    PRELIMINARIES

    Item Description Unit Amount

    1 Preliminaries

    Preliminaries comprising insurances, Contractor's organisation and Administration,plan and equipment, Conditions of Contract. Compliance With Authorities

    Requirement. Etc.

    The Contractor shall list such items below together with their monetary values

    extended accordingly in monetary columns and carried to collection. No subsequent

    claims for non - allowance of such item in the Preliminaries of this contract shall be

    entertained should contractor decide to or fail to list such items costs involvement or

    items of monetary value related to the contract but which have not been allowed for in

    the Preliminaries.

    List of other items of cost involvements required

    a) Contract Documents (without stamp duty)

    b) Level & Setting out of works

    c) Insurance

    d) Temporary water supply

    e) Temporary electrical supply

    f) Signboard

    g) Temporary store

    h) Site management & supervision

    i) Hoarding

    j) Site access maintenance, handover cleaning

    k) Machinery, scaffoldings

    l)

    m) ..

    n)

    o)

    TOTAL CARRIED TO FINAL SUMMARY : RM

    Prelim 1/1

  • 8/12/2019 Hj. Mansor_bill of Quantities

    2/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO.1 - SITE CLEARANCE AND EARTHWORK (

    ALL PROVISIONAL)

    SITE CLEARANCE

    Notes:

    The contractor shall exercise such care and attention as required to

    ensure thah clearing operationis confined within the areas to be

    cleared. The contractor shall be responsible and pay at his own cost

    for any remedial works required resulting from any clearing not

    authorised by the S.O or clearing beyond the area as specified.

    Lumpsum

    To Collection

    The contractor shall be deemed to have visited and examined the site

    and its surrounding to satisfied himself as the extent and nature of

    the works, means of access and transportation and in general to have

    obtained to himself all necessary information as to risks, contigencies

    and all circumstances influencing and effecting the work. no claim

    will be entertained on the ground lack of knowledge on the extend of

    the works and the condition of the site.

    All tree trunks, etc. shall be grubbed out and remove and the

    excavation backfilled with selected materials to be approved by the

    S.O. no broken up of brickwork, concrete and other hard materials

    shall be returned into the excavation.

    Allow for site clearance to the extend as shown on the drawings of

    all shrubs, grass, rubbish etc. cut down all trees irrespective of sizes

    and girth of trunk including grubbing up roots, stumps, etc.

    materials, etc. dispose of and cart away from site of the Contractor's

    own dumping area, all as directed by the S.O. (approximately area

    929M2)

    B1 2/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    3/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    4/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO.2 - WORK BELOW LOWEST FLOOR

    FINISH

    A Average 250mm deep M3 113

    Not exceeding 1.50m deep;

    B Pit for pad footing (Provisional) M3 39

    C Trench for ground beam M3 31

    D 150mm Thick to receive apron and corridor slab M3 29

    E 150mm Thick to receive ground floor slab M3 39

    F Pad footing M2 26

    G Ground beam M2 46

    H Suspended ground floor slab M2 257

    I Apron and corridor M2 196

    To Collection

    Excavate to reduce level not exceeding 1.50m deep commencing

    from formation level and well ram, deposit and spread in making up

    levels where directed within the site and remainder load and cart

    away from site to contractor's own dump:-

    Excavate commencing from reduce level including planking and

    strutting, get out, part return, fill in and well ram, deposit and spread

    in making up levels where directed within the site and remainder

    load and cart away from site to contractor's own dump:-

    Bed of hardcore as described, spread, levelled, well rammed and

    consolidated, watered and blinded, well rolled in and finished:-

    50mm Thick plain concrete (Grade 15-20mm aggregate) asdescribed blinding bed, spread and levelled beneath:-

    B2 4/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    5/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO.2 - WORK BELOW LOWEST FLOOR

    FINISH (Cont'd)

    A Pad footing M3 12

    B Column stump (Provisional) M3 1

    C Ground beam M3 23

    D 125mm Thick suspended ground floor slab M2 257

    E 125mm Thick apron and corridor slab M2 196

    F EXTRA OVER for thickening to underside of apron slab for an

    additional depth 50mm and average width 75mm including all

    necessary additional excavation, lean concrete, formwork and

    reinforcement M 111

    Mild steel bar reinforcement to B.S. 4449 as described in:-

    Column stump (Provisional)

    G 10mm Diameter as links Kg 187

    Ground beam

    I 10mm Diameter as stirrups Kg 1,934

    Pad footing

    J 16mm Diameter Kg 488

    K 12mm Diameter Kg 158

    L 10mm Diameter as binders Kg 110

    Column stump (Provisional)

    M 25mm Diameter Kg 355

    N 20mm Diameter Kg 105

    O 16mm Diameter Kg 319

    P 12mm Diameter Kg 146

    To Collection

    Vibrated reinforced concrete (Grade 30-20mm aggregate) as

    described in:-

    High tensile deformed steel bar reinforcement to B.S. 4449 as

    described in:-

    B2 5/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    6/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO.2 - WORK BELOW LOWEST FLOOR

    FINISH (Cont'd)

    Ground beam

    A 20mm Diameter Kg 710

    B 16mm Diameter Kg 1,029

    C 12mm Diameter Kg 2,354

    Ref.No. BRC A7 weighting 3.02Kg/M2 in;

    D Suspended ground floor slab M2 514

    E Apron and corridor slab M2 392

    Sawn formwork as described to:-

    F Sides of pad footing M2 59

    G Sides of column stump (Provisional) M2 22

    H Sides of ground beam M2 275

    I Edge of concrete slab exceeding 100mm high but not exceeding

    200mm high M 107

    J Edge of apron and corridor slab, ditto M 111

    0.25mm Thick Polythene' or other equal and approved damp-proof

    membrane as described beneath (measured net - no allowance made

    for laps) in:-

    K Suspended ground floor slab M2 257

    To Collection

    High tensile deformed steel bar reinforcement to B.S. 4449 as

    described in (cont'd) :-

    Steel fabric reinforcement to B.S.4483 with 150mm side and end

    laps including cutting, bending and bedding in concrete (measured

    nett-no allowance made for laps):-

    B2 6/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    7/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO.2 - WORK BELOW LOWEST FLOOR

    FINISH (Cont'd)

    Approved anti-termite treatment with a warranty of 5 years to be

    executed strictly in accordance with the manufacturer's instruction

    in:-

    A Pad footing M2 109

    B Column stump (Provisional) M2 22

    C Ground beam M2 275

    D Suspended ground floor slab M2 257

    E Apron and corridor slab M2 196

    F 230mm Diameter half round glazed drain as perimeter drain laid on

    an including 50mm thick lean concrete Grade 15, all necessary

    excavation, formwork, junction and ends and disposal of surplus

    excavated material M 118

    To Collection

    B2 7/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    8/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO.2 - WORK BELOW LOWEST FLOOR

    FINISH (Cont'd)

    COLLECTION

    Collection No. 1

    Collection No. 2

    Collection No. 3

    Collection No. 4

    Total To Summary

    B2 8/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    9/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 3 - FRAME

    Vibrated reinforced concrete (Grade 30-20mm aggregate) as

    described in:-

    A Column M3 7

    B Floor beam M3 24

    C Roof beam M3 14

    Mild steel bar reinforcement to B.S. 4449 as described in:-

    Column

    D 10mm Diameter as links Kg 658

    Floor beam

    E 10mm Diameter as stirrups Kg 2,035

    Roof beam

    F 10mm Diameter as stirrups Kg 765

    High tensile deformed steel bar reinforcement to B.S. 4449 as

    described in:-

    Column

    G 25mm Diameter Kg 178

    H 20mm Diameter Kg 71

    I 16mm Diameter Kg 817

    J 12mm Diameter Kg 391

    To Collection

    B3 9/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    10/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 3 - FRAME (Cont'd)

    High tensile deformed steel bar reinforcement to B.S. 4449 as

    described in (cont'd) :-

    Floor beam

    A 20mm Diameter Kg 835

    B 16mm Diameter Kg 1,763

    C 12mm Diameter Kg 2,554

    Roof beam

    D 20mm Diameter Kg 485

    E 16mm Diameter Kg 864

    F 12mm Diameter Kg 1,742

    Sawn formwork as described to:-

    G Sides of column M2 141

    H Sides and soffit of floor beam M2 351

    I Sides and soffit of roof beam M2 207

    To Collection

    B3 10/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    11/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 3 - FRAME (Cont'd)

    COLLECTION

    Collection No. 1

    Collection No. 2

    Total To Summary

    B3 11/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    12/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 4 - UPPER FLOOR CONSTRUCTION

    Vibrated reinforced concrete (Grade 30-20mm aggregate) as

    described in:-

    A 125mm Thick suspended floor slab M2 220

    Ref.No. BRC A7 weighting 3.02Kg/M2 in;

    B Suspended floor slab M2 440

    Sawn formwork as described to:-

    C Soffit of suspended floor slab M2 220

    DEdge of concrete slab exceeding 100mm high but not exceeding

    200mm highM 107

    To Collection

    B4 12/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    13/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 4 - UPPER FLOOR CONSTRUCTION

    (Cont'd)

    COLLECTION

    Collection No. 1

    Total To Summary

    B4 13/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    14/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 5 - ROOF CONSTRUCTION AND FINISHES

    Vibrated reinforced concrete (Grade 30-20mm aggregate) asdescribed in:-

    A Parapet wall M3 1

    B 125mm Thick gutter slab M2 6

    Steel fabric reinforcement to B.S.4483 with 150mm side and end

    laps including cutting, bending and bedding in concrete (measured

    nett-no allowance made for laps):-

    High tensile deformed steel bar reinforcement to B.S. 4449 as

    described in:-

    Parapet wall

    C 10mm Diameter Kg 128

    Ref.No. BRC A7 weighting 3.02Kg/M2 in;

    D Gutter slab M2 12

    Sawn formwork as described to:-

    E Sides of parapet wall M2 8

    F Soffit of gutter slab M2 6

    G Edge of gutter slab, ditto M 20

    Supply and apply two part polyurethane, liquid waterproofing

    membrane, all in accordance to manufacturer's specification and

    instruction:-

    H Gutter M2 6

    Water Ponding Test

    I Allow for testing, consisting of leaving to post cure for 5 days, filling

    up floor with water to 50mm high, leaving to pond for 24 hours and

    draining off and inspection of underneath of slab for dampness or

    leakage, all to the satisfaction of the S.O.

    Item

    To Collection

    B5 14/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    15/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 5 - ROOF CONSTRUCTION AND FINISHES

    (Cont'd)

    TIMBER ROOF TRUSS

    NOTE :-

    The Contractor must submit detailed calculation and drawings of the

    proposed timber roof trusses system as and when required or before

    the prefabrication of the system to the Structural Engineers for

    evaluation. The Contractor shall obtain the approval of the approval

    of the structural Engineer before they can proceed with their

    fabrication works. The design must be endorsed by the Qualified /

    Registered Engineer. The contarctor is also responsible for obtaining

    the necessary certeficate from the manufacturer for submission tu the

    Architect. The proposed timber roof trusses must have a warranty for

    10 years:-

    A

    Design, supply, fabrication and deliver to site including fixing and

    hoisting into position the approved prefabricated timber roof trusses

    comprising of rafters, tie beam / joists, struts, bolts and nuts or other

    equal and approved truss connectors, galvanised steel bracings

    and/or timber bracings, triple grips or other equal and approved

    framing anchors and all necessary fixing accessories requuered for

    the complete installation of the fabricated timber roof trusess system

    (appriximate area 539M2) LS

    ROOF FINISHES

    B

    Interlocking concrete roof tiles of approved colour, laid to slope 17degree pitch fixed to and including 50mm x 50mm sawn pressure

    treated 'Grade B' timber batten at 300mm centres including nailing

    each tile in every alternate course with 38mm galvanised iron nails

    (measured nett-no allowance for laps)

    M2 59

    CInterlocking concrete roof tiles of approved colour, laid to slope 25

    degree pitch, dittoM2 480

    D

    Ridge caping and ridge end tiles to match roofing tiles including

    bedding and pointing in matching colour water-proof cement and

    sand mortar as described

    M 139

    E Hip caping and hip starter tiles, ditto M 31

    F EXTRA FOR 3-way apex tiles, do No 6

    G EXTRA FOR 4-way apex tiles, do No 3

    To Collection

    B5 15/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    16/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 5 - ROOF CONSTRUCTION AND FINISHES

    (Cont'd)

    A

    A Layer of double-sided aluminium foil insulation as described laidon chicken wire mesh (measured separately) with 150mm

    (minimum) lap at joints, strictly in accordance with the

    manufacturer's instruction (measured nett-no allowance made for

    laps)

    M2 538

    BA layer of galvanised chicken wire mesh netting with 25mm x 25mm

    mesh fixed to timber batten, dittoM2 538

    Wrot pressure treated Grade "B" timber as described:-

    C 225mm x 25mm Thick fascia board M 160

    Knot, prime, stop, one undercoat and two finishing coats of approved

    gloss enamel paint on woodwork as described:-

    DExposed surface of fascia board exceeding 200mm not exceeding

    300mm girthM 160

    ROOF DRAINAGE AND PLUMBING

    Unplasticised polyvinyl chloride (uPVC) gutter and fittings as

    specified jointed with manufacturer's approved solvent cement all in

    strict accordance with the manufacturer's instructions:-

    E

    Box gutter overall size 180mm wide x 150mm high including gutter

    bracket and all necessary accessories, nailed to fascia board

    including painting with the manufacturer's instruction

    M 161

    F 100mm Diameter rainwater downpipe fixed to wall M 66

    G EXTRA FOR bend No 33

    H 100mm Diameter laid under concrete apron or slab M 6

    I EXTRA for diameter outlet No 11

    J EXTRA OVER for jointing to drain No 11

    K100mm Diameter galvanised iron wire ballon grating to suit and

    setting on top of rainwater downpipeNo 11

    To Collection

    B5 16/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    17/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 5 - ROOF CONSTRUCTION AND FINISHES

    (Cont'd)

    COLLECTION

    Collection No. 1

    Collection No. 2

    Collection No. 3

    Total To Summary

    B5 17/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    18/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    19/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 6 - STAIRCASE CONSTRUCTION AND

    FINISHES (Cont'd)

    Cement based skim coat plaster system consisting of one base coat

    and one finishing coat including preparing, grinding and patching

    formwork joints and undulating surfaces, trowelled smooth all in

    accordance with the manufacturer's instruction as describe

    A Plainface to sloping soffit of staircase M2 32

    B Plainface to sides and soffit of landing beam M2 10

    C Plainface to soffit of landing slab M2 15

    20mm Thick cement and sand (1:6) mixed with an approved

    plasticiser as described plainface to:-

    D Sides of open string 300mm wide (extreme) M 50

    EEdge of landing slab exceeding 100mm high but not exceeding

    200mm highM 29

    300mm x 300mm x 8mm Thick 'KIMGRESS' or other equal and

    approved ceramic floor tiles finish with approved colour and pattern,

    bedded, jointed and pointed in matching colour cement mortar (1:3)

    on 13mm thick cement and sand (1:3) backing (measured separately)

    as described to:-

    F Landing slab M2 15

    G Riser 161mm high M 15

    H Tread 250mm width M 26

    Prepare and apply one coat of alkaly resisting primer sealer and two

    coats emulsion paint as described on:-

    I Plastered surfaces of sides of open string 300mm wide (extreme) M 50

    JPlastered surfaces of edge of landing slab exceeding 100mm high

    but not exceeding 200mm highM 29

    To Collection

    B6 19/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    20/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    21/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 6 - STAIRCASE CONSTRUCTION AND

    FINISHES (Cont'd)

    COLLECTION

    Collection No. 1

    Collection No. 2

    Collection No. 3

    Total To Summary

    B6 21/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    22/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 7 - EXTERNAL WALL

    Reinforced vibrated precast concrete Grade 25 as described

    including all moulds, hoisting and setting in cement mortar (1:3):-

    A 50mm x 100mm Coping including all necessary reinforcement M 217

    Brickwork in common clay bricks jointed and pointed in cement and

    sand (1:3) mortar as described:-

    B300mm Thick balustered wall with and including brick

    reinforcement at every fourth courseM2 2

    C 112mm Thick brickwall, ditto M2 472

    D80mm Thick brick-on-edge wall with and including brick

    reinforcement at every fourth courseM2 38

    Three-ply bituminious felt damp-proof course well-lapped at joints

    on and including 20mm bed of cement and sand (1:1) coated with

    hot bitumen (measured nett-no allowance made for laps):-

    E115mm Wide horizontal damp-proof course laid on brickwork

    (measured nett-no allowance made for laps)M 101

    ...................................

    F

    6mm Diameter mild steel bonding tie 300mm girth with one end

    bent and cast into concrete and the other end wrapped in building

    paper and temporarily fixed to inner face of formwork andsubsequently straightened, split, caulked and built into joint

    No 288

    HANDRAILING AND BALUSTRADING

    G M 11

    To Collection

    Supply and install the following mild steel railing 600mm overall

    high including all necessary cutting, welding, fixing into position

    and painting all complete as per manufacturer's detail

    B7 22/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    23/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 7 - EXTERNAL WALL (Cont'd)

    COLLECTION

    Collection No. 1

    Total To Summary

    B7 23/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    24/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 8 - INTERNAL WALLS AND PARTITIONS

    Brickwork in common clay bricks jointed and pointed in cement andsand (1:3) mortar as described:-

    A115mm Thick brickwall with and including brick reinforcement at

    every fourth courseM2 348

    ...................................

    B

    6mm Diameter mild steel bonding tie 300mm girth with one end

    bent and cast into concrete and the other end wrapped in building

    paper and temporarily fixed to inner face of formwork and

    subsequently straightened, split, caulked and built into joint

    No 249

    To Collection

    B8 24/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    25/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 8 - INTERNAL WALLS AND PARTITIONS

    (Cont'd)

    COLLECTION

    Collection No. 1

    Total To Summary

    B8 25/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    26/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 9 - WINDOWS

    Reinforced vibrated precast concrete Grade 25 as describedincluding all moulds, hoisting and setting in cement mortar (1:3):-

    A

    100mm x 110mm Lintol reinforced with 4 nos 10mm diameter high

    tensile steel bar reinforcement hooked at ends with 8mm diameter

    mild steel stirrups at 150mm to centres (57 No)

    M 82

    General Notes

    The construction details and requirements including sizes and

    materials to be used for works included in this section shall be as

    shown in the drawings numbered

    All aluminium windows shall be in sections extruded fromaluminium alloy to BS 1474 as specified (unless otherwise stated)

    and to S.O.'s approval

    All prices shall be inclusive of all necessary materials, plants and

    labour for complete installation of the items in the norm of the local

    construction industry - notwithstanding whether categorically shown

    or specified in the drawing herein

    ALUMINIUM WINDOWS AND VENTS

    SUPPLY AND FIX complete the following approved natural

    anodised 0.5 micron aluminium extruded section including all

    necessary frames, mullions, transoms and cills, all to the

    manufacturer's details with and including P.V.C. weather strips,

    setting blocks

    (Notes:- All dimensions are based on structural openings only and

    the Contractor shall conform size of openings before ordering and

    make allowance for required tolerances)

    B

    Composite casement window (Type W1) overall size 1500mm x

    2700mm high and including 6mm thick tinted glass with top hung

    and hung into position

    No 4

    C

    Composite casement window (Type W2) overall size 750mm x

    2700mm high and including 6mm thick tinted glass with top hung

    and hung into position

    No 8

    D

    Composite casement window (Type W2a) overall size 1500mm x

    2700mm high and including 6mm thick tinted glass with top hung

    and hung into position

    No 1

    To Collection

    B9 26/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    27/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 9 - WINDOWS (Cont'd)

    ALUMINIUM WINDOWS AND VENTS (Cont'd)

    A

    Composite casement window (Type W3) overall size 1500mm x

    2100mm high and including 6mm thick tinted glass with top hung

    and hung into position

    No 2

    B

    Composite casement window (Type W4) overall size 2200mm x

    2100mm high and including 6mm thick tinted glass with top hung

    and hung into position

    No 1

    C

    Composite casement window (Type W5) overall size 750mm x

    2100mm high and including 6mm thick tinted glass with top hung

    and hung into position

    No 2

    D

    Composite casement window (Type W6) overall size 750mm x

    1800mm high and including 6mm thick tinted glass and hung intoposition

    No 10

    E

    Composite casement window (Type W7) overall size 750mm x

    2400mm high and including 6mm thick tinted glass and hung into

    position

    No 6

    F

    Composite casement window (Type W8) overall size 750mm x

    1800mm high and including 6mm thick tinted glass and hung into

    position

    No 2

    G

    Composite casement window (Type W9) overall size 2900mm x

    1800mm high and including 6mm thick tinted glass and hung into

    position

    No 1

    H

    Composite fixed glass window (Type W9a) overall size 2900mm x

    1800mm high and including 6mm thick tinted glass and hung into

    position

    No 2

    I

    Composite fixed glass window (Type W10) overall size 1500mm x

    2400mm high and including 6mm thick tinted glass and hung into

    position

    No 2

    J

    Composite fixed glass window (Type W11) overall size 1500mm x

    2850mm high and including 6mm thick tinted glass and hung into

    position

    No 2

    K

    Composite fixed glass window (Type W12) overall size 1200mm x

    600mm high and including 6mm thick tinted glass and hung into

    position

    No 14

    To Collection

    B9 27/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    28/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 9 - WINDOWS (Cont'd)

    COLLECTION

    Collection No. 1

    Collection No. 2

    Total To Summary

    B9 28/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    29/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 10 - DOORS AND IRONMONGERIES

    Reinforced vibrated precast concrete Grade 25 as describedincluding all moulds, hoisting and setting in cement mortar (1:3):-

    A

    100mm x 110mm Lintol reinforced with 4 nos 12mm diameter high

    tensile steel bar reinforcement hooked at ends with 6mm diameter

    mild steel stirrups at 150mm to centres (30 No)

    M 46

    .......................................

    B

    150mm x 38mm x 100mm High heelstone, cast to suit door frame

    with and including 2 nos of 12mm diameter x 150mm long mild steel

    dowel bar, one end left into concrete and the other end into foot of

    the frame and necessary formwork

    No 7

    Notes :-

    All dimension are based on structural openings only and the

    Contractor shall confirm size of openings before ordering and make

    allowance for require to tolerances:-

    The construction details and requirements including sizes and

    materials to be used for works included in this section shall be as

    shown in the drawings

    All prices shall be inclusive of all necessary materials, plants and

    labour for complete installation of the items in the norm of the local

    construction industry - notwithstanding whether categorically shown

    or specified in the drawing herein

    Supply and fix complete in position approved 160mm x 59mm x1.1mm thick M.S door frame with 114mm back opening with

    tagged, mitred, welded and treated corners including all accessories

    all in accordance to manufacturer's specification:-

    C Door frame overall size 1800mm x 2400mm high (Type D1) No 1

    D Door frame overall size 2850mm x 2400mm high (Type D2) No 1

    E Door frame overall size 1200mm x 2400mm high (Type D3) No 7

    F Door frame overall size 4000mm x 2400mm high (Type D4) No 1

    G Door frame overall size 1300mm x 2400mm high (Type D5) No 2

    H Door frame overall size 900mm x 2400mm high (Type D6) No 7

    I Door frame overall size 900mm x 2100mm high (Type D7) No 2

    J Door frame overall size 750mm x 2400mm high (Type D8) No 7

    K Door frame overall size 2000mm x 2400mm high (Type D9) No 2

    To Collection

    B10 29/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    30/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    Supply and fix complete in position approved deco panel timber door

    including ironmongery all in accordance with the manufacturer's

    specification and S.O. approval:-

    A

    38mm Thick double leaf deco panel timber door overall size

    1800mm x 2400mm high and hanging on butt hinges (measured

    separately) (Type D1)

    No 1

    B

    38mm Thick single leaf deco panel timber door overall size 1200mm

    x 2400mm high and hanging on butt hinges (measured separately)

    (Type D3)

    No 7

    C

    38mm Thick double leaf deco panel timber door overall size

    1300mm x 2400mm high and hanging on butt hinges (measuredseparately) (Type D5)

    No 2

    D

    38mm Thick single leaf deco panel timber door overall size 900mm

    x 2400mm high and hanging on butt hinges (measured separately)

    (Type D6)

    No 7

    E

    38mm Thick single leaf deco panel timber door overall size 900mm

    x 2100mm high and hanging on butt hinges (measured separately)

    (Type D7)

    No 2

    F

    38mm Thick single leaf deco panel timber door overall size 750mm

    x 2400mm high and hanging on butt hinges (measured separately)

    (Type D8)

    No 7

    Supply and fixed the following glass door with and including

    aluminium frame and all necessary ironmongeries, etc. in

    accordance with manufacturer's instruction and S.O. approval:-

    G

    6mm Thick clear glass sliding door overall size 2850mm x 2400mm

    high in 3 nos equal panel complete with all necessary sliding track

    and roller and ironmoneries (Type D2)

    No 1

    H

    6mm Thick clear glass sliding door overall size 4000mm x 2400mm

    high in 4 nos equal panel complete with all necessary sliding track

    and roller and ironmoneries (Type D4)

    No 1

    I

    6mm Thick clear glass sliding door overall size 2000mm x 2400mm

    high in 6 nos equal panel complete with all necessary sliding track

    and roller and ironmoneries (Type D9)

    No 2

    Knot, prime, stop, one undercoat and two finishing coats of gloss

    enamel paint on woodwork as described:-

    J General surfaces of door M2 124

    Prepare and apply one coat metallic primer, one undercoat and two

    coats of gloss enamel paint on metalwork as described:-

    K Metal frame girth exceeding 150mm but not exceeding 300mm M 180

    To Collection

    ELEMENT NO. 10 - DOORS AND IRONMONGERIES

    (Cont'd)

    B10 30/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    31/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    COLLECTION

    Collection No. 1

    Collection No. 2

    Total To Summary

    ELEMENT NO. 10 - DOORS AND IRONMONGERIES

    (Cont'd)

    B10 31/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    32/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 11 - INTERNAL WALL FINISHES

    20mm Thick cement and sand (1:6) mixed with an approved

    plasticiser as described plainface to:-

    A 115mm Thick wall, column, coping and the like M2 1,321

    13mm Thick cement and sand (1:3) backing screed:-

    To receive ceramic wall tiles (measured separately) to;

    B Wall M2 79

    300mm x 300mm x 8mm Thick 'KIMGRESS' or other equal and

    approved ceramic wall tiles finish with approved colour and pattern,

    bedded, jointed and pointed in matching colour cement mortar (1:3)

    on 13mm thick cement and sand (1:3) backing (measured separately)

    as described to:-

    C Wall, column and the like M2 79

    Prepare and apply one coat of sealer and two coats of emulsion paint

    internally on:-

    D Plastered wall, column, hood, sill, fin, coping and the like M2 1,321

    To Collection

    B11 32/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    33/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 11 - INTERNAL WALL FINISHES (Cont'd)

    COLLECTION

    Collection No. 1

    Total To Summary

    B11 33/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    34/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 12 - INTERNAL FLOOR FINISHES

    13mm Thick cement and sand (1:3) as described in screeded bed:-

    To receive ceramic floor tiles (measured separately) to;

    A Floor M2 209

    B 50mm Drop M 8

    To receive timber strip (measured separately) to;

    C Floor M2 76

    D 100mm High skirting M 112

    300mm x 300mm x 8mm Thick 'KIMGRESS' or other equal and

    approved ceramic floor tiles finish with approved colour and pattern,bedded, jointed and pointed in matching colour cement mortar (1:3)

    on 13mm thick cement and sand (1:3) backing (measured separately)

    as described to:-

    E Floor M2 209

    F 50mm Drop M 8

    G Floor M2 76

    H 100mm High skirting M 112

    To Collection

    Supply and install of 'AIR THRUST' Pneumatic timber flooring

    system comprises of 18mm x 90mm Kempas tongue and groove strip

    in random length design, 2 layer of 12mm thick WBP plywood with

    4.3mm thick 'AIR-THRUST' genuine air cells natural rubber pads

    and a layer of vapour proof membrane and c/w sanding and finishing

    with (one) 1 coat of strata base and (two) 2 coat strata prowaterbased polyurethane timber floor varnish.

    B12 34/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    35/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 12 - INTERNAL FLOOR FINISHES (Cont'd)

    COLLECTION

    Collection No. 1

    Total To Summary

    B12 35/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    36/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 13 - INTERNAL CEILING FINISHES

    A Ceiling panel M2 443

    B No 12

    C Surfaces of ceiling M2 443

    To Collection

    Prepare and apply one coat of sealer and two coats approved

    emulsion paints internally as described on:-

    1200mm x 600mm x 4.8mm Thick approved calcium fibre boardceiling set out symmetrically from the center of the room with and

    including approved exposed aluminium 'T' suspension system and

    hangers all to manufacturer's detail and Architect's approval

    EXTRA FOR forming 600mm x 600mm ceiling manhole including

    any necessary framing (Provisional)

    B13 36/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    37/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 13 - INTERNAL CEILING FINISHES

    (Cont'd)

    COLLECTION

    Collection No. 1

    Total To Summary

    B13 37/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    38/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 14 - EXTERNAL FINISHES

    WALL FINISHES

    20mm Thick cement and sand (1:6) mixed with an approved

    plasticiser as described plainface to:-

    A Wall, column, hood, sill, fin and the like M2 472

    B Wall, column, hood, sill, fin and the like M2 105

    Prepare and apply one coat sealer and two finishing coats of

    weathershield paint as described on:-

    C Plastered wall, column, hood, sill, fin and the like M2 472

    FLOOR FINISHES

    13mm Thick cement and sand (1:3) as described in screeded bed:-

    To receive homogenous floor tiles (measured separately) to;

    C Floor M2 84

    D 75mm Up M 10

    To receive ceramic floor tiles (measured separately) to;

    E Floor M2 34

    F 50mm Drop M 4

    G 100mm Drop M 2

    200mm x 200mm x 8mm Thick non-slip homogenous floor tiles in

    colour and pattern to be approved by the S.O., bedded and jointed in

    cement and sand (1:3) mortar and flush pointed with coloured

    cement on screeded beds (measured separately) to:-

    H Floor M2 84

    I 75mm Up M 10

    To Collection

    Supply and fix 'Indian Fossil Stone' or other equal and approved

    quality, 10mm - 18mm thick in random size and laid to 'broken

    marble' pattern, finish with application of 2 layer matt sealant finish

    or other equal and approved quality, standard colour including all

    necessary fixing to manufacturer's recommendation and all as per

    Architectural Drawing on the following surfaces :-

    B14 38/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    39/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    40/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 14 - EXTERNAL FINISHES (Cont'd)

    COLLECTION

    Collection No. 1

    Collection No. 2

    Total To Summary

    B14 40/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    41/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 15 - SANITARY PLUMBING SYSTEM (ALL

    PROVISIONAL)

    Provide the following Prime Cost Sum for Works to be executed byNominated Sub-Contractors :-

    NOTES:

    Profit on Prime Cost Item shall be adjusted Pro-Rata to the

    percentage inserted below on the Final Nett Cost of the item

    corncerned

    The Lump Sum figure so inserted is not subject to any relation to the

    Final Nett Cost of the item concerned

    A

    Allow for sanitary plumbing system including excavation, pipe work,

    sanitary fitting and accessories bracket, etc, testing for pipe, all as

    per Architect drawing.

    Lumpsum

    To Collection

    B15 41/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    42/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 15 - SANITARY PLUMBING SYSTEM (ALL

    PROVISIONAL) (Cont'd)

    COLLECTION

    Collection No. 1

    Total To Summary

    B15 42/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    43/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 16 - COLD WATER SUPPLY SYSTEM (ALL

    PROVISIONAL)

    Provide the following Prime Cost Sum for Works to be executed byNominated Sub-Contractors :-

    NOTES:

    Profit on Prime Cost Item shall be adjusted Pro-Rata to the

    percentage inserted below on the Final Nett Cost of the item

    corncerned

    The Lump Sum figure so inserted is not subject to any relation to the

    Final Nett Cost of the item concerned

    A

    Allow for cold water system including excavation, pipe work, fitting

    and accessories bracket, 2 polycarbonate water tank, etc, testing for

    pipe, all as per Architect drawing.

    Lumpsum

    To Collection

    B16 43/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    44/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 16 - COLD WATER SUPPLY SYSTEM (ALL

    PROVISIONAL) (Cont'd)

    COLLECTION

    Collection No. 1

    Total To Summary

    B16 44/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    45/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT 17 - ELECTRICAL AND MECHANICAL WORKS

    Provide the following Prime Cost Sum for Works to be executed byNominated Sub-Contractors :-

    NOTES:

    Profit on Prime Cost Item shall be adjusted Pro-Rata to the

    percentage inserted below on the Final Nett Cost of the item

    corncerned

    The Lump Sum figure so inserted is not subject to any relation to the

    Final Nett Cost of the item concerned

    ELECTRICAL SERVICES

    A Provide Electrical Services Lumpsum

    MECHANICAL SERVICES

    B Provide Mechanical Services Lumpsum

    To Collection

    B17 45/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    46/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT 17 - ELECTRICAL AND MECHANICAL

    WORKS (Cont'd)

    COLLECTION

    Collection No. 1

    Total To Summary

    B17 46/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    47/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 18 - SEWER RETICULATION (ALL

    PROVISIONAL)

    Excavate trenches to for sewer pipe and bed under (bothmeasured seperately) commencing from formation level, get

    out, part return, fill in and ram, part load, cart, deposit and

    spread in making up levels, where directed within the site and

    remainder load and cart away from site including all necessary

    planking and strutting, trimming sides and levelling and

    compacting bottom of excavation;

    225mm Wide trench for 100mm (internal diameter) vetrified

    clay pipe not exceeding 2.0m deep

    A Average 1.50m deep M 54

    Concrete Grade 20 as described:-

    B To receive 100mm diameter vetrified clay pipe (measured

    separately) M3 1

    Fill using selected backfill material as described spread, levelled

    and compacted on top of;

    C 100mm Diameter pipe M3 16

    Vitrified clay pipe and fittings with spigot and socket joints

    with flexible joints of rubber ring as described

    D 100mm Diameter M 54

    Excavate for manhole commencing from formation level, get

    out, part return, fill in and ram, part load, cart, deposit and

    spread in making up levels, where directed within the site and

    remainder load and cart away from site including all necessary

    planking and strutting, trimming sides and levelling and

    compacting bottom of excavation;

    E Not exceeding 2.00m deep M3 3

    Concrete Grade 20 as described:-

    F Base M3 1

    To Collection

    B18 47/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    48/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 18 - SEWER RETICULATION (ALL

    PROVISIONAL) (Cont'd)

    Brickwork in common clay bricks jointed and pointed in cement andsand (1:3) mortar as described:-

    A 100mm Thick brick wall M2 17

    20mm Thick cement and sand (1:6) mixed with an approved

    plasticiser as described plainface to:-

    B 100mm Thick brick wall M2 11

    Approved mild steel grating manhole cover and frame

    overall size 400mm x 400mm, comply with the

    C manufacturer's specification and approved by the JPP,

    frame in cement and sand (1:3) and sealing cover with grease,

    painting with two coats of approved black syntheticresin based paint all as per Engineer's drawing NO 6

    Sewerage Treatment Plant

    Supply, install and approved STP capacity 5 PE or

    D equivalent, including all necessary excavation, concrete base,

    reinforcement, piping, electrical work and other related works

    as per Architect drawing. NO 1

    Testing

    Testing the whole of the sewerage in the presence of the S.O.

    E with water or by other means make good and defects, re-test

    on completion and leave the whole works in perfect workingorder to the entire satisfaction of the S.O. and Local Authorities

    To Collection

    B18 48/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    49/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 18 - SEWER RETICULATION (ALL

    PROVISIONAL) (Cont'd)

    COLLECTION

    Collection No. 1

    Collection No. 2

    Total To Summary

    B18 49/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    50/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    51/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 19 - FENCING AND GATES (Cont'd)

    COLLECTION

    Collection No. 1

    Total To Summary

    B19 51/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    52/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 20 - TURFING (ALL PROVISIONAL)

    TURFING

    ATrim, level and grade horizontally or slightly sloping surfaces to

    receive turfing (measured separately)M2 477

    B

    Close turfing to flat surfaces with approved turves as described

    including 75mm thick approved semi compacted black earth top soil

    and watering, attending until firmly established and replacing badly

    ground areas as directed

    M2 477

    MAINTENANCE

    The Contractor shall provide all labour, tools, equipment, transport

    etc. and carry out maintenance during the Defects Liability Period

    for the whole Works. The Contractor shall be deemed to have read

    the specification on his responsibilities during this

    Maintenance shall include but not necessary be limited to watering,

    weeding, pruning, fertilizing, spraying and clearing of unnecessary

    growth etc. and any other horticultural management as directed by

    the Superintending Officer and as necessary fot the p

    C

    To maintain plant material including replacement of dead/missing

    plants, grass cutting around trees, watering, weeding, cultivation and

    loosening of soil, pruning and clipping, firming up and adjusting

    stake and ties, eradication of pest or insect attack,

    Month

    Total To Carried Foward

    B20 52/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    53/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 20 - TURFING (ALL PROVISIONAL)

    (Cont'd)

    COLLECTION

    Collection No. 1

    Total To Summary

    B20 53/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    54/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 21 - GAZEBO

    Provide the following Prime Cost Sum for Works to be executed by

    Nominated Sub-Contractors :-

    NOTES:

    Profit on Prime Cost Item shall be adjusted Pro-Rata to the

    percentage inserted below on the Final Nett Cost of the item

    corncerned

    The Lump Sum figure so inserted is not subject to any relation to the

    Final Nett Cost of the item concerned

    A

    Construct a gazebo overall size 4200 mm x 4000mm x 3000mm

    high, Grade 'A' timber with floor finishes timber strip and all

    necessary as per Architect drawing. (approximate area 16.8M2)

    Lumpsum

    Total To Carried Foward

    B21 54/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    55/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    ELEMENT NO. 21 - GAZEBO (Cont'd)

    COLLECTION

    Collection No. 1

    Total To Summary

    B21 55/57

  • 8/12/2019 Hj. Mansor_bill of Quantities

    56/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    PROVISIONAL SUMS

    Item Description Unit Quantity Amount

    Provide the following Provisional Sums to be expended in whole or in part as directed

    by the Architect/Superintending Officer in accordance with the Conditions ofContract.

    a) Soft landscaping 10,000.00

    b) Solar Hot Water and Pump System 10,000.00

    c) Alarm system 20,000.00

    d) CCTV system 50,000.00

    e) Contigencies 50,000.00

    f) Gazebo 20,000.00

    TOTAL CARRIED TO FINAL SUMMARY : RM 160,000.00

    PV SUM /1

  • 8/12/2019 Hj. Mansor_bill of Quantities

    57/57

    CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT BESERTA 1 UNIT WAKAF DI NO. 22

    JALAN MERAH SATU U9/1A, SEKSYEN U9, 40150 SHAH ALAM, SELANGOR DARUL EHSAN

    UNTUK TUAN HAJI MANSOR BIN MAZLAN & PUAN HJH AISHAH BINTI ALI

    Item Description Unit Quantity Rate Amount

    SUMMARY

    ELEMENT NO.1 - SITE CLEARANCE AND EARTHWORK

    ( ALL PROVISIONAL)

    ELEMENT NO. 2 - WORK BELOW LOWEST FLOOR FINISH

    ELEMENT NO. 3 - FRAME

    ELEMENT NO. 4 - UPPER FLOOR CONSTRUCTION

    ELEMENT NO. 5 - ROOF CONSTRUCTION AND FINISHES

    ELEMENT NO. 6 - STAIRCASE CONSTRUCTION AND

    FINISHES

    ELEMENT NO. 7 - EXTERNAL WALL

    ELEMENT NO. 8 - INTERNAL WALLS AND PARTITIONS

    ELEMENT NO. 9 - WINDOWS

    ELEMENT NO. 10 - DOORS AND IRONMONGERIES

    ELEMENT NO. 11 - INTERNAL WALL FINISHES

    ELEMENT NO. 12 - INTERNAL FLOOR FINISHES

    ELEMENT NO. 13 - INTERNAL CEILING FINISHES

    ELEMENT NO. 14 - EXTERNAL FINISHES

    ELEMENT NO. 15 - SANITARY PLUMBING SYSTEM (ALL

    PROVISIONAL)

    ELEMENT NO. 16 - COLD WATER SUPPLY SYSTEM (ALL

    PROVISIONAL)

    ELEMENT 17: ELECTRICAL AND MECHANICAL WORKS

    ELEMENT NO. 18 - SEWER RETICULATION (ALL

    PROVISIONAL)

    ELEMENT NO. 19 - FENCING AND GATES

    ELEMENT NO. 20 - TURFING (ALL PROVISIONAL)

    ELEMENT NO 21 GAZEBO