    KEPERLUAN PERMOHONAN BEKALANELEKTRIK DAN PEMANTAUAN PROJEK TNB

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    2/30

    POWERING THE NATION

    TNB KUALA LUMPUR TNB PUTRAJAYA

    No of Consumer 1,118,483 26,918

    Area width (kmsq) 506.801 49

    Maximum Demand (MW) 2,679 86

    No of Substation PMU : 34PPU : 137

    SSU 33kV : 36

    PE 11kV : 6911

    PMU: 3PPU: 9

    SSU 33KV: 2

    PE 11KV : 356

    SAIDI (min) 28.83 0.27

    LATAR BELAKANG TNB KUALA LUMPUR & TNB PUTRAJAYA

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    3/30

    POWERING THE NATION

    Akta Bekalan Elektrik 1990

    Peraturan-Peraturan Bekalan Pemegang

    Lesen 1990

    Peraturan-Peraturan Elektrik 1994

    Piagam Pelanggan TNB

    AKTA, PERATURAN & PIAGAM PELANGGAN

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    4/30

    POWERING THE NATION

    500kV, 275kV, 132kV

    33kV, 22kV and 6.6kV, 11kV, 400/230V

    SISTEM BEKALAN ELEKTRIK

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    5/30

    POWERING THE NATION

    TANGGUNGJAWAB PEMEGANG LESEN & PELANGGAN

    Single Tenant -Unit kediaman sesebuah seperti rumah teres atau rumah sebuah

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    6/30

    POWERING THE NATION

    Shop lot-Unit rumah kedai lebih dari satu tingkat

    TANGGUNGJAWAB PEMEGANG LESEN & PELANGGAN

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    7/30

    POWERING THE NATION

    Unit kediaman bertingkat dan pusat komersil bertingkat bagi pengguna berkelompok

    seperti rumah pangsa (flat), kondominium dan komersil (kompleks beli-belah)

    TANGGUNGJAWAB PEMEGANG LESEN & PELANGGAN

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    8/30

    POWERING THE NATION

    Unit kediaman bertingkat dan pusat komersil bertingkat bagi pengguna berkelompok

    seperti rumah pangsa (flat), kondominium dan komersil (kompleks beli-belah)

    ANGGUNGJAWAB PEMEGANG LESEN & PELANGGAN

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    9/30

    POWERING THE NATION

    Pilih Commercial & Industrial

    1

    Pilih Supply Application

    2

    Pilih READ MORE pada ELECTRICITY

    SUPPLY APPLICATION HANDBOOK

    (ESAH)

    3 4

    Muat turun panduan utama berkaitan

    CAPAIAN PANDUAN TNB www.tnb.com.my

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    10/30

    POWERING THE NATION 10

    Dalam seksyen ini, anda boleh membaca tentang caj sambungan ,deposit untuk bayaran , Caj Sambungan Beban ( CLC ), dan Surcaj

    Power Factor . Terdapat juga maklumat mengenai peralatan kimpalan

    elektrik dan surcaj bagi bekalan elektrik sementara. Maklumat lebih baik

    diberi supaya anda dapat mengelakkan kos yang tidak perlu .

    CAJ & PENALTI

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    11/30

    POWERING THE NATION 11

    Pengecualian deposit

    Kenalpasti pembayar bil kerana akaun yang dinamakan atas

    agensi/badan kerajaan adalah dikecualikan deposit.

    Untuk pengecualian deposit, pihak TNB perlu jelas siapakah pihak

    yang akan berkontrak dgn TNB. Deposit adalah merujuk kepada

    akaun yang bakal didaftarkan.

    Definisi Agensi Kerajaan

    Pihak Berkuasa Tempatan, Institusi Pengajian Awam, Lembaga &

    Perbadanan

    Kedutaan dan Suruhanjaya Tinggi

    Jabatan-Jabatan Kerajaan dan Badan-Badan Berkanun

    PENGECUALIAN DEPOSIT

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    12/30

    POWERING THE NATION

    < 100kVA

    Dipohon oleh

    kontraktor elektrikberdaftar dengan

    Suruhanjaya

    Tenaga(ST)

    > 100kVA

    Dipohon oleh

    Jurutera Perundingyang berdaftar

    dengan BEM

    Jenis

    Permohonan

    Bekalan

    Elektrik

    JENIS PERMOHONAN BEKALAN ELEKTRIK

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    13/30

    POWERING THE NATION

    Voltan

    Rendah

    VoltanTinggi

    Bekalan Tahap Voltan (V) Beban Maksima (kVA)

    1 fasa 230 < 12

    3 fasa400 < 45

    400 < 1,000

    Bekalan Tahap Voltan (kV) Beban Maksima (kVA)

    3 fasa

    11 > 1,000

    33 > 5,000

    132 & 275 > 25,000

    TAHAP VOLTAN BEKALAN ELEKTRIK

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    14/30

    POWERING THE NATION

    Beban Maksima Tahap Voltan

    Keperluan Pencawang

    Elektrik

    350kVA

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    15/30

    POWERING THE NATION

    P2 P3

    Pemberitahuan

    Mula Kerja

    Pertimbangan

    kepada Pelan-

    pelanCadangan

    Pemajuan

    Proses 2

    Proses 3

    Pengumpulan

    Maklumat

    Teknikal

    P5

    Pemeriksaan

    Akhir

    Peringkat I &Peringkat II

    Akhir

    P1

    Proses

    Mula

    Pendepositan

    CCC

    danBorang-

    Borang G

    P4

    Pemeriksaan

    Interim

    Proses 4 Proses 5 Proses 6

    P6

    Merangkumi dari peringkat Mula hingga Akhir pembinaan

    PROSES ONE STOP CENTER (OSC 3.0)YANG MELIBATKAN

    TNB

    HUBUNGKAIT PROSES

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    16/30

    POWERING THE NATION

    Proses OSC3.0 oleh PBT

    Proses TNB

    [Proses 1]

    Pengumpulan

    Maklumat

    Teknikal

    Pra-rundingan Kebenaran Merancang (KM)

    Pihak TNB akan mengulas keperluan pencawang elektrik dari segi

    bilangan, lokasi dan jenis. Keperluan pembekal (PPU & PMU) turut

    dinyatakan. Ulasan rezab talian penghataran (jika terlibat)

    [Proses 2]

    Pertimbangan

    Pelan-pelan

    Cadangan

    Perakuan Kebenaran Merancang kepada PBT & Permohonan

    Bekalan Elektrik kepada TNB

    Pihak TNB akan meluluskan pelan-pelan cadangan serta menetapkan

    Tapping Point of Supplyuntuk permohonan ini untuk proses

    berikutnya

    [Proses 3]

    Pemberitahua

    n Mula Kerja

    Penyediaan dan kelulusan Cadangan Perancangan Projek (CPP) bagipermohonan yang diterima.

    Pihak TNB akan mengeluarkan Caj Sambungan Pengguna (CSP)

    selepas kelulusan diperolehi untuk dibayar oleh pemaju/pemilik

    Jurutera Perunding perlu menguruskan permohonan izinlalu pada

    peringkat ini

    HUBUNGKAIT PROSES ONE STOP CENTER (OSC 3.0)

    DENGAN PERMOHONAN BEKALAN ELEKTRIK

    HUBUNGKAIT PROSES

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    17/30

    POWERING THE NATION

    Proses OSC3.0 oleh PBT

    Proses TNB

    [Proses 4]

    Pemeriksaan

    Interim

    Penerimaan Bangunan Pencawang Elektrik/Tapak Pembangunan

    Pihak TNB akan membuat semakan tapak dan pencawang-

    pencawang elektrik yang dibina sebelum diterima

    Kerja-kerja rentangan dan pemasangan aset TNB dimulakan

    [Proses 5]

    Pemeriksaan

    Akhir

    Pengeluaran Surat Sokongan CCC

    Pihak TNB akan membuat semakan kerja-kerja pemasangan aset

    TNB di tapak dan semua syarat-syarat TNB dipatuhi sepenuhnya

    Surat sokongan akan dikeluarkan selepas semua keperluan TNB

    dipatuhi dan aset TNB telah dimulatugas sehingga ke kabel servis

    TNB

    [Proses 6]

    Pendepositan

    CCC &

    Borang-

    Borang G

    Tidak berkaitan dengan TNB

    Pihak TNB akan memasang meter elektrik setelah deposit selesai

    dibayar untuk akaun-akaun elektrik yang terlibat

    HUBUNGKAIT PROSES ONE STOP CENTER (OSC 3.0)

    DENGAN PERMOHONAN BEKALAN ELEKTRIK

    PROSES PERMOHONAN BEKALAN ELEKTRIK TNB 100kVA

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    18/30

    POWERING THE NATION

    Nos. of process

    /procedures

    Nos. of customer

    Interaction required

    Stage 1: OSC

    infrastructure

    needsStage 2: Detail

    Supply

    Requirement

    data (Checklist)

    Process 1

    Pre-

    Consultation

    process

    Process 2

    OSC

    submission

    & PlanApproval

    (Inclusive of

    Wayleave &

    Permit

    approval)

    Process 3

    Tech.

    evaluation

    (ProjectPlanning &

    issue Conn.

    Charge)

    Process 4

    1. Pay Conn.

    Charge

    2. HandoverSubstation

    3. Handover

    site

    4. Obtained

    excavation

    permit

    Process 5

    Prepare &

    install

    supplysystem/

    service

    Process 6

    Pay

    deposit

    Process 7

    Install

    meter &

    connectsupply

    7

    3

    14 days 14 days 5 days

    Installation ConnectionPlanningOSC (One

    Stop Center)Pre-Consultation

    30 days 60 days

    PROSES PERMOHONAN BEKALAN ELEKTRIK TNB > 100kVA

    PURATA JANGKA MASA PROSES PERMOHONAN BEKALAN

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    19/30

    POWERING THE NATION

    TAHAP VOLTAN

    132kV ke atas

    33 kV

    11 kV

    400 V ke bawah

    (dengan pencawang)

    400 V ke bawah

    (tanpa pencawang)

    JANGKA MASA

    3 - 5 tahun

    18 - 24 bulan

    6 - 12 bulan

    3 - 12 bulan

    < 3 bulan

    PURATA JANGKA MASA PROSES PERMOHONAN BEKALAN

    ELEKTRIK > 100kVA

    PROSES PERMOHONAN BEKALAN ELEKTRIK TNB < 100kVA

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    20/30

    POWERING THE NATION

    Step number#

    Submit andpay at TNB

    Installation

    and meterinstall

    Issue 1stbill

    Conduct

    self

    estimation

    Submit & pay

    at Kedai

    Tenaga

    Meter Only /

    Overhead

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    21/30

    POWERING THE NATION

    Terms & Conditions:

    The completion of application forms submitted by contractors/customers

    The electricity connection fee and deposit have been paid by contractors/customers

    Service cable and premise meter board are presented and in good condition

    Permit has been approved by Local Authority

    New Supply Connection Application

    Estimation Duration (days)

    1 - 3 Days Meter Only

    Overhead(Talian Atas)

    10 - 14 days

    (non protocol area by PBT)

    Underground cable

    (Kabel Bawah Tanah)

    30 - 50 days

    (protocol area by PBT)

    Underground Cable

    (Kabel Bawah Tanah)

    3

    5 Days

    With/Without Permit

    With Permit

    Customer charter for New Individual Supply Application up to 140kVA

    Customer Charter

    published in TNB Kepong

    PURATA JANGKA MASA PROSES PERMOHONAN BEKALAN

    ELEKTRIK < 100kVA

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    22/30

    22

    POWERING THE NATION

    PERMOHONAN BEKALAN SECARA ONLINE

    Layari di sesawang TNB

    www.tnb.com.my

    Fungsi Permohonan bekalan elektrik

    dapat dilaksankan secara on-line

    Faedah Mudah, senang hanya di

    hujung jari anda!

    https://eapplication.tnb.com.my/

    http://www.tnb.com.my/http://www.tnb.com.my/http://www.tnb.com.my/
  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    23/30

    23

    POWERING THE NATION

    Layari di sesawang TNB

    www.tnb.com.my

    FUNGSI Ketelusan perkhidmatandalam pemantauan statusprojek secara on-line

    FAEDAH Pengguna dapat membuat

    semakan status bekalansecara on-line

    SEMAK BEKALAN SECARA ONLINE

    O C G

    http://www.tnb.com.my/http://www.tnb.com.my/http://www.tnb.com.my/
  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    24/30

    POWERING THE NATION 24

    Keperluan Pra-Rundingan

    Setiap perancangan projek amat digalakkan membuat pra-

    rundingan sebelum dokumen tender dibuat

    Memastikan keperluan pencawang dan tahap voltan bekalan yang

    akan diberi adalah mengikut panduan TNB yang terkini

    Pematuhan senarai semak permohonan bekalan

    Permohonan yang lengkap adalah diperlukan sebelum

    permohonan bekalan elektrik diproses mengikut jangka masa

    lazim. Pihak TNB akan memastikan pelan-pelan yang dimajukan

    diperakukan mengikut panduan TNB yang terkini

    WAY FORWARDPERANCANGAN

    PROJEK

    WAY FORWARD PERANCANGAN

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    25/30

    POWERING THE NATION 25

    Izinlalu dalam kawasan persendirian

    Pepasangan yang dipasang dalam kawasan/jalan persendirian

    perlu bersetuju dengan perjanjian izinlalu bagi memastikan akses

    untuk operasi TNB apabila diperlukan

    Dokumen Tapak Pencawang

    Perlu dimajukan sebelum Caj Sambungan Pengguna dikeluarkan

    Jaminan RM 20,000 setiap pencawang dikecualikan

    Borang Pindahmilik/Pajakan Tapak Pencawang

    Warta Tanah Kerajaan pada lot asal pembangunan

    Pelan Pra-hitungan bagi setiap tapak pencawang elektrik

    WAY FORWARDPERANCANGAN

    PROJEK

    WAY FORWARD PERANCANGAN

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    26/30

    POWERING THE NATION 26

    Pembayaran Caj Sambungan Pengguna (CSP)

    CSP perlu dibayar segera supaya unit Pembinaan TNB boleh

    memulakan proses kertas kerja pembinaan dan kerja-kerja tapak

    Mempunyai tempoh sah laku 6 bulan dan sekiranya lewat, CSP

    dibatalkan.

    Pemantauan status

    Ada pegawai pemantau tetap bagi setiap kementerian/agensi

    kerajaan supaya pihak TNB boleh memantau secara terus projek-

    projek secara bulanan supaya sebarang kemajuan/halangan dapat

    dikemaskini dan diambil tindakan segera oleh kedua pihak

    WAY FORWARDPERANCANGAN

    PROJEK

    WAY FORWARD PEMANTAUAN

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    27/30

    POWERING THE NATION 27

    Permohonan Permit

    Jurutera Perunding Elektrik perlulah menguruskan permohonan

    kebenaran izinlalu laluan kabel (pemotongan terbuka, HDD,

    korekan atas jalan, korekan atas tanah) daripada Pihak Berkuasa

    Tempatan (PBT) termasuk JKR (Jabatan Kerja Raya), KTM (Keretapi

    Tanah Melayu), LLM (Lembaga Lebuhraya Malaysia) dan PGN

    (Perbadanan Gas Negara) dan lain-lain serta menguruskan

    pembayaran kos-kos yang dikenakan oleh pihak PBT bagi

    membolehkan pihak TNB memulakan kerja rentangan kabel.

    WAY FORWARDPEMANTAUAN

    PEMBINAAN

    WAY FORWARD PEMANTAUAN

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    28/30

    POWERING THE NATION 28

    Pemantauan status Kemaskini status kemajuan/halangan projek berkala dengan

    tindakan seterusnya

    Pematuhan bangunan pencawang dan penyediaanpepasangan

    Kontraktor perlu memastikan bangunan dan infrastruktur

    pepasangan TNB adalah mengikut pelan-pelan yang telah

    diluluskan kepada perunding elektrikal (susunatur perparitan

    kabel, penyediaan paip, jenis MSB / panel meter)

    Isu kerap berbangkit apabila kontraktor membina mengikut

    dokumen tender dan bukannya mengikut pelan-pelan diluluskan

    TNB

    WAY FORWARDPEMANTAUAN

    PEMBINAAN

    WAY FORWARD PEMANTAUAN

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    29/30

    POWERING THE NATION 29

    Pembayaran Deposit

    Kenalpasti pembayar bil kerana akaun yang dinamakan atas

    agensi/badan kerajaan adalah dikecualikan deposit.

    Kelewatan pembayaran bagi akaun-akaun terlibat akan

    melewatkan pemasangan meter

    WAY FORWARDPEMANTAUAN

    PEMBINAAN

  • 7/26/2019 KWP - Keperluan Permohonan Bekalan Elekrik Dan Pemantauan Projek TNB

    30/30