NO SEBUTHARGA : JPS(SH)/PLSK/09/2020 TAJUK SEBUT HARGA : KERJA-KERJA MENYELENGGARA DAN BAIKPULIH SISTEM PERANGKAP SAMPAH PADA INLET SUMP DAN KERJA-KERJA LAIN YANG BERKAITAN DI RWTP SUNGAI BELONGKONG UNTUK PEJABAT LEMBANGAN SUNGAI KLANG (TAWARAN SEMULA). TAKLIMAT SEBUT HARGA JABATAN PENGAIRAN DAN SALIRAN WILAYAH PERSEKUTUAN KUALA LUMPUR

Transcript of NO SEBUTHARGA : JPS(SH)/PLSK/09/2020state.water.gov.my/wpkl/images/pdffile/plsk092020slide.pdfSkop...

  • NO SEBUTHARGA : JPS(SH)/PLSK/09/2020

    TAJUK SEBUT HARGA :

    KERJA-KERJA MENYELENGGARA DAN BAIKPULIH SISTEM PERANGKAP SAMPAH PADA INLET SUMP DAN KERJA-KERJA LAIN YANG BERKAITAN DI RWTP SUNGAI BELONGKONG UNTUK PEJABAT LEMBANGAN SUNGAI KLANG

    (TAWARAN SEMULA).

    TAKLIMAT SEBUT HARGA JABATAN PENGAIRAN DAN SALIRAN

    WILAYAH PERSEKUTUAN KUALA LUMPUR

  • 1. PENGKHUSUSAN/KELAS KONTRAKTOR

    2. TARIKH TUTUP SEBUT HARGA DAN TARIKH MUAT TURUN SEBUT HARGA

    3. LOKASI DAN KOORDINAT KAWASAN NAIKTARAF

    4. SKOP KERJA

    5. GAMBAR/VIDEO KEADAAN DI TAPAK

    6. TEMPOH SIAP KERJA

    7. PEGAWAI JPS YANG BERTANGGUNGJAWAB

  • Kontraktor yang ingin menyertai sebut harga ini perlu memenuhi syarat-syarat berikut :

    a. Berdaftar dengan CIDB di WPKL.

    b. Mempunyai Perakuan Pendaftaran Kontraktor (PPK).

    c. Sijil Taraf Bumiputera (STB).

    d. Sijil Perolehan Kerja Kerajaan (SPKK) di bawah bidang berikut :

    GRED G1

    KATEGORI ME

    PENGKHUSUSAN M15 – Kelengkapan Mekanikal Pelbagai DAN E11- kerja Am Elektrik

  • Tarikh Tutup Sebut Harga : 5 Ogos 2020 (Rabu) (Dokumen sebut harga perlu dikembalikan dalam bentuk hard copy dan dimasukkan ke dalam Peti Sebut Harga secara pandu lalu di Kawasan Tempat Letak Kereta, Jabatan Pengairan dan

    Saliran Wilayah Persekutuan Kuala Lumpur bermula 10.30 pagi sehingga jam 12.00 tengahari pada hari tersebut)

    Tarikh Muat Turun Sebut Harga :

    24 Julai 2020 (Jumaat) sehingga 5 Ogos 2020 (Rabu)

  • Lokasi adalah di RWTP SUNGAI BELONGKONG, JALAN KG BANDAR DALAM,KAMPUNG BANDAR DALAM, 51000 KUALA LUMPUR.

    Koordinat adalah: 3.206886, 101.700645< Klik

    Kontraktor boleh melawat tapak dengan inisiatif sendiri dengan sentiasa mengambil perhatian dan mematuhi langkah-langkah pencegahan COVID-19 dan penjarakkan social oleh KKM dan MKN.

    https://www.google.com/maps/search/rwtp+sungai+belongkong/@3.2060663,101.7004143,18zhttps://www.google.com/maps/search/rwtp+sungai+belongkong/@3.2060663,101.7004143,18zhttps://www.google.com/maps/search/rwtp+sungai+belongkong/@3.2060663,101.7004143,18zhttps://www.google.com/maps/search/rwtp+sungai+belongkong/@3.2060663,101.7004143,18zhttps://www.google.com/maps/search/rwtp+sungai+belongkong/@3.2060663,101.7004143,18zhttps://www.google.com/maps/search/rwtp+sungai+belongkong/@3.2060663,101.7004143,18zhttps://www.google.com/maps/search/rwtp+sungai+belongkong/@3.2060663,101.7004143,18zhttps://www.google.com/maps/search/rwtp+sungai+belongkong/@3.2060663,101.7004143,18z

  • Skop kerja adalah seperti berikut :

    1. Kerja-kerja rekabentuk sistem “Mechanical Fine Bar Screen” untuk tujuan kerja penyelenggaraan sampah di tapak.

    2. Kerja-kerja fabrikasi “Mechanical Fine Bar Screen” berserta “Local Control Panel” LCP dan “Collection bin”

    3. Membekal dan memasang “ Mechanical Fine Bar Screen” 4. Merombakbalik 1 unit “Mechanical Fine Bar Screen”

    dan“Local Control Panel” (LCP) sedia ada di tapak dan di tempatkan di stor Pejabat Lembangan Sungai Klang.

    5. Kerja-kerja pendawaian. 6. Endorsan, pengujian dan pentauliahan oleh jurutera

    professional (mekanikal) tempatan 7. Kerja-kerja naik taraf inlet sump

  • Kerja-kerja merombakbalik “mechanical Screen” sedia ada di tapak dan di hantar ke stor Pejabat Lembangan Sungai Klang. Pemasangan sistem baru di tempat sedia ada seperti di atas.

  • Rajah di atas menunjukkan kawasan pemasangan “Local Control Panel” baharu untuk sistem “Mechanical Fine Bar Screen”. LCP sedia ada perlu di rombakbalik dan di simpan di stor Pejabat Lembangan Sungai Klang.

  • Kerja-Kerja membuang kelodak di inlet sump dan membina

    struktur sediment Trap di Inlet chamber sebelum pemasangan

    “Mechanical Fine Bar Screen” baru.

  • Lifting Davit Sleeve

    Keja-kerja Fabrikasi 8 unit “Lifting Davit Sleeve” seperti diatas mengikut spesifikasi yang ditetapkan.

  • Tempoh siap kerja bagi sebut harga ini adalah :

    = 3 BULAN

  • Memandangkan taklimat dan lawatan tapak tidak diwajibkan, pihak kontraktor boleh berhubung

    dengan pegawai-pegawai berikut sekiranya terdapat kemusykilan tentang sebutharga ini pada waktu

    pejabat sahaja

    (8.00 pagi - 4.30 petang)

    En. Muhamad Huzaifah bin Md Yusof

    (011-11771718)

    Kontraktor boleh melawat tapak dengan inisiatif sendiri dengan

    sentiasa mengambil perhatian dan mematuhi langkah-langkah

    pencegahan COVID-19 dan penjarakkan social seperti

    saranan KKM dan MKN.

  • SEKIAN, TERIMA KASIH.

    HAK MILIK JABATAN PENGAIRAN DAN SALIRAN

    WILAYAH PERSEKUTUAN KUALA LUMPUR

    VIDEO/SLIDE INI DITAYANGKAN TANPA PREJUDIS