Subcontractor Registration Form (1)

download Subcontractor Registration Form (1)

of 13

Transcript of Subcontractor Registration Form (1)

  • 7/26/2019 Subcontractor Registration Form (1)

    1/13

  • 7/26/2019 Subcontractor Registration Form (1)

    2/13

    BAHTERA JAWI

    LOT 39099, NO2 JALAN 2/1C

    KG BATU MUDA 4 TIN, JALAN IPOH51100 KUALA LUMPUR, WILAYAH PERSEKUTUAN

    011 32000 299

    [email protected]

    UT0004593-U

    0120140512-WP156859

    CIDB B04 , CE21G1

    MINISTRY OF FINANCE (MOF) 040101, 221001,221002,221003,221006,221401,221402

  • 7/26/2019 Subcontractor Registration Form (1)

    3/13

    MAYBANK ISLAMIC BERHAD MALACCA MAIN 5540 2626 9683

  • 7/26/2019 Subcontractor Registration Form (1)

    4/13

  • 7/26/2019 Subcontractor Registration Form (1)

    5/13

    PAINTING AT

    SEMANTAN MRT STATION 2015PAINTING 244,836.24 NAIM ENGINEERING

    75% SEMANTAN

    PENYELENGGARAAN

    LANSKAP2015 LANDSKAP 42,600/MONTH PERKHIDMATAN ARAH 80% MELAKA

  • 7/26/2019 Subcontractor Registration Form (1)

    6/13

  • 7/26/2019 Subcontractor Registration Form (1)

    7/13

    MAZRI MOHD HAFIZ BIN MAZLAN 880307045325

    69, KM 23, JALAN BATU GAJAH, KG SOLOK TELOK77300 MERLIMAU MELAKA

    MANAGER

    PERMANENT

    4 YEARS DIPLOMA

  • 7/26/2019 Subcontractor Registration Form (1)

    8/13

    PERMODALANUSAHAWAN

    NASIONAL BERHAD(PUNB)

    REVOLVING RM198,000

  • 7/26/2019 Subcontractor Registration Form (1)

    9/13

    NO

    NO

    NO

  • 7/26/2019 Subcontractor Registration Form (1)

    10/13

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    N/A

    N/A

    N/A

    N/A

    NO

    NO

    FOLLOW CLIENT QUALITY STANDARDS

  • 7/26/2019 Subcontractor Registration Form (1)

    11/13

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    YES

    FOLLOW CLIENT SAFETY AND HEALTH REQUIREMENT

    FOLLOW RULES AND REGULATION

    OBSERVE ALL ACTIVITIES

  • 7/26/2019 Subcontractor Registration Form (1)

    12/13

    NO

    FOLLOW RULES AND REGULATIONS ND CLIENT REQUIREMENTS

    - SAFETY AND HEALTH INDUCTION -WORKES REGISTERD WITH CIDB GREEN CARD

    MAZRI MOHD HAFIZ BIN MAZLAN

    MANAGER

    13/NOV/2015

  • 7/26/2019 Subcontractor Registration Form (1)

    13/13