RPT Tkf4 2015 Ada Tarikh Dan Minggu

3
SEKOLAH BERASRAMA PENUH INTEGRASI RAWANG BANDAR TASIK PUTERI 48020, RAWANG, SELANGOR DARUL EHSAN RANCANGAN PELAJARAN TAHUNAN 2015 MATA PELAJARAN: TEKNOLOGI KEJURUTERAAN TINGKATAN:4DS MINGGU TARIKH OBJEKTIF PEMBELAJARAN PETA I- THINK CATATAN 1 12/1 - 16/1 PERKEMBANGAN TEKNOLOGI KEJURUTERAAN Peta Dakap 2 19/1 - 23/1 PENGENALAN KEPADA PEMBUATAN 3 26/1 - 30/1 PERALATAN Peta Buih 4 2/2 - 6/2 BAHAN-BAHAN KEJURUTERAAN Peta Buih 5 9/2 – 13/2 BAHAN-BAHAN KEJURUTERAAN Peta pokok 6 16/2 - 20/2 PENGENALAN KEPADA PERHUBUNGAN Peta buih 19/2 – 22/2 CUTI TAHUN BARU CINA 7 23/2 – 27/2 Ujian1/Penilaian PBS 8 2/3 - 6/3 PERHUBUNGAN ELEKTRONIK Peta Dakap 9 9/3 – 13/3 PERHUBUNGAN ELEKTRONIK 14/3 – 22/3 CUTI PERTENGAHAN PENGGAL SATU 10 23/3 – 27/3 PERHUBUNGAN ELEKTRONIK Peta Buih Peta buih bergand a 11 30/3 – 3/4 PENGENALAN KEPADA PENGANGKUTAN DAN KUASA 12 6/4 - 10/4 PENGANGKUTAN Peta pokok 13 13/4 - 17/4 SUMBER TENAGA Peta Bulatan 14 20/4 – 24/4 SUMBER TENAGA Peta Buih 15 27/4 - 1/5 MOTOR DAN PENJANA Peta Buih Peta Dakap 1/5 – 4/5 CUTI HARI PEKERJA DAN HARI WESAK

description

rancangan pelajaran tahunan

Transcript of RPT Tkf4 2015 Ada Tarikh Dan Minggu

SEKOLAH BERASRAMA PENUH INTEGRASI RAWANGBANDAR TASIK PUTERI 48020, RAWANG, SELANGOR DARUL EHSAN

RANCANGAN PELAJARAN TAHUNAN 2015MATA PELAJARAN: TEKNOLOGI KEJURUTERAAN TINGKATAN:4DS

MINGGUTARIKHOBJEKTIF PEMBELAJARAN

PETA I-THINKCATATAN

112/1 - 16/1 PERKEMBANGAN TEKNOLOGI KEJURUTERAANPeta Dakap

219/1 - 23/1PENGENALAN KEPADA PEMBUATAN

326/1 - 30/1PERALATANPeta Buih

42/2 - 6/2BAHAN-BAHAN KEJURUTERAANPeta Buih

59/2 13/2BAHAN-BAHAN KEJURUTERAANPeta pokok

616/2 - 20/2PENGENALAN KEPADA PERHUBUNGANPeta buih

19/2 22/2CUTI TAHUN BARU CINA

723/2 27/2Ujian1/Penilaian PBS

82/3 - 6/3PERHUBUNGAN ELEKTRONIKPeta Dakap

99/3 13/3PERHUBUNGAN ELEKTRONIK

14/3 22/3CUTI PERTENGAHAN PENGGAL SATU

1023/3 27/3PERHUBUNGAN ELEKTRONIKPeta BuihPeta buih berganda

1130/3 3/4PENGENALAN KEPADA PENGANGKUTAN DAN KUASA

126/4 - 10/4PENGANGKUTANPeta pokok

1313/4 - 17/4SUMBER TENAGAPeta Bulatan

1420/4 24/4SUMBER TENAGAPeta Buih

1527/4 - 1/5MOTOR DAN PENJANAPeta Buih Peta Dakap

1/5 4/5CUTI HARI PEKERJA DAN HARI WESAK

165/5 - 8/5PEPERIKSAAN PERTENGAHAN TAHUN

17 11/5 15/5PEPERIKSAAN PERTENGAHAN TAHUN

1818/5 22/5PEPERIKSAAN PERTENGAHAN TAHUN

1925/5 -28/5PEPERIKSAAN PERTENGAHAN TAHUN

29/5SAMBUTAN HARI GURU PERINGKAT SEKOLAH

30/5 - 14/6CUTI PERTENGAHAN TAHUN

2015/6 19/6MOTOR DAN PENJANA

Peta Pokok

2122/6 26/6MOTOR DAN PENJANAPeta Pokok

2229/6 - 3/7PENGENALAN KEPADA TEKNOLOGI PEMBINAANPeta Bulatan

236/7 - 10/7PERSEDIAAN UNTUK PROJEK BINAANPeta Dakap

2413/7 - 17/7PERSEDIAAN UNTUK PROJEK BINAANPeta Buih

16/7 19/7CUTI HARI RAYA PUASA

2520/7 24/7REKABENTUK DAN PERANCANGAN PROJEK PEMBINAANPeta Bulatan

2627/7 - 31/7REKABENTUK DAN PERANCANGAN PROJEK PEMBINAANPeta Dakap

273/8 - 7/8PENGENALAN KEPADA REKABENTUKPeta Buih

2810/8 - 14/8PENGENALAN KEPADA REKABENTUKPeta Pokok

2917/8 - 21/8UJIAN 2

3024/8 - 28/8ULANGKAJI

3131/8 -4/9ULANGKAJI

31/8CUTI SEMPENA HARI ULANG TAHUN KEMERDEKAAN KE 58

327/9 - 11/9ULANGKAJI

3314/9 -18/9ULANGKAJI

16/9CUTI HARI MALAYSIA

19/9 27/9CUTI PERTENGAHAN PENGGAL 2 DAN CUTI HARI RAYA QURBAN

3428/9 2/10ULANGKAJI PEPERIKSAAN DIAGNOSTIK

355/10 9/10 PEPERIKSAAN DIAGNOSTIK T.4

3612/10 16/10PEPERIKSAAN DIAGNOSTIK T.4

3719/10 - 23/10PEPERIKSAAN DIAGNOSTIK T.4

3826/10 - 30/10Persediaan Latihan dan Kerja Cuti Akhir Tahun/Pendedahan Sukatan T.5

392/11 6/11PEPERIKSAAN SPM 2015 BERMULA

40911 -13/11Persediaan Latihan dan Kerja Cuti Akhir Tahun/Pendedahan Sukatan T.5

4116/11 - 20/11Persediaan Latihan dan Kerja Cuti Akhir Tahun/Pendedahan Sukatan T.5

Cuti Akhir Tahun (21 November 3 Januari 2015)

Disediakan oleh:Panitia Teknologi KejuruteraanSBPI Rawang2015