PINTU DPNNN KASTAM
Transcript of PINTU DPNNN KASTAM
8/3/2019 PINTU DPNNN KASTAM
http://slidepdf.com/reader/full/pintu-dpnnn-kastam 1/4
8/3/2019 PINTU DPNNN KASTAM
http://slidepdf.com/reader/full/pintu-dpnnn-kastam 2/4
8/3/2019 PINTU DPNNN KASTAM
http://slidepdf.com/reader/full/pintu-dpnnn-kastam 3/4
1
23 4
5
3
1
4
LEGEND
DESCRIPTION
6
BIL
1
STAINLESS STEEL PLATE TO SUPPLIERS DETAIL WITH SO
APPROVAL
2 MS HOLLOW ,BOX UP FRAME TO SUPPLIERS DETAIL WITH SO
APPROVAL.
3 6 MM THK GLASS WITH GREEN TINTED TO SUPPLIERS DETAIL
WITH S.O APPROVAL.
4 12 MM THK TEMPERED GLASS DOOR WITH GREEN TINTED TO
SUPPLIERS DETAIL WITH S.O APPROVAL.
5 STAINLESS STEEL DOOR HANDLE TO SUPPLIERS DETAIL WITH
S.O APPROVAL .
6 CEILING PROFILE TO ID DETAIL WITH SO APPROVAL .
ELEVATION B
SECTION A-A SECTION B-B SECTION C-C
AHS ARCH ITECTS SDN. BHDBC/A108 (598849 -H )
PULAU PINANG
R
U K A SQUALITY
MANAGEMENT
043-A
REGISTERED TOISO9001 :2000CERTIFICATE NO. 17594
Disemak Oleh :
A R K I T E K
L E M B A G A
M A L A Y S I A 1 2 3 4 5
6 7 8 9 10
MALAYSIA AIRPORTS HOLDINGS BERHAD
NOTE :
SHOP DRAWINGS IS TO BE PROVIDED
BY CONTRACTOR TO ENGR'S AND
ARCHITECT'S APPROVAL.
No. Lukisan :
TD (TB01) / D / IF / ( / )
No. Kerja :AHS / 0210 / (MAHB) TD (TB01)
Perkara :
INTERIOR FACADE
•
Tarikh :
OKTOBER 2011
No.Revision : Dilukis :
HA
MOHAMED FARID
AFFANDI
ROSHAIZAL HAMID KHAIRUL AIDIL
Ar. ABU HASSAN SALLEH ARKITEK PROFESIONAL No.
pendaftaran LAM A / A 106
TAJUK :
PROPOSED DEVELOPMENT AND UPGRADING WORK AT PENANG
INTERNATIONAL AIRPORT BAYAN LEPAS, PULAU PINANG.
PACKAGE 2 - MAIN TERMINAL BUILDING AND ASSOCIATES WORKS UNTUK : TETUAN MALAYSIA AIRPORTS BERHAD
Disahkan Oleh :
8/3/2019 PINTU DPNNN KASTAM
http://slidepdf.com/reader/full/pintu-dpnnn-kastam 4/4