PPROPOSAL ROPOSAL
PPERMOHONAN ERMOHONAN LLELANG ELANG
PPENGEMBANGAN ENGEMBANGAN
MMASJID ASJID AALL--MMUHAJIRIN UHAJIRIN MMASJID ASJID AALL--MMUHAJIRIN UHAJIRIN
Taman Boston Taman Boston –– Puri Surya JayaPuri Surya Jaya
Gedangan Gedangan -- SidoarjoSidoarjo
Tahun 2017Tahun 2017
No Dokumen 001/TAM/RAB/I/2017
Tgl Berlaku 16-01-2017
No Revisi 1
Halaman -
Minggu 6
Minggu 7
Minggu 8
Minggu 9
Minggu 10
Minggu 11
Minggu 12
Minggu 13
Minggu 14
2,00%
15,50%
12,30%
2,50% 2,50% 7,50%
4,84% 19,35%
5,60% 5,60% 11,20%
6,55% 6,55%
5,58% 5,58% 11,15%
9,20% 9,20%
1,17% 1,17% 1,17% 3,50%
1,75% 1,75%
7,34% 8,10% 5,60% 12,13% 6,74% 10,37% 1,17% 1,75% 100,00%
54,15% 62,25% 67,85% 79,98% 86,72% 97,08% 98,25% 100,00%
SCHEDULE PEKERJAAN
PENGEMBANGAN MASJID AL-MUHAJIRIN
TAHUN 2017
Check (%)
ProgressMar-17 Apr-17 Mei-17
46,81%
54,15%
62,25%
67,85%
79,98%
86,72%
97,08%98,25%
100,00%
Minggu 1
Minggu 2
Minggu 3
Minggu 4
Minggu 5
Minggu
I.0 OVERALL
I.1 Pekerjaan Persiapan 2,00% 2,00%
I.2 Pekerjaan Pondasi 15,50% 3,88% 7,75% 3,88%
I.3 Pekerjaan Kolom & Dinding 12,30% 6,15% 6,15%
I.4 Pekerjaan Lantai 7,50% 2,50%
I.5 Pekerjaan Atap (incl. Dak cor) 19,35% 4,84% 4,84% 4,84%
I.6 Pekerjaan Toilet/Wudhu/dll. 11,20%
I.7 Pekerjaan Exterior (tulisan/dll.) 6,55%
I.8 Pekerjaan Listrik (icl. AC) 11,15%
I.9 Pekerjaan Sound System 9,20%
I.10 Pekerjaan Landscaping 3,50%
I.11 Pekerjaan Pembersihan 1,75%
Total Rencana 100,00% 5,88% 7,75% 14,86% 10,99% 7,34%
Komulatif Rencana - 5,88% 13,63% 28,49% 39,48% 46,81%
SCHEDULE PEKERJAAN
PENGEMBANGAN MASJID AL-MUHAJIRIN
TAHUN 2017
Feb-17No. Item
DeskripsiIndex Value (%)
-
5,88%
13,63%
28,49%
39,48%