Kadar Fi - Marine Fi Semasa Kadar Fi Baharu (RM) * C) PERKHIDMATAN 1 Survey fee 1960 Tiada Rujuk...

4
Bil Keterangan Tahun Terakhir Dipinda Kadar Fi Semasa Kadar Fi Baharu (RM) * C) PERKHIDMATAN 1 Survey fee 1960 Tiada Rujuk lampiran 1 2 Remuneration for auditor/surveyor(per audit/survey/inspection) Tiada Tiada RM200 3 Audit/Verification/Site Visit/Additional Fee: a) International Ship and Port Security 1960 Tiada 2,000.00 b) Company/Ship Audit/Ship Sampling/Initial Audit (International Safety Management) 1960 Tiada 2,000.00 c) ISM Additional Audit (for Detention under Port State Control etc) 1960 Tiada 4,000.00 d) Life Raft Service Station 1960 Tiada 2,000.00 e) Institusi Latihan Maritim Tiada Tiada 2,000.00 4 Ship Official Number bidding 1960 Tiada Reserve Price of RM1,000 5 RO Audit Fee 1960 Tiada 1,000.00 6 Port State dan Flag State Control Inspection: With detainable deficiency and followup inspection 1960 Tiada Rujuk Lampiran 2 7 KM Entry Approval Fee 1960 Tiada RM3000 8 Penceramah Pakar Untuk bukan agensi kerajaan. 1960 Tiada 1,600/hari

Transcript of Kadar Fi - Marine Fi Semasa Kadar Fi Baharu (RM) * C) PERKHIDMATAN 1 Survey fee 1960 Tiada Rujuk...

Page 1: Kadar Fi - Marine Fi Semasa Kadar Fi Baharu (RM) * C) PERKHIDMATAN 1 Survey fee 1960 Tiada Rujuk lampiran 1 ... Microsoft Word - Perkhidmatan[1].docx Author A-01-SGH73606T2 Created

Bil Keterangan Tahun Terakhir Dipinda

Kadar Fi Semasa

Kadar Fi Baharu (RM) *

C) PERKHIDMATAN  1  Survey fee  1960 Tiada Rujuk  

lampiran 1 2  Remuneration for auditor/surveyor(per 

audit/survey/inspection) Tiada  Tiada  RM200 

3  Audit/Verification/Site Visit/Additional Fee:  

a)  International Ship and Port Security  1960 Tiada 2,000.00

b)  Company/Ship Audit/Ship Sampling/Initial Audit (International Safety Management)  1960 Tiada 2,000.00

c)  ISM Additional Audit (for Detention under Port State Control etc)  1960 Tiada 4,000.00

d)  Life Raft Service Station  1960 Tiada 2,000.00

e)  Institusi Latihan Maritim  Tiada  Tiada  2,000.00 

4 Ship Official Number bidding  1960 Tiada Reserve Price 

of RM1,000

5  RO Audit Fee  1960 Tiada 1,000.00

6  Port State dan Flag State Control Inspection:‐With detainable deficiency and follow‐up inspection 

1960 Tiada Rujuk Lampiran 2

7 KM Entry Approval Fee  1960  Tiada  RM3000 

8  Penceramah Pakar  ‐Untuk bukan agensi kerajaan.  1960 Tiada 1,600/hari

 

Page 2: Kadar Fi - Marine Fi Semasa Kadar Fi Baharu (RM) * C) PERKHIDMATAN 1 Survey fee 1960 Tiada Rujuk lampiran 1 ... Microsoft Word - Perkhidmatan[1].docx Author A-01-SGH73606T2 Created

Lampiran 1 Fees for a Survey of Ship.

Fees for Inspection or Survey of Ships for the purpose of issuance of a Certificate including Passenger Certificate;

The total fees for an inspection or survey of a ship shall be the fees charged on the type of ship multiplied by the factors specified in the tables for the tonnage, type of certificate (convention/non-convention), type of inspection and age of ships.

Type of Ships

Type of ships Fees (RM) Unmanned Barges (Flat top, deck loading barges) 500 Tugs (Towing/Push Tugs, AHTs) 1000 General Cargoes/Semi-Containers 2000 Full Containers Vessel. 5000 Liquid Tankers 5000 Gas Carriers 10000 Passenger Vessels/RO-RO Ferries. 750

Tonnage of Ships

Tonnage Multiplier Under 1000 tons 1.0 Between 1001 tons and 1500 tons 1.1 Between 1501 tons and 3000 tons 1.2 3001 tons and above (for every additional 1,000 tons or part thereof)

1.3

Type of Inspection

Type of inspection/survey Multiplier Initial and renewal for five (5) years validity Certificate. 1.5 Annual endorsement 1.0 Issuance of one (1) year validity Certificate. 1.0

Type of Certificate.

Type of Certificate Multiplier Convention 1.5 Non-convention. 1.0

Page 3: Kadar Fi - Marine Fi Semasa Kadar Fi Baharu (RM) * C) PERKHIDMATAN 1 Survey fee 1960 Tiada Rujuk lampiran 1 ... Microsoft Word - Perkhidmatan[1].docx Author A-01-SGH73606T2 Created

Age of Ships

Age of ship Multiplier 0 – 5 years 1.0 6 – 10 years 1.1 11 – 15 years 1.3 16 – 20 years 1.5 21 – 25 years 2.0 Above 25 years. 3.0

Any other charges related to the Survey of a Ship.

RM Oversea charges per surveyor per 24 hours or part thereof … … … 1000.00 Overtime per surveyor per hour (week days) … … … … … 200.00 Overtime per surveyor per hour (Saturday, Sunday and Public Holiday) … 500.00  

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 4: Kadar Fi - Marine Fi Semasa Kadar Fi Baharu (RM) * C) PERKHIDMATAN 1 Survey fee 1960 Tiada Rujuk lampiran 1 ... Microsoft Word - Perkhidmatan[1].docx Author A-01-SGH73606T2 Created

Lampiran 2 

Port State and Flag State Inspection.

Port State and Flag State Inspection Within office hour

Outside office hour

Without deficiency FOC FOC

With deficiency and follow up inspection

- First hour or part thereof RM150 RM300

- Every 30 minutes RM75 RM150

- Land transportation, if required/not provided by the company RM50 RM100

- Transportation by launch, if required/not provided by the company As per bill by launch operator