    HE IMPLEMENTATION ANDEAKNESSES OF EIA INMALAYSIA

  • 8/14/2019 Enviro Last Pezen8

    2/16

    ADIBAH BT MAT TAHIR

    NOR RUZAINI BT MOHD TASSERIF

    MUNIRAH MARLINDA BT MAHAT

    CLAIRENA EMLY ANAK FRANKIE

    RAIHAN BT MOHD NAWI

    SALMI BT ABDAN

    GROUP MEMBERS

  • 8/14/2019 Enviro Last Pezen8

    3/16

    DEFINITION

    HAT IS ENVIRONMENTAL IMPACTHAT IS ENVIRONMENTAL IMPACTASSESSMENT?SSESSMENT?

  • 8/14/2019 Enviro Last Pezen8

    4/16

    NVIRONMENTAL IMPACT ASSESSMENTNVIRONMENTAL IMPACT ASSESSMENTN MALAYSIAN MALAYSIAv as introduce in Malaysia in 1988 as mandatory.egislativev equirement Environmental Impact Assessment Order( , ).OE 1987v as developed based on the National Environmental( )olicy Act NEPA 1969 of the United States( ., ).riffett et al 2004v - ( )nder the 127 Act Environment Quality Act 1974v o protect and enhance the quality of the,nvironment through licensing setting of,tandards coordination of research and .issemination of information to the publicv .nder federal government responsibilityv tates of Sarawak and Sabah having adopted

    ndependent impact assessment procedures for.atural resource management ARTICIPATIONARTICIPATIONvCo ( )munity involvement public participant

  • 8/14/2019 Enviro Last Pezen8

    5/16

    IA PROCESS IN MALAYSIAIA PROCESS IN MALAYSIAProject Proponent

    Screening and consultation with DOE

    Detailed AssessmentPreliminary AssessmentNo EIA

    .Project proponent prepare TOR after informal consultation with DOEPreparation of Detailed Assessment

    Brief by Review Panel appoint

    Preliminary Assessment by project proponent

    ( )Review by DOE either at federal level or state level

    Public comments on brief

    :Preparation of Detailed Assessment by project

    Public comments on brief

    Review by Review Panel

    Project implement and monitoring

    Approving Authority

    : ..Source Staerdahl et al( )2004

  • 8/14/2019 Enviro Last Pezen8

    6/16

    HEN AN EIA APPLICABLE ?HEN AN EIA APPLICABLE ? ny project which has a significant effect onhe environment should e considered as having a potential EIA.equirement he term significant however may vary from one.etting to another n action that would have a minimal impact inn urban area may be .ignificant in rural setting or vice versa ignificant effects can also include actionshich may have both eneficial and detrimental effects even ifhe proponent believes that he project as a whole would generate.eneficial effects

  • 8/14/2019 Enviro Last Pezen8

    7/16

    ROJECTS REQUIRING EIA ajor manufacturingndustrial ower plantation,ining extractive andmelting airport gricultural development dams oads and highways( )ncluding railroads orts and harbors (rban development including)ousing unicipal utilitiesHEN AN EIA APPLICABLE ?

    Ex -ept when expressly exempted by the decision making,uthority all prop ( )nents government or private of majorevelopment projects which are anticip - -ted to cause short term and long termignificant adverse environme tal effects shall be required to prepared.n EIA study

    he impact study hall be prepared during the lanningtages of proposed .roject

  • 8/14/2019 Enviro Last Pezen8

    8/16

    AJOR MANUFACTURINGNDUSTRIAL IA CYCLE

    OWER PLANTATION

    ROJECTS OFROJECTS OFEIAIA

    WEAKNESS OF EIA INWEAKNESS OF EIA IN

  • 8/14/2019 Enviro Last Pezen8

    9/16

    WEAKNESS OF EIA INWEAKNESS OF EIA INMALAYSIAMALAYSIA

    A number of other EIA issues and

    problems have been identified in Malaysia(Harun, 1994), and these are comparableto those in other developing countries:

    Lack of awareness of the strength of EIA

    as a planning tool. Many still perceiveEIA as a stumbling block todevelopment.

    Perception that carrying out an EIAstudy would delay project approvaland implementation.

    EIA not carried out prior to final projectdesign, so that issues such as sittingand technology are not considered.

    Lack of base-line data on environmentalquality.

    Poor prediction of impacts.

  • 8/14/2019 Enviro Last Pezen8

    10/16

    v ( : )ccording to Briffett 1999 336ometimes the EIA process in Southeast( ) sia including Malaysia was simplysed as a means to obtaining planning . :ermission For example only 19rescribed activities listed in theandbook of Environmental Impact( , )ssessment Guidelines DOE 1995.equired EIA study

    v here were some weaknesses in theuantitative guidelines provided in theIA handbook and raised criticismecause of it was vulnerable to abusey submitting multiple mini projects( ., ).riffett et al 2004v ,or example an EIA was only required ifhe project was proposed forevelopment on a hilltop or hillside,xceeding 50 hectares or a hotel with,ore than 80 rooms irrigation schemesf more than 5000 hectares an coastaleclamation or clearance of mangrove

  • 8/14/2019 Enviro Last Pezen8

    11/16

    v , ,ut in March 2005 after the localewspapers exposed the environmentalestruction from the development,ear to Kuala Lumpur the Malaysian, (rime Minister Abdullah Ahmad)adawi asks for the changes to the(xisting EIA requirements Utusan

    , ).alaysia 2005v he government then proposed aompulsory EIA study of anyevelopment project starting with 20,ectares and above compared to 50ectares and above in current( , ).equirement Utusan Malaysia 2005v ,owever the proposal has not beeninalized and still in the revision.rocess

  • 8/14/2019 Enviro Last Pezen8

    12/16

    Babi: Perlu buat kajian EIAUtusan Malaysia, 12 Apr 2008

    KUALA LUMPUR 11 April - Kerajaan Selangor dimintamengemukakan kajian Penilaian Alam Sekitar (EIA)terhadap projek ternakan babi secara moden bernilaiRM100 juta yang akan dilaksanakan di kawasanSepang.Penasihat Persatuan Perlindungan Alam SekitarMalaysia (EPSM), Dr. Gurmit Singh berkata, sehinggakini kajian EIA terhadap projek itu masih menjadi tandatanya kerana kerajaan negeri tidak pernahmengumumkannya.''Kita mahu tahu bila EIA untuk projek ini diluluskan.Siapa yang luluskan. Bila ia diluluskan,'' katanyakepada Utusan Malaysia di sini hari ini.Isu ladang babi bernilai RM100 juta di Sepang hangatdiperkatakan setelah Exco Selangor, Teresa Kok

    mengesahkan kelulusan projek tersebut oleh kerajaannegeri.

    Berikutan kenyataan tersebut, pelbagai pihak termasukpenduduk setempat dan pertubuhan bukan kerajaan (NGO)membantah kerana keputusan kerajaan negeri itu disifatkantidak menghormati sensitiviti rakyat.Bagaimanapun, kerajaan campuran Parti Keadilan Rakyat(PKR), DAP dan Pas negeri Selangor tetap dengankeputusan untuk meneruskan projek itu walaupun mendapatbantahan pelbagai pihak.Menurut Gurmit, Jabatan Pengairan dan Saliran (JPS) danJabatan Perkhidmatan Haiwan (JPH) perlu memastikanprojek ternakan itu mempunyai sistem tertentu sepertirawatan najis babi bagi memastikan sisa najis haiwan itutidak disalurkan ke dalam sungai.Selain itu, katanya, satu sistem khas perlu dilakukan bagi

    memastikan bau haiwan itu tidak mengganggu pendudukberhampiran projek itu.

    XAMPLE OF EIA CASES INXAMPLE OF EIA CASES INMALAYSIAALAYSIA

    : :// . . . / / / .Reference http www jphpk gov my Malay berita Apr08 12 htm

  • 8/14/2019 Enviro Last Pezen8

    13/16

    , :anuary 26 2007 18 19 PM, ( ) --HAH ALAM Jan 26 Bernama Selangor is confident that the construction of a, ,anitary solid waste disposal system in Jeram Kuala Selangor will meet the( ),onditions of the Environmental Impact Assessment EIA said Menteri Besar.atuk Seri Dr Mohamad Khir Toyo

    te said this was because the site was not a sensitive area and all parties.nvolved had agreed to its usage for a solid waste disposal systemrhe disposal system was being developed by Worldwide Sdn Bhd which had 20 years,f experience in the field he told reporters after attending the People's.nven tor y Pro ble ms se ssio n her e t odayr Mohamad Khir was commenting on a TV3 news report that the waste disposal.ystem was being developed without getting the EIA approvalr" hat will happen to our solid waste disposal system after we close down the,ir Hitam Puchong disposal site? That is why we have chosen the site and.verything is done according to procedures however minute they are" , .t is not true that we don't have the EIA approval we don't do such thing The, " ,eople concerned visited the site every week he said adding that the .pplication for EIA was done simultaneously with the development of the systemr

    ,he development of the sanitary solid waste disposal system in Jeram Kuala,elangor was approved by the state and federal governments to replace the one.n Air Hitam which was closed on Dec 31 last year -r Mohamad Khir said the development was done on a fast track basis as thetate government was racing against time to start a new solid waste disposal.ystem as soon as possible-- ERNAMA

    ERAM SOLID WASTE DISPOSAL SYSTEM TO MEET EIACONDITIONS

    : :// . . / / .Reference http www bernama com selangor_maju news php

  • 8/14/2019 Enviro Last Pezen8

    14/16

    CONCLUSIONONCLUSION,n conclusion the implementationf EIA in Malaysia was not been.onstruct very well The EIA studies aremportant to ensure a sustainable. ,evelopment Therefore the publicwareness and their knowledge and

    .nderstanding about EIA are limited Theublic also did not have a chance to.oice their concern and desires,o now on the government shouldake an action to improve our.egulation and legislation systemarticipant by the publics is the mostmportant that would create the.inimize impact in development

  • 8/14/2019 Enviro Last Pezen8

    15/16

    REFERENCESEFERENCESv : // . .ttp www wikipedia comvv : // . . . / / /ttp www jphpk gov my Malay berita Apr08.2 htmvv : // . . / / .ttp www bernama com selangor_maju newsphpvv NEP Environmental Impact Assessment.raining Resource Manualvv .( ).arzuki A 2009 REVIEW ON PUBLIC

    ARTICIPATION IN ENVIRONMENTAL IMPACTSSESSMENT IN (ALAYSIA heoretical andmpirical Researches in Urban,anagement ( ) / )umber 3 12 August 2009