Skt (Dokumen Sokongan)

download Skt (Dokumen Sokongan)

of 4

Transcript of Skt (Dokumen Sokongan)

SASARAN KERJA TAHUNAN 2013

NAMA :JEE SZE LINGKATEGORI : JURURAWAT U29IC : 880817-52-5310

BilPetunjuk prestasi(masa,kualiti,kuantiti)Sasaran kerjaPencapaian

1Clinical Services (60%)

Masa: January-december

Kuantiti : 300

Kualiti : Follow S.O.P1.1 Nursing care to all non ambulating patient in the ward.

-500 Nursing care done to bedridden patient,ventilatored patient and postoperative patient since January until December.

1.2 Writing report and proper documentation in patient casenote including incident. Example: death,DAMA,absconded.

-daily nursing report done in every duty with every nursing intervention and date n pages of the nursing report written including death report and DAMA report since January- december

1.2 Pre-operative care and post-operative care.

-50 pre-operative care done since January-December-50post-operative care done since January-December

1.3 Achievement of 4 National Nursing Audit Procedures.a) Intravenous infusion.b) Blood transfusion.c) Wound dressing.d) Oral medication.

-2 National nursing Audit has been audited since January-December.

BilPetunjuk prestasi(masa,kualiti,kuantiti)Sasaran kerjaPencapaian

2.Nursing administrative and management (10%)

2.1. Proper checking in equipment, drugs, surgical items and stationary.

-30 times Daily checking in equipment and drug done since January- December-12 times Monthly checking surgical items and stationary done since January- December.

2.2. Monitor and complaint using 5 Hospital Support Services (5HSS). Example : linen services, BEM/FEM, cleansing, clinical waste and general waste.

-15 complaint has been made throught help desk according to job not done and any faulty since January- december

2.3. Proper storage of drugs in the ward. Example : in-patient drug and DDA.

-60 times of Daily arrangement of storage of drug such as in-patient drug and DDA drug done since January-December

BilPetunjuk prestasi(masa,kualiti,kuantiti)Sasaran kerjaPencapaian sebenar

3Human Resources Development (15%)

3.1. CNE : Ward or hospital level.

-2 hospital level CNE has been attended since January-December-5 ward level CNE has been attended since January-December

3.2. APC : Achieve 25-30 points for licensing.

-51 point has been collected for licensing

3.3. Attend ward meeting to obtain latest news circular.

-2 ward meeting has been attended to obtain latest news circular since January-December

3.4. Attend external courses, conferences, workshop, seminar.

-3 courses has been attended since January-December

BilPetunjuk prestasi(masa, kuantiti, kualiti)Sasaran kerja.Pencapaian sebenar.

4Quality Activity (5%)

4.1. Hospital infection control a). practice proper hand hygiene and maintained aseptic technique for sterile procedure.

-300 proper hand hygiene and 300 aseptic technique done for sterile procedure since January-December

4.2. Allocated patient with infection cases in side room and proper PPE in handling them.

-10 cases of allocation patient with infection cases in side room and proper PPE in handling item.

4.3. To practice and carry out development policy 5S.

-200 times 5S policy has been carry out and practice since January-December.

BilPetunjuk prestasi(masa ,kuantiti ,kualiti)Sasaran kerjaPencapaian

5Inter-agency collaboration (5%)

5.1.Assess student when they are practicing their skill and knowledge in the ward -200 student has been assess to do practicing and their skill and knowledge in the ward since January-december

5.2. Get together activity (dinner)-attend any dinner been organized by the department.-Attended 1 nurses night dinner 2013 since January-december

BilPetunjuk prestasi(masa, kuantiti, kualiti)Sasaran kerjaPencapaian

6Other project (5%)

6.1. Thrombopheblitis

-500 patient has been assess thrombopheblitis during patient admission in the ward since January-December.

6.2. Bedsore

-500 patient has been assess bedsore of patient during admission since January-December

6.3 surgical store ordering

12 times surgical store ordering has been done since January-December