonal and cross-cultural skill, able to build relationship with people at any level, detailed and result oriented, thrives under pressure and able to meet tight deadlines, meticulous and posses’ excellent analytical thinking.

SEMINAR / COURSE ATTAND

NO DESCRIPTION LOCATION1 In-house Seminar of Understanding of Fabrication process, Pressure Vessel

Fabrication Process and inspection, Fabrication work flow (Heavy Wall SS Pressure Vessel), Fabrication sequence of activities and inspection points by Mr. Ronnie A Villareal ( QC MANAGER KNM/KPS )

KNM, Kuantan Port

2 NATIONAL INSTITUTE OF OCCUPATION & HEALTH (NIOSH) COURSE and EXAMINATION

1. NIOSH oil and Gas Safety Passport (OGSP)2. NIOSH TNB

NIOSH, Bangi

3 DOMI Course – Understanding of Boiler system, HRSG, Fire Tube etc.Jutasama, Shah Alam

1

MOHD SYAHRIL AWANG TIHYEAR : 2014

UPDATE DATE : 19/01/15

POSITION of : MECHANICAL, WELDING INSPECTOR

ADDRESS

A209, PANGSAPURI SRI WIRA, JALAN UKAY PERDANA 2, TAMAN UKAY

PERDANA, 68000 AMPANG SELANGOR, MALAYSIA.

PHONE NO

+6 0199855467

D.O.B : 19 July 1986

SKYPE :msyahrilawth

EMAIL ADDRESS / Linkedin [email protected] / my.linkedin.com/pub/mohd-syahril-awth/50/6b1/605/

W O R K I N G O B J E C T I V E S

C O U R S E & P R O F F E S S I O N A L Q U A L I F I C A T I O N

Page 2: Cv mohd syahril awth

4 CSWIP 3.1 – Welding Inspector Level 2 TWI SEA, KL5 CSWIP 3.4 – Radiographic Interpretation Level 2 TWI SEA, KL6 NDE ITALY - SAUDI ARAMCO Preparation course & Examination,

Date : 14 July -21 July 2013Bergamo, Italy

7 Technical Engineer Training on DESALTER PROCESS SYSTEM, presented by DR. Maruyama, Morito at CAMERON JAPAN LTD TOKYO Office. Agenda covering :1. Understanding of Desalter System Unit.2. Internal Item and Bush Technical Assembly procedures.3. Practically handling on assembly Bush, Inspection and Leak Test training.

Gobancho, Chiyoda-Ku Tokyo.

.

CERTIFICATION OBTAIN

NO DESCRIPTION EXP DATE1 CSWIP 3.1- Welding Inspector – Level 2 , ID no : 75620 04-04-2018

2 NDT Certificates of ASNT-TC-1A - NDT Level 2 at Budiman Inspection SDN BHD 1. RT2. UT3. MPT4. LPT

27-06-201520-08-201513-06-201513-06-2015

3 NDE GLOBAL TECHNICAL SERVICES (USA) ONLINE QUALIFICATION EXAMINATION

1. Safety Approval Certificates (HSSE) – Certificates No: HM00002132. Expeditor Approval Certificates – Certificates No: EM00001023. Inspector Approval Certificates (General Mechanical & Welding) – Certificates

No: IM0000256

NA

4 ARAMCO APPROVED INSPECTOR, SAP No : 70016485

NO

SAP CODE SAP DESCRIPTION

1 QM06 Fabricated Piping (01)2 QM07 Valve (04)3 QM08 Fittings (03)4 QM09 Gaskets (06)5 QM37 Relief Valve, Control Valve (34) 6 QM03 Mechanical-General (01-04,13,31,32)7 QM13 Lumber (09)8 QM14 Fasteners (10)9 QM15 Structural Steels (12)

10 QM24 Aircraft Re-fuelers & de-fuel11 QM35 Skid Mounted Equip-Mech (34)12 QM45 Vehicle & Accessories (24)13 QM04 MPE, X-Ray, US & LPE14 QM32 Boilers (32)15 QM33 Heaters (32)16 QM30 Pressure Vessel (32)17 QM34 Tanks

NA

** NOTE: The proven certificates will be submitted upon request

2

Page 3: Cv mohd syahril awth

ADDITIONAL INFO

Highest Education

Course : Diploma in Mechanical Engineering (Grad with 3.71 CGPA)

CLASS : Year of 2005 - 2007

Institute : Politeknik Seberang Perai, Pulau Pinang

On-Going Education : Bachelor Degree of Mechanical – UTM Space (Part Time)

Soft skills : AutoCAD 2D / 3D, Microsoft Office (doc. Pdf, Excel and Email systems)

- Carry out Inspection base on approved ITP (Inspection Test Plan), drawing and procedures.

- Witnessed (spot), traceability, fit up inspection, nozzles layout dimension, welding and visual,

internal and external, outline drawing and involved in welder qualification test (WQT) for the assign

project. Monitor the welding activity as per approved WPS/PQR and project procedures.

- Spot witnessed on PWHT activity, Thermocouple installation refer as per approved PWHT

procedure for assign project.

- Witnessed and carried out inspection for the arriving material such as Plate, flange (ASME B16.5),

pipe and others related item refer to Material certification with Approved drawing, ASME Section II

Part A Edition 2010 (material Specification).

- Conduct Inspection for Hydro Test, Final Dimension Internal/External, Blasting and Painting with

related test (DFT, Holiday Test), Hardness Test, PMI test and Visual Inspection for assign project

refer to approved ITP and procedures. Review and witnessed the calibrated gauge, temp gauge,

water analysis and chart decoder while perform HT.

- Review and witnessed some of NDE activity such WFMT, MT, PTF, PT, RT and UT examination in

accordance with ASME Section V (NDT Examination) for the assign project refer to ITP and client

procedures.

- Review Manufacturing Data Record (MDR) accordingly to make sure all the related document are

completed and comply with the ASME Section VIII Div 1 (Pressure Vessel edition 2010), ITP,

3

Language and Communications• Good command of written and verbal in

English and Excelent in Bahasa Malaysia/Indonesia.

Others• Full clean driving license (D)

• Possess Own Transport.

• Willing To Travel and Located

E D U C A T I O N

G E N E R A L I N D U S T R I A L K N O W L E D G E

Page 4: Cv mohd syahril awth

Procedures, Approved drawing and project specification.

- Involved in packing activity and final inspection before delivery subject reference approved packing

procedure, packing list etc. as per agreed in Purchase order and project specification.

- Generate reporting for inspection activity as per client instruction such as weekly report or daily

report.

- Generate the Inspection Release Note/Certificate ( IRN/IRC) upon completion and satisfaction final

inspection.

Valve Inspection Activity

- Witnessed the Hydro Testing for Body, seat Leak test, Functional Test refer to approved project

procedures/manufacture recommended procedure.

- Visual Inspection such as painting condition (visual and DFT check), parts installation as per

Drawing and Specification Sheet, Painting, Packing and review the related document as per client

request.

- Witnessed the cryogenic testing (low temperature material), review certificate such as mill

certificate, test certificates, COC to ensure all document comply with project specification.

- Familiar with valve requirement and testing for Butterfly valve, control valve, globe valve, ball

valve, pressure safety relieve valve, Emergency Shutdown Valve (ESDV) and etc.

Blasting and Painting Inspection

- Monitoring the blasting activity and ensure the compressed air was free from water and oil (check

the water and oil trap was install and air used was free from moisture) – ASTM D4285 (test of

compressed air).

- Production test such as blotter test on air compressor, checking the blasting pot, hose, air gun,

competent blasting personal etc. which is required to comply with safety requirement.

- Inspect the abrasive media to be free from moisture and contamination, the media use required

proper storage as per approved project procedure.

- Visual inspection on equipment that will be blasting to ensure that it is free from any of mechanical

damage, weld spatter, grease, debris, oil and others defect that can affected on poor quality of

painting.

- To ensure the blasting and painting was carried out at acceptable ambient temperature which is

can be recorded by Hygrometer. – Refer to Painting and blasting project procedure for value of

humidity and dew point.

- Verified the anchor profile after blasting, normally use testex or needle gauge. All painting shall be

following the Manufacturer Recommendation to ensure the coating free from defect.

- Witnessed the wet film thickness (WFT) checking during painting – use comb gauge.

- Witnessed the dry film thickness (DFT) with calibrated electromagnetic gauge.

- Visual inspection was carried out after painting to check the detrimental film, irregularities such as

4

Page 5: Cv mohd syahril awth

lifting, peeling, mud cracks, blisters excessive sagging and other like insufficient coverage, color

variations, overspray, dry spray etc.

- Involved with the adhesion test (Dolly - pull off testing (ASTM D4541) and cross cut test) which

been carried out by competent paint personnel.

- Involved with the Holiday Test activity – check the continuity of protective coatings to detect

unacceptable discontinuities such as pinholes and voids.

- Review the painting report, which is required to be endorsed by Paint Manufacturers Competent

Personnel.

ENGGAGED COMPANY FOR AD-HOC / RESDIENT / CONTRACT JOB:

1. Company Name : Budiman Inspection Sdn Bhd, Malaysia.Position : Mechanical Inspector / Welding Inspector/ Expeditor Date Joined : November 2011 – Present (On Call Assignment)

2. Company Name : Velosi ( M ) Sdn Bhd, Malaysia.Position : Mechanical Inspector / Welding InspectorDate Joined : On Call Assignment.

3. Company Name : Cuteh Solution Pte. Ltd, Singapore. Position : Mechanical Inspector / Welding Inspector Date Joined : On Call Assignment

4. Company Name : AMO & Partners Engineering, Jeddah KSA

Position : Mechanical Inspector / Welding InspectorDate Joined : On Call Assignment

1. Company Name : KNM Ogpet ( East Cost ) Sdn Bhd, Pelabuhan Kuantan, PahangPosition : Site SupervisorClient : Shell Refining Co (Federation of Malaya) Bhd, Port Dickson. Date joined : August 2011 – November 2011

Position : QC InspectorDate joined : Early 2008 – November 2009

5

C O M P A N I E S J O I N E D

Page 6: Cv mohd syahril awth

2. Company Name : Mackenzie Industries Sdn Bhd (Wasco Group), Shah Alam .Position : QC InspectorClient : Delcom Services Sdn Bhd. Project : Fabrication and Installation 1 Unit of HRSG Boiler, Thermal

Dearator, GAS TURBINE, Refractory and etc. at PERSTIMA, Pasir Gudang, Johor Malaysia.

Date joined : December 2009 – July 2011

Project : KCSBO (GPPA Petronas Gas Kertih, Terengganu)Equipment : HRSG Boiler (40T/h @ 25 Bar) /Piping and StructuresDate Joined : November 2009 – June 2010

POSTION : VENDOR INSPECTOR (MECHANICAL& WELDING)

NO PROJECT DETAILS1. Vendor/Sub Vendor : Technip-MMHE (TMJV) / Valser Sdn Bhd

Owner /Project : Petronas Carigali Sdn Bhd (PCSB) / SK316 Development ProjectEquipment : Ball Actuated Valve, MOV and Butterfly with Instruments Panel. Agency : Intertek for TMJVLocation/Date : Nilai Negeri Sembilan, Malaysia / December 2014

SUMMARIZE ACTIVITY• To attend the Factory Acceptance Test as per assign NOI.

• Expedite the documentation submission by vendor, client such as ITP and related

procedures.• Witness hydro test on ball valves.

• Witness visual and dimensional inspection

• Witness FAT inspection which includes seat leak test and function test (including

failure mode test).• Perform spot inspection on painting using DFT elcometer

• Perform witness inspection on material composition using portable Spectrometer gun

• Documentation review on mill certification, NDT report, PMI report, valve link report and

also COC.

2. Vendor/Sub Vendor : Emerson Europe / Emerson Manufacturing

Owner /Project : Technicas Reunidas for KEMYA / SAUDI ELASTOMERS

PORJECT (SEP)Equipment : Control Valve Agency : Budiman Inspection for NDE, Singapore / EUROCONTROLLocation/Date : Emerson , Nilai Malaysia / July – November 2014

SUMMARIZE ACTIVITY•To attend the Factory Acceptance Test as per assign NOI.

6

P R O J E C T I N V O L V E D & D U T I E S

Page 7: Cv mohd syahril awth

•Expedite the documentation submission by vendor, client such as ITP and related

procedures.•Witness the testing of painted valve covering the Hydrostatic shell test, Hydrostatic seat

Test, functional test, valve failure system etc.•Visual and final dimension of the complete assemble valve against valve specification

sheet and drawing.•Review the MDR/CMTR contains material and test certificates.

•Produce Inspection report and Inspection release Certificates (IRC).3. Vendor/Sub Vendor : Korea FA. Co Ltd / Emerson Manufacturing

Owner /Project : SKEC for EPPETROECUADOR (EPP) / ESMERALDAS

REFINERY PROJECT.Equipment : Control Valve ( V – Ball)Agency : Budiman Inspection for NDE, Singapore / GoodIn KoreaLocation/Date : Emerson , Nilai Malaysia / July – November 2014

SUMMARIZE ACTIVITY•To attend the Factory Acceptance Test as per assign NOI.

•Expedite the documentation submission by vendor, client such as ITP and related

procedures.•Witness the testing of painted valve covering the Hydrostatic shell test, Hydrostatic seat

Test, functional test, valve failure system etc.•Visual and final dimension of the complete assemble valve against valve specification

sheet and drawing.•Packing Inspection activity.

•Review the MDR/CMTR contains material and test certificates.

•Produce Inspection report and Inspection release Certificates (IRC).4. Vendor/Sub Vendor : SIEMENS MULHEIM GERMAN/ SIEMENS PTSI, CILEGON BANTEN

Owner /Project : SEPCO for SAUDI ARAMCO OVERSEAS BV / JAZAN - JIGCC Power Block Project (Package 4)

Equipment : LP Outer Casing for Turbine ( Mechanical General (QM 03))Agency : Budiman Inspection for NDE, Singapore / TUV RHEINLANDLocation/Date : SIMENS PTSI CILEGON, JAKARTA INDONESIA / November 2014

SUMMARIZE ACTIVITY•To attend the Factory Acceptance Test / Final Inspection as per assign NOI.

•Expedite the documentation approval submission by vendor, client such as ITP and

related procedures.•Witness the dimensional and visual inspection including pre-assembly check and

identification marking. Final check for completeness of all inspection steps•Witness the try fit/assembly condition for outer casing, verified the bolting alignment

condition, fit-up assemble condition, visual inspection on material/equipment and others related activity as per Inspection test plan witness point.

•Review the MDR contains material and test certificates.

•Produce Inspection report and Inspection release Certificates (IRC) if applicable.

5. Vendor/Sub Vendor : Emerson Process System Pte ltd / Emerson Manufacturing Owner /Project : GSEC for SAUDI ARAMCO OVERSEAS BV / RABIGH PHASE II

7

Page 8: Cv mohd syahril awth

CP3/4 PROJECT Equipment : Control Valve (QM 37)Agency : Budiman Inspection for NDE, Singapore / GoodIn KoreaLocation/Date : Emerson , Nilai Malaysia / July – Present year of 2014

SUMMARIZE ACTIVITY•To attend the Factory Acceptance Test as per assign NOI.

•Expedite the documentation submission by vendor, client such as ITP and related

procedures.•Witness the testing of painted valve covering the Hydrostatic shell test, Hydrostatic seat

Test, functional test, valve failure system etc.•Visual and final dimension of the complete assemble valve against valve specification

sheet and drawing.•Packing Inspection activity.

•Review the MDR/CMTR contains material and test certificates.

•Produce Inspection report and Inspection release Certificates (IRC).

• Inspection carried out together with AOC representative as a Monitoring Inspector (BV

Malaysia).

6. Vendor/Sub Vendor : GS Engineering & Construction Corp / Shibata Industrial Co. Ltd Owner /Project : Aramco Oversea Company BV & Sumitomo Chemical Co Ltd / Rabigh

II Project Interconnecting Package.Equipment : Jetty Fender ( Steel Frame, Rubber Fender & UHMWP Surface

Pad) - QM03/04/12/30 Agency : Budiman Inspection Sdn Bhd for NDE Singapore.Location/Date : Klang , Malaysia / August 2014

SUMMARIZE ACTIVITY•To attend the Factory Acceptance Test for Rubber Fender and Frame fender as per assign

NOI.•Expedite the documentation submission by vendor, client such as ITP and related

procedures.•Witness the testing of rubber fender – compression test (kN-m) as per required I project

specification.•Visual and final dimension of the complete assemble of frame fender and UMPWP face

fender.•Assembly/final inspection for Fender- completes with face pad and rubber fender

installation.•Packing Inspection activity.

•Review the MDR/CMTR contains material and test certificates.

•Produce Inspection report and Inspection release Certificates (IRC).

7. Vendor/Sub Vendor : KOFAC (Korea FA.CO Ltd) / Emerson Manufacturing Owner /Project : eTEC E&C Ltd SEOL KOREA for SABIC / SADARA GAS SUPPLYEquipment : Control Valve Agency : IPTS for TUV NORD-INCOK, KoreaLocation/Date : Emerson , Nilai Malaysia / August 2014

8

Page 9: Cv mohd syahril awth

SUMMARIZE ACTIVITY•To attend the Factory Acceptance Test as per assign NOI.

•Expedite the documentation submission by vendor, client such as ITP and related

procedures.•Witness the testing of painted valve covering the Hydrostatic shell test, Hydrostatic seat

Test, functional test, valve failure system etc.•Visual and final dimension of the complete assemble valve against valve specification

sheet and drawing.•Packing Inspection activity.

•Review the MDR/CMTR contains material and test certificates.

•Produce Inspection report and Inspection release Certificates (IRC).

8. Vendor/Sub Vendor : Emerson Process System Pte ltd / Emerson Manufacturing Owner /Project : SKEC for SAUDI ARAMCO OVERSEAS BV / WASIT INLET GAS

PACKAGE #1Equipment : Control Valve (QM 37)Agency : IPTS for TUV NORD-INCOK, KoreaLocation/Date : Emerson , Nilai Malaysia / July and August 2014

SUMMARIZE ACTIVITY•To attend the Factory Acceptance Test as per assign NOI.

•Expedite the documentation submission by vendor, client such as ITP and related

procedures.•Witness the testing of painted valve covering the Hydrostatic shell test, Hydrostatic seat

Test, functional test, valve failure system etc.•Visual and final dimension of the complete assemble valve against valve specification

sheet and drawing.•Packing Inspection activity.

•Review the MDR/CMTR contains material and test certificates.

•Produce Inspection report and Inspection release Certificates (IRC).

• Inspection carried out together with AOC representative as a Monitoring Inspector (BV

Malaysia).

9. Vendor/Sub Vendor : SHENZEN JUTAL MACINERY EQUIPMENT CO LTD / ZHUHAI JUTAL OFFSHORE OIL SERVCE LIMITED

Owner /Project : SKEC for ARAMCO OVERSEAS / WASIT GAS PROCESSING PLANTEquipment : Pressure Vessel ( Filter ) - QM 30 Agency : Budiman Inspection for NDE SingaporeLocation/Date : Zhuhai, China / July 2014

SUMMARIZE ACTIVITY•To attend the Final Inspection as per assign NOI for 16 units of Vessel ( filter & separator)

•Expedite the documentation submission by vendor for approval from Client and AOC

including the ITP, related procedures and drawing.•Witness the final visual welding, dimensional as per approved drawing, hardness test,

hydrostatic test , RT Film Review, NDE Report review- MT, PT, DPT and blasting activity during the visit.

9

Page 10: Cv mohd syahril awth

•To ensure that all the fabrication been doing as per client – AOC specification, SAMSS**

•Review the MDR/CMTR contains material certificates, NDE report, test report – PWHT, HT,

fabrication record and etc.• Inspection carried out together with AOC representative as a Monitoring Inspector (SGS

China).•Produce Daily Inspection report and Inspection release Certificates (IRC).

10. Vendor/Sub Vendor : Emerson Process System Pte ltd / Emerson Manufacturing Owner /Project : DAEWOO / SADARA ProjectEquipment : Control Valve Agency : Budiman Inspection for Goodin Inspection, KoreaLocation/Date : Emerson , Nilai Malaysia / May 2014

SUMMARIZE ACTIVITY•To attend the Factory Acceptance Test as per assign NOI.

•Expedite the documentation submission by vendor, client such as ITP and related

procedures.•Witness the testing of painted valve covering the Hydrostatic shell test, Hydrostatic seat

Test, functional test, valve failure system etc.•Visual and final dimension of the complete assemble valve against valve specification

sheet and drawing.•Packing Inspection activity.

•Review the MDR/CMTR contains material and test certificates.

•Produce Inspection report and Inspection release Certificates (IRC).

11. Vendor/Sub Vendor : KNM-KEE Shah Alam Owner /Project : Lukoil Uzbekistan./ GISSAR Project Equipment : GAS EXCHANGER & VESSEL

Agency : Velosi Malaysia.Location/Date : Shah Alam, Selangor Malaysia / May 2014

SUMMARIZE ACTIVITY•To attend the Final Inspection as per assign NOI.

•Expedite the documentation submission by vendor, client such as ITP and related

procedures.•Visual and final dimension of the exchanger refer to approved drawing.

•Witness the Hydro testing for the Vessel and exchanger.

•Review the MDR such as material, NDE report, PWHT and test certificates.

•Produce Inspection report for every visit

12. Vendor/Sub Vendor : Tharphone Energy Services Asia Pacific / Vantage Eng.works S/BOwner /Project : Caracal Energy Inc./ Moundou Generation Project Equipment : E HOUSE STRUCTURE & WELDING WORKS

Agency : Budiman Inspection for NDE, Singapore.Location/Date : Teluk Panglima Garang, Selangor Malaysia / May 2014

SUMMARIZE ACTIVITY

10

Page 11: Cv mohd syahril awth

•To attend the Final Inspection as per assign NOI.

•Expedite the documentation submission by vendor, client such as ITP and related

procedures.•Visual and final dimension of the E-HOUSE refer to approved drawing.

•Painting inspection, DFT check and paint report review.

•Review the MDR such as material, NDE report and test certificates.

•Produce Inspection report and IRC (Inspection release Certificates)

13. Vendor/Sub Vendor : In Line Co Ltd / Paladon System Sdn BhdOwner /Project : Darya Pala Engineering Co. / SHURIJEH “D” Gas Injection Project Equipment : Control Valve sizing 3” & 4” (30 units)Agency : IKA Eng. & Tech Co, Iran.Location/Date : Paladon System Sdn Bhd , Malaysia / April 2014 - Present

SUMMARIZE ACTIVITY•To attend the Factory Acceptance Test as per assign NOI.

•Expedite the documentation submission by vendor, client such as ITP and related

procedures.•Witness the testing of Control Valve for valve and actuator integration covering the

activity on functional test, valve failure system, joint leakage test, linearity, and hysteresis.

•Visual and final dimension of the complete assemble valve against valve specification

sheet and drawing.•Painting Inspection activity.

•Review the MDR such as material and test certificates.

•Produce Inspection report and Inspection release Certificates (IRC).14. Vendor/Sub Vendor : Frames Separation Tech. BV / BKT Fraser Thermal Tech. Sdn Bhd

Owner /Project : STONE FPSO-TOPSIDE OIL SEPARATOREquipment : 4 Units of Vessel Test SeparatorAgency : Budiman Inspection for OGTECH Singapore.Location/Date : Rawang Integrated Industrial Estate Malaysia / April 2014

SUMMARIZE ACTIVITY•To attend the Final Inspection – Visual & Dimension, HT and Painting as per assign NOI.

• Verified the traceability of heat no for all inspected items, review the mill certificates and

endorsed.• Expedite the status of approved document such as ITP and related procedures.

•MDR review activity, mill certificates and test report (NDE – MT, UT & RT)

• Produce Inspection report and Inspection release Certificates (IRC).

15. Vendor/Sub Vendor : PHOCEENNE / KT Fittings Sdn BhdOwner /Project : Saudi Aramco / SADARA Project Equipment : SS BW Fittings (QM 08) Agency : Budiman Inspection for NDE, Singapore.Location/Date : Klang, Malaysia / January 2014

SUMMARIZE ACTIVITY

11

Page 12: Cv mohd syahril awth

•To attend the Final Inspection as per assign NOI.

• Final Inspection before Delivery, covering the dimensional, visual inspection, QTTY

verification vs PO and packing for the SS fittings. • Verified the traceability of heat no for all inspected items, review the mill certificates and

endorsed.• Expedite the status of approved document such as ITP and related procedures.

• Produce Inspection report and Inspection release Certificates (IRC).

16. Vendor/Sub Vendor : PT. VME ProcessOwner /Project : Saudi Aramco / WASIT Gas Processing Project Equipment : Control Valve (QM 07) Agency : AMO & Partners Engineering, Jeddah KSA.Location/Date : Emerson , Nilai Malaysia / February 2014 - Present

SUMMARIZE ACTIVITY•To attend the Factory Acceptance Test as per assign NOI.

•Expedite the documentation submission by vendor, client such as ITP and related

procedures.•Witness the testing of unpainted valve covering the Hydrostatic shell test, Hydrostatic

seat Test, functional test, valve failure system etc.•Visual and final dimension of the complete assemble valve against valve specification

sheet and drawing.•Packing Inspection activity.

•Review the MDR such as material and test certificates.

•Produce Inspection report and Inspection release Certificates (IRC).

• Inspection carried out together with AOC representative as a Monitoring Inspector (ABS

Malaysia).

17. Vendor/Sub Vendor : PT. VME ProcessOwner /Project : Saudi Aramco / WASIT Gas Processing Project Equipment : Structural Fabrication (QM 15) Agency : Cutech Solution Pte Ltd, Singapore.Location/Date : Batam Island, Indonesia / December 2013 – Present.

SUMMARIZE ACTIVITY•To attend the Inspection as per assign NOI with references to ITP activity.

•Activity covering the monitoring and surveillance of fabrication such as fit up, welding,

consumable control, dimensional and welding visual inspection for structure (H-Beam).•MDR review activity, mill certificates and test report (NDE)

•Expedite the documentation and procedures approval status

•Produce Inspection report and Inspection release Certificates (IRC).

18. Vendor/Sub Vendor : JAG Flowcomponents LP / Mir Valve, MalaysiaOwner /Project : Enbridge Pipeline Inc / South Edmonton Terminal Equipment : Ball ValveAgency : Budiman Inspection for NDE, Singapore.Location/Date : Shah Alam Selangor / December 2013

12

Page 13: Cv mohd syahril awth

SUMMARIZE ACTIVITY•To attend the Factory Acceptance Test as per assign NOI.

•Testing activities covering the Hydrostatic shell test, Hydrostatic seat Test, Double

isolation and bleed (DIB) test and low pressure air seat test for the unpainted valve.•All the testing was carried out as per FAT test procedures provide by Vendor/client.

•Review the quality document such as Mill certificates, test report as per stated in project

specification sheet.•Produce Inspection report and Inspection release Certificates (IRC).

19. Vendor/Sub Vendor : Technip - NPCC / Favelle Favco Crane (M) Sdn BhdOwner /Project : ZAKUM Development Company /Upper ZAKUM Project Equipment : 5 units of pedestal Crane with inspected items - Pedestal, Turret,

Powerpack, Winch and Boom.Agency : Velosi (M) Sdn BhdLocation/Date : Senawang, Negeri Sembilan, Malaysia / December 2013 - Present

SUMMARIZE ACTIVITY• Attend the inspection as per given NOI with references by ITP inspection point.

•The activity covering the in process of fabrication (visual on welding) for pedestal, turret,

boom top & bottom, winch and power pack•Final inspection before delivery for pedestal on painting and all quality document such as

painting report etc.•Review all the NDE report, Mill certificates and MDR for all the crane parts.

• Pre-commissioning inspection on major part for winch, cabin, slew ring, slew drive, bolt

torque inspection and associate work.• Witness the high pressure hydro test for hydraulic hose.

• Involved in FAT & COMMISSIONING for pedestal crane such as functional test, load test

and endurance test.•Produce Inspection report and Inspection release Certificates (IRC).

20. Vendor/Sub Vendor : Sterling Deaerator Company / VESSELTECH Engineering S/BOwner /Project : Technicas Reunidas for KEMYA / SAUDI ELASTOMERS ProjectEquipment : Thermal Dearator - Heater Tank (SS) and Storage Tank.Agency : Budiman Inspection for NDE, SingaporeLocation/Date : Balakong, Selangor Malaysia / December 2013

SUMMARIZE ACTIVITY•Attend the inspection as per given NOI with references by ITP inspection point.

•Activity covering the monitoring and surveillance of fabrication such as fit up, welding,

consumable control, dimensional and welding visual inspection.•Witness the Hydrostatics shell test, PWHT result report etc.

•Review the NDE report, Mill certificates and MDR for the equipment’s.

•Witness the painting visual inspection, review report and endorsed.

•Attend the factory acceptance test, final inspection before delivery and packing.

•Produce Inspection report and Inspection release Certificates (IRC).

13

Page 14: Cv mohd syahril awth

21. Vendor/Sub Vendor : The Reynold’s Company / IME Cable support System Sdn BhdOwner /Project : AMEC Oil&Gas Inc for Exxon Mobil USA / Angola Blck Kizomba

Satellite Phase 2 Equipment : Cable Tray / ladder with Multiple Tag and Hardware.Agency : Budiman Inspection for NDE, SingaporeLocation / Date : Subang, Selangor Malaysia / November 2013

22. Vendor/Sub Vendor : Frame Separation Technology BV / Tepat Teknik SBOwner /Project : SBM OFFSHORE / Shell Stone FPSOEquipment : Chemical Injection Skid Module (Structure, Tank, Pressure Vessel

and Pump Skid)Agency : Budiman Inspection for OGTECH, SingaporeLocation / Date : Shah Alam, Selangor, Malaysia/ October 2012

23. Vendor/Sub Vendor : KROHNE OIL & GAS - Malaysia / PeerMark Engineering Owner /Project : FLUOR Philippine for SANTOS Ltd / GLADSTONE Equipment : Metering Skid (Piping Fabrication as per B31.3 –Process Piping).Agency : Budiman Inspection for NDE, SingaporeLocation / Date : Telok Gong, Klang, Malaysia / April 2012 – October 2013

24. Vendor/Sub Vendor : OVIVO / Peer Mark Engineering SDN BHDOwner /Project : MALAKOFF Eng.SDN BHD / Tanjung Bin Power Plant Equipment : Skid Module (Structure and Piping SS and CS)Agency : Budiman Inspection Malaysia.Location / Date : Telok Gong, Klang, Malaysia / October & November 2013

25. Vendor/Sub Vendor : Hyundai Eng. Co. Ltd / Interstate M&E, MalaysiaOwner /Project : Petronas Gas Berhad (PGB) / PRR2Equipment : Junction Box, Cable TrayAgency : Budiman Inspection for Goodin Inspection, KoreaLocation / Date : Subang, Selangor, Malaysia / March 2013

26. Vendor/Sub Vendor : Emerson Process Management Sdn BhdOwner /Project : FLUOR Aust. PTY LTD. / GLNG – Equipment : Pneumatic Control - Globe ValveAgency : Budiman Inspection for NDE, SingaporeLocation / Date : Nilai, Negeri Sembilan, Malaysia / October – December 2013

27. Vendor/Sub Vendor : Hyundai Eng. Co. Ltd / Mir Valve, MalaysiaOwner /Project : Petronas Gas Berhad (PGB) / PRR2 Project Equipment : Ball Valve with Cryogenic TestingAgency : Budiman Inspection for Goodin Inspection, KoreaLocation / Date : Shah Alam, Selangor, Malaysia / March 2013

28. Vendor/Sub Vendor : Frame Separation Technology BV / Tepat Teknik SB Owner /Project : SBM OFFSHORE / FPSO N’GOMA Equipment : Chemical Injection Skid Module (Structure, Tank, Pressure Vessel and Pump Skid)Agency : Budiman Inspection for OGTECH, SingaporeLocation / Date : Shah Alam, Selangor, Malaysia / September 2013

14

Page 15: Cv mohd syahril awth

29. Vendor/Sub Vendor : Frame Separation Technology BV / Petra Fabricator SBOwner /Project : BUMI ARMADA BHD / FPSO ARMADA CLAIREEquipment : Pressure VesselAgency : Budiman Inspection for OGTECH, SingaporeLocation / Date : Shah Alam, Selangor, Malaysia / February 2013 – April 2013

30. Vendor/Sub Vendor : Emerson Process ManagementOwner /Project : CB & I / PNG-LNGEquipment : Control Pneumatic Globe/Ball ValveAgency : Budiman Inspection for NDE, SingaporeLocation/Date : Nilai, Negeri Sembilan, Malaysia / May 2012 – July 2012

31. Vendor/Sub Vendor : Siemens Energy INC / Jord International PTY LTD Owner /Project : FLUOR US / Gas Turbine Alternator Equipment : Lube Oil Cooler PackageAgency : Budiman Inspection for NDE, SingaporeLocation/ Date : Rawang, Selangor, Malaysia / July 2012

32. Vendor/Sub Vendor : Hyundai Eng Corp (HEC) / KNM Exotic Equipment SDN BHD Owner /Project : Petronas Gas Berhad / PRR2Equipment : Heat Exchanger Agency : Budiman Inspection for Goodin Inspection, Korea Location /Date : Shah Alam, Selangor, Malaysia / July 2012 – August 2012

33. Vendor/Sub Vendor : Korea F.A. Co. Ltd / Emerson Process Management.Owner / Project : S K Eng. and Construction Co. Ltd / TAKREER RRE PROJECTEquipment : Globe Pneumatic Valve with Cryogenic TestingAgency : Budiman Inspection for NDE, SingaporeLocation / Date : Nilai, Negeri Sembilan, Malaysia / March 2012 – April 2014

34. Vendor/Sub Vendor : Hyundai Eng Corp (HEC) / Emerson Process Management. Owner /Project : Petronas Gas Berhad / PRR2Equipment : Globe Pneumatic ValveAgency : Budiman Inspection for Goodin Inspection, KoreaLocation /Date : Nilai, Negeri Sembilan, Malaysia / April – May 2012

35. Vendor/Sub Vendor : Krohne Oil and Gas Sdn Bhd/Peer Mark Engineering Sdn Bhd Owner/Project : ORIGIN, Australia / Australia Pacific LNG Project Equipment : Metering Skids (Piping Fabrication as per B31.3 -Process Piping). Agency : Budiman Inspection for NDE, SingaporeLocation / Date : Telok Gong, Klang, Malaysia / March 2012 – April 2012

36. Vendor/Sub Vendor : Frame Separation Technology BV /Petra Fabricator SBOwner/Project : SIME DARBY/ B193 HP Gas Compression Module Equipment : Pressure Vessel (Separator)Agency : Budiman Inspection for OGTECH, Singapore Location / Date : Shah Alam, Selangor Malaysia / November 2011 – April 2012

15

Page 16: Cv mohd syahril awth

Project Involved with KNM – Year of 2008Location - Kuantan Port Fabrication Yard

1. Project Name• Stainless Stell Vessel for Pluto Onshore LNG Project Australia (2st-st Flare KO Drum)

Client• Foster Wheeler Woodside (FWUK)

2. Project Name• Propylene Fractionators for NCP Ethylene Plant, Al-Jubail

Client • Saudi Chevron Philips / Contractor: JGC Corporation ( NIKKI )

3. Project Name• C4 SPLITTER (FPT10) for SPT OLEFIN RECOVERY

Owner /Client• Exxon Mobil Chemical Asia Pacific / Stone & Webster International Inc.

Tuan Adnan Tuan Ali (Managing Director) Budiman Inspection Sdn Bhd (Malaysia)

Tel: +6013 9821405

Rasidah Wagiman

Technical Coordinator

NDE Technical Services Singapore Pte Ltd (Singapore)

Tel: +65 6425 0018

Nurul Adibah Hashim (Inspector Coordinator)Velosi (M) Sdn Bhd (Malaysia)

Tel: O: 03 56337219, M: +6013 5947796

Krishnan Muthukumar (QA/QC Manager)Cutech Quality Solution Pte Ltd (Singapore)

Tel: 68963556, 66650187

John Varghese (Section Head I&C)AMO & Partners Engineering Co. (Jeddah KSA)

Ph:+9663 -8589403 Ext:250

Fax: + 9663 857 9132, Mob:+966-530705067

Emi Moriyama

Assistant Project Engineer

Cameron Japan Ltd (Japan)

DD +81-3-6893-4270

16

R E F E R E N C E S

Page 17: Cv mohd syahril awth

Laveena Pinto

Resource Coordinator – Asia and Far East

Energy Engineering Oil & GAS Technical Service (Ajman – UAE)

Ph : +971 6 7419328, Ext 217 7 Fax : +971 6 741932

17