SAIFUL BAHRI BIN ZAKARIA No. 4345 Lorong Nyior...

17
SAIFUL BAHRI BIN ZAKARIA Page 1 of 17 SAIFUL BAHRI BIN ZAKARIA No. 4345 Lorong Nyior Pandan Satu, Kampung Baru Dusun Nyior, Chukai, 24000 Kemaman, Terengganu, Malaysia. RESUME NAME : SAIFUL BAHRI BIN ZAKARIA POSITION : SITE QA/QC MANAGER DATE OF BIRTH : 15 th AUGUST 1967 PLACE OF BIRTH : KUANTAN, PAHANG DARUL MAKMUR, MALAYSIA. MARITAL STATUS : MARRIED WITH 04 CHILDS. WIFE NAME : AZIZAH BINTI ABDUL AZIZ CHILD NAME : 1) SARAH AFIQAH BINTI SAIFUL BAHRI (15 YEARS) : 2) SAFIYAH AMIRA BINTI SAIFUL BAHRI (13 YEARS) : 3) SHAFIQ ASYRAF BIN SAIFUL BAHRI (08 YEARS) : 4) SYAHMI AMAR BIN SAIFUL BAHRI (07 YEARS) NATIONALITY : MALAYSIA RACE : MALAY RELIGION : ISLAM ADDRESS : NO. 4345 LORONG NYIOR PANDAN SATU, KAMPUNG BARU DUSUN NYIOR, CHUKAI, 24000 KEMAMAN, TERENGGANU DARUL IMAN. 609-859 4536 (HOME) 6019-915 2174 (H/P) PERSONAL EMAIL ADDRESS : [email protected] EMERGENCY CONTACT NUMBER : 6019-948 4261 (AZIZAH BINTI ABDUL AZIZ - WIFE) BLOOD TYPE : 0+ (POSITIF) OVERALL PROFESSIONAL EXPERIENCE Over twenty years of experience in a Marine, Petrochemical, Oil and Gas industrial in Project management, QA/QC Management System plus Internal Audit activity, Project Plant Preventive Maintenance, Shut-down/ Turn around Activity, Safety Management for Manufacturing, Fabrication, Repair/ Refurbishment, Setting, Testing and Blasting/ Painting works for Steel Structural, Pipeline/ Piping Works, Pipeline Valve (Gate, Globe, Check, PSV, PCV, PRV, etc), Christmas Tree and Wellhead (Single and Dual Type), Drilling Equipment (Drill Bit, Stabilizer, Drill Pipe, etc.), Rotating/ Mechanical equipments/ items, Marine Safety Equipment (Enclosed Life Boat, Life Raft, LSA, etc.), Electric Motor (Rewinding), Instrumentation and Electrical Works (Installation and Testing).

Transcript of SAIFUL BAHRI BIN ZAKARIA No. 4345 Lorong Nyior...

Page 1: SAIFUL BAHRI BIN ZAKARIA No. 4345 Lorong Nyior …pathwaydmx.com/uploaded_files/resumes/resume_6325.pdf · kampung baru dusun nyior, chukai, ... bahri bin zakaria . position : site

SAIFUL BAHRI BIN ZAKARIA

Page 1 of 17

SAIFUL BAHRI BIN ZAKARIA

No. 4345 Lorong Nyior Pandan Satu, Kampung Baru Dusun Nyior, Chukai,

24000 Kemaman, Terengganu,

Malaysia.

RESUME

NAME : SAIFUL BAHRI BIN ZAKARIA

POSITION : SITE QA/QC MANAGER

DATE OF BIRTH : 15th AUGUST 1967

PLACE OF BIRTH : KUANTAN, PAHANG DARUL MAKMUR, MALAYSIA.

MARITAL STATUS : MARRIED WITH 04 CHILDS.

WIFE NAME : AZIZAH BINTI ABDUL AZIZ

CHILD NAME : 1) SARAH AFIQAH BINTI SAIFUL BAHRI (15 YEARS)

: 2) SAFIYAH AMIRA BINTI SAIFUL BAHRI (13 YEARS)

: 3) SHAFIQ ASYRAF BIN SAIFUL BAHRI (08 YEARS)

: 4) SYAHMI AMAR BIN SAIFUL BAHRI (07 YEARS)

NATIONALITY : MALAYSIA

RACE : MALAY

RELIGION : ISLAM

ADDRESS : NO. 4345 LORONG NYIOR PANDAN SATU,

KAMPUNG BARU DUSUN NYIOR, CHUKAI,

24000 KEMAMAN, TERENGGANU DARUL IMAN.

609-859 4536 (HOME)

6019-915 2174 (H/P)

PERSONAL EMAIL ADDRESS : [email protected]

EMERGENCY CONTACT NUMBER : 6019-948 4261 (AZIZAH BINTI ABDUL AZIZ - WIFE)

BLOOD TYPE : 0+ (POSITIF)

OVERALL PROFESSIONAL EXPERIENCE Over twenty years of experience in a Marine, Petrochemical, Oil and Gas industrial in Project management, QA/QC Management System plus Internal Audit activity, Project Plant Preventive Maintenance, Shut-down/ Turn around Activity, Safety Management for Manufacturing, Fabrication, Repair/ Refurbishment, Setting, Testing and Blasting/ Painting works for Steel Structural, Pipeline/ Piping Works, Pipeline Valve (Gate, Globe, Check, PSV, PCV, PRV, etc), Christmas Tree and Wellhead (Single and Dual Type), Drilling Equipment (Drill Bit, Stabilizer, Drill Pipe, etc.), Rotating/ Mechanical equipments/ items, Marine Safety Equipment (Enclosed Life Boat, Life Raft, LSA, etc.), Electric Motor (Rewinding), Instrumentation and Electrical Works (Installation and Testing).

Page 2: SAIFUL BAHRI BIN ZAKARIA No. 4345 Lorong Nyior …pathwaydmx.com/uploaded_files/resumes/resume_6325.pdf · kampung baru dusun nyior, chukai, ... bahri bin zakaria . position : site

SAIFUL BAHRI BIN ZAKARIA

Page 2 of 17

EMPLOYMENT HISTORY Year June 2007 – Present GLOBAL PROCESS SYSTEMS SDN BHD QA/QC MANAGER – SITE (Operation and Maintenance Department)

• Project Name:-

• EPCIC of GPS Producer #1 – Self Elevated Relocatable Facility (SERF) Jack-up Rig for Murphy Oil (Ltd) Sdn Bhd at Labuan Shipyard Engineering Sdn Bhd.

• EPCIC of Provision of Lease, Operation and Maintenance of Two(2) Mobile Offshore Production Units (MOPU’s) Jack-up Rig Facilities – MOPU D30(SATU) and MOPU DANA(DUA) for D30 and DANA Field Development Project for PCPP (Petronas Carigali, Pertamina, Petrovietnam) Operating Company Sdn Bhd at Malaysia Marine and Heavy Engineering Sdn Bhd(MMHE) [Seconded to Malaysia Offshore Mobile Production (L) Ltd (MOMPL) – Joint Venture with MISC).

• Function:-

• Manage QA/QC Department at site construction activities for following:-

• Construction activities to comply with ABS Classification for MODU & Offshore Fix Structural Platform, IACS, ISPS, SOLAS, IMO, MARPOL, ILO, PETRONAS PGBOOM, PTS, MMD and MHS Aviation Berhad for Helideck ICAO, UK Cap 437 and Riser pipeline with Malaysia DOSH.

• Construction of Marine Piping, Mechanical, Safety Equipments, Communication, Electrical and Instrumentation to comply with ABS Classification, IMO, SOLAS and PETRONAS PG BOOM requirements.

• Construction and Installation of Top Side piping, mechanical, electrical and instrumentation to comply with PETRONAS PTS, CSP, ANSI B31.3 and etc.

• Construction and Installation of Pig Launcher and Pig Receiver including pipeline to comply with API 1104, ANSI B31.8, FMA 319 and PETRONAS PTS.

• Liaise with DOSH/ JKKP and apply PTI/ PTO for Launcher Pipeline.

• Liaise with ABS Class Surveyor and ABS Consultation.

• Monitoring Quality and Documentation Control activity during project execution.

• To provide Quality Procedure, Inspection Test Report (ITR’s) and operated OPTIMA PCS system for construction Check Sheet.

• Monitoring implementation of GPS QMS on project activities.

• Attending Weekly progress and QA/QC finding punch list meetings with client.

• Chairman/ Lead QA/QC weekly progress meeting with contractor and sub-contractor.

• Working with GPS Marine Department on marine requirements and review HSE lay-out plan for SERF/ MOPU to comply with API std 510, IEEC, ABS Classification, HMAS and MMD(Malaysia Marine Department).

Page 3: SAIFUL BAHRI BIN ZAKARIA No. 4345 Lorong Nyior …pathwaydmx.com/uploaded_files/resumes/resume_6325.pdf · kampung baru dusun nyior, chukai, ... bahri bin zakaria . position : site

SAIFUL BAHRI BIN ZAKARIA

Page 3 of 17

June. 2006 – June. 2007 ENPROSERVE (M) SDN BHD Construction Manager

• Project Name:-

• EPCC of Kuantan Compressor Plant Expension Project (PETRONAS GAS BERHAD) with Main Contractor Sime Engineering Sdn Bhd at PETRONAS GAS Berhad Gambang Plant.

• EPCC of Segamat Compressor Plant Expension Project (PETRONAS GAS BERHAD) with Main Contractor Sime Engineering Sdn Bhd at PETRONAS GAS Berhad, Segamat Plant.

• Function:-

• Manage site construction activities for following:-

• Fabrication, Inspection, Testing, commissioning and Blasting/ Painting activities for piping system to comply with ASME IX, API 1104, ANSI B31.3, ANSI 31.8, ANSI B31.4, FMA 139, OSHA 514, MS 308 and PETRONAS Specification.

• Manage, planning and reschedule construction activities.

• Liaise with JKKP Pipeline.

• Liaise with client/ PGB on construction activities issue.

• Cooperate with others contractor on installation mechanical, instrumentation and electrical equipments.

• Attend weekly progress, Quality and HSE meeting with PGB and Client.

• Chairman weekly progress, quality and safety meeting with sub-contractor.

• Lead QSHE team construction on implementation of Quality and HSE requirements.

• Lead Tie-In and Hot Tapping activity at PGB Plant for new piping line to connected with life pipeline – PGB Gambang Compressor and PGB Segamat Compressor.

• Lead Company Safety Committee.

June 2005 – June 2006 FLEXYSYS ACE SDN BHD Preventive Maintenance Manager

• Project Name:-

• Plant Shutdown activities for Pressure Safety Valve(PSV), Pressure Relief Valve(PRV) and Pipeline Valve at FSO Puteri Cakerawala – M3 Energy Sdn Bhd.

• Plant Shutdown activ Plant Shutdown activities for Pressure Safety Valve(PSV), Pressure Relief Valve(PRV) and Pipeline Valve at RESAK platform.

• Plant Shutdown activities for Pressure Safety Valve(PSV), Pressure Relief Valve(PRV), Pipeline Valve and rotating equipment at FPSO Bunga Kertas.

Page 4: SAIFUL BAHRI BIN ZAKARIA No. 4345 Lorong Nyior …pathwaydmx.com/uploaded_files/resumes/resume_6325.pdf · kampung baru dusun nyior, chukai, ... bahri bin zakaria . position : site

SAIFUL BAHRI BIN ZAKARIA

Page 4 of 17

• Plant Shutdown activities for repair and service and alignment rotating equipment at PETRONAS GAS GPP A, B, C and D.

• Plant Shutdown activities for alignment Mechanical and rotating equipment at PETRONAS Carigali platform.

• Function:-

• Manage construction activities for following:-

• Manage, planning and execute works for shutdown Valve.

• Manage, planning and execute works for shutdown Mechanical equipments – Pump and Electric Motor.

• Manage, Planning and Execute works for shutdown Rotating Equipment.

June 2004 – June 2005 PETROLIFE ENGINEERING (M) SDN BHD General Manager

• Project:-

• Repair, Service and calibrate Motor Actuator Valve(MOV) to MOZA Sdn Bhd.

• Repair, service and calibrate Pressure Control Valve(PCV) at RESAK Platform.

• Repair, service and setting 4-way valve at FPSO Bunga Kertas for Bumiflow Sdn Bhd.

• Supply Manpower, Rerouting instrument tubing for hydraulic and pneumatic at FPSO Bunga Kertas.

• Supply Manpower, service and repair Crude Oil Pump at FPSO Bunga Kertas.

• Supply Technical Manager and Manpower to Majutera Sdn Bhd for upgrade LPG house system project Kem Kementah Sungai Besi Selangor (LTAT).

• Supply Technical Manager and Manpower to KENCANA LPG Trading Sdn Bhd for EPCC project upgrade LPG System to Hotel Suria Cherating, Swiss Garden, Awana Kijal.

• Supply manpower for servicing and calibrate Pressure Control Valve(PCV) on maintenance schedule works to Excel Oilfield Manufacturing Services Sdn Bhd at RESAK, OGT and ANSI platform.

• Fabricate, welding and install stainless steel frame to Majutera Sdn Bhd at VCMSB.

• Construct, fabricate and install fire water pump including piping system to Dugong Engineering Sdn Bhd at TNB PAKA Power Station, Kerteh, Kemaman, Terengganu.

• Service and testing flexible hoses to Dynamic Sdn Bhd at CTOC Warehouse 11, Kemaman Supply Base, Kemaman, Terengganu.

• Provide transportation to carry-out, install and testing Offloading Hoses & Mooring Hawser to Offshore Subsea Work(OSW) at FPSO Puteri Cakerawala, CTOC.

Page 5: SAIFUL BAHRI BIN ZAKARIA No. 4345 Lorong Nyior …pathwaydmx.com/uploaded_files/resumes/resume_6325.pdf · kampung baru dusun nyior, chukai, ... bahri bin zakaria . position : site

SAIFUL BAHRI BIN ZAKARIA

Page 5 of 17

• Function:-

• Manage company activities for following:-

• Develop new business for company in Marine, Petrochemical, Oil and Gas industrial for supply, fabricate, service, maintenance and repair works.

• Develop new business for Servicing, Maintenance, plant shutdown/ turn around for Mechanical, Valve servicing and Welding works.

• Develop new business for minor fabrication and installation of civil construction, steel structural, piping, pipeline.

• Target, schedule and planning on company business target and vision.

• Lead Company Safety Committee.

Jan. 2004 – June 2004 BEST WIDE-MCCS SDN BHD QSHE Manager

• Project Name:-

• Re-test, Re-commissioning, and Start-up Project for Cakerawala Gas Facilities – CKP, CKA, CKB, CKC and FSO Puteri Cakerawala.

• Function:-

• Manage Project QSHE Department on construction activities for following:-

• Provide Quality and HSE procedure, Inspection Testing Plan(ITP), Safe Operation Procedure, Job Safety Analysis(JSA) to comply with contract requirements.

• Liaise with client representative.

• Offshore construction activities.

• Monthly visit to offshore to witness of project QMS and HSE implementation.

• Lead Company Project Safety Committee.

YEAR 2003 – YEAR 2004 UM OIL SUPPLY AND SERVICES SDN BHD Project Manager

• Project Name:-

• Supply Quality Management to Excel Oilfield Manufacturing Services Sdn Bhd for ensure continuous of quality system accreditation on ISO 9002 series and API Std Q1.

• Supply Quality Management personnel to ESM Promat Sdn Bhd for ensure continuous quality system and HSE implementation on manufacturing Flanges and Pipe fittings.

• Supply Welding Technical Management to Excel Oilfield Manufacturing services Sdn Bhd, Majutera Sdn Bhd and Proskill Sdn Bhd.

Page 6: SAIFUL BAHRI BIN ZAKARIA No. 4345 Lorong Nyior …pathwaydmx.com/uploaded_files/resumes/resume_6325.pdf · kampung baru dusun nyior, chukai, ... bahri bin zakaria . position : site

SAIFUL BAHRI BIN ZAKARIA

Page 6 of 17

• Servicing, repair and install fire hoses box project to Al-Wahid Supply Sdn Bhd at CUF Gebeng, Kuantan, Pahang and CUF Kerteh, Kemaman, Terengganu.

• Prepared of project quality, HSE and Environmental system to comply with ISO 14000 and OSHAH 18000 for high pressure system on Christmas Tree and Wellhead equipment for Excel Oilfield Manufacturing Services Sdn Bhd.

• Prepared of WPS, PQR and conduct WQT for new project to Excel Oilfield Manufacturing SERVICES Sdn Bhd, Talang Pacific Engineering Sdn Bhd, Majutera Sdn Bhd, ECO DUA Engineering Sdn Bhd and Proskill Sdn Bhd.

• Supply Technical Management for prepared Technical Specification, Quality Procedure and Inspection Test Plan (ITP) suitable with new project to Excel Oilfield Manufacturing SERVICES Sdn Bhd, Majutera Sdn Bhd and Proskill Sdn Bhd and ECO DUA Engineering Sdn Bhd.

• Supply Technical Team to TATI Production Sdn Bhd on servicing, repair, maintenance and refurbishment Motor Actuator Valve (MOV) for PETRONAS GAS.

• Function:-

• Manage company activities for following:-

• Develop new project for company and lead Business Development team for new business area.

• Quality system and Safety Management Service.

• Welding Technical Service.

• Technical Management Service.

• Technical Management for valve servicing and repair.

YEAR 2000 – YEAR 2003 EXCEL OILFIELD MANUFACTURING SERVICES SDN BHD QA/QC cum HSE MANAGER

• Project Name:-

• Plant Shutdown/ Turn Around year 2000 for repair, service, maintenance and refurbishment pipeline valve at BASF, Gebeng, Kuantan, Pahang.

• Plant Shutdown/ Turn Around at PGB Export Terminal, Kemaman, Terengganu.

• Plant Shutdown/ Turn Around at GPP A, B and Export Terminal Kerteh, Kemaman, Terengganu.

• Plant Shutdown/ Turn Around for repair, service and refurbishment Rotating Equipment (Pump) and Pipeline Valve at Vinyl Chloride (M) Sdn Bhd.

• Plant Shutdwn/ Turn Around for Electric Motor and Pumps at GPP A, B, 5, 6, Export Terminal Kemaman, MTBE and BASF for years 2000 to 2003.

• Fabrication and Installation piping works for IDCHE SUKWON – SAMSUNG Olefin project at OptimaL (M) Sdn Bhd, Keteh, Terengganu.

Page 7: SAIFUL BAHRI BIN ZAKARIA No. 4345 Lorong Nyior …pathwaydmx.com/uploaded_files/resumes/resume_6325.pdf · kampung baru dusun nyior, chukai, ... bahri bin zakaria . position : site

SAIFUL BAHRI BIN ZAKARIA

Page 7 of 17

• EPCC of NGDS GMSB piping to Tech See Plastic Bangi, Selangor.

• EPCC of NGDS GMSB to Nicom Steel Center, Bangi, Selangor.

• EPCC of NGDS GMSB to Taima Casting, Senai, Johor.

• Dismantle, Service, Repair, Assemble and Testing Chain Swivel Buoy for EPMI.

• Function:-

• Manage QA/QC Department on machining and Fabrication activities for following:-

• As a Company Representative during Quality and Safety Audit Surveying from ABS Quality and API for annually audit.

• Apply/ Renew API License and Quality System (ISO 9002) accreditation.

• Monitoring Quality System (ISO 9002 & API Std Q1) and HSE implementation from receiving until delivering of equipment/ items to client.

• Company Representative to attend Project Progress, Quality and Safety Meeting with client/ customers.

• Develop Quality Procedure, HSE Safe Operation Procedure(SOP), Inspection Testing Plan(ITP) and Job Safety Analysis for Fabricate, Installation, Hydrostatic Test, Purging and Commissioning NG Pipeline.

• Develop Quality Procedure, HSE Safe Operation Procedure(SOP), Inspection Testing Plan(ITP) and Job Safety Analysis for Repair, Servicing, Maintenance and Refurbishment of Pipeline Valve, PSV, PRV, PCV, MOV works.

• Develop Quality Procedure, HSE Safe Operation Procedure(SOP), Inspection Testing Plan(ITP) and Job Safety Analysis for Pipeline Valve, Christmas Tree and Wellhead Greasing and Lubrication works.

• Develop Quality Procedure, HSE Safe Operating Procedure, Inspection Testing Procedure and Job Safety Analysis for Rotating Equipments Maintenance works.

• Develop Quality Procedure, HSE Safe Operation Procedure(SOP), Inspection Testing Plan(ITP) and Job Safety Analysis(JSA) for Blasting, Painting and Metal Spray Coating work activity on Christmas tree, wellhead, pipeline valve, structural, piping to comply with SSPC-SP Spec., NACE Spec, ISO 8502 and Client Specification – PETRONAS CARIGALI, PETRONAS GAS and/ or EPMI.

• Performing Dye Penetrant Inspection (DPI) and Magnetic Particle Inspection (MPI) on Manufacturing, Remanufacturing, Service, Repair, Maintenance and Refurbishment for Pipeline Valve, Christmas Tree, Wellhead, Drilling Equipment, Innerlay Welding and etc.

• Machining and welding inspection for manufacturing, remanufacturing, repair, servicing, refurbishment of pipeline valve, Christmas tree and wellhead especially on innerlay welding on valve pocket, ring groove and thru bore – carbon steel/ stainless steel innerlay.

Page 8: SAIFUL BAHRI BIN ZAKARIA No. 4345 Lorong Nyior …pathwaydmx.com/uploaded_files/resumes/resume_6325.pdf · kampung baru dusun nyior, chukai, ... bahri bin zakaria . position : site

SAIFUL BAHRI BIN ZAKARIA

Page 8 of 17

• Conduct Welder Qualification Test (WQT) for Structural, Piping, Pipeline Valve, Christmas Tree and/or Wellhead.

• Blasting, Painting and Metal Spray Coating inspection during works activity on pipeline valve, structural, piping and/or pipe spool to comply with SSPC-SP Spec., NACE Spec, ISO 8502 and Cleint Specification – PETRONAS CARIGALI, PETRONAS GAS and/ or EPMI.

• Provide AUTOCAD and CAD-CAM drawing for machining works of lubricator Christmas Tree and Wellhead (API Spec 6A/ 16A/ 14D), Cross Over (API Spec 5CT), Flanges (API Spec 6A/ ANSI B16.5) and valve component (API Spec 6D).

• Lead Safety Committee meeting.

• Inspection of assemble, repair, servicing, maintenance, refurbishment of actuator valve (AV) and motor operating valve (MOV) for:-

• Axelson * Rotork * Baker

• AVA * Bettis * Valve-Tek

• Fisher * Rosemount * Samsonite

YEAR 1996 – YEAR 2000 DREXEL BAKTI OILFIELD SDN BHD QA/QC EXECUTIVE

• Project Name:-

• Fabricate, Inspection, Testing and Install Carbon Steel, Stainless Steel, Cooper Nickel, Duplex Stainless Steel pipe spool at EPMI and PETRONAS CARIGALI Platform on new, repair and modification on piping system.

• EPCC of NGDS GMSB to Kaneka, Gebeng, Kuantan, Pahang.

• EPCC of NGDS GMSB to MTBE Plant, Gebeng, Kuantan, Pahang.

• Fabrication, Inspection, Testing and Installation of piping system for KR2 Project under PERMINT Engineering Sdn Bhd.

• Fabrication, Inspection, Testing and Installation Carbon Steel, Duplex Stainless Steel, 90/10 Cooper Nickel, A333 Grade 3, A333 Grade 6 and A335 Grade 1 pipe Spool for Seligi “A”, TABU “A”, PULAI “A” platform modification and upgrade – joint venture with Penang Shipbuilding and Construction Sdn Bhd (PSC).

• Fabrication, Inspection, Testing and Installation of piping system for BASF Phase 1, Acrylic Acid Plant, Gebeng, Kuantan, Pahang.

• Function:-

• Manage QA/QC Department on machining and fabrication activities for following:-

• As a Company Representative during Quality and Safety Audit Surveying from ABS Quality and API for annually audit.

• Apply/ Renew API License (API Std Q1) and Quality System (ISO 9002) accreditation.

Page 9: SAIFUL BAHRI BIN ZAKARIA No. 4345 Lorong Nyior …pathwaydmx.com/uploaded_files/resumes/resume_6325.pdf · kampung baru dusun nyior, chukai, ... bahri bin zakaria . position : site

SAIFUL BAHRI BIN ZAKARIA

Page 9 of 17

• Monitoring Quality System (ISO 9002 & API Std Q1) and HSE implementation from receiving until delivering of equipment/ items to client.

• Develop Company Quality System and Procedure to comply and/or suitable with New Specification/ Std/ Recommended Practice for API Spec. 5CT, API Spec. 7/ RP 7G and/ or API Spec Q1 and ISO 9002 series requirements.

• Develop Quality Procedure, Inspection Testing Plan(ITP) for machining works on casing, tubing and drilling pipe thread connection.

• Develop Quality Procedure, Inspection Testing Plan, Method of Statement for fabricate, install and hydrostatic test of pipeline, piping and/or pipe spool.

• Develop Welding Procedure Specification (WPS) and to qualified Procedure Qualification Report (PQR) for welding Carbon Steel pipe such as API Spec. 5L Grade B, X40, X56, X60 and X70 to comply with API Std 1104, API Std 1107 and ANSI B31.8.

• Develop Welding Procedure Specification (WPS) and to qualified Procedure Qualification Report (PQR) for welding Carbon Steel, Low Temp A333 Grade 3, A333 Grade 6, A335 Grade 1.Stainless Steel 316 and/or 304, Duplex Stainless Steel, 90/10 Cooper Nickel, Titanium, Hestalloy for piping, spool to comply with ASME IX and ANSI B31.3.

• Develop Welding Procedure Specification (WPS) and to qualified Procedure Qualification Report (PQR) for welding Carbon Steel and/or Stainless Steel and/ or Aluminium for steel structural to comply with AWS D1.1.

• Conduct Welder Qualification Test (WQT) for Structural, Piping, Pipeline Valve and NG Pipeline to comply with API 1104, ASME IX, ANSI B31.3, ANSI B31.8 and AWS D1.1.

• Blasting, Painting and Metal Spray Coating inspection during works activity on pipeline valve, structural, piping and/or pipe spool to comply with SSPC-SP Spec., NACE Spec, ISO 8502 and Client Specification – PETRONAS CARIGALI, PETRONAS GAS and/ or EPMI.

• Safety Committee membership.

YEAR 1991 – YEAR 1996 EXCEL OILFIELD MANUFACTURING SERVICES SDN BHD QA/QC ENGINEER

• Project Name:-

• Manufacturing, Remanufacturing, Servicing, Repair and Refurbishment of Wellhead, Christmas Tree (API Spec 6A and API Spec 14D) and Pipeline Valve (API Spec. 6D) for WOM Canada, Cooper Cameron Singapore, IKS Japan, EPMI, PETRONAS CARIGALI and LUNDIN.

• Manufacturing, Dull Grading, Remanufacturing, Servicing, Repair and Refurbishment of Drill Bit, Rock Bit, Stabilizer for DBS Texas, DBS China, EPMI, PETRONAS CARIGALI and LUNDIN.

• Contract machining works, mechanical supply and install for New FPG Oleo Chemical Kuantan plant.

Page 10: SAIFUL BAHRI BIN ZAKARIA No. 4345 Lorong Nyior …pathwaydmx.com/uploaded_files/resumes/resume_6325.pdf · kampung baru dusun nyior, chukai, ... bahri bin zakaria . position : site

SAIFUL BAHRI BIN ZAKARIA

Page 10 of 17

• Machining works for FPG Oleo Chemical, Huntsman Tioxide, MTBE, AMOCO, PETRONAS GAS, PETRONAS CARIGALI/ OGT and EPMI.

• Servicing, Repair and Refurbishment of Calm Buoy for PETRONAS PENAPISAN (T) Sdn Bhd at Promet Engineering Sdn Bhd – Ramunia Yards.

• Servicing, Repair and Refurbishment of Marine Swivel for EPMI at KSB Yard.

• Fabrication of Module Structural and Piping for PROMET Engineering Sdn Bhd at Ramunia Yards.

• Fabrication and Installation Pipe Spool and Structural at Hunstman Tioxide, MTBE, AMOCO, PETRONAS GAS, PETRONAS CARIGALI/ OGT, EPMI and PETRONAS PENAPISAN.

• Plant Annual TURN Around/ Shutdown repair, servicing and refurbishment of Pipeline Valve, PSV, PCV, PRV, Electric Motor, Pumps, Rotating Equipment for Huntsman Tioxide, PETRONAS CARIGALI/ OGT, PETRONAS GAS, MTBE, AMOCO and Roving Gang (Rotating Equipments).

• Repair, Servicing and Refurbishment of Pump, Electric Motor, Pipeline Valve, Mud Pump, MUD Block valves, for Tioman Drilling, JDM, LUNDIN, EPMI, PETRONAS Carigali,

• Pressure Gauge and Pressure Transmittal calibration for EOMS-ENIKON Sdn Bhd Calibration Laboratory at FPG Oleochemical Kuantan, MTBE, PETRONAS GAS, PETRONAS CARIGALI and etc.

• 5 years contract with CARIGALI, EPMI, LUNDIN, for Valve Greasing and lubrication at offshore/ rigs.

• Metal/ Flame Spray on Worn of Equipment/ Shaft.

• Function:-

• Lead QA/QC Department activities for following:-

• As a Company Representative during Quality and Safety Audit Surveying from ABS Quality and API for annually audit.

• Apply/ Renew API License and Quality System (ISO 9002) accreditation.

• Monitoring Quality System (ISO 9002 & API Std Q1) and HSE implementation from receiving until delivering of equipment/ items to client.

• Develop Company Quality System and Procedure to comply and/or suitable with New Specification/ Std/ Recommended Practice for API Spec. 6A/ 14D/ 16A, API Spec. 6D, API Spec. 7/ RP 7G and/ or API Spec Q1 and ISO 9002 series requirements.

• Monitoring Quality works during project execution with PETRONAS and EPMI Roving Gang on servicing and maintenance Rotating and Mechanical Equipment/ items.

• Supervise calibration activity for EOMS-ENIKON Sdn Bhd calibration laboratory – Pressure Gauge and/ or Pressure Transmittal under SIRIM Accreditation Laboratory ISO G25 (SAMM 042).

Page 11: SAIFUL BAHRI BIN ZAKARIA No. 4345 Lorong Nyior …pathwaydmx.com/uploaded_files/resumes/resume_6325.pdf · kampung baru dusun nyior, chukai, ... bahri bin zakaria . position : site

SAIFUL BAHRI BIN ZAKARIA

Page 11 of 17

• Monitoring Quality process for Pipeline Valve, Wellhead and Christmas Tree Greasing and Lubrication under ICAT (M) Sdn Bhd.

• Blasting, Painting and Metal Spray Coating inspection during work activity on Christmas tree, wellhead, pipeline valve, structural, piping to comply with SSPC-SP Spec., NACE Spec, ISO 8502 and Client Specification – PETRONAS CARIGALI, PETRONAS GAS and/ or EPMI.

• Performing Dye Penetrant Inspection (DPI), Magnetic Particle Inspection (MPI) on Manufacturing, Remanufacturing, Servicing, Maintenance, Repair and Refurbishment, Pipeline Valve, Christmas Tree, Wellhead, Drilling equipment, Welding fabrication, hard facing welding process.

• Performing Receiving, Dismantle, Repair, Service, Refurbishment inspection of Calm Buoy including welding activity – inconel/ incoloy, stainless Steel interlay.

• Perform inspection for dull grading, manufacturing, remanufacturing, servicing, repair and/ or refurbishment and/or welding activity of hard facing, interconnection shank connection on drill bit, rock bit, stabilizer and drilling equipment.

• Machining and welding inspection for manufacturing, remanufacturing, repair, servicing, refurbishment of pipeline valve, Christmas tree and wellhead especially on Stainless Steel& Inconel innerlay welding on valve pocket, ring groove and thru bore – carbon steel/ stainless steel innerlay.

• Develop Welding Procedure Specification (WPS) and to qualified Procedure Qualification Report (PQR) for welding Carbon Steel and/or stainless steel for structural and/or pipe, Aluminium Welding for Steel Structural, to comply with ASME IX, ANSI B31.3 and AWS D1.1.

• Develop Welding Procedure Specification (WPS) and to qualified Procedure Qualification Report (PQR) for welding Carbon Steel and/or stainless steel, Inconel/ Incolloy innerlay, Stainless Steel Innerlay, Monel on pipeline valve, drilling valve, Christmas tree, wellhead, pumps, drilling bit, rock bit and hard facing on Drilling pipe to comply with API Spec. 6A, API Spec 14D, API Spec 16A, API Spec 6D/ ANSI B16.5 and API Spec 7/ API RP 7G.

• Conduct Welder Qualification Test (WQT) for Structural, Piping, Pipeline Valve, Christmas Tree and/or Wellhead.

• Provide AUTOCAD and CAD-CAM drawing for machining works of lubricator Christmas Tree and Wellhead (API Spec 6A/ 16A/ 14D), Cross Over (API Spec 5CT), Flanges (API Spec 6A/ ANSI B16.5) and valve component (API Spec 6D).

• Lead Company Safety Committee meeting.

• Inspection of assemble, repair, servicing, maintenance, refurbishment of actuator valve (AV) and motor operating valve (MOV) for:-

• Axelson * Rotork * Baker

• AVA * Bettis * Valve-Tek

• Fisher * Rosemount * Samsonite

Page 12: SAIFUL BAHRI BIN ZAKARIA No. 4345 Lorong Nyior …pathwaydmx.com/uploaded_files/resumes/resume_6325.pdf · kampung baru dusun nyior, chukai, ... bahri bin zakaria . position : site

SAIFUL BAHRI BIN ZAKARIA

Page 12 of 17

YEAR 1990 – YEAR 1991 EXCEL TUBULAR SDN BHD SENIOR QA/QC INSPECTOR

• Project:-

• Process Quality Inspection of manufacturing, repair, remanufacturing, and refurbishment for machining thread connections on Oil Country Tubular Goods (OCTG) – Casing and Tubing (EUE, Buttress, MANESMAN, TKC 40/40, NSCT/ NSCC) for PETRONAS CARIGALI, EPMI and Shell.

• Process Quality inspection of manufacturing, repair, remanufacturing and refurbishment for machining thread connections on drilling pipe and drilling equipment such HWDP, Drill Collar, Spiral Drill Pipe and Stabilizer.

• Performed hydrostatic test and “Tongue Make-up” process quality inspection to comply with API Specification 5CT, OCTG, API Spec. 5L, TKC 40/40, MANESMAN and client specification for PETRONAS, EPMI, Shell, Weatherford, Tioman Drilling and JDM.

• Function:-

• Lead QA/QC Inspector at site machining process activities for following:-

• Perform Receiving Inspection during Loading/ Unloading of Casing and/ or Tubing at Kuantan Port from Ship and company yard storage area.

• Perform process machining Inspection during and after complete Manufacturing, Repair, Servicing and Refurbishment pipe thread.

• Perform “Hydrostatic Test” and “Tongue Make-up” process quality inspection.

• Provide Safe Operating Procedure (SOP) and Inspection Testing Plan (ITP’s).

• Checking thread profile using thread profile projector for new product machining.

• Implement of Company QMS and HSE requirements.

• Attending weekly progress and quality production meeting.

• Perform gauge calibration for following type of thread:- • API Buttress thread.

• API EUE and NUE thread.

• MANESMAN thread.

• TKC 40/40 thread.

• NSCT & NSCC.

• Perform Inspection of Parkerising/ coating plating thread connection on casing and/ or tubing coupling.

• Company Safety Committee membership.

Page 13: SAIFUL BAHRI BIN ZAKARIA No. 4345 Lorong Nyior …pathwaydmx.com/uploaded_files/resumes/resume_6325.pdf · kampung baru dusun nyior, chukai, ... bahri bin zakaria . position : site

SAIFUL BAHRI BIN ZAKARIA

Page 13 of 17

YEAR 1989 – YEAR 1990 SOBENA OFFSHORE SDN BHD – KUANTAN, PAHANG. QA/QC INSPECTOR

• Project:-

• Process Quality Inspection of manufacturing, repair, remanufacturing, and refurbishment for machining thread connections on Oil Country Tubular Goods (OCTG) – Casing and Tubing (EUE, Buttress, MANESMAN, KAWASAKI-FOX, NSCT/ NSCC) for PETRONAS CARIGALI, EPMI and Shell.

• Process Quality inspection of manufacturing, repair, remanufacturing and refurbishment machining thread on drilling pipe and drilling equipment such as float Collar/ shoe for Weatherford and Tioman Drilling.

• Performed hydrostatic test and “Tongue Make-up” process quality inspection to comply with API Specification 5CT, OCTG, API Spec. 5L, KAWASAKI FOX, MANESMAN and client specification for PETRONAS, EPMI, Shell, Weatherford, Tioman Drilling and JDM.

• Function:-

• QA/QC Inspector at workshop machining process activities for following:-

• Perform Receiving Inspection during Loading/ Unloading of Casing and/ or Tubing at Kuantan Port from Ship and company yard storage area.

• Perform process machining Inspection during and after complete Manufacturing, Repair, Servicing and Refurbishment pipe thread.

• Perform “Hydrostatic Test” and “Tongue Make-up” process quality inspection.

• Provide Safe Operating Procedure (SOP) and Inspection Testing Plan (ITP’s).

• Implement of Company QMS and HSE requirements.

• Checking thread profile using thread profile projector for new product machining.

• Attending weekly progress and quality production meeting.

• Perform gauge calibration for following type of thread:- • API Buttress thread.

• API EUE and NUE thread.

• MANESMAN thread.

• KAWASAKI – FOX Joint thread.

• NSCT & NSCC.

• Perform Inspection of Parkerising/ coating plating thread connection on casing and/ or tubing coupling.

• Company Safety Committee membership.

Page 14: SAIFUL BAHRI BIN ZAKARIA No. 4345 Lorong Nyior …pathwaydmx.com/uploaded_files/resumes/resume_6325.pdf · kampung baru dusun nyior, chukai, ... bahri bin zakaria . position : site

SAIFUL BAHRI BIN ZAKARIA

Page 14 of 17

EDUCATIONAL QUALIFICATIONS Academic 1) Primary School : Ahmad Primary School, Pekan, Pahang, Malaysia.

: Std 6.

2) Secondary School : Ahmad High School, Pekan, Pahang, Malaysia.

: Form 5 – Sijil Pelajaran Malaysia.

3) Tertiary Education : Institute Kemahiran Mara

Certificate of Mechanical Draughmanship.

: MARA Technical Colleague.

Diploma in Oil and Gas Piping Design (MARA-PROTEK).

Professional Registration 1) Suruhanjaya Tenaga : Gas Pipeline Fitter Class 1 - Neutral Gas (NG).

(Gas Pipeline Department)

2) DOSH (JKKP) : Pipeline Engineer.

3) CIDB (LPIPM) : Green Card

4) NIOSH : Authorized Entrance and Supervisor Confined Space.

Page 15: SAIFUL BAHRI BIN ZAKARIA No. 4345 Lorong Nyior …pathwaydmx.com/uploaded_files/resumes/resume_6325.pdf · kampung baru dusun nyior, chukai, ... bahri bin zakaria . position : site

SAIFUL BAHRI BIN ZAKARIA

Page 15 of 17

Trainings & Seminars 1) RUANE – TATI SDN BHD : Non Destructive Testing and Appreciation.

2) CIDB (LPIPM) : Dynamic of Contract Management.

3) PRESCAN SDN BHD : Level II NDT Inspector for DPI and MPI.

4) NS Pipe Technolgy Inc. : NSPJ Gauging and Technical Training

5) SIRIM : Quality Internal Audit Course for ISO 9000/ 1994

Series.

6) QMI-QUEST Sdn Bhd : Quality Awareness ISO 9000 Series.

7) QMI Quest Sdn Bhd : Quality Internal Audit Course for ISO 9000/ 1998

Series.

8) SIRIM : Welding Inspection and Quality Control Course.

9) FMM - IM : Safety and Health Officer Certificate.

10) FMM - ESD : Technical for Supervisor.

11) SIRIM : Workshop Calibration and Measurement

Traceability.

12) MARA : Simpan Kira – Kira.

13) SIRIM : Calibration Pressure Gauge and Measuring

Instrumentation (ISO G25) – Training and Course.

14) Mc Murry Oil Tools Inc. : Gas Lift Technology Seminar (API Spec. 11V1).

15) Institute of engineer Malaysia : CORAL Protective Coating Technician Training and

& Institute of Material Malaysia Certification.

16) OTS - EPMI : Safety Orientation Course - Onshore.

17) Ranaco Marine Sdn Bhd : Basic Fire Fighting and First Aids.

18) Terengganu Safety Training Center : Combined Safety Course (Offshore Safety, Sea

Sdn Bhd. Survival, Helicopter Underwater Escape Training,

Fire Extinguisher and Self Rescue).

19) MEDI-IHSAN Occupational Safety : Seminar Pengurusan Kimia Merbahaya di tempat

and Heath Sdn Bhd. Kerja dan Pengunaan Portal MIOSHnet.

20) Biro Tata Negara Jabatan Perdana : Kursus Bina Negara.

Menteri

21) Metco Spray Sdn Bhd : Metal/ Flame Spray internal training.

22) WOM – EOMS (1992) : Manufacturing, Remanufacturing, Repair, Servicing

National Oilwell Ltd Singapore (1994) and Refurbishment of Wellhead, Christmas Tree

and

Cooper Oil Tools Ltd Singapore (1994) Pipeline Valve (API Spec. 6A, 14D, 6AR and 6D).

(WKM & IKS)

Page 16: SAIFUL BAHRI BIN ZAKARIA No. 4345 Lorong Nyior …pathwaydmx.com/uploaded_files/resumes/resume_6325.pdf · kampung baru dusun nyior, chukai, ... bahri bin zakaria . position : site

SAIFUL BAHRI BIN ZAKARIA

Page 16 of 17

23) Diamond Board Stratabit Ltd Singapore : Manufacturing, Repair, Servicing and

Refurbishment of Drilling Tools, Stabilizer, Drilling

Bit and Rock Bit (API Spec. 7) – Internal Training

and Course.

24) NSCC/NSCT : NSCC/ NSCT quality practice internal training.

25) KAWASAKI-FOX : KAWASAKI-FOX quality practice internal training.

26) ICAT Malaysia Sdn Bhd. : Pipeline valve, Christmas Tree and Wellhead

Greasing

And Lubricate - Internal Training and Course.

27) Ruane Tati Sdn Bhd. : Welding Inspector Course.

28) IMM - TAFE : Coating Inspector Course.

29) DOSH : Pipeline Seminar – DOSH and Contractor Pipeline.

30) SSPC : SSPC Coating Seminar.

29) NIOSH : NIOSH Safety Seminar and Workshop. 30) NIOSH : Safety Health Officer Examination. Computer Literacy 1) Microsoft Words.

2) Microsoft Excel.

3) Microsoft Power Point.

4) Microsoft Project.

5) Acrobat PDF.

6) Microsoft Access.

7) CAD-CAM System.

8) Auto-Cad System.

9) Optimal Platform Completion System (PCS).

Page 17: SAIFUL BAHRI BIN ZAKARIA No. 4345 Lorong Nyior …pathwaydmx.com/uploaded_files/resumes/resume_6325.pdf · kampung baru dusun nyior, chukai, ... bahri bin zakaria . position : site

SAIFUL BAHRI BIN ZAKARIA

Page 17 of 17

Reference Person 1) Abdul Rahman Bin Abdul Ghaffar.

PETROFAC – Project Superintendent. H/P No.:- 019 - 254 4989

LEVEL 19, MENARA II, KLCC,

KUALA LUMPUR

2) Mohd Rafi Bin Rahmat.

GPS – PROJECT MANAGER H/P No.:- 012 – 205 3827

LEVEL 08, MENARA SEE HOY CHAN,

NO. 374 JALAN TUN RAZAK, 54000 KUALA LUMPUR.

3) Mohd Azhar Bin Awang.

MISC – ASSET MANAGER H/P No.:- 012 - 308 5216

LEVEL 24, MENARA DAYABUMI,

KUALA LUMPUR

4) Mohd Rizal Bin Mengan.

PCPPOC – RESIDENT ENGINEER H/P No.:- 012 - 525 6755

LEVEL 21, MENARA II, KLCC,

KUALA LUMPUR