Kkbi Biodiversity 2010

9
INSTITUT PENDIDIKAN GURU KEMENTERIAN PELAJARAN MALAYSIA JADUAL PENENTUAN TUGASAN PROJEK SEMESTER 4 PROGRAM IJAZAH SARJANA MUDA PERGURUAN (SAINS PENDIDIKAN RENDAH) AMBILAN JANUARI 2009 INSTITUTE : IPG KAMPUS KOTA BHARU DEPARTMENT : SCIENCE COURSE CODE : SCE 3107 COURSE TITLE : ECOSYSTEMS AND BIODIVERSITY DATE OF COMMENCEMENT 28 JULY 2010 DUE DATE 08 SEPTEMBER 2010 OBJECTIVES OF PROJECT: The students should be able to: 1. Gather information on the relevant “Ecosystem And Biodiversity” laboratory practical and PCK topics; 2. Acquire the knowledge and understanding of the concepts in the laboratory practical and PCK activities, 3. Do and write reports based on the laboratory practical and PCK activities; 4. Answer questions related to each laboratory practical and PCK activities. 1

Transcript of Kkbi Biodiversity 2010

Page 1: Kkbi Biodiversity 2010

INSTITUT PENDIDIKAN GURUKEMENTERIAN PELAJARAN MALAYSIA

JADUAL PENENTUAN TUGASAN PROJEK SEMESTER 4PROGRAM IJAZAH SARJANA MUDA PERGURUAN (SAINS PENDIDIKAN RENDAH)

AMBILAN JANUARI 2009

INSTITUTE : IPG KAMPUS KOTA BHARUDEPARTMENT : SCIENCECOURSE CODE : SCE 3107COURSE TITLE : ECOSYSTEMS AND BIODIVERSITY

DATE OF COMMENCEMENT 28 JULY 2010 DUE DATE 08 SEPTEMBER 2010

OBJECTIVES OF PROJECT:

The students should be able to:

1. Gather information on the relevant “Ecosystem And Biodiversity” laboratory practical and PCK topics; 2. Acquire the knowledge and understanding of the concepts in the laboratory practical and PCK activities, 3. Do and write reports based on the laboratory practical and PCK activities; 4. Answer questions related to each laboratory practical and PCK activities.

1

Page 2: Kkbi Biodiversity 2010

SPECIFICATION OF KNOWLEDGE- BASED COURSEWORK ( PROJECT)

PROGRAM IJAZAH SARJANA MUDA PERGURUAN (SAINS PENDIDIKAN RENDAH)AMBILAN JANUARI 2009

Specification

Topic

Task level DAttitude and personality

(15%)AAcquisition of

knowledge(25%)

BMastery of knowledge

and skill (25%)

CTransfer of knowledge

(35%)

Practical 1: Soil Ecosystem Practical 2: When is it a species?Practical 3: ex-situ ConservationPractical 4: Measuring and Comparing Species DiversityPractical 5: Understanding Population TrendsPractical 6: Measuring Genetic DiversityPCK 1: Soil Ecosystems data collationPCK 2: ex-situ ConservationpresentationPCK 3: Acoustic Ecology

Collect information related to the 6 practical topics and 3 PCK activities.

A portfolio containing information related to Practical 1-6 and PCK 1-3.

Collaboratively produce a presentation using powerpoint on the ex-situ Conservation

Burn it on a CD

Do and write reports for practical 1 to 6 and write the reflective essay.

Commitment Has shown

conscientious-ness and full involvement in carrying out the task

Collaboration Has shown

effort in obtaining guidance from various parties (Collaboration Form)

.

2

Page 3: Kkbi Biodiversity 2010

INSTITUTE: IPG KAMPUS KOTA BHARU STUDENT’S NAME :

SUBJECT : SCE 3107 ECOSYSTEM AND BIODIVERSITY NAME OF UNIT : PISMP SEMESTER 4

DATE OF COMMENCEMENT : 28 JULY 2010 DUE DATE : 08 SEPTEMBER 2010

PROJECT ASSIGMENT FOR PISMP SEMESTER 4

JAN 2009 INTAKE

This course is designed to develop students’ awareness of the functions of ecosystem, and issues relating to biodiversity conservation

Tasks

You are required to:

1. Collect information about 6 practical topics and 3 PCK activities and keep them in a portfolio2. In a group of three , making a 10 minute presentation how the survival of one plant or one animal you

“observed” is being assisted by ex situ conservation strategies. If possible, use some images to illustrate your presentation3. Do and write reports for practical 1 to 6 .4. Write a reflective essay on the ex situ conservation strategies.

General Instruction

All reports should be typed using the computer, font type Arial, font size 12 and paragraph 1.5 spacing. State references using the APA format. The cover page should include the following:

1. Name of student2. Metric number3. Identification card number4. Group / Unit5. Code and name of subject6. Name of lecturer7. Date of submission

3

Page 4: Kkbi Biodiversity 2010

Program Ijazah Sarjana Muda Perguruan (Sains Pendidikan Rendah)SCE 3107 ECOLOGY AND BIODIVERSITY

PROJECT RUBRIC ASSESSMENT

Aspect evaluated and weighing

Task componentsCriteria

Good Average Weak

A (25%)Acquisition of

knowledge

Collect information about 6 practical topics and 3 PCK activities from various resources

18-25 9-17 0-8

Clear proof of reading.

More than 3 different types of reference resources.

Content is complete, precise, and relevant.

Proof of reading.

2-3 of different types of reference resources.

Content relevant but incomplete.

Some proof of reading.

Less than 2 different types of reference resources.

Content less relevant

B (25%)Mastery of knowledge

Producing aex-situ Conservation Presentation

18-25

A very clear and very good presentation. The powerpoint is interesting and very effective

9-17

A clear and good presentation. The powerpoint is quite interesting and effective

0-8

A dull and not good presentation. The powerpoint is uninteresting and not effective

C (35%)Transfer of knowledge

Do and write reports for practical 1 to 6 and write the reflective essay .

26-35 16-25 0-15Reports completed and written in the correct format with accepted range of result.Very clear understanding of concepts in the discussion and essay reflection.

Reports completed and written in the correct format with accepted range of reflection..Clear understanding of concepts in the discussion and essay reflection

Reports completed and written in the correct format with accepted range of reflection Weak understanding of concepts in the discussion and essay reflection

4

Page 5: Kkbi Biodiversity 2010

Aspect evaluated and weighing

Task components CriteriaGood Average Weak

D (15%)Attitude and personality

Commitment (5%)

4-5 2-3 0-1Highly committed in carrying out task.ConscientiousShows keen interest

Less committed in carrying out task.Less conscientiousShows some interest

Not committed in carrying out task.Lackadaisical.Shows little or no interest

Collaboration with peers and lecturers (10%)

6-10 3-5 0-2Able to work independently and collaboratively.

Able to work rather independently as well as collaboratively.

Unable to work independently as well as collaboratively.

Total mark for this KNOWLEDGE- BASED COURSEWORK ( PROJECT) = 60/100%

5

Page 6: Kkbi Biodiversity 2010

PROGRAM PERGURUAN PENDIDIKAN RENDAH PENGAJIAN 4 TAHUN (SAINS PENDIDIKAN RENDAH) AMBILAN JANUARI 2008

JADUAL PELAKSANAAN TUGASAN PEMBELAJARAN BERASASKAN PROJEKCourse: SCE3107 Ecosystem and Biodiversity

Bil Tarikh Aktiviti Rujukan Tindakan

1 23 Jun 2008 Menerima taklimat pelaksanaan KKBI daripada Penyelaras Kerja Kursus Jabatan

Buku Panduan KKBI Pensyarah kursus

2 24 Jun 2008 Mesyuarat penggubalan KKBI dengan pensyarah kursus SCE3107

Buku Panduan KKBICourse Pro forma, Scope and sequence SCE3107

Penyelaras kursus, pensyarah kursus

3 25 Jun 2008 Penggubalan KKBI oleh pensyarah kursus Buku Panduan KKBICourse Pro forma, Scope and sequence, SCE3107 Course

Penyelaras kursus, pensyarah kursus

4 26 Jun 2008 Taklimat KKBI kepada semua pensyarah kursus Tugasan KKBI Penyelaras kursus, pensyarah kursus

5 28July 2010 Taklimat KKBI kepada guru pelatih Tugasan KKBI Pensyarah kursus

6 28 July – 08 September 2010

Perancangan tugasan KKBI oleh guru pelatih dengan bimbingan pensyarah dijalankan

Tugasan KKBI, course pro forma, scope and sequence, SCE3107

Pensyarah kursus

7 28 July – 08 September 2010

Pelaksanaan tugasan KKBI oleh guru pelatih dengan bimbingan pensyarah dijalankan

Tugasan KKBI Pensyarah kursus

8 08 September 2010 Penyerahan kerja kursus oleh guru pelatih kepada pensyarah Tugasan KKBI Pensyarah kursus

10 29 Ogos – 02 september 2010

Penilaian dan pemarkahan tugasan KKBI oleh pensyarah Rubric penilaian LAM PT 14-01 Pensyarah kursus

11 05-06 September 2010

Moderasi dan penyerahan markah tugasan kepada penyelaras.

Rubric penilaianBorang pemarkahanLAM PT14-01, LAM PT14-03, LAM PT 14-04

Penyelaras kursus, pensyarah kursus & Ketua Jabatan

6