Malaysia Productivity Blueprint Private Healthcare Productivity … · 2020-05-08 · SECRETARY...
Transcript of Malaysia Productivity Blueprint Private Healthcare Productivity … · 2020-05-08 · SECRETARY...
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
Malaysia Productivity Blueprint&
Private Healthcare Productivity Nexus(PHPN)
➢
➢
➢
➢
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
Delivering successfully on the Blueprint will pave the way to achieving the ambitious labour
productivity growth target of 3.7% per annum during the 11MP (2016 – 2020) period.
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
Co-chaired by YB MITI MinisterAnd YB MEA Minister
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
Note: list is not exhaustive
MINISTRY OF PRIME
MINISTER
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
Reducing Unnecessary Regulatory Burdens on Private Hospitals: Renewal
of license to operate and provide
Develop guidelines for hospital facility extension/ renovation
Reducing Unnecessary Regulatory Burdens on Private Hospitals: Setting Up
a New Private Hospital
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
Harmonization of the requirements in the process of setting up new
hospitals
• Increased number of “complete and comply” applications expected to reduce 20% of processing time (days)
• Compliance cost savings of RM750 mil over 5 years
CURRENT SITUATION ACTION TAKEN OUTPUT
• Inconsistencies in the technical
requirements and standards imposed
by multiple regulatory agencies in the
process of setting up new hospitals
• Re-submission have caused time
(delay) and money, and this escalates
the cost of doing business.
• List of harmonized requirements,
procedures and guidelines
• Facilitates the private healthcare facilities
providers to complete and comply
• A reference source for all stakeholders
regulators, operators, technical
professionals and other interested parties.
• Stakeholder Engagements and
Coordination between CKAPS and local
councils for zoning and pre-
establishment approvals
• Harmonization of technical requirements
between CKAPS and technical agencies
(PBT, BOMBA)
• Series of Dealing with Construction
Permits (DCP) Training Program for
Private Hospital
HANDBOOK ON SETTING UP A PRIVATE HOSPITAL IN MALAYSIA: SUBMISSION PROCESS & HARMONIZATION OF TECHNICAL REQUIREMENTS
Real case: there was an application
approved after
17 times of re-submission
Reduced to
2-3 times of re-submission
EXPECTED IMPACT
7
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
CAWANGAN KAWALAN AMALAN PERUBATAN SWASTA(CKAPS)
BAHAGIAN AMALAN PERUBATAN
Ministry of Health
Malaysia
MINISTER OF HEALTH
Deputy Minister
SECRETARY GENERAL
DIRECTOR GENERAL OF HEALTH
Deputy SecretaryGeneral
(Management)
Deputy DirectorGeneral (Public
Health)
DEPUTY DIRECTORGENERAL
(MEDICAL)
Deputy DirectorGeneral (Research
& Technical Support)
Principal Director (Oral
Health)
Principal Director
(Pharmaceutical Services)
Principal Director (Food
Safety & Quality)
Deputy SecretaryGeneral
(Finance)
INSTITUTIONSRESEARCH CENTRE
AUTHORITIES
Medical Development
Division
MEDICAL PRACTICE DIVISION
TCM Division NursingDivision
Allied Health
Division
STATE HEALTH DEPARTMENTS
MALAYSIAN OPTIC COUNCIL
(MOM)
MEDICAL ASSISTANTS BOARD (LPP)
MEDICO-LEGAL SECTION (CML)
LEGISLATION SECTION (CGA)
PRIVATE MEDICAL PRACTICE CONTROL SECTION (CKAPS HQ)
CKAPS JKN/WP
Sektor Polisi, Sumber & Piawaian
Sektor Teknikal &
Operasi
Sektor Penilaian
Perkhidmatan
Pendaftaran & Pelesenan
Aduan &Penguatkuasaan
TECHNICAL ROLES
ADMINISTRATIVE ROLES
Note: HEALTHCARE IN MALAYSIA ~ DUAL SYSTEMS: PUBLIC & PRIVATE
❑ PUBLIC UNDER MINISTRY (GENERAL ORDER & TREASURY ORDER)❑ PRIVATE UNDER ACT 586
CKAPS HQ CKAPS JKN/WP
Registration of Private Medical Clinic and Private Dental Clinic Registration of Private Medical Clinic & Private Dental Clinic
Pre-establishment & Appoval to establish or maintain PHFSother than private clinics
-
Licensing of PHFS other than private clinics (New & Renewal of Licences)
Licensing of PHFS other than private clinics (Renewal of Licences & verification)
Extension or Alteration of PHFS -
Transfer, assignment or disposal of, variation or amendment, duplication, search on or extract from Register (COR, COA or Licence)
-
Withdraw of applications: registration, approval and licence -
Handling Complaint Handling Complaint
Handling Quality improvement activity (Incident Reporting & Assessable Death)
-
Enforcement Enforcement activities
Standard & Development + Information System ( incld. MedPCs) : e.g. DG Directive
-
Administration & Implementation Policies -
16
LAWS GOVERNING
HEALTHCARE FACILITIES & SERVICES
FACTORIES AND MACHINERY ACT, 1967
THE ATOMIC ENERGY LICENSING ACT 1984
Pathology Laboratory Act 2007
PRIVATE HEALTHCARE FACILITIES & SERVICES ACT 1998
Medical Device Act 2012
CROSS-REFER BETWEEN THE PRIVATE HEALTHCARE FACILITIES AND SERVICES ACT 1998 [Act 586] and its SUBSIDIARY LEGISLATIONS on PHFS
HEALTHCARE FACILITIES AND SERVICES HEALTHCARE PROFESSIONALl/Para Profesional PRACTICES
Radioactive material, nuclear
material/ prescribed substance
The Atomic Energy Licensing Act 1984
[Act 304]MEDICAL DOCTORS MEDICAL ACT 1971 [ACT 50] Psychiatric services Mental Health Act 2001 [Act 615]
Land, Certificate of Completion and
Compliance of buildings or
equivalent & signboard approval
Uniform Building By-Laws 1984 By
Local Authorities DENTISTS
DENTAL ACT 1971
[ACT 51]
Consent and
Causing miscarriagePenal Code [Act 574]
Steam Boiler, Unfired Pressure
Vessel + machinery equipments
Factories and Machinery Act, 1967
[64/1967] By Department of
Occupational Safety and Health
PHARMACISTSREGISTRATION OF PHARMACISTS
ACT 1951, (Revised 1989) [ACT 371]Drugs & Medicines
Poisons Act 1952 (Revised 1989) [Act
366]
Safety for fire exitFire Services Act 1988 [Act 341]
By Fire DepartmentOPTICIAN & OPTOMETRIST
OPTICAL ACT 1991
[ACT 469]
Dangerous Drugs Act 1952 (Revised
1980) [Act 234]
Environmental safety and clinical
waste
Environmental Quality Act 1974 [Act
127] By Department of Environment NURSES NURSES ACT 1950 [ACT 14]
Sale of Drugs Act 1952 (Revised 1989)
[Act 368]
Estate workers
Workers’ Minimum Standards of
Housing and Amenities Act 1990 [Act
446]
MIDWIVESMIDWIVES ACT 1966 (Revised 1990)
[ACT 436]Medicines (Advertisements and Sale) Act
1956 (Revised 1983) [Act 290]Advertisements
Medical devices Medical Device Act 2012 [Act 737]MEDICAL ASSISTANTS
MEDICAL ASSISTANTS
(REGISTRATION) ACT 1977 [ACT 180]
Therapeutic, medical education
and research Human Tissues Act 1974 [Act 130]
Pathology laboratoryPathology Laboratory Act 2007
[Act 674]HOSPITAL ESTATE
ASSISTANTS
ESTATE HOSPITAL ASSISTANTS
(REGISTRATION) ACT 1965 (Revised
1990) [ACT 435]Infectious Diseases Control
Destruction of Disease-Bearing Insects
Act 1975 [Act 154]
Private Aged Healthcare Facilities
and Services Act 2018 [Act 802]
Companies Act 2016 [Act 777]
(replaced 1965 – Act 125)ALLIED HEALTH
PROFESSIONALS (23 categories)
ALLIED HEALTH PROFESSIONAL
ACT 2016 [ACT 774]
Prevention and Control of Infectious
Diseases Act 1988 [Act 342]
Artificial Reproductive Technology
(ART) BillSociety - Society Act 1966 [Act 335] TCM PRACTITIONERS
TRADITIONAL AND
COMPLEMENTARY MEDICINE ACT
2016 [ACT 775]
Hydrogen Cyanide (Fumigation) Act 1953
(Revised1981) [Act 260]
Organ and Tissue Transplantation
(OTT) Bill
Sole proprietor - HCP Acts i.e. Act 50,
51, 14, 436FOOD ANALYSTS
FOOD ANALYSTS ACT 2011 [ACT
727]Food safety Food Act 1983 [Act 281]
Partnership – Act 50 TECHNICAL STAFF*Contracts Act 1950
*Employment Act etc.
Health Promotion Programmes
and Activities
Malaysian Health Promotion Board Act
2006 [Act 651]
PERSONAL CARE AIDES ETC Practise telemedicine Telemedicine Act 1997 [Act 564]
18
Approvals needed for the HEALTHCARE FACILITIES &
SERVICES from different agencies
ACT REGULATE
Private Healthcare Facilities & Services Act 1998 [Act 586] - MOH Healthcare Facilities & Services & its related matters
The Atomic Energy Licensing Act 1984 [Act 304] - MOH Radioactive material, nuclear material/ prescribed substance
Factories and Machinery Act, 1967 [64/1967] By Department of Occupational Safety and Health
Steam Boiler, Unfired Pressure Vessel + machinery equipments e.g. Autoclave, lift
Uniform Building By-Laws 1984 By Local Authorities Land, Certificate of Completion and Compliance of buildings
or equivalent & signboard approval
Fire Services Act 1988 [Act 341] By Fire Department Safety for fire exit
Environmental Quality Act 1974 [Act 127] By Department of Environment
Environment safety & Clinical Waste Management
Workers’ Minimum Standards of Housing and Amenities Act 1990 [Act 446] – Human Resource Ministry
Healthcare Facilities For estate workers
Medical Device Act 2012 [Act 737]-MDA Medical devices
Pathology Laboratory Act 2007 [Act 674] - MOH Pathology Laboratory (yet to be enforced)
CROSS-REFER ACT 586 & ITS SUBSIDIARY LEGISLATION TO -1. Companies Act 1965 [Act 125] – replaced by Companies
Act 2016 [Act 777]
2. Societies Act 1966 [Act 335]
3. Poisons Act 1952 [Act 366]
4. Dangerous Drugs Act 1952 [Act 234]
5. Sale of Drugs Act 1952 [Act 368]
6. Medicines (Advertisement and Sale) Act 1956 [Act 290].
7. Limitation Act 1953 [Act 254]
8. Factories and Machinery Act 1967 (DOSH)
9. Environmental Quality Act 1974 [Act 127]
10. The Atomic Energy Licensing Act 1984 [Act 304]
11. Fire Certificate – Fire Services Act 1988 [Act 341] – Fire Services Department
12. Certificate of Completion and Compliance – Uniform Building By-Laws 1984
13. Mental Health Act 2001 [Act 615]
14. Penal Code [Act 574]
15. Evidence Act 1950 [Act 56]
16. Criminal Procedure Code [Act 593]
1. Medical Act 1971 [Act 50]
2. Dental Act 1971 [Act 51]
3. Midwives Act 1966 [Act 436]
4. Nurses Act 1950 [Act 14]
5. Registration of Pharmacists Act 1951 (revised 1989) [Act 371]
6. Medical Assistants (Registration) Act 1977 [Act 180]
Act 586 ~ end regulator
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
Act 586
• Private Healthcare Facilities & Services Act 1998 & its subsidiaries legislation
• 3 IMPORTANT WORDS
1. Healthcare Facilities (Including equipment)
2. Healthcare Services
3. Personnel – all healthcare & healthcare related professional, para-professional & technical etc.
control: REGISTRATION & LICENSING
REGULATE: ENFORCEMENT
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
Handbook of Setting Up Private Hospital in Malaysia
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
Public Consultation on Improving Efficiency “Dealing with Construction Permits for Private Hospital”Date : 22 January 2019Venue : Hilton Petaling Jaya
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
Public Consultation on Improving Efficiency “Dealing with Construction Permits for Private Hospital”Date : 22 January 2019Venue : Hilton Petaling Jaya
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
Launching of Four Handbooks and Guidelines by YB Health MinisterDate : 29 July 2019Venue : APHM’s 27th International Healthcare Conference & Exhibition 2019, KL Convention Centre
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
Launching of Four Handbooks and Guidelines by YB Health MinisterDate : 29 July 2019Venue : APHM’s 27th International Healthcare Conference & Exhibition 2019, KL Convention Centre
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
Gather Technical
Information From
• Local Council
(Local Plan
Zoning, Etc)
Gathering
Technical
Information From:
• SKMM
• Electricity
Supply Provider
• Water Supply
Providers
Submission Of
Development
Order To
• Local Council
Submission Of
Building Plan
Approval To Local
Council
Submission Of
Engineering Plan
To Local Council
Notify To Start
Construction Work
to:
• Local Council
• Architect Board
• Sewerage
Service Provider
Receive Interim
Inspections from:
• Local Council
• Department Of
Occupational
Safety & Health
(JKKP)
Receive Final
Inspections from:
• (Phase 1)
Local Council
• (Phase 2)
Department Of
Occupational
Safety & Health
(JKKP)
Compliance Of G1
– G21
Deposit Certificate
Of Compliance
And Completion to:
• Local Council
• Architect Board
Gathering Land
Information From
• Land Office
Receive Interim
Inspections from:
• Electricity
Supply Provider
• Water Supply
Provider
• Sewerage
Service
Providers
Receive Final
Inspections from:
• (Phase 1)
Electricity Supply
Provider
Water Supply
Provider
• (Phase 2)
Sewerage Service
Provider
Approval
Development
Order
Full Approval Of
Building Plan And
Engineering Plan
Issuance Of
C.C.C.
(Borang F)
• CF Autoclave
JKKP
• Atomic
Energy
License by
MOH
PREVIOUS PROCESSES OF SETTING UP PRIVATE HOSPITALS (Under OSC 3.0)
Submission of
(HOSPITAL Facility
PRE-
ESTABLISHMENT
Service) to CKAPS
Submit Application of
Operation for Private
Healthcare Services
and Facilities to MoH
BORANG 3
Submit Healthcare
Facility’s Plan Layout
for MoH – BORANG 1
• FULLY LOADED
DRAWINGS
SURAT TIADA
HALANGAN from
CKPAS for Pre-
Establishment
ISSUANCE -
BORANG 4, License to
Operate / Provide a
Healthcare Facility and
Services From MoH
Issuance of BORANG
2 by CKAPS
• Autoclave JKKP
Licence
• Radiation Certificate
by MOH
PROCESS 1 PROCESS 2 PROCESS 3 PROCESS 4 PROCESS 5 PROCESS 6
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
15 April 2020
Submission Of
(Approval For Pre-
establishment
Application) To
CKAPS
• Functional
Planning Unit
(FPU)
Processing Fee**
Gather Technical
Information (Local Plan,
Zoning, etc.) From
• Jabatan Teknikal
Dalaman PBT
• PLANMalaysia
Gather Technical
Information From:
• JKR
• JAS
• PTG/PTD
• BOMBA
• JMG
• JPS
• LLM
• PBAN (Water Supply
Providers)
• Electricity Supply
Provider (TNB, Etc.)
• SKMM
• IWK/MAJAARI
• SWCorp
• JKKP
Submission of Land
Matters Application and
Kebenaran Merancang
(KM) or Development
Order (DO) for Approval
to
• Jabatan/Agensi Teknikal
Luaran dan Dalaman
Submission of Building
Plan for Approval to
Jabatan/Agensi Teknikal
Luaran dan Dalaman
Submission of
Engineering Plan for
Approval to
Jabatan/Agensi Teknikal
Luaran dan Dalaman
Notification of Construction
Work to:
• Jabatan Bangunan
• Jabatan Kejuruteraan
• Lain-Lain Jabatan/Agensi
Teknikal Luaran dan
Dalaman
Site Monitoring and Interim
Inspection Notifications
involving:
• PBAN (Water Supply
Providers)
• Electricity Supply
Provider (TNB, Etc.)
• Jabatan Kejuruteraan
• JKR
• JKKP
• IWK/MAJAARI
• BOMBA
Final Inspection Notifications
involving:
• Phase 1
• PBAN (Water Supply
Providers)
• Electricity Supply
Provider (TNB, Etc.)
• Jabatan Teknikal
Dalaman PBT
• JKR
• Phase 2
• BOMBA
• Department Of
Occupational Safety &
Health (JKKP)
• IWK/MAJAARI
Deposit:
• Certificate of
Completion and
Compliance;
• Forms G1 – G21, to:
• Jabatan Bangunan
• Board of Architects
Malaysia
Receive Interim Inspections
from:
• PBAN (Water Supply
Providers)
• Electricity Supply
Provider (TNB, Etc.)
• Jabatan Kejuruteraan
• JKR
• JKKP
• IWK/MAJAARI
• BOMBA
Receive Final Inspections
from:
• Phase 1
• PBAN (Water Supply
Providers)
• Electricity Supply
Provider (TNB, Etc.)
• Jabatan Teknikal
Dalaman PBT
• JKR
• Phase 2
• BOMBA
• Department Of
Occupational Safety &
Health (JKKP)
• IWK/MAJAARI
Submit Private
Hospital’s Plan
Layout for MoH
• Fully Loaded
Drawing
Processing Fee**
Submit Private
Hospital’s Plan for
MoH – BORANG 1
• Building Plans
No Objection
Letter for Pre-
establishment
Approval Kebenaran
Merancang or
Development Order
Provisional
Approval
Full Approval of
Building Plan and
Engineering Plan
Issuance of
CCC
(Borang F)
Issuance of
BORANG 2
• Autoclave
Requirements
• Radiation Design
MOH
• CF Autoclave
JKKP
• Atomic Energy
License by MOH
Submission to CKAPS (MoH)
Approval from MoH
(through CKAPS)
Submission to Local Council &
Planning Department
Approval from Local Council/Service &
Utility Provider
Submission and Works with Service &
Utility Provider
Processing fee is payable only after
amendment of the Third Schedule of the
Regulations, P.U.(A)138/2006
***
Submit Application
for License to
Operate or Provide
a Private Hospital
to MoH
(Borang 3)
Submit Application
for License to
Operate or Provide
a Private Hospital
to MoH including
Manpower And
Facilities
Resources
Requirements
(Borang 3)
ISSUANCE -
BORANG 4
License to
Operate /
Provide A
Private
Hospital
Provisional
Licence –
Validity 6
Months ***
SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
EIGHT PROCESSES OF SETTING UP PRIVATE HOSPITALS (Under OSC 3.0 Plus)
PROCESS 1 PROCESS 2 PROCESS 3 PROCESS 4 PROCESS 5 PROCESS 6 PROCESS 7 PROCESS 8
Submission Of (Approval For
Pre-establishment Application)
To CKAPS
• Functional Planning Unit
(FPU)
Processing Fee**
Gather Technical Information
(Local Plan, Zoning):
• Jabatan Teknikal Dalaman
PBT
• PLANMalaysia
Gathering Technical Information
From:
• JKR / JAS / PTG/PTD
• BOMBA / JMG / JPS / LLM
• PBAN (Water Supply)
• Electricity Supply Provider
(TNB, Etc.) / SKMM
• SKMM / JKKP
• IWK/MAJAARI / SWCorp
No Objection Letter for Pre-
establishment
EIGHT PROCESSES OF SETTING UP PRIVATE HOSPITALS
PROCESS 1: PRE-ESTABLISHMENT (MOH)
• Consultants should gather all technical information and planning
requirement (data gathering) from Local Authority (Pihak Berkuasa
Tempatan - PBT) and other Technical Agencies;
• To comply with the check-list as per CKAPS for “Pre-Establishment for
Private Hospital”
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
Submission Of (Approval For
Pre-establishment Application)
To CKAPS
• Functional Planning Unit
(FPU)
Processing Fee**
Gather Technical Information
(Local Plan, Zoning):
• Jabatan Teknikal Dalaman
PBT
• PLANMalaysia
Gathering Technical Information
From:
• JKR / JAS / PTG/PTD
• BOMBA / JMG / JPS / LLM
• PBAN (Water Supply)
• Electricity Supply Provider
(TNB, Etc.) / SKMM
• SKMM / JKKP
• IWK/MAJAARI / SWCorp
No Objection Letter for Pre-
establishment
EIGHT PROCESSES OF SETTING UP PRIVATE HOSPITALS
PROCESS 1: PRE-ESTABLISHMENT (MOH)
• Consultants should gather all technical information and planning
requirement (data gathering) from Local Authority (Pihak Berkuasa
Tempatan - PBT) and other Technical Agencies;
• To comply with the check-list as per CKAPS for “Pre-Establishment for
Private Hospital”
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
Submission Of (Approval For
Pre-establishment Application)
To CKAPS
• Functional Planning Unit
(FPU)
Processing Fee**
Gather Technical Information
(Local Plan, Zoning):
• Jabatan Teknikal Dalaman
PBT
• PLANMalaysia
Gathering Technical Information
From:
• JKR / JAS / PTG/PTD
• BOMBA / JMG / JPS / LLM
• PBAN (Water Supply)
• Electricity Supply Provider
(TNB, Etc.) / SKMM
• SKMM / JKKP
• IWK/MAJAARI / SWCorp
No Objection Letter for Pre-
establishment
EIGHT PROCESSES OF SETTING UP PRIVATE HOSPITALS
PROCESS 1: PRE-ESTABLISHMENT (MOH)
• Consultants should gather all technical information and planning
requirement (data gathering) from Local Authority (Pihak Berkuasa
Tempatan - PBT) and other Technical Agencies;
• To comply with the check-list as per CKAPS for “Pre-Establishment for
Private Hospital”
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
Submission Of (Approval For
Pre-establishment Application)
To CKAPS
• Functional Planning Unit
(FPU)
Processing Fee**
Gather Technical Information
(Local Plan, Zoning):
• Jabatan Teknikal Dalaman
PBT
• PLANMalaysia
Gathering Technical Information
From:
• JKR / JAS / PTG/PTD
• BOMBA / JMG / JPS / LLM
• PBAN (Water Supply)
• Electricity Supply Provider
(TNB, Etc.) / SKMM
• SKMM / JKKP
• IWK/MAJAARI / SWCorp
No Objection Letter for Pre-
establishment
EIGHT PROCESSES OF SETTING UP PRIVATE HOSPITALS
PROCESS 1: PRE-ESTABLISHMENT (MOH)
• Consultants should gather all technical information and planning
requirement (data gathering) from Local Authority (Pihak Berkuasa
Tempatan - PBT) and other Technical Agencies;
• To comply with the check-list as per CKAPS for “Pre-Establishment for
Private Hospital”
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
EIGHT PROCESSES OF SETTING UP PRIVATE HOSPITALS
PROCESS 2: DEVELOPMENT ORDER (D.O.) & BUILDING PLAN (B.P.)
• Consultants to prepare and submit Planning Permission (Kebenaran
Merancang – KM) to obtain Development Planning Approval from
respective Local Authority (PBT).
• New item to be included in PBT’s DO Check List: “No Objection
Letter” from MoH
• KM Approval issued by Local Authority ( PBT)
• Developer/Operator to fill in and complete Borang 1 - Bhg 1; as per CKAPS
“Checklist on Submission for Borang 1 – Bahagian 1 (Body Corporate).”
together with D.O. Approval Letter and Drawing from Local Authority
• Consultants to prepare a Building Plans, as prescribed in “UBBL 1984, By-
Law 9 (Skala Pelan) & 10 (Pelan-pelan Yang Dikehendaki)”
Submission of Land Matters
Application and Kebenaran
Merancang (KM) or Development
Order (DO) for Approval to
Jabatan/Agensi Teknikal Luaran
dan Dalaman
Submit Private Hospital’s Plan for
MoH – BORANG 1
• Building Plans
Approval Kebenaran
Merancang (KM) or
Development Order (DO)
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
EIGHT PROCESSES OF SETTING UP PRIVATE HOSPITALS
PROCESS 2: DEVELOPMENT ORDER (D.O.) & BUILDING PLAN (B.P.)
Submission of Land Matters
Application and Kebenaran
Merancang (KM) or Development
Order (DO) for Approval to
Jabatan/Agensi Teknikal Luaran
dan Dalaman
Submit Private Hospital’s Plan for
MoH – BORANG 1
• Building Plans
Approval Kebenaran
Merancang (KM) or
Development Order (DO)
Provisional Approval
from MoH
• Autoclave Requirements
• Radiation Design MOH
• Building Plans prepared and submitted to CKAPS shall comprise the following
but not limited to:
1. Co-ordinated Drawings from all technical disciplines;
2. All drawings submitted shall be endorsed by Principal Submitting Persons
(PSP) and Submitting Persons (SP);
3. Details drawings of Scale 1:50 on Staircase, Corridor, Door Opening, etc to
demonstrate the Distance and Spacing compliance.
• Consultants also required to accommodate and incorporate any radiation
requirement into the proposed drawings: i.e. Jabatan Keselamatan Dan
Kesihatan Pekerjaan (JKKP) , Bahagian Kawalselia Radiasi Perubatan, MoH
(BKRP)
• CKAPS will review Borang 1 with drawings and documents submitted.
• Upon all drawings and documentations complete and comply, “Provisional
Approval” will be issued by MoH within 4 working weeks from the date of
acceptance of complete and compliance of drawings and documents; with the
validity of 12 months.
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
EIGHT PROCESSES OF SETTING UP PRIVATE HOSPITALS
PROCESS 2: DEVELOPMENT ORDER (D.O.) & BUILDING PLAN (B.P.)
• Consultants to develop and prepare Building Plan Drawings; Engineering
Plans Drawings and submit to Local Authority (PBT) with attachment of
Provisional Approval from MoH.
• New item to be included in PBT’s BP Check List: “Provisional
Approval Letter ” from MoH
• Local Authority and Technical Agencies will review Building Plan &
Engineering Plan submitted.
• Upon fulfilment of all requirements, PBT will issue Approved Building
Plan and Engineering Plan to applicant.
Submission of Land Matters
Application and Kebenaran
Merancang (KM) or Development
Order (DO) for Approval to
Jabatan/Agensi Teknikal Luaran
dan Dalaman
Submit Private Hospital’s Plan for
MoH – BORANG 1
• Building Plans
Approval Kebenaran
Merancang (KM) or
Development Order (DO)
Provisional Approval
from MoH
• Autoclave Requirements
• Radiation Design MOH
Submission Of Building Plan for
Approval To Jabatan/Agensi
Teknikal Luaran dan Dalaman
Submission Of Engineering Plan
for Approval To PBT
Full Approval Of Building Plan
And Engineering Plan15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGI
URUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
EIGHT PROCESSES OF SETTING UP PRIVATE HOSPITALS
PROCESS 3: BORANG B (PBT) AND FULLY LOADED DRAWINGS SUBMISSION (MOH)
• Upon obtaining Full Building Plan (BP) Approval, Developer can
commence construction works by submission of “Borang B (Notice to
Start Work)” to PBT.
• Developer/Operator to fill in and complete Borang 1 – Bahagian 2 as per
CKAPS “Checklist on Submission for Borang 1 – Bahagian 2 (Body
Corporate).” together with B.P. Approval Letter and Drawing from PBT.
• Consultants to prepare Fully Loaded Drawings and Mechanical &
Electrical (M&E) Drawings and submit to CKAPS as per the approved BP.
Notification of Construction
Work to:
• Jabatan Bangunan
• Jabatan Kejuruteraan
• Lain-Lain Jabatan/Agensi
Teknikal Luaran dan
Dalaman
Submit Private Hospital’s Plan
Layout for MoH
• Fully Loaded Drawing
Processing Fee**
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
EIGHT PROCESSES OF SETTING UP PRIVATE HOSPITALS
PROCESS 3: BORANG B (PBT) AND FULLY LOADED DRAWINGS SUBMISSION (MOH)
Notification of Construction
Work to:
• Jabatan Bangunan
• Jabatan Kejuruteraan
• Lain-Lain Jabatan/Agensi
Teknikal Luaran dan
Dalaman
Submit Private Hospital’s Plan
Layout for MoH
• Fully Loaded Drawing
Processing Fee**
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
EIGHT PROCESSES OF SETTING UP PRIVATE HOSPITALS
PROCESS 4: CONSTRUCTION & INSPECTION AND BORANG 2 (MOH)
• Building construction to follow all guidelines and regulations set by PBT
and Other Technical Agencies.
• Upon receiving completed and complied drawings, MoH to issue “Borang
2” with validity of 36 months from the date of issuance.
Site Monitoring and
Interim Inspection
Notifications involving:
• PBAN (Water
Supply Providers)
• Electricity Supply
Provider (TNB, Etc.)
• Jabatan
Kejuruteraan
• JKR
• JKKP
• IWK/MAJAARI
• BOMBA
Receive Interim
Inspections from:
• PBAN (Water
Supply Providers)
• Electricity Supply
Provider (TNB, Etc.)
• Jabatan
Kejuruteraan
• JKR
• JKKP
• IWK/MAJAARI
• BOMBA
Iss
ua
nc
e O
f BO
RA
NG
2
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
EIGHT PROCESSES OF SETTING UP PRIVATE HOSPITALS
PROCESS 5: FINAL INSPECTION BY PBT & TECHNICAL AGENCIES
Obtain the Clearance Letters from the following six agencies prior issuance of
CCC by PsP:
1. The confirmation of electrical supply from TNB.
2. The confirmation of water supply from the relevant water authorities.
3. The confirmation of connection to sewerage treatment plants or other
relevant regulators/agencies;
4. The clearance for active fire fighting systems from the Fire and Rescue
Department of Malaysia.
5. The clearance letter of roads and drainage from PBT/JKR.
6. The clearance of Machinery & Lifts and Autoclave from Jabatan
Keselamatan & Kesihatan Pekerjaan (JKKP).
Final Inspection Notifications
involving:
Phase 1
• PBAN (Water Supply Providers)
• Electricity Supply Provider
(TNB, Etc.)
• Jabatan Teknikal Dalaman PBT
• JKR
Phase 2
• BOMBA
• Department Of Occupational
Safety & Health (JKKP)
• IWK/MAJAARI
Receive Final Inspections from:
Phase 1
• PBAN (Water Supply Providers)
• Electricity Supply Provider
(TNB, Etc.)
• Jabatan Teknikal Dalaman PBT
• JKR
Phase 2
• BOMBA
• Department Of Occupational
Safety & Health (JKKP)
• IWK/MAJAARI
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
EIGHT PROCESSES OF SETTING UP PRIVATE HOSPITALS
PROCESS 6: CCC
• Principal Submitting Person (PSP) to issue the Certificate of Completion
and Compliance (Borang F)
• Atomic Energy License needs to be obtained from Bahagian Kawalselia
Radiasi Perubatan (BKRP), if any.
Deposit:
• Certificate of Completion and
Compliance;
• Forms G1 – G21, to:
• Jabatan Bangunan
• Board of Architects Malaysia
Issuance Of C.C.C.
(Borang F)
• CF Autoclave JKKP
• Atomic Energy License by
MOH
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
EIGHT PROCESSES OF SETTING UP PRIVATE HOSPITALS
PROCESS 7: BORANG 3 (MOH)
• Hospital Operator to complete “Borang 3 – Bahagian 1” as per CKAPS
Checklist together with a copy of Borang F/CFC/CCC.
• Applicant to ensure the facility is fully fitted and equipped as per described
in “Checklist for Floor Plans and Inspection Visit”
• CKAPS will conduct Site Inspection
• Upon compliance with the requirement after inspection, “Clearance Letter
of Compliance” to issue to Applicant.
Submit Application for License
to Operate or Provide a Private
Hospital to MoH
(Borang 3)
Provisional Licence – Validity
6 Months ***
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
EIGHT PROCESSES OF SETTING UP PRIVATE HOSPITALS
PROCESS 8: BORANG 4 (MOH)
• Hospital Operator will submit Application for License to Operate within the
validity of the Provisional License to Ministry of Health (MOH) with
complete documentation of Manpower And Facilities Resources
Requirements; as per stipulated in the CKAPS Checklist Borang 3 –
Bahagian 2.
• After receiving complete and compliance application, and payment has
made; MoH will issue Borang 4 License to Operate / Provide a Private
Hospital.
Submit Application for License
to Operate or Provide a Private
Hospital to MoH including
Manpower And Facilities
Resources Requirements
(Borang 3)
ISSUANCE - BORANG 4
License to Operate / Provide A
Private Hospital
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
15 April 2020
Submission Of
(Approval For Pre-
establishment
Application) To
CKAPS
• Functional
Planning Unit
(FPU)
Processing Fee**
Gather Technical
Information (Local Plan,
Zoning, etc.) From
• Jabatan Teknikal
Dalaman PBT
• PLANMalaysia
Gather Technical
Information From:
• JKR
• JAS
• PTG/PTD
• BOMBA
• JMG
• JPS
• LLM
• PBAN (Water Supply
Providers)
• Electricity Supply
Provider (TNB, Etc.)
• SKMM
• IWK/MAJAARI
• SWCorp
• JKKP
Submission of Land
Matters Application and
Kebenaran Merancang
(KM) or Development
Order (DO) for Approval
to
• Jabatan/Agensi Teknikal
Luaran dan Dalaman
Submission of Building
Plan for Approval to
Jabatan/Agensi Teknikal
Luaran dan Dalaman
Submission of
Engineering Plan for
Approval to
Jabatan/Agensi Teknikal
Luaran dan Dalaman
Notification of Construction
Work to:
• Jabatan Bangunan
• Jabatan Kejuruteraan
• Lain-Lain Jabatan/Agensi
Teknikal Luaran dan
Dalaman
Site Monitoring and Interim
Inspection Notifications
involving:
• PBAN (Water Supply
Providers)
• Electricity Supply
Provider (TNB, Etc.)
• Jabatan Kejuruteraan
• JKR
• JKKP
• IWK/MAJAARI
• BOMBA
Final Inspection Notifications
involving:
• Phase 1
• PBAN (Water Supply
Providers)
• Electricity Supply
Provider (TNB, Etc.)
• Jabatan Teknikal
Dalaman PBT
• JKR
• Phase 2
• BOMBA
• Department Of
Occupational Safety &
Health (JKKP)
• IWK/MAJAARI
Deposit:
• Certificate of
Completion and
Compliance;
• Forms G1 – G21, to:
• Jabatan Bangunan
• Board of Architects
Malaysia
Receive Interim Inspections
from:
• PBAN (Water Supply
Providers)
• Electricity Supply
Provider (TNB, Etc.)
• Jabatan Kejuruteraan
• JKR
• JKKP
• IWK/MAJAARI
• BOMBA
Receive Final Inspections
from:
• Phase 1
• PBAN (Water Supply
Providers)
• Electricity Supply
Provider (TNB, Etc.)
• Jabatan Teknikal
Dalaman PBT
• JKR
• Phase 2
• BOMBA
• Department Of
Occupational Safety &
Health (JKKP)
• IWK/MAJAARI
Submit Private
Hospital’s Plan
Layout for MoH
• Fully Loaded
Drawing
Processing Fee**
Submit Private
Hospital’s Plan for
MoH – BORANG 1
• Building Plans
No Objection
Letter for Pre-
establishment
Approval Kebenaran
Merancang or
Development Order
Provisional
Approval
Full Approval of
Building Plan and
Engineering Plan
Issuance of
CCC
(Borang F)
Issuance of
BORANG 2
• Autoclave
Requirements
• Radiation Design
MOH
• CF Autoclave
JKKP
• Atomic Energy
License by MOH
Submission to CKAPS (MoH)
Approval from MoH
(through CKAPS)
Submission to Local Council &
Planning Department
Approval from Local Council/Service &
Utility Provider
Submission and Works with Service &
Utility Provider
Processing fee is payable only after
amendment of the Third Schedule of the
Regulations, P.U.(A)138/2006
***
Submit Application
for License to
Operate or Provide
a Private Hospital
to MoH
(Borang 3)
Submit Application
for License to
Operate or Provide
a Private Hospital
to MoH including
Manpower And
Facilities
Resources
Requirements
(Borang 3)
ISSUANCE -
BORANG 4
License to
Operate /
Provide A
Private
Hospital
Provisional
Licence –
Validity 6
Months ***
SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
EIGHT PROCESSES OF SETTING UP PRIVATE HOSPITALS (Under OSC 3.0 Plus)
PROCESS 1 PROCESS 2 PROCESS 3 PROCESS 4 PROCESS 5 PROCESS 6 PROCESS 7 PROCESS 8
Private Healthcare Facilities & Services Act 1998 & its Subsidiaries Legislation
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
1. Corridors
2. Doors (Patients)
3. Ramps
4. Stairways
5. Elevators / Lifts
6. Ceilings
7. Doors (Toilet)
8. Refuge Area
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
TECHNICAL SPECIFICATIONS REQUIREMENTS BETWEEN ACT 586, UBBL AND OTHERS
ITEM 1: CORRIDOR
•
• •
•
•
•
•
•
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
TECHNICAL SPECIFICATIONS REQUIREMENTS BETWEEN ACT 586, UBBL AND OTHERS
EXAMPLE 1: CORRIDOR
TECHNICAL SPECIFICATIONS REQUIREMENTS BETWEEN ACT 586, UBBL AND OTHERS
ITEM 2: RAMPS
•
•
•
•
•
•
•
•
•
•
•
•
•
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
TECHNICAL SPECIFICATIONS REQUIREMENTS BETWEEN ACT 586, UBBL AND OTHERS
ITEM 2: RAMPS
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
TECHNICAL SPECIFICATIONS REQUIREMENTS BETWEEN ACT 586, UBBL AND OTHERS
ITEM 2: RAMPS
TECHNICAL SPECIFICATIONS REQUIREMENTS BETWEEN ACT 586, UBBL AND OTHERS
ITEM 3: STAIRCASE
•
•
•
•
•
•
•
•
•
•
•
•
•
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA
TECHNICAL SPECIFICATIONS REQUIREMENTS BETWEEN ACT 586, UBBL AND OTHERS
ITEM 3: STAIRCASE
TECHNICAL SPECIFICATIONS REQUIREMENTS BETWEEN ACT 586, UBBL AND OTHERS
ITEM 4: CEILING
•
• •
•
•
•
TECHNICAL SPECIFICATIONS REQUIREMENTS BETWEEN ACT 586, UBBL AND OTHERS
ITEM 4: CEILING
15 April 2020SESI PEMBENTANGAN BAGI PENAMBAHBAIKAN PROSES & GARIS PANDUAN TEKNIKAL BAGIURUSAN MENDAPATKAN LESEN BAGI MEMBINA HOSPITAL SWASTA