This is highly confidential document. Ealingoo
RESUME
NAME:
i) Ealingoo s/o Veerappan
DATE OF BIRTH:
13. 06.1969
MARITAL STATUS:
ii) Married
CURRENT ADDRESS:
No. 8B, Jalan Tun Sambanthan,Taman Seri Andalas42100 KlangSelangor. MalaysiaH/P: +6012 – 2915556 or +6012 – 2915559 +603 – 3323 7619 (H)
PERMANENT / FUTURE ADDRESS:
No. 8B, Jalan Tun Sambanthan,Taman Seri Andalas42100 KlangSelangor. MalaysiaH/P: +6012 – 2915556 or +6012 – 2915559
Page 1 of 18
This is highly confidential document. Ealingoo
EDUCATION BACKGROUND.
1. Masters in Environmental Studies (with CGPA 3.7). The University Putra Malaysia (2002/2003).
2. Bachelors in Engineering (Electrical/Electronics) (with CGPA 2.5). The University of Ballarat, Victoria, Australia (1991-1993).
3. Electrical Engineering Technicians (FTC). City and Guilds of London Institute (1989 – 1990).
4. Diploma in Engineering (Electrical/Electronics). Institute of Technology Negri. Seremban, N.S. Malaysia. (1987-1990). (Tafe College, Seremban, Mal.)
5. Primary/Secondary School. Methodist (ACS) Kampar, Pk. Malaysia.
(1976-1981) / (1982 -1986)
ACADEMIC ACHIEVEMENT.
1. Completed Masters Degree in Environmental Studies/Science.
Obtained extensive theoretical and practical knowledge in Environmental Engineering project and thesis, gaining experience in the areas of data collection (research), problem solving, designing and quality presentation.
Obtained extensive theoretical and practical knowledge in Pollution prevention engineering project and, gaining experience in the areas of data collection (research), problem solving, and designing control measure.
Obtained extensive theoretical and practical knowledge in Energy conservation project and, gaining experience in the areas of data collection (research), problem solving, redesigning.
Obtained extensive theoretical and practical knowledge in Waste minimisation project and, gaining experience in the areas of data collection (research), problem solving, redesigning and reengineering waste management.
2. Completed Bachelors Degree in Electrical/Electronics Engineering.
Obtained extensive theoretical and practical knowledge in Engineering project and Thesis, gaining experience in the areas of data collection (research), problem solving, designing and quality presentation.
Undertook extensive Engineering Management course work including Total Quality Management for continuous improvement and Project Management for completion of task and time management.
Page 2 of 18
This is highly confidential document. Ealingoo
Obtained extensive theoretical and practical Occupational Health, Safety & Environment Management program for a year and half, with 6-month period of practical Industrial consultation experience.
Obtained extensive theoretical and practical Engineering Computation knowledge in word processors, spread sheet and programming languages (DOS 6, Microsoft Office for Windows, Word Perfect 5.1, Lotus 123, Dbase, GWBasic, Turbo Pascal & Turbo C).
3. Diploma in Electrical/Electronic Engineering.
Obtained extensive theoretical and practical Engineering knowledge throughout the course.
4. YEAR 11 (SPM)
OTHER PROFESIONAL QUALIFICATIONS.
1. Full Technical Certificate from City and Guilds of London Institute
2. EMS Auditor - IRCA. UK. [Cert. no. 01192830]
3. Competent Safety and Health Officer. [JKKP IS 127/438/2/1591]
4. Competent Chemical Health Risk Assessor [JKKP IH 127/171-2(146)]
5. Competent Engineering Control Equipment Assessor [JKKP IH 147/171-(146)]
6. Gradate member of IEM/BEM
7. Member of Engineers Australia – 2007 - (917927)
LANGUAGE.
1. Spoken: English, Bahasa Malaysia and Tamil.2. Written: English, Bahasa Malaysia and Tamil.
EXTRA CURRICULAR ACTIVITIES.
1. Chairman of Class Representatives Council (1989 -1990), Recommended changes to the college education board, Negotiated and solved differences between student and college staffs.
2. Committee Member of Student Council (1989 - 1990), Organised conventions with other college education board, Organised college functions.
3. Sport Council (1989 -1990),
Page 3 of 18
This is highly confidential document. Ealingoo
Organised sports competition (inter-college and within the college).
4. College soccer player (1987 -1990),
5. Soccer Player for Ballarat Overseas Students and Ballarat University,
8. Executive Member of Ballarat Asian Australian Association. Organized functions and gatherings for Asian and Australian
community.
PROFESSIONAL EXPERIENCE.
1. Jones Lang Lassalle (APM SB) HSBC Account (2014 to date)EHS Regional Manager - South Asia
i.) Environmental Health and Safety Management + Facilities Management support Develop EHS plan and implementation policies and strategies. EHS Legal review and compliance assessment for the region. Implement OSH Management System, OHSAS 18001:2007. Plan, Review and Audit EHS compliance and inspection programs with appropriate
corrective actions and ensure closure of audit findings. Develop implement and sustain EHS policy and procedures. Drive EHS Legislative implementation and compliance throughout the region Lead and support EHS Leaders and coordinators in the region for successful
implementation of ESH Policies & programs. Prepare and conduct monthly & quarterly report review and presentation to Client for
the region. Carry out investigation on all OSHE-related incidents, identify critical OSHE hazards
and recommending corrective and preventive actions to be taken and monitor their effectiveness.
Support, Coaching and mentoring country EHS team members on a regular and on-need basis.
Conduct and co-ordinate training, for employees and contractors. Lead and support food safety management at all client sites in the region. Contractor EHS management – review compliance for the region. Review on Safe Work system (work permit) for contract work – contractors work
approval. Conduct environmental management compliance review for sites in the region - waste
management. Support environmental compliance monitoring in the region. Lead and manage Fire Risk Assessment and compliance for the region. Lead and manage Asbestos survey and removal for the region.
Page 4 of 18
This is highly confidential document. Ealingoo
ERP implementation and compliance review for the region including in-vacuation process.
ii.) Building Maintenance and Management support
Review Master plan for Building maintenance Building fire & life safety review on all site within South Asia. UPS compliance and installation for serve and data storage centres. Generator maintenance and compliance. Thermograph Scanning and visual inspection review HVAC system maintenance and compliance Fire protection and detection system maintenance and compliance Housekeeping and cleanliness of all location. Utility upgrading Services On site Vendor/contractor management. Monitor and review vendor performance and compliance.
2. IBM Malaysia Sdn.Bhd. (2009 to 2014)Occupational Health & Safety Country Manager
iii.) Safety and Health + RESO Support
Plan and design Implementation of Occupational Safety and Health Management System for office environment in multi-tenant occupancy.
Develop and implement common Occupational Safety and Health practice for sites in Malaysia.
Support all sites in the country for H&S program implementation. Implemented H&S regulatory compliance tracking system and ensure compliance to
legal requirement for sites in Malaysia. Conduct environmental management compliance review for sites in Malaysia Support environmental compliance monitoring in Malaysia Provide, conduct and organise training for all levels of employees on various subjects
and areas related to Health and Safety. Conduct investigation and report to top management on incident within sites in
Malaysia related to Health and Safety. Assess, evaluate and redesign work station to comply with IBM ergonomic
requirement/standard - office workstation, labs, design station, call centers etc. Ensure compliance to Indoor Air Quality – IBM standard. Conduct regular S&H audit and inspection
Acquisitions and Outsourcing Driving/Transportation Safety Equipment/Process Installation Equipment/Products in Office-Based Activities Events safety Home Working Installation and Maintenance of IT Equipment Manual/Materials Handling and Storage Mobile Working Potentially Hazardous Work Activities
Page 5 of 18
This is highly confidential document. Ealingoo
Working at Customer Locations Workstation Ergonomics Asbestos Management Building Maintenance Operations Catering and Food Hygiene Confined Space Hot work High work Red tag Electrical safety Contractor Safety Emergency Response Fire and Life Safety General Building/Site Design Factors Housekeeping and Cleanliness Operational Parameters Space, Layout, Furniture Water Management Chemical Safety Hazardous Operations Hearing Conservation. Air Contaminant Exposure Assessments Ionizing & Non-Ionizing Radiation Protection Laser Safety Lockout/Tagout Maintenance Safety Personal Protective Equipment Process Hazard Review Training Ventilation HVAC
iv.) RESO support Review Master plan for Building maintenance Building fire & life safety review on all site within ASEAN. UPS compliance and installation for serve and data storage centres. Generator maintenance and compliance. Thermograph Scanning and visual inspection Cooling system maintenance and compliance Fire protection and detection system maintenance and compliance House keeping and cleanliness of all location. Utility upgrading Services On site Vendor/contractor management. Monitor vendor performance and compliance through MAXIMO.
iii) Employee Wellness Plan and conduct/arrange wellness program for employees.
Health Promotion Mental Health & Work Life Coaching
Page 6 of 18
This is highly confidential document. Ealingoo
Medical Case Management Medical Services Administration Occupational Illness and Injury Management Public Health Issues Management Travel
iii.) Crisis Management
Review and implement Disaster Response and Recovery Plan (DRRP) for site in Malaysia.
Implement and review of crisis management plans and programs DRRP, manual and procedures.
Review and conduct Pandemic preparedness plan and test the plan. Implement and review of Emergency Responses Plan, Procedures, Checklist
including testing the plan. Provide, conduct and organise training for all levels of employees on various subjects
and areas related to Business continuity. Organise Functional Exercise for site on Crisis management & Business recovery. Conduct investigation and report to site management on incident within the plant
related to DRRP. Support loss prevention team on underwriter’s activities.
3. Emerson Process Management Manufacturing (M) Sdn. Bhd. (Fisher Valve & Valve Automation Division) (March 2008 – March 2009)Department Manager: Environmental, Health & Safety, Facilities and Security
i.) Environmental, Health & Safety Support all sites in the region for EHS program implementation. Implemented EHS regulatory compliance tracking system and ensure compliance to
legal requirement for sites in Asia. Prepare report and conduct environmental management review meeting for the
region. Plan and design Implementation of Occupational Safety and Health Management
System for Asia. Develop and implement common Occupational Safety and Health practice for sites in
Asia. Provide, conduct and organise training for all levels of employees on various subjects
and areas related to Environment, Health and Safety for Asia. Conduct investigation and report to top management on incident within sites in Asia
related to Environment, Health and Safety. Evaluate and redesign work processes with ergonomic consideration. Conduct audit and inspect at all sites in Asia. Provide audit support for other regions, America & Europe.
ii). Facilities Engineering
Page 7 of 18
This is highly confidential document. Ealingoo
Responsible for day-to-day utilities operation of the plant. Manage and meet manufacturing operation requirement on utilities supply. Ensure continues electricity supply for manufacturing operation. Ensure continues supply of compressed air to support manufacturing operation. Manage and maintain Air conditioning for plant operation. Ensure continues supply of water (raw water & RO water) for manufacturing
operation. Manage and maintain Wastewater Treatment Plant to support manufacturing
operation. Manage and maintain sewage system to support plant operation. Manage and maintain the housekeeping of the plant with 5s concept. Provide, conduct and organise training for all levels of employees on various
subjects and areas related to resources conservation (Energy saving, and Water reduction).
Conduct investigation and submit report to top management on any incident within the plant related to Facilities failures.
Installation of UPS for IT server room. Undertake all project related to facilities including operation expansions.
iii). Crisis Management
Develop and implement Disaster Response and Recovery Plan (DRRP) for site and region.
Implement and review of crisis management plans and programs DRRP, manual and procedures.
Implement and review of Emergency Responses Plan, Procedures, Checklist including forming of ERT.
Provide, conduct and organise training for all levels of employees on various subjects and areas related to Business continuity.
Organise and conduct Functional Exercise for site on Crisis management & Business recovery.
Conduct investigation and report to site management on incident within the plant related to DRRP.
Lead loss prevention team and support underwriter’s activities.
iv). Security Management
Develop and implemented Security Management System to track employees, material, and visitors movement.
Installed CCTV system to enhance monitoring system. Develop and provide 24hrs vigilance for the plant including patrolling and
clocking. Associate with local police force for regular patrolling and visiting. Implemented theft prevention program by constant inspection and checking on
all vehicles. Recording of all visitors including VIPs.
Page 8 of 18
This is highly confidential document. Ealingoo
Checking and verifying all material finish goods before loading into trucks. Implemented controlled timing for shipment and trucks movement are restricted
within the time.
4. Solectron (1999 – 2008)Manager: Facilities, Environmental, Health & Safety and Disaster Response Recovery Planning.
I.)South Asia RegionFrom Sept. 2005 –Feb 2008
II.) Asia RegionFrom Sept. 2004 - Aug 2005
i.) Facilities, Environmental, Health & Safety Responsible for day-to-day utilities operation of the plant. Manage and meet manufacturing operation requirement on Utilities. Ensure continues supply of electricity (including standby gen-set) for
manufacturing operation. Ensure continues supply of compressed air and vacuum to support
manufacturing operation. Manage and maintain Air conditioning system (Cooling Tower, Condenser
Pump, Water Cool Package Unit, Air Cool Cooling Unit, Split cond.) for plant operation.
Manage and maintain chillier unit to supply chilled water continuously for manufacturing operation.
Ensure continues supply of Liquid Nitrogen for manufacturing operation. Ensure continues supply of water (raw water & DI water) for manufacturing
operation. Manage and maintain Wastewater Treatment Plant to support manufacturing
operation. Manage and maintain sewage system to support plant operation. Manage and maintain the housekeeping of the plant with 5s concept. Provide, conduct and organise training for all levels of employees on various
subjects and areas related to resources conservation (Energy saving, and Water reduction).
Conduct investigation and submit report to top management on any incident within the plant related to Facilities failures.
Implemented ROSH & Pb Free Initiative for Penang site and sites in Asia. Support all sites in the region for EHS program implementation. Plan and design Implementation of Environmental Management System (EMS
ISO14001) for multi site certification. Implemented EHS regulatory compliance tracking system and ensure compliance to
legal requirement for sites in Asia. Leading Asia EHS team for EMS ISO 14001: 2004 implementation of multi site
certification.
Page 9 of 18
This is highly confidential document. Ealingoo
Drafting and implementing common EMS Manual, policies, procedures for the region and site specifics.
Lead Asia EHS team on EMS ISO 14001: 2004 implementation for sites within Asia. Planning and conducting Internal/External audit and inspection program on
Environmental Management System relating to ISO 14001:2004 for sites in Asia.
Conduct annual audit and inspection on Vendors and Suppliers on Environmental Management System relating to ISO 14001.
Prepare report and conduct environmental management review meeting for the region.
Plan and design Implementation of Occupational Safety and Health Management System for Asia.
Develop and implement common Occupational Safety and Health practice for sites in Asia.
Provide, conduct and organise training for all levels of employees on various subjects and areas related to Environment, Health and Safety for Asia.
Conduct investigation and report to top management on incident within sites in Asia related to Environment, Health and Safety.
Evaluate and redesign work processes with ergonomic consideration. Conduct audit and inspect at all sites in Asia. Provide audit support for other regions, America & Europe.
ii.) Disaster Response and Recovery Program Asia Team Lead on Disaster Response and Recovery Plan (DRRP)
implementation for sites within Asia by using LDRPS. Draft, implement and review of DRRP, manual and procedures for sites in Asia
and maintain LDRPS application. Provide, conduct and organise training for all levels of employees on various subjects
and areas related to Crisis management & Business continuity for sites in Asia using LDRPS.
Conduct investigation and report to Corporate on any incident within the plant related to DRRP in Asia.
Conduct audit and provide recommendation on DRRP improvement for sites with in Asia.
Provide guidance and support for sites in Asia on Functional Exercise - Crisis management & Business recovery.
Provide training and audit support for other regions, America & Europe.
iii.) Sites Acquisition and Outsourcing Conduct due diligence on new site for Facilities EHS & DRRP compliance. Assess viability of the new site including risk. Assess legal issue and statutory compliance of the new site. Assess current facilities availability and future requirements of the site including
possible expansions. Assess current environmental, occupational safety and health, and disaster recovery
plans of the new sites.
2.1 Solectron Technology (Penang, Malaysia)
Page 10 of 18
This is highly confidential document. Ealingoo
I.) Manager : Environmental, Health & Safety and DRRP From Sept. 2002
II.) Assistant Manager : Facilities, Environmental, Health & SafetyFrom Feb. 1999 to Aug. 2002
i.) Site Environmental, Health & Safety Successfully completed Chemical Health Risk Assessor (CHRA) by NIOSH &
DOSH, 2002. Successfully complete Advance Environmental Auditor course (EARA certified). Plan and design Implementation of Environmental Management System (EMS
ISO14001) for Penang site. Lead EMS Working Committee for EMS ISO 14001 implementation & certification.
For Penang site. Draft and implement EMS Manual, policies and procedures. Plan and conducting Internal Audit and inspection program on SLR Environmental
Management System relating to ISO 14001. Conduct annual audit and inspection on SLR Vendors and Suppliers Environmental
Management System relating to ISO 14001. Introduce and lead a team on waste reduction and recycling (WMS) for Penang Site. Lead a team on Resources Conservation Program (RCS) for Penang Site. Prepare report and conduct environmental management review meeting. Plan and design Implementation of Occupational Safety and Health Management
System. Lead OSH Working Committee for OSHMS implementation using OSHAS 18001
template. Draft, implement and review Solectron Technology’s Occupational Safety & Health
Policy and performance. Draft, implement and review Solectron Technology’s Legal and other
requirements including customer, vendor and contractors. Provide, conduct and organise training for all levels of employees on various subjects
and areas related to Environment, Health and Safety. Conduct investigation and submit report to top management on any incident within
the plant related to Environment, Health and Safety. Advisory on proactive measure to Solectron Technology management on all
Environmental, Health and Safety matter and design program for improvement. Redesign and evaluating new work process with ergonomic consideration of 12 hours
work.
ii.) Site Disaster Response and Recovery Program Lead a team on Disaster Response and Recovery Plan (DRRP). Implement and review of DRRP, manual and procedures. Implement and review of Emergency Responses Plan, Procedures, Checklist
including forming of ERT. Provide, conduct and organise training for all levels of employees on various subjects
and areas related to Business continuity. Organise and conduct Functional Exercise for site on Crisis
management & Business recovery. Conduct investigation and report to site management on incident
within the plant related to DRRP.
Page 11 of 18
This is highly confidential document. Ealingoo
iii). Facilities Engineering (1 plant) Responsible for day-to-day utilities operation of the plant. Manage and meet manufacturing operation requirement on Utilities. Ensure continues supply of electricity (including standby gen-set) for
manufacturing operation. Ensure continues supply of compressed air and vacuum to support
manufacturing operation. Manage and maintain Air conditioning system (Cooling Tower, Condenser
Pump, Water Cool Package Unit, Air Cool Cooling Unit, Split cond.) for plant operation.
Manage and maintain chillier unit to supply chilled water continuously for manufacturing operation.
Ensure continues supply of Liquid Nitrogen for manufacturing operation. Ensure continues supply of water (raw water & DI water) for manufacturing
operation. Manage and maintain Wastewater Treatment Plant to support manufacturing
operation. Manage and maintain sewage system to support plant operation. Manage and maintain the housekeeping of the plant with 5s concept. Provide, conduct and organise training for all levels of employees on various
subjects and areas related to resources conservation (Energy saving, and Water reduction).
Conduct investigation and submit report to top management on any incident within the plant related to Facilities failures.
Computation (Windows 98, MS Word, Excel, Power Point, Access, Project, Lotus notes, Dbase, GW-Basic, and Turbo C).
5. Toshiba Electronics Malaysia. Sdn. Bhd (1994 – 1999)
3.1 Senior Engineer: Safety, Health & Environmental From Sept. 1997 to Jan. 1999
3.2 Engineer: Safety, Health & Environmental From Sept. 1994 to Aug. 1997
i.) Safety, Health & Environmental Draft and review TEM’s Occupational Safety & Health Policy and forming
committee. Draft and review TEM’s Environment Policy and forming committee. Provide, conduct and organise training for all levels of employees on various subjects
and areas related to Safety, Health and Environment. Draft and review of Emergency Responses Plan, Procedures, Checklist, Permit to
Work, etc. Conduct regular audit and inspection on TEM Environmental management System
relating to ISO 14001.
Page 12 of 18
This is highly confidential document. Ealingoo
Conduct annual audit and inspection on TEM Vendors and Suppliers Environmental management System relating to ISO 14001.
Conduct regular audit and inspection on TEM Occupational Safety & Health management system.
Conduct annual audit and inspection on TEM Vendors and Suppliers Occupational Safety & Health management system.
Conduct regular audit and inspection on TEM Quality Management System relating to ISO 9002.
Conduct investigation and submit report to top management on any incident within the plant relating to Safety, Health and Environment.
Successfully completed program on Quality Management System ISO 9002 Implementation.
Successfully Completed program on Internal Auditors for Quality Management System.
Successfully Completed courses on Radiation Protection and appointed as RPO. Successfully completed a course on Industrial Major Accident Hazards Regulation
1996, organised by FMM Selangor. Successfully completed a course on Hearing Conservation Program with NIOSH and
DOSH. Successfully completed a course on Safety in the Use of Chemicals with NIOSH and
DOSH. Successfully completed a course on One-Day Workshop on Occupational Safety and
Health Act 1994 with NIOSH and DOSH. Successfully Completed course on Inspection & Accident Investigation with FMM
Selangor Branch. Attended a short course on Occupational Safety & Health and Environmental
Management in Toshiba Kita-Kyushu Works Japan. President of Occupational Safety & Health Committee (OSHCOM). Computation (Windows 95, DOS. 6, MS Office for Windows 97, Lotus notes, Dbase,
GW-Basic, Turbo Pascal and Turbo C). Successfully Completed Intermediate and Advance Microsoft Excel 97. Successfully Completed course on Implementation of Environmental Management
System (ISO 14001). Successfully Completed course on Internal Auditors for Environmental Management
System. Leader for Occupational Safety & Health Management System Internal Auditor
Group. Leader for Environmental Management System Internal Auditor Group. Leader for Chemical Safety Group. Successfully Completed Total Team Power Program with Best Master Award Jan. 96. Successfully Completed Safety & Health Officer Competency course with NIOSH
Malaysia. Liase with government agencies (DOE, DOSH, BOMBA, DOH, LPTA).
6. Lecturer: 2nd & 3rd Year Diploma course Tafe College Seremban. Malaysia From March 1994 to Aug. 1994
Lectured on Electrical and Electronics Engineering.
Page 13 of 18
This is highly confidential document. Ealingoo
Lectured on Workplace Safety Management. Lectured on Engineering Management.
PROFESIONAL SKILL
1. Facilities Management to provide constant utility supply.
2. Project works and installation of utilities and machines (Fire Risk Assessment,
Electrical installation, UPS, Overhead Crane, VTL Machine, Plasma Welding Machine,
Compressor etc).
3. Extension and building relay out for production and process flow improvement.
4. Coordinate and implementation RoSH & Pb Free Initiative for single and multi sites.
5. Implementation of Environmental Management System ISO 14001 for single site and
multi sites certification within Asia.
6. Implementation of Disaster Response and Recovery Program for site within Asia.
7. Implementation of Waste Management System for handling hazardous and toxic
waste.
8. Implementation of waste reduction program for soldering process.
9. Implementation of Occupational Health and Safety Management System (OSHMS).
10. Implementation of Ergonomics practice in manufacturing assembly line.
11. Conducting Chemical Health Risk Assessment (CHRA) for employees handling
chemicals.
12. Implementation of Hot Work Permit and Red Tag system to prevent fire occurrence.
13. Implementation of Noise Conservation Program to reduce and prevent noise exposure.
14. Implementation of Energy Saving Program (ESP) to reduce utility cost.
15. Implementation of Pollution prevention system for wastewater treatment plant
16. EMS advance auditing (EARA Approved)
17. Auditing EMS and OSHMS for sites within Asia.
18. Auditing supplier and vendor on EHS related issue with in Asia.
19. Auditing Waste Recycling contractors for hazardous and non hazardous waste.
20. Site acquisition auditing & conduct due diligent for new site acquisition and transfers.
21. Complying and managing customer compliance audit for various customers.
22. Investigation and reporting of accident and incident.
23. Conducting training pertaining to EHS & DRRP for all level of staff.
24. Implementation of Business / Crisis Management.
Page 14 of 18
This is highly confidential document. Ealingoo
25. Advance use of Microsoft office application (Word, Excel and PowerPoint)
26. Intermediate use of Microsoft Application (Project, Access, and Visio).
PROFESSIONAL ACHEIVEMENTS.
A. Jones Lang Lassalle (APM MY) – HSBC Account
1. Successfully completed business mobilization & transitions for HSBC in the region. 2. Successfully completed legal compliance review for all countries in the region.3. Successfully completed business mobilization & transitions for Bank Ekonomi Indonesia.
B. IBM Malaysia
1. Successfully leading GCG & ASEAN in implementing Well Being Management System (WBMS) programs. – (Content Focal Point).
2. Successfully lead, manage and control pandemic programs in Malaysia.3. Successfully lead Building Review for ASEAN and closely follow-up and completed
implementation. 4. Successfully lead and implemented S& H Online Training for ASEAN.5. Successfully lead and implemented Transitional Coaching for ASEAN.
C. Emerson Process Management
1. Successfully implemented Optimum Electricity utilization for operation. 2. Successfully implemented Energy Saving Program (ESP) which achieved 18%
reduction in utility cost.3. Successfully completed installation of Fire Protection System which reduce annual
premium (FM) by 51%. 4. Successfully implemented and achieved 90% Mark on Corp. EHS program
implementation. 5. CCTV Installation and implementation for Security enhancement.
D. Solectron Technology (M) S/B
1. Successfully coordinated and implemented ROSH & Pb Free Initiative for Penang site. 2. Successfully coordinated and implemented EMS ISO 14001: 2004 for all sites within
Asia. 3. Successfully coordinated and implemented OHSMS for all sites within Asia. 4. Successfully Implemented Disaster Response & Recovery Program for all sites within
Asia.
Page 15 of 18
This is highly confidential document. Ealingoo
5. Implement regulatory tracking system for EHS activities for sites within Asia
6. Successfully completed reduction of Liquid Nitrogen usage by 45% for Lucent Project, which has 5 months ROI.
7. Successfully implemented Energy Saving Program (ESP) which achieved 10% reduction in utility cost.
8. Successfully implemented Water Reduction Program (WRP) which achieved 23% reduction and increase optimal usage of material.
9. Successfully implemented Chemical Reduction Program (CRP) which achieved 15% reduction in total usage.
10. Successfully completed EMS ISO 14001 certification audit with zero non-conformance (NCR) within 5 months from the time of commencement.
11. Successfully completed Paper usage reduction program which achieve 50% reduction in total usage.
12. Appointed as EMR (Environmental Management Representative) for SLR.13. Establish and implement Environmental Management System (EMS) to meet
customer, corporate and local requirement.14. Establish and implement Occupational Safety and Health Management System
(OSHMS) to meet customer, corporate and local requirement.15. Appointed as Chemical Risk Assessment Committee Member by Solectron
Corporation (HQ).16. Establish and implement Chemical Health Risk Assessment (CHRA) to assess the
employee’s exposure to chemical. 17. Establish and implemented Waste Management System (WMS) to increase recycling
and meeting legal requirement.18. Establish noise reduction program to reduce noise source and prevent employees from
exposure. 19. Establish ergonomics workstation for SMT line and inspection station. 20. Implemented Hot Work & Red Tag Permit to reduce and eliminate risk related to
human elements and fire.21. Designed and implement Local Exhaust Ventilation System (LEV) to prevent lead
fume from escaping to the atmosphere and prevent exposure to employees. 22. Establish and implemented Close Loop System in Waste Water Treatment Plant to
ensure water discharge meet legal requirement at all time.
E. Toshiba Electronics (M) S/B
1. Achieved ISO 14001 Environmental Management System certification for TEM within 6 months from the time of commencement.
2. Establish and implemented Safety & Health Management System (SHMS) for TEM to be adopted as standard system.
Page 16 of 18
This is highly confidential document. Ealingoo
3. Lead Environmental & Safety Engineering Team in redesign of soldering deep machine to avoid solder lead exposure by operators and release to atmosphere in TEM.
4. Lead Environmental & Safety Engineering Team in redesign of work process in reducing noise to a maximum level of 80-dB (A).
5. Lead Toshiba Emergency Response Squad to finals in Selangor State Fire Fighting Competition 1995 and won 1st runners-up.
6. Lead Toshiba Emergency Response Squad to Finals in National Convention & Competition of Fire Fighting Squads representing Kuala Langat, Selangor.
7. Reduce the number of accident to a very minimum level.8. Japan tour on understanding Occupational Safety & Health and Environmental
Management of Toshiba Semiconductors Kita-Kyushu Works Japan.
CURRENT PROJECTS
1. Fire Risk Assessment and rectification for all HSBC sites in South Asia.
2. Asbestos Risk Assessment and rectification for all HSBC sites in South Asia.
3. Regional EHS Training development and implementation for HSBC Branch managers.
4. Regional Hazardous waste management, reduction and recycling.
STRENGTH
1. Driver: Implementing, coordinating and completing project or task on time.
2. Team player: Work closely with all involve parties for common goal.
3. Leader: Provide guidance and support to team members to accomplish given task.
4. Communication: Communicate well with all level of staff to complete and achieve common goal.
CAREER ASPIRATION
Page 17 of 18
This is highly confidential document. Ealingoo
1. To work in an organization & a team that am able to demonstrate my professional knowledge, capability & skills to the utmost with full compliance.
2. To work in an organization & a team that constantly striving for improvement and simplifications.
3. To work in an organization & a team that always values and recognises employees as an asset of the organization.
REFEREES.
1. Mr. Kenneth Ho HR Country LeaderIBM Malaysia S/B17th Floor, Plaza IBM,8 First Avenue, Persiaran Bandar Utama,Petaling Jaya Sel 47800Office Tel: +603 2301 2220Mobile: +6012 301 3220
2. Mr. Jumaat MansurHuman Resource ManagerEmerson Process Management Manufacturing S/BLot 13111, Mukim Labu, Kawasan Perindustrian Nilai,71807 Nilai,Negeri SembilanMalaysia.Office Tel: +606 7992323Mobile: +6012 9378273
I have 21 years of experience as Environmental, Safety and Health and Building Facilities Management. My current work focus on the EHS compliance and improvement in Integrated Facilities Management. In the last 12 years I was working mainly on regional support and country lead including Business Crisis Management. I was also responsible for facilities management that includes compliance to underwriters ( FM Global Insurance & AIG insurance compliance). During my career, I gained experience in the full project lifecycle from project proposal, development & design, implementation and completion. I was involved in projects like system implementation, energy reduction, waste reduction, risk prevention and improvement, customer compliance, auditing, etc.
Page 18 of 18