Kompleks Kerja Raya 2 (KKR2) Ongoing Projects 2012 IEN ... Project Portfolio - February 2012.pdf ·...
-
Upload
nguyennguyet -
Category
Documents
-
view
248 -
download
8
Transcript of Kompleks Kerja Raya 2 (KKR2) Ongoing Projects 2012 IEN ... Project Portfolio - February 2012.pdf ·...
Kompleks Kerja Raya 2 (KKR2)Kuala Lumpur, MalaysiaFirst high-rise energy efficient office building in South-East Asia.Client: Ministry of Works & JKRContractor: Ahmad Zaki Sdn BhdArchitect: GDP Architects
GBIPlatinum
51,000m2
90kWh/m2year
348 Sentral (Shell HQ)Kuala Lumpur, MalaysiaThe new corporate HQ for Shell Malaysia at KL Sentral.Client: Shell MalaysiaContractor: MRCBArchitect: Hijjas Kasturi Architects
LEEDGold
79,000m2
136kWh/m2year
Sunpower PV Manufacturing PlantMelaka, MalaysiaAdministration building for the Sunpower Corp.factory in Melaka with LEED Platinum Certification.Client: Sunpower Corp.Contractor: Hexagon LEED
Platinum
6,600m2
120kWh/m2year
Public Mutual Bank HQKuala Lumpur, MalaysiaHQ for Public Mutual Bank in Kuala Lumpur, with a Double Gold Certification.Client: Public Mutual BankArchitect: MAA Architects GBI
GoldLEEDGold
60,000m2
110kWh/m2year
KLIA Terminal 2 (LCCT)Kuala Lumpur, MalaysiaThe most green airport in South-East Asia with a Double Gold Certification.Client: Malaysia Airports BerhadContractor: UEM & Bina Puri JVArchitect: LKMD & AHAN Architects
GBIGold
GBIGold
LEEDGold
LEEDGold
250,000m2
~ 450kWh/m2year
Setia City MallSetia Alam, MalaysiaThe first green certified shopping mall inMalaysia, with a Double Gold Certification.Client: GreenHillContractor: Bovis LendLeaseArchitect: Archicentre
GBICertified
Green Mark Gold
100,000m2
303kWh/m2year(Including tenants)
Sarawak Energy HQKuching, Sarawak, MalaysiaThe new energy efficient and green HQ forSarawak Energy Berhad in Kuching.Client: Sarawak Energy BerhadContractor: Putra Perdana ConstructionsArchitect: Jurubina Unireka
GBICertified
40,000m2
120kWh/m2year
Rafflesia @ the ParkKuala Lumpur, MalaysiaThe first large high-end green housing project in Malaysia.Client: MK LandArchitect: Architects 61
GBIPlatinum
140Semi-D’s
MK Business CentreKuala Lumpur, MalaysiaThe new corporate HQ for Tan Sri Mustapha Kamal - “Affordable Green”Client: EMKAY GroupArchitect: Architects 61
GBIGold
43,000m2
< 100kWh/m2year
Steadhaus CondominiumKuala Lumpur, MalaysiaHigh-end condominium at KLCC with a Green Mark Platinum certification.Client: Steadmont Development Sdn BhdArchitect: Mstudio
Green MarkPlatinum
17,000m2
N/A
KL Eco CityKuala Lumpur, MalaysiaThe first comprehensive green city development in Malaysia.Client: SP SetiaArchitect: GDP, GRA & BEP Architects
320,000m2
N/A
N/A
N/A
National Cancer Institute IEN Consultants Sdn Bhd 4
Key Data
1.1 NCI MODEL
A detailed 3D energy model has been modelled with based on the latest architectural drawings and the AC zoning drawings provided by the M&E consultants.
Modelled Air-conditioned area in this 3D model is 48,167 m². Window to wall area is 20%. 1.2 CONSTRUCTION DETAILS OF THE BASE MODEL
1.3 BASE HOSPITAL TEMPLATE
Description U-value (W/m²K) Roof Roof with 100mm polystyrene foam insulation 0.27 External Wall Precast Concrete Blocks 3.54 External glazing Clear float green tint, 6mm 5.32
Cooling setpoint Based on AC zoning (varies from 19oC to 23oC) Humidity during cooling 55% Fresh air Based on AC zoning (varies from 2 ach to 40 ach) Fluorescent Lighting 15 W/m² People 14 m²/person Equipment 12 W/m² Additional Air Infiltration 0.5 air change per hour (ach), 24 hours. (assumptions) Lift energy 1.7 kWh/m2/year (budgeted for 10 lifts) Facade Lighting 70 kW,7pm to 12am (assumptions)
35 kW,12am to 7am TNB tariff rm0.39/kWh (average tariff in combination with maximum demand)
National Cancer InstitutePutrajaya, MalaysiaEnergy efficient hospital in Putrajaya built according to the new JKR energy standards.Client: KKM & JKRContractor: Kiara Teratai & IJM JVArchitect: Perunding Alam Bina Sdn Bhd
50,000m2
< 145kWh/m2year
N/A
UIAM Teaching HospitalKuantan, MalaysiaEnergy efficient hospital in Kuantan built according to the new JKR energy standards.Client: UIAMContractor: Ahmad Zaki Sdn BhdArchitect: I-TAAC Architect
110,000m2
< 145kWh/m2year
OLC Integrated Development at KLCCKuala Lumpur, MalaysiaEnergy efficient hospital in Kota Kinabalu built according to the new JKR energy standards.Client: UT ProjectsArchitect: Pickard Chilton (USA) & GDP (Malaysia)
150,000m2
< 110kWh/m2year
Ong
oing
Pro
ject
s 201
2IE
N C
onsu
ltant
s
GBIGold
LEEDGold