Mohamed Atef Abbas C.V

5
[Type text] Mohamed Atef Abbas [email protected] EL-Nozha, Cairo, Egypt +201279221350 Personal Information: Marital status : Married. Nationality : Egyptian. Place of Birth : Egypt. Date of Birth : 01/09/1978. Military status : Exempted. Objective: I’m truly passionate about my work and always eager to connect with other construction professional. While I enjoy all aspects of my job, I think my favorite stage of a project is executing, when I see that a set of drawings becomes a tangible asset and met the initiating objectives for my client. As I go through that collaborative process, not only did I have fun managing the project, but also I found it rewarding to see the results. Education: 2012, PMP preparation course in MENA CHAPER Institute. June 2003, Shubra Faculty of engineering, Zagazig University Bachelor of Civil Engineer, Construction designing section. June 1996, Ahmad El-Besher El- Romey, Kuwait. High school degree in science of mathematics Degree: Excellent / Major: Mathematics. Introduction: I’m +13 Years’ experience in construction field. PMP preparation course and IASP course certified. Work in MEGA Projects and high rise building in Gulf and Egypt .And now working in Nile Corniche Project (St.Regis Hotel) as Senior Quality Control. Experience in: - Steel structure (Trusses, Frames, etc.). - Concrete work ( Bridges ,Frames ,Precast concrete ,all Types Of slabs : Solid ,Hollow ,Flat, Waffle ,etc.) and high rise building. - Finish work. (Nile Corniche Project (St. Regis Hotel), Mall Of Egypt, Commercial Towers, Clinic Tower). - Foundation. (Shallow foundation, Shoring system, Bored piles, diaphragm walls, dewatering system). Languages: Arabic: Native Language. English: Writing: Excellent Speaking: Excellent Reading: Excellent.

Transcript of Mohamed Atef Abbas C.V

Page 1: Mohamed Atef Abbas C.V

[Type text]

Mohamed Atef Abbas [email protected] EL-Nozha, Cairo, Egypt +201279221350

Personal Information:

Marital status : Married.

Nationality : Egyptian.

Place of Birth : Egypt.

Date of Birth : 01/09/1978.

Military status : Exempted.

Objective:

I’m truly passionate about my work and always eager to connect with other construction professional. While I enjoy all aspects of my job, I think my favorite stage of a project is executing, when I see that a set of drawings becomes a tangible asset and met the initiating objectives for my client. As I go through that collaborative process, not only did I have fun managing the project, but also I found it rewarding to see the results.

Education:

2012, PMP preparation course in MENA CHAPER Institute.

June 2003, Shubra Faculty of engineering, Zagazig University Bachelor of Civil

Engineer, Construction designing section.

June 1996, Ahmad El-Besher El- Romey, Kuwait.

High school degree in science of mathematics

Degree: Excellent / Major: Mathematics.

Introduction:

I’m +13 Years’ experience in construction field. PMP preparation course and IASP course

certified. Work in MEGA Projects and high rise building in Gulf and Egypt .And now working in Nile Corniche Project (St.Regis Hotel) as Senior Quality Control. Experience in: - Steel structure (Trusses, Frames, etc.).

- Concrete work ( Bridges ,Frames ,Precast concrete ,all Types Of slabs : Solid ,Hollow ,Flat, Waffle ,etc.) and high rise building.

- Finish work. (Nile Corniche Project (St. Regis Hotel), Mall Of Egypt, Commercial Towers, Clinic Tower).

- Foundation. (Shallow foundation, Shoring system, Bored piles, diaphragm walls, dewatering system).

Languages:

Arabic: Native Language.

English: Writing: Excellent Speaking: Excellent Reading: Excellent.

[Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote text box.]

Page 2: Mohamed Atef Abbas C.V

[Type text]

Working Experience:

CCC Senior Quality Control Engineer : April 2016 –Present

Owner: Qatari Diar Real estate and Tourism Investment Company. Egypt. LLC

Owner: Majid Al futtaim properties

WSP Senior Inspector Engineer: Sep.2013- March 2016

The Project: Mall Of Egypt one of Majid Al futtaim properties (MAF) projects Project management:

Davis Langdon (An AECOM Company)

MACE Contractor: Besix & Orascom Joint venture (BOJV). Designer: WSP Group Consultant:

Medhat Abu Zayed Egyptian Consultant House (MZECH)

WSP Group. Raafat& Miller partners Consultant.(RMC)

Budget: 400 Million$

Project brief:

GLA: 162,500 M2

Shops: 400

Opening: February 2017

Mall of Egypt is a super-regional mall of 162,500

sq. that will dominate the western half of the

greater Cairo Metropolis and The 6th of October

City.

Scheduled to open in 2017, the mall will be a

sister brand to Mall of the Emirates, combining a

powerful range of retailers with the most

comprehensive leisure offer in North Africa.

The Project: The Nile Corniche Project (NCP)(ST Regis

Hotel) one of Qatari Diar properties projects.

Project management: Turner Construction Company.

Contractor: Consolidated Contractors Company (CCC).

Consultant: Engineering Consultants Group S.A (ECG). Designer: MGA-HKS, LLC.

Budget: 800 Million$.

Page 3: Mohamed Atef Abbas C.V

[Type text]

Owner: Housing & Development Real Estate

Investment.

0.

WARA PROJECT Engineer

The Project: Qadissia Club Complex construction

project. (7 million KD)

Project management: AL-NOOR COMPANY.

Investor: PEARL REAL ESTATE CO.

Owner: Qadissia Club

WORK WITH WARA Construction Company .

May 2005 - Sep 2008

Consultant Site Engineer Sep2008 - June2010

DarSoor Engineering Bearu, Al. Sharq, Kuwait.

The Project: Clover Medical Clinics construction

project (7 million KD).

Owner: MAZAYA REAL ESTATE EVELOPMENT CO.

CONSTRUCTIOM MANAGER July 2010-Sep.2013.

Al-Banna Construction Company. Egypt.

The Project: Housing &Development Towers construction

project

(200 million EGP)

Owner: Housing & Development Real Estate Investment.

Experience in Gulf: Apr 2005- June2010

Page 4: Mohamed Atef Abbas C.V

[Type text]

Computer Skills:

Operating Systems: Windows (All editions).

Applications: Microsoft office (Word, Excel, PowerPoint, Outlook)

SAP2000.

Primavera.

AutoCAD.

Tekla Structures BIM software.

Accreditations and Licenses :

Member in Kuwait Society of Engineers.

Member in International Association of Safety Professionals (IASP).

Member in Egypt Society of Engineers.

Kuwaiti driving license. International Driving license.

Wara Site Engineer:

Project: AREC Head Quarter Tower.

DESIGNER: Emad Bo Khamsein

Consutanat Office

Owner: ARAB REAL ESTATE CO.

Consultant: Osama Bo Khamsein

Consutanat Office

Contractor: WARA Construction Company.

Site Engineer: Oct. 2004- Apr 2005

Project: Buildings and Villas in New Cairo.

Designer& consultant: AL-Fager

Consultant Office

Contractor: Sara Construction Company.

Page 5: Mohamed Atef Abbas C.V

[Type text]

Skills :

Effective work prioritization and time management required to ensure all

related activity is performed to ensure operational efficiency is maintained.

Able to generate all required documentation, included but not limited to

procedures, protocols, maintenance schedules etc.

Must work to a high standard and accuracy in completion of all related

documentation.

High degree of attention to detail and diligence.

Excellent written and oral communication skills for concise and accurate reporting.

Time management and planning.

Hands-on attitude.

Disciplined detail conscious and self-motivated.

Knowledge:

Understanding and ability to apply working knowledge of maintenance systems in a regulated GMP environment required.

Experience in a similar role, ideally in a regulated industry

Experienced in working to IS013485 and/or ISO 9001 quality systems

Good practical and theoretical knowledge of LEAN principles and application in a Manufacturing environment

Knowledge of Process and/or Equipment Validation, theory and application, in the medical device industry

Key Strengths: Achiever, Arranger, Discipline, Restorative, Focus