“KNOWLEDGE TRANSFER PROGRAMME” –...
Transcript of “KNOWLEDGE TRANSFER PROGRAMME” –...
“KNOWLEDGE TRANSFER PROGRAMME” – (KTP)
JABATAN PENGAJIAN TINGGI, KEMENTERIAN PENDIDIKAN MALAYSIA
LAPORAN KEMAJUAN BERKALA / PERIODIC PROGRESS REPORT
NOTA :Jikaterdapatsebarangperubahansepertidalamborangasal, silapohonkelulusandaripihakUrusetia. NOTE: If there any changes in the original form, kindly get approval from Secretariat.
3 bulan / 3 months 6 bulan / 6 months 9 bulan/ 9 months 12 bulan/ 12 months
15 bulan / 15 months 18 bulan / 18 months 21 bulan/ 21 months 24 bulan/ 24 months
*Silatanda (√) di ruang yang berkenaan / Please tick (√) in the appropriate space.
A : MAKLUMAT GERAN / Information of Grant
KOD RUJUKAN GERAN: I-GT/15(UPM-13) Reference Code of Grant:
B : MAKLUMAT KETUA PROJEK / Details of Project Leader
NAMA KETUA PROJEK : Nor AzahYusof Name of Project Leader:
731024085280
NO.KAD PENGENALAN :
ID no.:
FAKULTI/JABATAN/: InstitutTeknologiMaju (ITMA), Universiti Putra Malaysia, 43400 Serdang, Selangor. Faculty/School/Centre:
(AlamatPenuh/Full Address):
NO. TELEFON NO. FAKSIMILI : NO. TELEFON BIMBIT: ALAMAT EMEL: DIREKTORI : PEJABAT : Fax No.: Mobile No.: E-mail Address: Directory : Office Phone No.:
03-89466782 03-89435380 019-2421472 [email protected]
C : MAKLUMAT PROJEK / Details of Project
TAJUK PROJEK :
Title of Project: Green and Renewable Sorbent for Mercury Cleanup in Petroleum Industries for Sustainable Malaysian Environment
OBJEKTIF PROJEK: OBJEKTIF BERDASARKAN PERMOHONAN / SILA TANDAKAN (√)
Objective(s) of Project: Objective(s) based on application: SEKIRANYA
MENCAPAI OBJEKTIF/
Please tick (√) If
Silasenaraikanobjektifasaldanperubahanobjektif , objective(s) achieved:
sekiranyaada
Please list down original and changes objective(s), if any. 1. To apply the developed sorbent (Poly (ethyl hydrazide) grafted Oil
Palm Empty Fruit Bunch Fiber (peh-g-opefb) and iminodiacetic acid x
chelating functional group grafted kenaffiber for mercury clean up
petroleum industrial waste water in PAKA Trengganu.
2. To work together with the industrial partner in solving all related x
problems in mercury clean up based on the actual industrial set
up x
3. To supply the technology to the industry together with the
developed sorbent in large scale
4. To consult the industry on problems related to the technology In progress
PERUBAHAN OBJEKTIF/ Changes Objective(s):
1.
2.
3.
4.
5.
2 tahun
TEMPOH PROJEK : TEMPOH : LOKASI PROJEK :
Tarikhberdasarkansuratkelulusandaripusatbertanggungjawab Duration Location(s) of Project:
IPTA masing-masing.
Ogos 2013
Duration of Project: TARIKH KUAT KUASA : 1. ITMA, UPM
Date is based on approval letter from IPTAs responsible center Effective Date:
2. Hg Solution Laboratory, Paka ,
Trengganu
Julai 2015
TARIKH TAMAT :
End Date:
D : MAKLUMAT AKADEMIA BERSAMA / Details of Co-Academia
3
JUMLAH AKADEMIA BERSAMA :
Numbers of Co-Researcher:
AKADEMIA BERSAMA1: NAMA : Nor AzahYusof
Co-Researcher 1: Name:
FAKULTI/JABATAN: Jabatan Kimia, FakultiSains, UPM
Faculty/School/Centre:
(AlamatPenuh/ Full
Address):
JAWATAN/Designation: BIDANG KEPAKARAN/Area of TAHAP KELAYAKAN
Expertise: AKADEMIK &IPTA/ Academic Qualification & IPTA
Profesor Analytical Chemistry, PhD Environmental Related Research
Abdul Halim Abdullah
AKADEMIA BERSAMA2: NAMA :
Co-Researcher 2: Name:
Jabatan Kimia, FakultiSains, UPM
FAKULTI/JABATAN:
Faculty/School/Centre:
(AlamatPenuh/ Full
Address):
JAWATAN/Designation: BIDANG KEPAKARAN/Area of TAHAP KELAYAKAN
Expertise: AKADEMIK &IPTA /Academic Qualification & IPTA
Associate Profesor Environmental Related Research, PhD Material Chemistry
RobiahYunus
AKADEMIA BERSAMA3: NAMA :
Co-Researcher 3: Name:
JabatanKejuruteraan Kimia, Fakulti Kejuruteraan, UPM
FAKULTI/JABATAN:
Faculty/School/Centre:
(AlamatPenuh/ Full
Address):
JAWATAN/Designation: BIDANG KEPAKARAN/Area of TAHAP KELAYAKAN
Expertise: AKADEMIK &IPTA /Academic Qualification & IPTA
Profesor PhD
Chemical Engineering,
Biolubricants
E : MAKLUMAT RAKAN INDUSTRI/KOMUNITI / Details of Partners Industry/Community
NAMA INDUSTRI / Hg Solution SdnBhd KOMUNITI :
Name of Industry /
Community:
NAMA KETUA INDUSTRI / ShaharuddinSafri JAWATAN KETUA INDUSTRI / KOMUNITI : KOMUNITI : Designation of Industry / Community Leader:
Name of Industry / Community
Leader:
PengarahUrusan
ALAMAT No 10, Jalan P/19, Taman IndustriSelaman, Seksyen 10, Bandar BaruBangi, 43650 Selangor DarulEhsan INDUSTRI / KOMUNITI :
Address of Industry /
Community:
MAKLUMAT NO. TELEFON NO. FAKSIMILI : NO. TELEFON BIMBIT: ALAMAT EMEL:
PERHUBUNGAN : PEJABAT : Fax No.: Mobile No.: E-mail Address:
Contact Person: Office Phone No.:
603-89267102 60194790525
JENIS PENDAFTARAN BILANGAN PEKERJA/AHLI DALAM KOMUNITI:
SYARIKAT/KOMUNITI : Persendirian Berhad x Koperasi Enterprise No. of Employees/:No.of Members in Community:
Type of Company
Registration/Community:
Masyarakat
NGO
Organisasi
41
Lain-Lain(SilaNyatakan) : __________________
*Silatanda(√) di ruang yang berkenaan / Please tick (√) in the appropriate space.
PENERIMA MANFAAT :
(Sekiranya berlainan dari nama
industri/komuniti)
Beneficiary:
(If different from industry /
community name):
NAMA :
MAKLUMAT PERHUBUNGAN Name:
PENERIMA MANFAAT 1:
Contact Person of JAWATAN :
Beneficiary 1: Designation:
NO. TELEFON PEJABAT:
Office Telephone No.:
NO. TELEFON BIMBIT:
Mobile Phone No.:
ALAMAT EMEL:
E-mail Address:
NAMA :
MAKLUMAT PERHUBUNGAN Name:
PENERIMA MANFAAT 2:
Contact Person of JAWATAN :
Beneficiary 2: Designation:
NO. TELEFON PEJABAT:
Office Telephone No.:
NO. TELEFON BIMBIT:
Mobile Phone No.:
ALAMAT EMEL:
E-mail Address:
KUMPULAN SASARAN: 1.
Targeted Audience :
2.
3.
F : MAKLUMAT GRADUATE INTERN(GI) / Details of Graduate Intern (GI)
NAMA : Siti Khadijah Abdul Rahman
BILANGAN GI 1 : Name:
Details of GI 1:
DIREKTORI: NO. TELEFON BIMBIT: ALAMAT EMEL:
Directory: Mobile No.: E-mail Address:
0192331179
STATUS BERKHIDMAT : MULA / Start TAMAT / End
Period of Internship:
1/8/2013
31/7/2014
AKADEMIK: STATUS/Status: KELAYAKAN/Qualification:
Academic:
X MasihBelajar
IjazahSarjanaMuda
Student Bachelor Degree
TelahBerijazah IjazahSarjana
Graduated Master
X PhD
*Silatanda(√) di ruang yang berkenaan / Please tick (√) in the appropriate space.
JUMLAH GAJI/ELAUN/
SAGUHATI (Bulanan): RM1500
Total of Wage/Allowance/
Consolation (Per Month):
NAMA : Nor AinShahera Bt. Khairi
BILANGAN GI 2 : Name:
Details of GI 2:
DIREKTORI: NO. TELEFON BIMBIT: ALAMAT EMEL:
Directory: Mobile No.: E-mail Address:
*Silagunakanlampiran 0126169552
tambahanjikaperlu/
Kindly use additional sheet if necessary STATUS BERKHIDMAT : MULA / Start TAMAT / End
Period of Internship:
1/8/2013
31/7/2014
AKADEMIK: STATUS/Status: KELAYAKAN/Qualification:
Academic:
X MasihBelajar
IjazahSarjanaMuda
Student Bachelor Degree
TelahBerijazah X IjazahSarjana
Graduated Master
PhD
*Silatanda(√) di ruang yang berkenaan / Please tick (√) in the appropriate space.
JUMLAH GAJI/ELAUN/ RM1200
SAGUHATI (Bulanan):
Total of Wage/Allowance/
Consolation (Per Month):
G : MAKLUMAT KEWANGAN (GERAN, PERBELANJAAN DAN SUMBANGAN /
Details of Financial (Grant, Expenses and Contribution )
JUMLAH GERAN KTP: PECAHAN VOT/VOT Breakdown
Amount of KTP Grant :
RM
11000
21000
23000
24000
27000
29000
86400 10000 5000 3285
131,317.87 - 30000
BAKI GERAN DAN JUMLAH PECAHAN VOT/VOT Breakdown
PECAHAN MENGIKUT VOT: RM
*Silasertakan slip 11000 21000 23000 24000 27000 29000
bayarandaribendahari.
Balance of Approved Grant
and Total Fractions According 7218.00
to VOT :
*Please attach payment slip
from bursary
95%
PeratusBelanja: ( ) % ( ) % ( ) % ( ) % ( ) % ( )
Percentage of Expenses: %
JUMLAH SUMBANGAN RM PERINCIAN SUMBANGAN KEWANGAN ATAU SETARA/ NILAI ANGGARAN/
KEWANGAN DARIPADA Details of Monetary Contribution or Equivalent to: Estimated Value
RAKAN INDUSTRI / (RM)
KOMUNITI KEPADA PROJEK
SEHINGGA KINI: 1.
Amount of Monetary 1.Ujian Makmaluntukmerkuri – RM67,500 (150 sampel x RM450)
2.
Contribution from Industry /
2.Peralatan AnalisisMerkuri yang dipinjamkan – RM35,000 (35hari x RM1000)
Community Partner to Project
3.
According to Progress:
JUMLAH SUMBANGAN RM NILAI ANGGARAN/
BUKAN KEWANGAN Estimated Value
DARIPADA RAKAN (RM)
INDUSTRI / KOMUNITI
KEPADA PROJEK 1. Konsultansi
SEHINGGA KINI:
2. Membekalkansampeldariindustri/pelupusansampelmerkuri
Amount of Non-Monetary
Contribution from Industry /
Community Partner to Project
According to Progress:
RM PERINCIAN SUMBANGAN KEWANGAN ATAU SETARA/ NILAI
LAIN-LAIN SUMBANGAN KEPADA Details of Monetary Contribution or Equivalent to: ANGGARAN/
PROJEK SEHINGGA KINI: Estimated Value
Others Contribution According to (RM)
Progress:
1.
1.
2. 2.
3. 3.
H : STATUS PROJEK / Status of Project
ILMU YANG DIPINDAHKAN SEHINGGA ISU/ MASALAH/ TINDAKAN YANG DIAMBIL UNTUK MENANGANI ISU/ MASALAH/ TEMPOH MASA
KINI: CABARAN: CABARAN: MENANGANI
Knowledge Transferred According to Issues/ Problems/ Action Taken to Overcome/Issues/ Problems/ Challenges: ISU/MASALAH/CABA
Progress: Challenges: RAN:
Duration to Overcome
Obstacles:
1. Analisisperingkat ‘Pilot plant’ 1. ‘pilot plant’ 1. Berkerjasamadenganpenyelidikdarikejuruteraankimiauntuk 1. 6bulan
untukujikeupayaandalamskala perlu di merekabentuk ‘pilot plant’ dalamskala yang kecil
besarpenjerap yang Buatsendiri dah
dihasilkan Ulu kerana
university dan
industry
Tiada kemudah
an tersebut
Silagunakanlampirantambahanjikaperlu/ Kindly use additional sheet if necessary
I : HASIL DAN IMPAK BERDASARKAN ‘MILESTONE’ / Outcome and Impact based on Milestone
PENCAPAIAN MENGIKUT ‘MILESTONE’ / HASIL/ IMPAK/
‘MILESTONE’ BERDASARKAN Milestone Outcome Impact
PROGRES BESERTA PERATUS: 1. To apply the developed sorbent(100)% 1. Sorbent has been proved to be 1. Possible sorbent can
Achievement(s) based on (Poly (ethyl hydrazide) grafted Oil able to adsorpt mercury be commercialized
Milestone According to Progress Palm Empty Fruit Bunch Fiber however the physical form is
(peh-g-opefb) and iminodiacetic
and Percentage :
not suitable
acid chelating functional group
2.
grafted kenaffiber for mercury
clean up in petroleum industrial
waste water in PAKA Trengganu.
3.
2. To work together with the (100)%
2. We have carried out industrial
industrial partner in solving all
visit together with HgSolution 4.
related problems in mercury
Sdn Bhd to Petronas Carigali
clean up based on the actual
Sdn Bhd and Petronas
industrial set up
3. To supply the technology to the (50%)
industry together with the
developed sorbent in large scale
4. To consult the industry on problems related to the technology (70%)
Ammonium Sdn Bhd to gain 5. knowledge on actual industrial set up.
3. Block diagram has been designed for upscaling process, however more fund is needed to carry out this plan. Suggestion to work with HgSolution for Technofund
J : PENCAPAIAN PROJEK BERDASARKAN PROGRES / Project Achievement Based on Progress
HASIL KEPADA INDUSTRI / HASIL/ IMPAK/
KOMUNITI SASARAN Outcome Impact
BERDASARKAN PROGRES:
Outcome(s) to Targeted Industry / 1. As of now, we have been working side by 1.
Community According to Progress : side with the industry, and the strategy will
be to present together the outcome to fund
provider. First is to apply TechnoFund for 2.
precommercialization (to built pilot plant for
upscaling) and followed by presentation to
Petronas or other oil and gas company for 3.
licensing purposes
2. prototype for removal of mercury in condensate and produced water has been built and currently under testing. 3. Suitable form (sylinder like) of polymer has been obtained using mould 4. Upscaling study has been successfully carried out up to 200%
PULANGAN KEPADA IPTA: HASIL/ Outcome IMPAK/ Impact
Return(s) to IPTA :
1.
2.
3.
SUMBANGAN KEPADA HASIL/ Outcome IMPAK/ Impact
PEMBANGUNAN MODAL INSAN:
Contribution(s) to Human Capital
1. 2 pelajar (1 MSc dan 1 PhD) 1.
Development:
2. 2.
3. 3.
HASIL TIDAK LANGSUNG YANG DITERIMA OLEH INDUSTRI / KOMUNITI (SASARAN): Indirect Outcome received by recipient Industry / Community (Targeted):
1. New technology potential for commercialization
2. Working together for technofund
3.
*Silagunakanlampirantambahanjikaperlu/ Kindly use additional sheet if necessary.
HASIL TIDAK LANGSUNG YANG DITERIMA OLEH 1. PIHAK KETIGA(BUKAN SASARAN):
Indirect Outcome received by third party: 2.
3.
*Silagunakanlampirantambahanjikaperlu/ Kindly use additional sheet if necessary.
K : AKUAN KETUA PROJEK / Declaration by Project Leader
TANDATANGAN KETUA PROJEK : _______________ _____________ TARIKH : 24/4/2015 Project Leader’s Signature : (TandatanganElektronik)Tarikh:
(Electronic Signature)
L : AKUAN TIMBALAN NAIB CANSELOR/PENGARAH YANG BERTANGGUNGJAWAB / Declaration by responsible Deputy Vice Chancellor/Director
NAMA PUSAT BERTANGGUNGJAWAB: Name of Responsible Center :
NAMA TIMBALAN CANSELOR YANG BERTANGGUNGJAWAB: Name of Responsible Deputy Vice Chancellor :
TANDATANGAN TNC : ____________________________ TARIKH : DVC’s Signature : (TandatanganElektronik)Tarikh:
(Electronic Signature)
M : RESPON DARI SEKRETARIAT/Response By Secretariat
UNTUK KEGUNAAN SEKRETARIAT SAHAJA/ For Secretariat Use Only
NO. BAHAGIAN / PART LENGKAP / Complete TIDAK LENGKAP / Incomplete
1 A : MAKLUMAT GERAN /Information of Grant
2 B : MAKLUMAT KETUA PROJEK / Details of Project Leader
3 C : MAKLUMAT PROJEK / Details of Project
4 D : MAKLUMAT AKADEMIA BERSAMA / Details of Co-Academia
5 E : MAKLUMAT RAKAN INDUSTRI/KOMUNITI /
Details of Partners Industry/Community
6 F : MAKLUMAT GRADUATE INTERN(GI) /
Details of Graduate Intern (GI)
7 G : MAKLUMAT KEWANGAN (GERAN, PERBELANJAAN DAN SUMBANGAN )
Details of Financial (Grant, Expenses and Contribution )
8 H : STATUS PROJEK / Status of Project
9 I : HASIL DAN IMPAK BERDASARKAN ‘MILESTONE’ /
Outcome and Impact based on Milestone
10 J : PENCAPAIAN PROJEK BERDASARKAN PROGRES /
Project Achievement Based on Progress
11 K : AKUAN KETUA PROJEK / Declaration by Project Leader
12 L : AKUAN TIMBALAN NAIB CANSELOR/ PENGARAH YANG
BERTANGGUNGJAWAB /
Declaration by responsible Deputy Vice Chancellor/ Director
SEKRETARIAT KNOWLEDGE TRANSFER PROGRAMME – (KTP)
TERIMA/ Received
DIKEMBALIKAN/Returned
SUITE 125, KOMPLEKS EUREKA
ULASAN / Comments:
UNIVERSITI SAINS MALAYSIA