SEMENANJUNG MALAYSIA PENINSULAR MALAYSIA(UNTUK KERJA-KERJA PEMBINAAN BANGUNAN DAN STRUKTUR) (For Building and Structural Works)

JANUARI 2011JANUARY 2011

JABATAN PERANGKAAN MALAYSIADEPARTMENT OF STATISTICS, MALAYSIA

Tarikh: Date:

16 Februari 2011 16th February 2011

KANDUNGAN CONTENTS

MUKA SURAT PAGE

NOTA TEKNIKAL TECHNICAL NOTES RINGKASAN INDEKS KOS BAHAN BINAAN BANGUNAN (IKB), JANUARI 2011 SUMMARY OF BUILDING MATERIALS COST INDEX (BCI), JANUARY 2011 JADUAL 1A TABLE 1A : INDEKS KOS BAHAN BINAAN BANGUNAN (JULAI 2008=100) SEM. MALAYSIA (INDEKS TANPA BAR KELULI) : BUILDING MATERIALS COST INDEX (JULY 2008=100) PEN. MALAYSIA (INDEX WITHOUT STEEL BARS) : INDEKS KOS BAHAN BINAAN BANGUNAN (JULAI 2008=100) SEM. MALAYSIA (INDEKS TERMASUK BAR KELULI) : BUILDING MATERIALS COST INDEX (JULY 2008=100) PEN. MALAYSIA (INDEX WITH STEEL BARS) : INDEKS HARGA SEUNIT BAGI : : UNIT PRICE INDEX FOR : - BATU BATA & DINDING / BRICKS & WALL - KACA / GLASS - BATU BAUR / AGGREGATES - BAHAN SILING / CEILING MATERIALS - BAHAN BUMBUNG / ROOFING MATERIALS - KAYU / TIMBER - PAPAN LAPIS / PLYWOOD - LENGKAPAN KEBERSIHAN / SANITARY FITTINGS - JUBIN LANTAI & DINDING / FLOOR & WALL TILES - BAHAN KERJA PAIP / PLUMBING MATERIALS - KERATAN KELULI & LOGAM / STEEL & METAL SECTIONS - PASIR / SAND - CAT / PAINTS JADUAL 3 TABLE 3 : INDEKS HARGA SEUNIT BAGI : : UNIT PRICE INDEX FOR : - CERUCUK KEPING JENIS 'U' / 'U' TYPE SHEET PILES - KERATAN GERONGGANG SEGIEMPAT SAMA / SQUARE HOLLOW SECTIONS - KERATAN GERONGGANG SEGIEMPAT TEPAT / RECTANGULAR HOLLOW SECTIONS - RASUK SEMESTA / UNIVERSAL BEAMS - GELEGAR KELULI GULING / ROLLED STEEL JOISTS - SESIKU SAMA / EQUAL ANGLES - SESIKU TAK SAMA / UNEQUAL ANGLES - SESALUR U / U CHANNELS - SESALUR BIBIR / LIPPED CHANNELS

3

9

13

JADUAL 1B TABLE 1B

19

JADUAL 2 TABLE 2

25

30

i

MUKA SURAT PAGE

LAMPIRAN A APPENDIX A LAMPIRAN B APPENDIX B LAMPIRAN C APPENDIX C

JADUAL FAKTOR PELARASAN (INDEKS TANPA BAR KELULI) ADJUSTMENT FACTOR TABLE (INDEX WITHOUT STEEL BARS) JADUAL FAKTOR PELARASAN (INDEKS TERMASUK BAR KELULI) ADJUSTMENT FACTOR TABLE (INDEX WITH STEEL BARS) CONTOH MENGIRA INDEKS LAMA IKB (JULAI 2002=100) DENGAN MENGGUNAKAN INDEKS BARU IKB (JULAI 2008=100) EXAMPLE FOR CALCULATING THE OLD BCI (JULY 2002=100) USING THE NEW INDEX BCI (JULY 2008=100)

35

36

37

ii

NOTA TEKNIKALTECHNICAL NOTES

NOTA TEKNIKAL INDEKS KOS BAHAN BINAAN BANGUNAN SEMENANJUNG MALAYSIA (JULAI 2008=100)Indeks Kos Bahan Binaan Bangunan (IKB) adalah suatu indeks yang dibentuk untuk mengukur kadar perubahan purata harga 15 bahan binaan terpilih yang digunakan dalam 8 kategori bangunan untuk 6 kawasan di Semenanjung Malaysia. Indeks ini dibentuk berasaskan formula Laspeyres.

IKB digunakan dalam Pelaksanaan Syarat Perubahan Harga dalam kontrak-kontrak kerja bangunan kerajaan sahaja. Spesifikasi dan pemberat untuk 15 bahan binaan terpilih mengikut 8 kategori bangunan disediakan oleh Jabatan Kerja Raya (JKR).

Anggaran 2900 sebutharga dipungut setiap bulan daripada lebih kurang 500 outlet untuk 164 jenis spesifikasi bahan binaan terpilih.

Bermula penerbitan Januari 2009, indeks ini berasaskan kepada tahun asas yang ditukar daripada (Julai 2002=100) kepada (Julai 2008=100) serta pemilihan spesifikasi bahan binaan dan pemberat yang dikemaskini oleh JKR.

Bagi kontrak-kontrak yang telah ditandatangani sebelum Januari 2009, sila lihat Jadual Faktor Pelarasan (Lampiran A) dan Contoh Mengira Indeks Lama Kos Bahan Binaan Bangunan (Lampiran B) untuk panduan dalam Pelaksanaan Syarat Perubahan Harga. Bagi kontrak-kontrak mulai Januari 2009 dan seterusnya, indeks baru hendaklah digunakan terus tanpa sebarang pelarasan.

Harga unit purata bagi bar keluli adalah seperti di Lampiran C.

-3-

PENGIRAAN PERUBAHAN INDEKS

IKB mengukur perubahan harga dari suatu tempoh rujukan yang ditetapkan, iaitu (Julai 2008=100).

Pergerakan IKB dari satu bulan ke satu bulan yang lain dinyatakan sebagai perubahan peratus dan bukan perubahan mata indeks (index points) kerana perubahan mata indeks dipengaruhi oleh aras indeks yang berkaitan dengan tempoh asasnya, manakala perubahan peratus tidak mempunyai pengaruh sedemikian. Contoh berikut menunjukkan cara pengiraan perubahan peratus mata indeks dan perubahan peratus.

Perubahan Mata Indeks

Perubahan Peratus

Indeks Kos Bahan Binaan Bangunan

130.5

Perubahan mata indeks dibahagi dengan indeks sebelumnya, didarab dengan seratus

Tolak indeks sebelumnya

129.3 ______

Bersamaan dengan

1.2 ______

130.5 - 129.3 ____________ x 100 = 0.9% 129.3

-4-

TECHNICAL NOTES ON BUILDING MATERIALS COST INDEX FOR PENINSULAR MALAYSIA (JULY 2008=100)The Building Materials Cost Index (BCI) is an index designed to measure the average rate of change in prices for 15 selected building materials utilized in 8 building categories for 6 regions in Peninsular Malaysia. The BCI is based on the Laspeyres formula.

The BCI is used in Special Provisions to the Conditions of Contract (Variation of Price) in government building contracts only. The specifications and weightage for 15 selected building materials in 8 building categories are provided by Public Works Department (JKR).

Approximately 2900 price quotations are collected monthly from 500 outlets for 164 selected building material specifications.

Starting from January 2009 publication, the series is based on the revised base year which has been changed from (July 2002=100) to (July 2008=100) as well as the selection of new building material specifications and weightage updated by JKR. For contracts signed before January 2009, please refer to the Adjustment Factor Table (Appendix A) and the Example For Calculating The Old Building Materials Cost Index (Appendix B) for the implementation of the Variation of Price. For contracts commencing January 2009 and thereafter, the new index is to be used without any further adjustment.

Average unit prices for steel bars are shown in Appendix C.

-5-

INDEX CHANGE CALCULATION

The BCI measures price changes from a designated period, i.e (July 2008=100). Movements of the BCI from one month to another are expressed as percentage changes rather than changes in index points because index point changes are affected by the level of the index in relation to its base period while percentage changes are not. The following example illustrates the computation of index point and percentage changes.

Index Point Change Building Materials Cost Index 130.5

Percentage Change Index point difference divided by the previous index, multiplied by one hundred

Less previous index

129.3 1. 2 130.5 129.3 x 100 = 0.9 % 129.3

-6-

RINGKASANSUMMARY

INDEKS KOS BAHAN BINAAN BANGUNAN SEMENANJUNG MALAYSIA JANUARI 2011

Secara keseluruhan, Indeks Kos Bahan Binaan Bangunan (IKB) (tanpa bar keluli) dan IKB (termasuk bar keluli) bagi bulan Januari 2011 menunjukkan pergerakan positif bagi kebanyakan kategori bangunan di semua kawasan. Walau bagaimanapun, IKB (tanpa bar keluli) dan IKB (termasuk bar keluli) mencatatkan penurunan bagi majoriti kategori bangunan di kawasan E.

Beberapa bahan binaan merekodkan indeks harga seunit yang lebih tinggi bagi bulan Januari 2011 berbanding bulan sebelumnya. Indeks harga seunit bagi batu bata & dinding, bahan siling, lengkapan kebersihan, keratan keluli & logam dan cat meningkat di kebanyakan kawasan. Bagi kawasan B pula, bahan-bahan binaan yang turut mencatatkan peningkatan indeks harga seunit ialah bahan bumbung (+0.1%) dan bahan kerja paip (+0.3%). Sementara itu, bagi kawasan C, bahan-bahan binaan lain yang merekodkan pergerakan indeks harga seunit yang positif ialah kaca (+0.9%), jubin lantai & dinding (+0.6%), bahan kerja paip (+0.2%) dan pasir (+2.4%). Indeks harga seunit bagi bahan bumbung meningkat sebanyak 0.6 peratus di kawasan D. Selain itu, indeks harga seunit bagi batu baur, jubin lantai & dinding dan pasir meningkat masing-masing sebanyak 1.8 peratus, 3.7 peratus dan 3.5 peratus di kawasan F.

Beberapa bahan binaan turut mencatatkan penurunan indeks harga seunit bagi bulan Januari 2011 berbanding bulan sebelumnya. Bagi kawasan A, bahan-bahan yang terlibat ialah bahan bumbung (-0.3%) dan jubin lantai & dinding (-0.6%). Indeks harga seunit bagi batu baur dan bahan bumbung menurun masing-masing sebanyak 0.1 peratus dan 0.3 peratus di kawasan C. Selain itu, indeks harga seunit bagi bahan siling menurun sebanyak 0.7 peratus di kawasan D. Bagi kawasan E, indeks harga seunit bagi bahan siling menurun sebanyak 0.4 peratus, manakala indeks harga seunit bagi keratan keluli & logam menurun sebanyak 1.7 peratus. Bagi kawasan F pula, bahan-bahan binaan yang turut merekodkan penurunan indeks harga seunit ialah batu bata & dinding (-1.2%) dan bahan siling (-0.6%).

Kebanyakan bahan keluli berstruktur merekodkan peningkatan indeks harga seunit pada bulan Januari 2011 berbanding bulan sebelumnya di kawasan Selangor dan Wilayah Persekutuan Kuala Lumpur.

-9-

BUILDING MATERIALS COST INDEX PENINSULAR MALAYSIA JANUARY 2011

Overall, the Building Materials Cost Index (BCI) (without steel bars) and the BCI (with steel bars) for January 2011 showed positive changes for most of the building categories in all regions. However, the BCI (without steel bars) and the BCI (with steel bars) recorded decreases for majority building categories in region E.

There were some building materials which recorded higher unit price indices in January 2011 as compared to the previous month. The unit price indices for bricks & wall, ceiling materials, sanitary fittings, steel & metal sections and paints increased in most of the regions. In region B, the building materials which also registered increases in the unit price indices were roofing materials (+0.1%) and plumbing materials (+0.3%). Meanwhile, in region C, the other building materials which recorded positive changes in the unit price indices were glass (+0.9%), floor & wall tiles (+0.6%), plumbing materials (+0.2%) and sand (+2.4%). The unit price index for roofing materials increased by 0.6 per cent in region D. In addition, the unit price indices for aggregates, floor & wall tiles and sand increased by 1.8 per cent, 3.7 per cent and 3.5 per cent respectively in region F.

There were some building materials which also registered decreases in the unit price indices in January 2011 as compared to the previous month. In region A, these materials were roofing materials (-0.3%) and floor & wall tiles (-0.6%). The unit price indices for aggregates and roofing materials declined by 0.1 per cent and 0.3 per cent respectively in region C. Furthermore, the unit price index for ceiling materials declined by 0.7 per cent in region D. In region E, the unit price index for ceiling materials declined by 0.4 per cent, while the unit price index for steel & metal sections decreased by 1.7 per cent. In region F, the building materials which also recorded decreases in the unit price indices were bricks & wall (-1.2%) and ceiling materials (-0.6%).

Most of the structural steel materials recorded increases in the unit price indices in January 2011 as compared to the previous month in Selangor and Federal Territory of Kuala Lumpur.

- 10 -

INDEKS KOS BAHAN BINAAN BANGUNAN (JULAI 2008=100) SEM. MALAYSIA

BUILDING MATERIALS COST INDEX (JULY 2008=100) PEN. MALAYSIA

(INDEKS TANPA BAR KELULI)(INDEX WITHOUT STEEL BARS)

Jadual 1A - Indeks Kos Bahan Binaan Bangunan Mengikut Kategori Bangunan dan Kawasan (Tanpa Bar Keluli) Table 1A - Building Materials Cost Index by Category of Building and Region (Without Steel Bars) (Julai 2008=100) (July 2008=100) Kategori Bangunan Category of Building(1) Bangunan (K.T.) Satu Tingkat Single - Storey (R.C.) Building

Tempoh Period2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS

Kawasan* Region A108.6 108.6

B107.7 107.7

C110.6 111.0

D107.9 108.0

E111.7 111.5

F111.1 111.4

(2) Bangunan (K.T.) 2-4 Tingkat (Berbumbung Rata) 2-4 Storey (R.C.) Building (Flat Roof)

108.1 108.2

106.3 106.2

109.5 109.8

106.4 106.5

110.6 110.4

111.1 111.5

(3) Bangunan (K.T.) 2-4 Tingkat (Berbumbung Curam) 2-4 Storey (R.C.) Building (Pitched Roof)

107.8 107.8

106.4 106.4

109.7 110.0

106.4 106.5

110.3 110.1

110.7 111.0

K.T. = Konkrit Bertetulang / R.C. = Reinforced Concrete * Lihat nota kaki di hujung Jadual 1A / See footnotes at end of Table 1A

- 13 -

Jadual 1A (Samb.) - Indeks Kos Bahan Binaan Bangunan Mengikut Kategori Bangunan dan Kawasan (Tanpa Bar Keluli) Table 1A (Cont'd.) - Building Materials Cost Index by Category of Building and Region (Without Steel Bars) (Julai 2008=100) (July 2008=100) Kategori Bangunan Category of Building(4) Bangunan (K.T.) 5 Tingkat dan Lebih (Untuk Penginapan) 5 Storey and Above (R.C.) Building (For Accommodation)

Tempoh Period2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS

Kawasan* Region A106.7 106.8

B105.9 105.9

C108.6 109.0

D105.6 105.6

E109.1 108.9

F110.4 110.6

(5) Bangunan (K.T.) 5 Tingkat dan Lebih (Untuk Pejabat) 5 Storey and Above (R.C.) Building (For Office)

106.6 106.6

104.2 104.2

108.4 108.8

104.3 104.4

110.9 110.6

109.8 110.2

(6) Bangunan Kayu Timber Building

115.0 115.0

115.1 115.2

116.3 116.5

115.4 115.4

118.0 117.9

115.9 115.9

K.T. = Konkrit Bertetulang / R.C. = Reinforced Concrete * Lihat nota kaki di hujung Jadual 1A / See footnotes at end of Table 1A

- 14 -

Jadual 1A (Samb.) - Indeks Kos Bahan Binaan Bangunan Mengikut Kategori Bangunan dan Kawasan (Tanpa Bar Keluli) Table 1A (Cont'd.) - Building Materials Cost Index by Category of Building and Region (Without Steel Bars) (Julai 2008=100) (July 2008=100) Kategori Bangunan Category of Building(7) Cerucuk Kayu Timber Piling

Tempoh Period2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS

Kawasan* Region A119.8 119.8

B119.8 119.8

C119.8 119.8

D119.8 119.8

E119.8 119.8

F119.8 119.8

(8) Cerucuk K.T. R.C. Piling

106.9 106.8

108.1 107.8

109.4 109.6

107.0 106.9

104.9 104.9

110.1 110.8

K.T. = Konkrit Bertetulang / R.C. = Reinforced Concrete

*

Kawasan / Region A B C D E F = = = = = = Pulau Pinang, Kedah dan Perlis Perak Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan dan Selangor Johor Pahang Kelantan dan Terengganu

- 15 -

INDEKS KOS BAHAN BINAAN BANGUNAN (JULAI 2008=100) SEM. MALAYSIA

BUILDING MATERIALS COST INDEX (JULY 2008=100) PEN. MALAYSIA

(INDEKS TERMASUK BAR KELULI)(INDEX WITH STEEL BARS)

Jadual 1B - Indeks Kos Bahan Binaan Bangunan Mengikut Kategori Bangunan dan Kawasan (Termasuk Bar Keluli) Table 1B - Building Materials Cost Index by Category of Building and Region (With Steel Bars) (Julai 2008=100) (July 2008=100) Kawasan* Region A103.2 103.4

Kategori Bangunan Category of Building(1) Bangunan (K.T.) Satu Tingkat Single - Storey (R.C.) Building

Tempoh Period2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS

B102.3 102.4

C105.0 105.4

D102.6 102.7

E106.2 106.0

F105.5 105.9

(2) Bangunan (K.T.) 2-4 Tingkat (Berbumbung Rata) 2-4 Storey (R.C.) Building (Flat Roof)

97.7 98.2

96.3 96.2

98.9 99.1

96.3 96.5

100.2 100.0

100.3 100.8

(3) Bangunan (K.T.) 2-4 Tingkat (Berbumbung Curam) 2-4 Storey (R.C.) Building (Pitched Roof)

98.2 98.5

97.1 97.1

99.7 100.0

97.0 97.2

100.7 100.5

100.7 101.1

K.T. = Konkrit Bertetulang / R.C. = Reinforced Concrete * Lihat nota kaki di hujung Jadual 1B / See footnotes at end of Table 1B

- 19 -

Jadual 1B (Samb.) - Indeks Kos Bahan Binaan Bangunan Mengikut Kategori Bangunan dan Kawasan (Termasuk Bar Keluli) Table 1B (Cont'd.) - Building Materials Cost Index by Category of Building and Region (With Steel Bars) (Julai 2008=100) (July 2008=100) Kawasan* Region A95.6 96.0

Kategori Bangunan Category of Building(4) Bangunan (K.T.) 5 Tingkat dan Lebih (Untuk Penginapan) 5 Storey and Above (R.C.) Building (For Accommodation)

Tempoh Period2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS

B94.9 94.9

C97.1 97.4

D94.6 94.8

E97.9 97.8

F98.6 99.0

(5) Bangunan (K.T.) 5 Tingkat dan Lebih (Untuk Pejabat) 5 Storey and Above (R.C.) Building (For Office)

94.8 95.3

93.0 93.0

96.3 96.6

93.0 93.2

98.7 98.5

97.5 98.0

(6) Bangunan Kayu Timber Building

115.0 115.0

115.1 115.2

116.3 116.5

115.4 115.4

118.0 117.9

115.9 115.9

K.T. = Konkrit Bertetulang / R.C. = Reinforced Concrete * Lihat nota kaki di hujung Jadual 1B / See footnotes at end of Table 1B

- 20 -

Jadual 1B (Samb.) - Indeks Kos Bahan Binaan Bangunan Mengikut Kategori Bangunan dan Kawasan (Termasuk Bar Keluli) Table 1B (Cont'd.) - Building Materials Cost Index by Category of Building and Region (With Steel Bars) (Julai 2008=100) (July 2008=100) Kawasan* Region A119.8 119.8

Kategori Bangunan Category of Building(7) Cerucuk Kayu Timber Piling

Tempoh Period2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS

B119.8 119.8

C119.8 119.8

D119.8 119.8

E119.8 119.8

F119.8 119.8

(8) Cerucuk K.T. R.C. Piling

82.1 83.0

82.7 82.6

83.3 83.4

82.0 82.3

81.5 81.5

83.8 85.0

K.T. = Konkrit Bertetulang / R.C. = Reinforced Concrete

*

Kawasan / Region A B C D E F = = = = = = Pulau Pinang, Kedah dan Perlis Perak Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan dan Selangor Johor Pahang Kelantan dan Terengganu

- 21 -

INDEKS HARGA SEUNIT BAHAN BINAAN BANGUNAN (JULAI 2008=100) SEM. MALAYSIA

UNIT PRICE INDEX FOR BUILDING MATERIALS (JULY 2008=100) PEN. MALAYSIA

Jadual 2 - Indeks Harga Seunit Bagi Batu Bata dan Dinding, Kaca, Batu Baur, Bahan Siling, Bahan Bumbung, Kayu, Papan Lapis, Lengkapan Kebersihan, Jubin Lantai dan Dinding, Bahan Kerja Paip, Keratan Keluli dan Logam, Pasir dan Cat Table 2 - Unit Price Index For Bricks and Wall, Glass, Aggregates, Ceiling Materials, Roofing Materials, Timber, Plywood, Sanitary Fittings, Floor and Wall Tiles, Plumbing Materials, Steel and Metal Sections, Sand and Paints (Julai 2008=100) (July 2008=100) Perkara Item Bahan Binaan Building Materials (1) Batu Bata dan Dinding Bricks and Wall 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 96.2 96.3 96.5 96.5 101.1 102.2 110.5 110.8 95.2 95.2 103.7 102.5 Tempoh Period Kawasan* Region

A

B

C

D

E

F

(2) Kaca Glass

104.0 104.0

102.5 102.5

105.8 106.7

100.1 100.1

102.1 102.1

101.8 101.8

(3) Batu Baur Aggregates

97.9 97.9

96.2 96.2

100.3 100.2

100.2 100.2

100.0 100.0

113.7 115.7

*

Lihat nota kaki di hujung Jadual 2 / See footnotes at end of Table 2- 25 -

Jadual 2 (Samb.) - Indeks Harga Seunit Bagi Batu Bata dan Dinding, Kaca, Batu Baur, Bahan Siling, Bahan Bumbung, Kayu, Papan Lapis, Lengkapan Kebersihan, Jubin Lantai dan Dinding, Bahan Kerja Paip, Keratan dan Keluli Logam, Pasir dan Cat Table 2 (Cont'd.) - Unit Price Index For Bricks and Wall, Glass, Aggregates, Ceiling Materials, Roofing Materials, Timber, Plywood, Sanitary Fittings, Floor and Wall Tiles, Plumbing Materials, Steel and Metal Sections, Sand and Paints (Julai 2008=100) (July 2008=100) Perkara Item Bahan Binaan Building Materials (4) Bahan Siling Ceiling Materials 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 93.1 93.2 98.4 98.6 103.7 106.9 101.0 100.3 158.6 158.0 105.6 105.0 Tempoh Period Kawasan* Region

A

B

C

D

E

F

(5) Bahan Bumbung Roofing Materials

93.9 93.6

96.5 96.6

108.7 108.4

100.9 101.5

100.0 100.0

90.9 90.9

(6a) Kayu Timber

119.8 119.8

119.8 119.8

119.8 119.8

119.8 119.8

119.8 119.8

119.8 119.8

*

Lihat nota kaki di hujung Jadual 2 / See footnotes at end of Table 2- 26 -

Jadual 2 (Samb.) - Indeks Harga Seunit Bagi Batu Bata dan Dinding, Kaca, Batu Baur, Bahan Siling, Bahan Bumbung, Kayu, Papan Lapis, Lengkapan Kebersihan, Jubin Lantai dan Dinding, Bahan Kerja Paip, Keratan dan Keluli Logam, Pasir dan Cat Table 2 (Cont'd.) - Unit Price Index For Bricks and Wall, Glass, Aggregates, Ceiling Materials, Roofing Materials, Timber, Plywood, Sanitary Fittings, Floor and Wall Tiles, Plumbing Materials, Steel and Metal Sections, Sand and Paints (Julai 2008=100) (July 2008=100) Perkara Item Bahan Binaan Building Materials (6b) Papan Lapis Plywood 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 109.0 109.0 109.0 109.0 109.0 109.0 109.0 109.0 109.0 109.0 109.0 109.0 Tempoh Period Kawasan* Region

A

B

C

D

E

F

(7) Lengkapan Kebersihan Sanitary Fittings

102.5 102.5

100.9 101.0

103.4 103.4

101.1 101.2

101.2 101.2

105.5 107.1

(8) Jubin Lantai dan Dinding Floor and Wall Tiles

104.5 103.9

101.8 101.8

109.0 109.6

100.0 100.0

108.8 108.8

105.1 109.0

*

Lihat nota kaki di hujung Jadual 2 / See footnotes at end of Table 2- 27 -

Jadual 2 (Samb.) - Indeks Harga Seunit Bagi Batu Bata dan Dinding, Kaca, Batu Baur, Bahan Siling, Bahan Bumbung, Kayu, Papan Lapis, Lengkapan Kebersihan, Jubin Lantai dan Dinding, Bahan Kerja Paip, Keratan dan Keluli Logam, Pasir dan Cat Table 2 (Cont'd.) - Unit Price Index For Bricks and Wall, Glass, Aggregates, Ceiling Materials, Roofing Materials, Timber, Plywood, Sanitary Fittings, Floor and Wall Tiles, Plumbing Materials, Steel and Metal Sections, Sand and Paints (Julai 2008=100) (July 2008=100) Perkara Item Bahan Binaan Building Materials (9) Bahan Kerja Paip Plumbing Materials 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 95.7 95.7 99.1 99.4 99.5 99.7 88.0 88.0 102.6 102.6 104.3 104.3 Tempoh Period Kawasan* Region

A

B

C

D

E

F

(10) Keratan Keluli dan Logam Steel and Metal Sections

92.9 93.7

72.9 73.3

92.0 92.4

77.2 78.4

108.8 107.0

100.3 100.3

(11) Pasir Sand

99.4 99.4

104.7 104.7

103.3 105.8

103.9 103.9

91.9 91.9

104.3 108.0

*

Lihat nota kaki di hujung Jadual 2 / See footnotes at end of Table 2- 28 -

Jadual 2 (Samb.) - Indeks Harga Seunit Bagi Batu Bata dan Dinding, Kaca, Batu Baur, Bahan Siling, Bahan Bumbung, Kayu, Papan Lapis, Lengkapan Kebersihan, Jubin Lantai dan Dinding, Bahan Kerja Paip, Keratan dan Keluli Logam, Pasir dan Cat Table 2 (Cont'd.) - Unit Price Index For Bricks and Wall, Glass, Aggregates, Ceiling Materials, Roofing Materials, Timber, Plywood, Sanitary Fittings, Floor and Wall Tiles, Plumbing Materials, Steel and Metal Sections, Sand and Paints (Julai 2008=100) (July 2008=100) Perkara Item Bahan Binaan Building Materials (12) Cat Paints 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 107.4 107.5 108.0 108.4 106.0 107.9 107.8 107.8 103.5 103.5 114.3 114.3 Tempoh Period Kawasan* Region

A

B

C

D

E

F

*

Kawasan / Region A B C D E F = = = = = = Pulau Pinang, Kedah dan Perlis Perak Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan dan Selangor Johor Pahang Kelantan dan Terengganu

- 29 -

Jadual 3 - Indeks Harga Seunit Bagi Cerucuk Keping Jenis 'U', Keratan Geronggang Segiempat Sama, Keratan Geronggang Segiempat Tepat, Rasuk Semesta, Gelegar Keluli Guling, Sesiku Sama, Sesiku Tak Sama, Sesalur dan Sesalur Bibir Table 3 - Unit Price Index for 'U' Type Sheet Piles, Square Hollow Sections, Rectangular Hollow Sections, Universal Beams, Rolled Steel Joists, Equal Angles, Unequal Angles, Channels and Lipped Channels (Julai 2008=100) (July 2008=100) Perkara Item Keluli Struktur Structural Steel (1) Cerucuk Keping Jenis 'U' U' Type Sheet Piles 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 99.6 99.6 Tempoh Period Selangor dan Wilayah Persekutuan Kuala Lumpur Selangor and Kuala Lumpur Federal Territory

(2) Keratan Geronggang Segiempat Sama Square Hollow Sections

87.7 87.9

(3) Keratan Geronggang Segiempat Tepat Rectangular Hollow Sections

84.9 85.0

- 30 -

Jadual 3 (Samb.) - Indeks Harga Seunit Bagi Cerucuk Keping Jenis 'U', Keratan Geronggang Segiempat Sama, Keratan Geronggang Segiempat Tepat, Rasuk Semesta, Gelegar Keluli Guling, Sesiku Sama, Sesiku Tak Sama, Sesalur dan Sesalur Bibir Table 3 (Cont'd.) - Unit Price Index for 'U' Type Sheet Piles, Square Hollow Sections, Rectangular Hollow Sections, Universal Beams, Rolled Steel Joists, Equal Angles, Unequal Angles, Channels and Lipped Channels (Julai 2008=100) (July 2008=100) Perkara Item Keluli Struktur Structural Steel (4) Rasuk Semesta Universal Beams 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 91.4 91.4 Tempoh Period Selangor dan Wilayah Persekutuan Kuala Lumpur Selangor and Kuala Lumpur Federal Territory

(5) Gelegar Keluli Guling Rolled Steel Joists

100.0 100.0

(6) Sesiku Sama Equal Angles

86.0 86.8

- 31 -

Jadual 3 (Samb.) - Indeks Harga Seunit Bagi Cerucuk Keping Jenis 'U', Keratan Geronggang Segiempat Sama, Keratan Geronggang Segiempat Tepat, Rasuk Semesta, Gelegar Keluli Guling, Sesiku Sama, Sesiku Tak Sama, Sesalur dan Sesalur Bibir Table 3 (Cont'd.) - Unit Price Index for 'U' Type Sheet Piles, Square Hollow Sections, Rectangular Hollow Sections, Universal Beams, Rolled Steel Joists, Equal Angles, Unequal Angles, Channels and Lipped Channels (Julai 2008=100) (July 2008=100) Perkara Item Keluli Struktur Structural Steel (7) Sesiku Tak Sama Unequal Angles 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 2010 DIS 2011 JAN FEB MAC APR MEI JUN JUL OGO SEP OKT NOV DIS 97.0 97.0 Tempoh Period Selangor dan Wilayah Persekutuan Kuala Lumpur Selangor and Kuala Lumpur Federal Territory

(8) Sesalur U U Channels

94.3 94.5

(9) Sesalur Bibir Lipped Channels

85.8 86.0

- 32 -

LAMPIRAN APPENDIX

LAMPIRAN A APPENDIX A JADUAL FAKTOR PELARASAN (INDEKS TANPA BAR KELULI) Adjustment Factor Table (Index Without Steel Bars) Faktor Pelarasan Mengikut Kawasan Adjustment Factor By Region A 1.3474 B 1.3419 C 1.3150 D 1.3744 E 1.3513 F 1.3120

Kategori Category

1. Bangunan (K.T.) Satu Tingkat Single Storey (R.C.) Building 2. Bangunan (K.T.) 2-4 Tingkat (Berbumbung Rata) 2-4 Storey (R.C.) Building (Flat Roof) 3. Bangunan (K.T.) 2-4 Tingkat (Berbumbung Curam) 2-4 Storey (R.C.) Building (Pitched Roof) 4. Bangunan (K.T.) 5 Tingkat dan Lebih (Untuk Penginapan) 5 Storey and Above (R.C.) Building (For Accomodation) 5. Bangunan (K.T.) 5 Tingkat dan Lebih (Untuk Pejabat) 5 Storey and Above (R.C.) Building (For Office) 6. Bangunan Kayu Timber Building 7. Cerucuk Kayu Timber Piling 8. Cerucuk (K.T.) (R.C.) Piling

1.3628

1.3640

1.3340

1.3874

1.3612

1.3207

1.3563

1.3599

1.3212

1.3886

1.3569

1.3110

1.3586

1.3695

1.3255

1.3918

1.3694

1.3079

1.3583

1.3629

1.3172

1.3919

1.3432

1.3049

1.3869

1.3845

1.3689

1.4016

1.3871

1.3727

1.4254

1.4254

1.4254

1.4254

1.4254

1.4254

1.3422

1.3183

1.3301

1.3416

1.3456

1.2874

(K.T.) = Konkrit Bertetulang / (R.C.) = Reinforced Concrete

- 35 -

LAMPIRAN B APPENDIX B JADUAL FAKTOR PELARASAN (INDEKS TERMASUK BAR KELULI) Adjustment Factor Table (Index With Steel Bars) Faktor Pelarasan Mengikut Kawasan Adjustment Factor By Region A 1.4509 B 1.4600 C 1.4339 D 1.4854 E 1.4784 F 1.4422

Kategori Category

1. Bangunan (K.T.) Satu Tingkat Single Storey (R.C.) Building 2. Bangunan (K.T.) 2 - 4 Tingkat (Berbumbung Rata) 2 - 4 Storey (R.C) Building (flat roof) 3. Bangunan (K.T.) 2 - 4 Tingkat (Berbumbung Curam) 2 - 4 Storey (R.C.) Building (Pitched Roof) 4. Bangunan (K.T.) 5 Tingkat dan Lebih (Untuk Penginapan) 5 Storey and Above (R.C.) Building (For Accomodation) 5. Bangunan (K.T) 5 tingkat dan lebih (untuk pejabat) 5 Storey and above (R.C) Building (for office) 6. Bangunan Kayu Timber Building 7. Cerucuk Kayu Timber Piling 8. Cerucuk (K.T) (R.C.) Piling

1.5719

1.6108

1.5724

1.6115

1.6178

1.5800

1.5509

1.5867

1.5454

1.5974

1.5970

1.5533

1.5910

1.6408

1.5919

1.6407

1.6528

1.6002

1.6051

1.6558

1.6038

1.6576

1.6512

1.6162

1.3898

1.3885

1.3718

1.4055

1.3910

1.3776

1.4254

1.4254

1.4254

1.4254

1.4254

1.4254

2.0666

2.0714

2.0448

2.1070

2.0756

2.0788

(K.T.) = Konkrit Bertetulang / (R.C.) = Reinforced Concrete

- 36 -

LAMPIRAN C APPENDIX C

CONTOH MENGIRA INDEKS LAMA KOS BAHAN BINAAN BANGUNAN (JULAI 2002=100) DENGAN MENGGUNAKAN INDEKS BARU KOS BAHAN BINAAN BANGUNAN (JULAI 2008=100)(i) Contoh mengira indeks lama (tanpa bar keluli) bagi bulan Januari 2011 untuk kategori Bangunan (K.T) Satu Tingkat bagi kawasan A adalah seperti berikut :j

I lama Januari 2011 = FP (seperti di Lampiran A) x iaitu, indeks lama Januari 2011 = 1.3474 x 108.6 = 146.3276 = 146.3 (ii)

j

I baru Januari 2011

Contoh mengira indeks lama (termasuk bar keluli) bagi bulan Januari 2011 untuk kategori Bangunan Kayu bagi kawasan F adalah seperti berikut :j

I lama Januari 2011 = FP (seperti di Lampiran B) x iaitu, indeks lama Januari 2011 = 1.3776 x 115.9 = 159.6638 = 159.7 di mana, FP = Faktor Pelarasan j I = Indeks bagi kategori bangunan j j = 1, 8

j

I baru Januari 2011

EXAMPLE FOR CALCULATING THE OLD BUILDING MATERIALS COST INDEX (JULY 2002=100) USING THE NEW BUILDING MATERIALS COST INDEX (JULY 2008=100)(i) Example for calculating the old index (without steel bars) for the month of January 2011 for Single Storey (R.C) Building in region A is as follows:Old j I for January 2011 = AF (as in Appendix A) x new i.e. old index for January 2011 = 1.3474 x 108.6 = 146.3276 = 146.3 (ii)j

I for January 2011

Example for calculating the old index (with steel bars) for the month of January 2011 for Timber Building in region F is as follows :Old j I for January 2011 = AF (as in Appendix B) x new i.e. old index for January 2011 = 1.3776 x 115.9 = 159.6638 = 159.7 where, AF = Adjustment Factor j I = Index for building category j j = 1,.. 8- 37 j

I for January 2011