1 v TAIWAN HON CHUAN GROUP – Malaysia Plant – Phase 2 Project Owner : HON CHUAN Malaysia Sdn. Bhd. Project Status : Engineering Stage v NSCI Bahau Plant – BioMass Project Project Owner : CIMA Technology Partner : Taiheyo Engineering Corporation (TEC) Project Status : Engineering Stage v AEON Kulai Shopping Complex Project Owner : AEON CO. (M) BHD Main Contractor: NAKANO Construction Sdn Bhd Project Status : Construction Stage v HONDA Malaysia Engineering Center Project Owner : Honda Malaysia Sdn Bhd Project Status : Construction Stage v Fibertex Nilai 3 New Line Extension Project Owner: Fibertex Nonwovens Sdn. Bhd Turnkey Builder: Shimizu Corporation Project Status: Construction Stage v HONDA Malaysia LINE 2 Project Owner : Honda Malaysia Sdn Bhd Main Contractor: Shimizu Corporation Project Status : Construction Stage v MLNG NEW BOILDER (MNB) PROJECT Project Owner : Malaysia LNG Sdn. Bhd. EPCC Contractor: SYNERLITZ – NEM CONSORTIUM SYNERLITZ Malaysia Sdn Bhd Project Status : Construction Stage v EPCC of CRUDE DISTILLATION UNIT (CDU) PARALLEL PREHEAT TRAIN PROJECT Project Owner : PETRONAS PENAPISAN (TERENGGANU) SDN BHD. EPCC Contractor: SYNERLITZ Malaysia Sdn Bhd Project Status : Construction Stage v HONDA Malaysia PDI Building Fast-Track Project Project Owner : Honda Malaysia Sdn Bhd Project Status : Completed v KLIA2 Watch Tower – Steel Structure Works Project Owner : Malaysia Airports Holdings Berhad Design & Built Contractor: Perkasa Jauhari Sdn Bhd Project Status : Construction Stage v Singapore Marina Bay Sands DCP2 Expansion Project Owner : Singapore District Cooling Pte Ltd Specialist Builder: Truwater Cooling Towers Sdn Bhd v TAIWAN HON CHUAN GROUP – Malaysia Plant Project Owner : HON CHUAN Malaysia Sdn. Bhd. Main Contractor: Multiguna Construction & Development Sdn Bhd Project Status : Construction Stage v NSCI Bahau Second Clinker Production Line of 5000 TPD Project Owner : CIMA Project Management Team : OPUS Management Sdn Bhd. and L.V. Technology Public Company Limited Turnkey Contractor: SINOMA International Engineering Co. Ltd Project Status : Construction Stage

Transcript of v TAIWAN HON CHUAN GROUP – Malaysia Plant – Phase...

Page 1: v TAIWAN HON CHUAN GROUP – Malaysia Plant – Phase 2tgtanconsult.com/Resource/TGTanATM/2014-1223-140525EELR.pdf · v TAIWAN HON CHUAN GROUP – Malaysia Plant – Phase 2 ... v

1

v TAIWAN HON CHUAN GROUP – Malaysia Plant – Phase 2 Project Owner : HON CHUAN Malaysia Sdn. Bhd.

Project Status : Engineering Stage

v NSCI Bahau Plant – BioMass Project Project Owner : CIMA

Technology Partner : Taiheyo Engineering Corporation (TEC) Project Status : Engineering Stage

v AEON Kulai Shopping Complex Project Owner : AEON CO. (M) BHD

Main Contractor: NAKANO Construction Sdn Bhd Project Status : Construction Stage

v HONDA Malaysia Engineering Center Project Owner : Honda Malaysia Sdn Bhd

Project Status : Construction Stage

v Fibertex Nilai 3 New Line Extension Project Owner: Fibertex Nonwovens Sdn. Bhd

Turnkey Builder: Shimizu Corporation Project Status: Construction Stage

v HONDA Malaysia LINE 2

Project Owner : Honda Malaysia Sdn Bhd Main Contractor: Shimizu Corporation

Project Status : Construction Stage

v MLNG NEW BOILDER (MNB) PROJECT Project Owner : Malaysia LNG Sdn. Bhd.

EPCC Contractor: SYNERLITZ – NEM CONSORTIUM SYNERLITZ Malaysia Sdn Bhd

Project Status : Construction Stage

v EPCC of CRUDE DISTILLATION UNIT (CDU) PARALLEL PREHEAT TRAIN PROJECT Project Owner : PETRONAS PENAPISAN (TERENGGANU) SDN BHD.

EPCC Contractor: SYNERLITZ Malaysia Sdn Bhd Project Status : Construction Stage

v HONDA Malaysia PDI Building Fast-Track Project

Project Owner : Honda Malaysia Sdn Bhd Project Status : Completed

v KLIA2 Watch Tower – Steel Structure Works

Project Owner : Malaysia Airports Holdings Berhad Design & Built Contractor: Perkasa Jauhari Sdn Bhd

Project Status : Construction Stage

v Singapore Marina Bay Sands DCP2 Expansion Project Owner : Singapore District Cooling Pte Ltd

Specialist Builder: Truwater Cooling Towers Sdn Bhd

v TAIWAN HON CHUAN GROUP – Malaysia Plant Project Owner : HON CHUAN Malaysia Sdn. Bhd.

Main Contractor: Multiguna Construction & Development Sdn Bhd Project Status : Construction Stage

v NSCI Bahau Second Clinker Production Line of 5000 TPD

Project Owner : CIMA Project Management Team : OPUS Management Sdn Bhd. and

L.V. Technology Public Company Limited Turnkey Contractor: SINOMA International Engineering Co. Ltd

Project Status : Construction Stage

Page 2: v TAIWAN HON CHUAN GROUP – Malaysia Plant – Phase 2tgtanconsult.com/Resource/TGTanATM/2014-1223-140525EELR.pdf · v TAIWAN HON CHUAN GROUP – Malaysia Plant – Phase 2 ... v

2

v BOOSTER COMPRESSOR For LABUAN GAS TERMINAL (LGAST) PROJECT Project Owner : Petronas CARIGALI

EPCM Contractor: CHIYODA MALAYSIA Sdn Bhd Project Status : Completed

v KIMANIS Power Project

EPCC For 300MW Combined Cycle Power Plant Project Owner : KIMANIS POWER Sdn. Bhd.

EPCC Contractor: CTCI Corporation; Synerlitz (Malaysia) Sdn Bhd; SCHB Engineering Services Sdn Bhd CONSORTIUM Project Status : Construction Stage

v Shell Refining Co. Bhd- Hijau Gasoil Project

Project Owner : Shell Refining Co. Bhd EPC : Fluor Corporation

Builder: Synerlitz (Malaysia) Sdn Bhd Project Status : Commissioning Stage

v KLIA2-District Cooling Plant Project

Project Owner : Malaysia Airport Holding Berhad Concessionaires : TNB Engineering Corporation Sdn. Bhd.

Project Status : Commissioning Stage

v Kawasan Perindustrian Senai 3, Warehouse Project Project Owner : KYM Senai Sdn Bhd

Project Status :Completed

v PROPOSED DATA CENTER COMPRISING OF PHASE 1 (BLOCK A-5/6 STOREY DATA CENTER AND OFFICES INCLUDING MEZZANINE FLOOR, BLOCK B-5

STOREYS DATA CENTER AND OFFICES INCLUDING MEZZANINE FLOOR, BLOCK C- 5 STOREYS DATA CENTER AND OFFICES) AND PHASE 2 (1 UNIT OF 2

STOREYS CAFE) AND ALL ASSOCIATED INFRASTRUCTURE WORKS ON PART OF LOT PT44045, ZON FLAGSHIP (ZON CYBER 12), CYBERJAYA

Project Owner: INTEGRATED DC BUILDERS SDN. BHD Project Status :Completed

. v Kapar, Klang Warehouse Extension

Project Owner : SAMUDRA KIMIA Sdn Bhd Project Status :Construction Stage

v Demolition & Rebuild 2 Storey Bungalow

At Lot 30595 & 30596, No. 29 PersiaranBurhanuddinHelmi, Taman Tun Dr. Ismail, 60000 Kuala Lumpur.

Project Owner : Tan Sri Rozali Bin Ismail Project Status: Tender Stage

v 99 SpeedMart Warehouse

Proposed 1 storey warehouse with 3 storey office at Lot 5203, KawasanPerindustrian Balakong Jaya, MukimKajang, Daerah Ulu Langat, Selangor

Project Owner: 99 SpeedMart Sdn Bhd Project Status: Completed & Operating

v Lam Soon Bukit Minyak Warehouse with GBI certification submision.

CadanganMendirikan 1 Blok 1 Tingkat Kilang Dan 3 Tingkat Pejabat Di Atas Plot 99, LorongPerindustrian Bukit Minyak 16, KawasanPerindustrian Bukit

Minyak, Mukim 13, S.P.T., Pulau Pinang Project Owner : Lam Soon Edible Oil

Project Status: Completed

v FibertexNilai 3 Factory & Warehouse Extension Project Owner: Fibertex Nonwovens Sdn. Bhd

Turnkey Builder: Shimizu Corporation Project Status: Completed

Page 3: v TAIWAN HON CHUAN GROUP – Malaysia Plant – Phase 2tgtanconsult.com/Resource/TGTanATM/2014-1223-140525EELR.pdf · v TAIWAN HON CHUAN GROUP – Malaysia Plant – Phase 2 ... v

3

v Nilai 3 Lot 16670 Warehouse & Office Project Project Owner : D.S.S Auto Accessoroes Sdn. Bhd.

Project Status : Completed

v PROPOSED 5&6 STOREY COMPUTER EXCHANGE CENTER AND ALL ASSOCIATED WORKS ON LOT PT12144 & PT12145, ZON FLAGSHIP, CYBERJAYA

Project Owner : CSF-CX SDN. BHD. Project Status : Completed

v Modular District Cooling System

Inventor: Shinryo Corporation

v PDI (Pre-Delivery Inspection) Hub Development (50 acres) for Proton Edar/ KonsortiumLogistikBerhad including PDI Building; Repair Building;

Ancillary Buildings & Facilities and main federal road upgrading at lot 7316 (PT 3609),JalanKlangBanting, Bandar Sijangkang,Selangor.

Project Owner: Corporate Landmarks Sdn. Bhd. Project Status: Completed

v The Engineering, Procurement, Construction and Management (EPCM) of

PSR2 Revamp Project, Sg. Udang, Melaka Project Owner: Malaysian Refining Company [MRC]

EPCM: Foster Wheeler E & C (Malaysia) Project Status: Completed

v Demolition & Rebuild 2 Storey Bungalow with Basement @ Bukit Gasing,

Petaling Jaya. Project Owner: Dato’ Vijayeswaran&DatinUmayal

Project Status: Construction

10.MAXIS-BTS Project Project Owner: Maxis Broadband Sdn. Bhd

Contractor: SediabenaSdn Bhd. Project Status: on going

v Proposed 3 Storey Bungalow with Basement & Swimming Pool @ Bukit

Damansara, KL Project Owner: Dato’ Lee Kok Kwan

Project Status: Construction

v 12. Proposed Development and Construction of the Bab Al Shams Desert Resort & Spa Expansion in Bab Al Shams, Dubai, United Arab Emirates

Project Owner: MEYDAN L.L.C Lead Consultant:: TAK (Teo A. Khing Design Consultant (Dubai Br.)

Project Status: Completed

v 13. The Engineering, Procurement, Installation and Commissioning (EPIC) of HRSG Boiler at Kertih Compressor Station ‘B’ in GPP-1 Complex (KCSB) In GPP-A at

Lot 1903 & lot 3541, MukimKertih, Daerah Kemaman, Terengganu DarulIman Project Owner :Petronas Gas Berhad

EPIC Contractor: Steamline (M) Sdn. Bhd. Project Status : Completed

v The Engineering, Procurement, Construction and Commissioning (EPCC) of PFKSB -

DEBOTTLENECKING Project- EPCC of GAS TURBINE COGENERATION SYSTEM at Lot 10750, MukimGurun Daerah Kuala Muda, Kedah DarulAman

Project Owner :Petronas Fertilizer (Kedah) Sdn. Bhd. EPCC Contractor: Shinryo (M) - Steamline(M) Consortium

Project Status : Completed

Page 4: v TAIWAN HON CHUAN GROUP – Malaysia Plant – Phase 2tgtanconsult.com/Resource/TGTanATM/2014-1223-140525EELR.pdf · v TAIWAN HON CHUAN GROUP – Malaysia Plant – Phase 2 ... v

4

v The Engineering, Procurement, Construction and Commissioning (EPCC) of PP(M)SB - COGENERATION EXPANSION Project-Sg. Udang, Melaka

Project Owner :PetronasPenapisan Melaka Sdn. Bhd. [PP(M)SB] EPCC Contractor: Shinryo (M) - Steamline(M) Consortium

Project Cost : RM 100 million (Including Machinery and Equipment)

v The Engineering, Procurement, Construction and Commissioning (EPCC) of DXN BIO-FUELS PLANT Project- Lot 9916, KawasanPelabuhanKuantan, Pahang

Project Owner : DXN BIOFUELS Sdn. Bhd. EPCC Contractor: BIO SYNERGY ENGINEERING SDN. BHD.

Project Cost : USD 30 million

v The Engineering, Procurement, Construction and Commissioning (EPCC) of PP(M)SB -COGENERATION Project- Sg. Udang, Melaka

Project Owner :PetronasPenapisan Melaka Sdn. Bhd. PMC :Consortiom of OGP & Foster Wheeler TechologyPartner :Enprima Limited (Finland)

EPCC Contractor: Shinryo (M) - Steamline(M) Consortium Project Cost : RM 600 million (Including Machinery and Equipment)

v CADANGAN PEMBANGUNAN LOJI SISTEM PENDINGINAN SETEMPAT

2 TINGKAT SERTA SATU TINGKAT SUB BESMEN DAN SATU UNIT GAS METERING STESEN DI ATAS SEBAHAGIAN PLOT 5U1, PRESINT 5, WILAYAH PERSEKUTUAN PUTRAJAYA GAS DISTRICT COOLING

(PUTRAJAYA) SDN BHD. (The Engineering, Procurement, Construction and Commissioning (EPCC)

ofPutrajaya Precinct 5, District Cooling Plant Project- Chiller Plant Package) Concessionaire : Gas District Cooling (Putrajaya) Sdn. Bhd.

EPCC Contractor :Steamline (M) -Shinryo Consortium Project Cost : RM 18 million (Building & Civil Work Contractual Cost

v CADANGAN TAMBAHAN SISTEM PENYEJUKAN (COOLING TOWER)

DAN KERJA NAIK TARAF SISTEM RAWATAN AIR SISA (WASTE WATER TREATMENT) KEPADA KOMPLEKS KILANG SEDIAADA DI ATAS LOT 1863, JALAN PELABUHAN 1, KAWASAN PELABUHAN KUANTAN, MUKIM SG. KARANG, DAERAH KUANTAN, PAHANG

DARUL MAKMUR. Project Owner : FPG OLEOCHEMICALS SDN. BHD.

Project Cost : RM 15 million (including Machinery and Equipment)

v CADANGAN TAMBAHAN LOJI PENAPISAN GLYCERINE KEPADA KOMPLEKS KILANG SEDIAADA DI ATAS LOT 1863, JalanPelabuhan 1, KAWASAN PELABUHAN KUANTAN, MUKIM SG. KARANG, DAERAH

KUANTAN, PAHANG DARUL MAKMUR. (Glycerine Refinery Plant and Tankage Extension Project- Kuantan Port,

Kuantan, Pahang DarulMakmur.) Project Owner : FPG OLEOCHEMICALS SDN. BHD. EPCC Contractor :: TOYO Engineering Corporation

Project Cost : RM 65 million (including Machinery and Equipment)

v CADANGAN TAMBAHAN KILANG ELEKTRONIK 2-TINGKAT KEPADA KILANG SEDIADA DIATAS LOT 8, JALAN SEMENTA 27/91, SEKSYEN

27, 40400 BANDARAYA SHAH ALAM, SELANGOR DARUL EHSAN. (2 Storey Electronic Factory Extension for ShinEtsu- Shah Alam)

Project Owner : S.E.H. (SHAH ALAM) SDN. BHD. Turnkey Contractor : Shimizu Corporation

Project Cost : RM 5.3 million

v CADANGAN MEMBINA SATU TINGKAT KOMPLEKS KILANG DENGAN MEZZANIN DIATAS LOT S11, BEHRANG, MUKIM HULU BERNAM

TIMUR, DAERAH BATANG PADANG, TANJUNG MALIM, PERAK D.R. (Single Storey Factory Complex with Mezzanine Floor and Ancillary

Buildings- Proton City, TanjungMalim, Perak Darul Ridzuan.

Page 5: v TAIWAN HON CHUAN GROUP – Malaysia Plant – Phase 2tgtanconsult.com/Resource/TGTanATM/2014-1223-140525EELR.pdf · v TAIWAN HON CHUAN GROUP – Malaysia Plant – Phase 2 ... v

5

Project Owner : MODERN SEAT CORPORATION SDN. BHD. Turnkey Contractor : Nakano Construction Sdn. Bhd.

v FACTORY COMPLEX CONSISTING OF WELDING SHOP, PAINT SHOP, BODY SHOP AND CVJ SHOP WITH ADMINS BLOCK on Lot-lot No PT75, PT76 and PT79, HicomPegohIndustrian Park, MukimPegoh, Daerah Alor

Gajah, Melaka. For HONDA MALAYSIA SDN BHD. Project Owner : HONDA MALAYSIA

Turnkey Contractor : Shimizu Corporation

v 2 Storey Office and 1 Storey Factory Complex and Ancillary Buildings and Equipment Foundation- Seremban, Negeri Sembilan DarulKhusus

Project Owner : YAKULT (MALAYSIA) SDN. BHD. Turnkey Contractor: Shimizu Corporation