Post on 21-Mar-2018
CorporateProfile
(143959-V)PLB- Bina Sdn. Bhd.
Amemberof
R
PLB- Bina Sdn. Bhd.
Committedtoprovideour customers with quality
products andserviceswhich notonlymeettheir
requirements but drive their success.
Infulfillingourcommitment, we shall keepabreast
with technological advancement;be innovativeand
continually seek improvement ineverything we do. We
shall live quality as a wayof lifeandshallpursue
excellence ateverylevelsothatwe may consistently
and continually delightourcustomersin their
associations with
As a
certified company, we are...
MS ISO 9001:2000
MSISO 9001:2000REG. NO.AR2341
Contents
page1
page2
page3
page4
page6
page7
page9
page10
page11
ExecutiveSummary
TheCompany-PLB-KHBina
CorporateInformation
Organization Structure
Management Team
Financial Highlights
List ofAssets-HeavyMachinery& Equipment
Project Information
CorporateStructure
ValueofContractsfor theLast5Years- Listof PrestigiousProjects- Listof On-GoingProjects(pertypeofproject)- Listof CompletedProjects(pertype ofproject)
Thisprofilewaslastupdated on20thOctober2009
CorporateProfile
MSISO9001:2000REG.NO.AR2341
ExecutiveSummary
Executive Summary
CorporateProfile 1
TheCompany
ManagementTeam
FinancialHighlights
ListofAssets-HeavyMachineryandEquipment
Expertise
PLB-KHBina SdnBhd(“PKH/TheCompany”)is awhollyownedsubsidiaryofPLBEngineeringBerhad;apublic-listed companyonBursaMalaysia. PKHisthe construction arm and o n e o f t h e major revenuecontributortoPLBEngineeringBerhad.
The Company had i ts inception in 1973 when itcommenced business in foundry works, steelfabrication,andthefabricationofmachineryparts.Todate,PKHhasgrowntobeapremiercontractor withapaid up capital of Rm20 million.
thereby allowing the Company t oundertakebuildingconstructionprojectsofunlimitedvalue.
OurManagementplaysanimportant roletoleadtheCompanytomeetthediscerningneedsofourclientsthrough , , ,and
;the cornerstonesofoursuccess.
PKHcanaddvaluetoyourconstructionrequirementswiththesupportofourexperiencedprofessionalsledbythe ExecutiveChairman, Dato'OngChoo Hoonwho has been involved in the construction andproperty development industries for more than 3 0years.Intheareaofprojectplanning, redesigningandoperationsmanagement,Dato' Dr. OngSengSoon,theManagingDirector ofPKH, leadsawell-balancedteamofengineersandprojectmanagers.
The company isregistered as a PKK-Class A and CIDB-G7contractor
PKHhas alsobeencertified by SirimQASSdnBhdof MSISO:9001:2000forProvisionofConstruction Services In Building and CivilEngineeringWorksandDesignCoordinationandManagementofTurnkeyProjects.
Flexibility Innovation TeamworkExpertise
PKHhas had an average turnover of more than RM120millionperyearforthepast5financialyears.Ourshareholders' fund and total assets are RM54.1million and RM115.5 million respectively. I naddition,theCompany isona sound financialfootingtoassumesizeableprojectswiththestrongback-upofourprincipalbankers.
Forflexibility inmachineryandequipmentsupplytotheconstructionsite,PKHhasitsownfleet ofheavy
machinery and motor vehicles to support ourconstructionactivities.Thelogistics support enablesustomanageourprojectsmoreefficiently to ensureon-timecompletionofourconstructions.
PKHhasextensiveexperienceinhandlingindustrial,commercial, hotel and residential bui ldingconstructions including turnkey projects that ar e“Design and Build” in nature. The Company hassuccessfullycompleted anarrayof projects with atotalprojectvalueofmorethanRM1billion.SomeofPKH's valued customers include PermodalanNational Berhad (PNB), Majlis Perbandaran PulauPinang (MPPP), Kementrian Dalam Negeri,Kumpulan Wang Simpanan Pekerja (KWSP), LionGroup,Acidchem,Carrefour, AcerTechnologiesandXerox.
We, theBoard ofDirectors,trustthatthisprofilewillbe able to provideyou with sufficient informationabout PKH to make an informed decision on ourcapabilities in meeting your constructionrequirements.
We thankyou for according us the opportunity t osubmit our proposal and w e look forward to amutuallybeneficialrelationship.
BoardofDirectorsPLB-KHBina SdnBhd
Pic:PLBEngineeringBerhad’sHeadOfficeatPrai,Penang.
MSISO9001:2000REG.NO.AR2341
CorporateStructure
Corporate Structure
SebadiCorporationSdnBhd100%
VestingoldSdnBhd100%
PLBGreenConstructionSdnBhd70%
PLBSteelEngineeringSdnBhd100%
PLB- BinaSdnBhd100%
GaintrendSdnBhd100%
PLBLandSdnBhd100%
ConstructionMaterial
Manufacturing
PropertyDevelopment
PLBVenturesSdnBhd100%
EraPujaanSdnBhd100%
ImbasKayaSdnBhd100%
PelangiSehatiDevelopmentSdnBhd100%
HektarPujaanSdnBhd100%
ExcelgrandPropertiesSdnBhd100%
InvestmentHolding
PLBSelasihPropertySdnBhd(formerlyknownasPLB.ComVenturesSdnBhd)100%
FattigoldSdnBhd51%
DilligentSuccessSdnBhd50%
CorporateProfile 2
MSISO9001:2000REG.NO.AR2341
BuiltonlandsPalmSdnBhd100%
Construction
DynabricksSdnBhd100%
SubsidiaryAssociatedCompany
IndahMuliaDevelopmentSdnBhd100%
LandsdaleDevelopmentSdnBhd100%
PLB-WonderBayDevelopmentSdnBhd50.0%
PLBLeisureSdnBhd100%
The Company
- PLB-KH Bina
The Company
PLB- BinaSdnBhdKH
Pic:OurstaffatourprojectsiteinPenang.
PLB-KHBina SdnBhd(“PKH/theCompany”)wasincorporatedinMalays iaon 22 August 1985 as aprivate limited company.TheCompanyis a whollysubsidiary of PLBEngineering Berhad; a public-listed company on BursaMalaysia with a paid-upcapitalofRM91.3 million.
The principal activity ofPKH is the constructionofbuildings and infrastructure in the industrial,commercial, hotel and residential sectors. PKHprovides designing, planning and managementsupport services in civil engineering, structural an dpiling projects. TheCompanyhasalsoaccumulatedexperience and expertise in the management ofTurnkeyprojectswhereweprovidea comprehensivepackageofservicesindesign,constructionandprojectmanagement. To date, PKH has undertaken amultitude ofconstructionprojectsof variousdesignsandstructuresthroughoutthenation.
The strong foundation and experience o f PKH'smanagement team in the construction industry hasbeenhonedfor morethan30yearssince1973.LedbyDato'OngChooHoon, the Executive Chairman o fPKHandthefounderofthecompany,theCompany'sbusinesscommenced withsteelandmetalfabricationand later expanded into construction i n 1976.Currently, the day to day operations, planning an dstrategic management come under the purview ofDato'Dr.OngSengSoon,theManagingDirector,whohas propelled the Company to greater heights withconstructionastheprimecontributor.
whichallows th eCompanytotenderandparticipatein theconstructionofgovernment andprivateprojectsofunlimitedvalue.In the course of providingquality constructionstomeetthe discerningrequirements o f our clients,wehave adopted standardized procedures through aprovenQualityManagement System.PKHisthefirstconstruction-basedcompany to becertifiedbySirimQASSdnBhd of the standardunder the scope of
Ournetworkofcementedpartnershipswitharchitects,consultants andspecialistcontractors in thevariousrelated fields enables us toservice thetotal projectrequirementsofourclients.
PKHisproudof theexcellentback-up andafter-salesservicethat weofferto ourclients.
PKHhasemphasized theimportanceoftraininganddevelopment of our human resource to ensurecompetence. With the rising significance o fInformationTechnology, the Company h as investedheavily in software and hardware for greaterefficiencyinoperationsmanagement andcontrol.Asaresponsible corporate citizen, PKH diligentlysubscribes to the strict conformance of SafetyStandardsatourjobsites.
Withtheexpertiseandcommitment oftheteam,ourproven trackrecordand a s ound financial backing,PKH c a n continue to undertake and implementprojectsto thehighest standardofquality.
PKHisregisteredasaPKKClassA,CIDBGradeG7 and JPP Class D contractor
MS:ISO 9001 : 2000Provision of Construction
ServicesinBuildingandCivilEngineeringWorksand Design Coordination and Management ofTurnkeyProjects.
CorporateProfile 3
MSISO9001:2000REG.NO.AR2341
MSISO9001:2000REG.NO.AR2341
CorporateInformation
Corporate Information
DateofIncorporation
AuthorisedCapital
Paid-upCapital
Board of Directors
CompanySecretaries
Shareholder
RegisteredOffice
22August,1985
RM25,000,000.00 divided into25,000,000ordinarysharesofRM1.00each
RM20,000,000.00divided into20,000,000ordinarysharesofRM1.00each
Dato'OngChooHoonDato'Dr.OngSengSoonMs.OngGuatBengMr. OngSengChyeEncikMardzukhi BinAbu BakarMr. Happy NgNeohSoo
Mr. CheeWaiHong
PLB Engineering BerhadListedontheMain Board oftheBursaMalaysia SecuritiesBerhadPaid-upcapitalas at30thJune2009isRM91,281,667.00dividedinto91,281,667 ordinarysharesofRM1.00each
51-8-BMenaraBHLBank,JalanSultanAhmadShah,10050Penang
(Executive Chairman(ManagingDirector)
(ExecutiveDirector)(ExecutiveDirector)
(ExecutiveDirector)(ExecutiveDirector)
(MIA 17181)
)
Ms.WongYeeLinMs.FooLiLing
1320,Jalan Baru,TamanChaiLeng,13700Prai,Penang,West MalaysiaTelephoneNo:604-3905737 FaxNo:604-3998323E-mailAddress:happy@plbgroup.com.my
GrantThornton,51-8-AMenaraBHLBank,JalanSultanAhmadShah,10050Penang
RHBBank BerhadMalayanBanking BerhadEONBank BerhadHongLeongBankBerhad
(MIA15898)(MAICSA7019557)
BusinessAddress
Auditor
Bankers
CorporateProfile 4
MSISO9001:2000REG.NO.AR2341
Corporate Information (cont’d)
Solicitors
GovernmentRegistration
RelevantAssociationsMembership
MessrsGhazi&LimMessrsBan Eng,Anual&Foong
1.PusatKhidmatKontraktor(PKK)Class“A”Contractor2.ConstructionIndustryDevelopmentBoardMalaysia(CIDB)
GradeG7Contractor3.SuruhanjayaPerkhidmatanAir Negara (SPAN),
PermitIPAJenisC1(Pembentungan)
1.
2.CommitteeMember
3.HonoraryTreasurer@AlternateCommittee
4.
5.NationalInstituteofOccupationalSafety&Health(NIOSH)Member
6.MalaysianEmployersFederationMember
MessrsSalinaLim KimChuan&Co.MessrsIbrahim& KimMessrsShahrizat, Rashid&LeeMessrsMahinder Singh& Co.MessrsRamliAmarJit&Tan
MasterBuilders AssociationMalaysiaMemberPenangChinese ChamberofCommerce
PenangBuilders'&BuildingMaterialsDealers'Association
PenangStateFoundry& Engineering IndustrialAssociationHonouraryPresident
CorporateProfile 5
MSISO9001:2000REG.NO.AR2341
OrganizationStructure
ManagementTeam
Management Team
Withover 31yearsofexperienceinthe constructionindustry, theGroupExecutive Chairman Dato' OngChooHoon,playsanimportant rolein thecompany.On theday-to-daymanagement,heissupportedbyastrongteamofqualified engineersand professionalswho have proven track record in the constructionindustry.
, aged 43 i s the.Heholdsadegreeof Doctorateof
Philosophy (Ph.D.) in Construction ManagementfromClaytonUniversity, United States ofAmerica.HejoinedPLB-KHBina Sdn.BhdasaSiteEngineerin 1989 and was responsible for the site andconstructionmanagement of allmajor constructionprojects undertaken by the Company.
DATO' ONG C HOO HOON
ONG GUAT BENG
, aged 70, i s the. Heisthe founderofthe PLB
Groupandhasmorethan46yearsofexperienceinthemachinery, engineering and construction industry.He wasactively involved inmachine engineeringcontractsandprovisionofmaintenanceservices from1962to1975beforehesubsequentlyventuredintotheconstructionbusinessin1976. Dato'OngChooHoonhasalsoembarkedonanumberofsuccessfulpropertydevelopmentprojectsovertheyears. H e representsPLB-KH BinaSdn.Bhd. asthe patronofthePenangState Foundry and Engineering IndustriesAssociation. He is responsible for the overallmanagement and strategic planning of the G roup.Currently,healso sitson theboardofseveralprivatelimitedcompanies.
, aged 51, is an. ShejoinedPLB-KHBinaSdn.Bhd.(PKH)
in 1977toassist Dato'OngChooHoon tooverseeonoperationsofPKH.She hasover31yearsofworkingexperience in purchasing, accounting and officeadministration. Subsequently, she was speciallyassigned tooverseetheFinance andHumanResourceand Administration Departments. Currently, sheoversees the Human Resource, Procurement,Maintenanceand Internal Audit Departments of theCompany. Madam Ong Guat Beng a lso assists theGroup Executive Chairman and Group ManagingDirector intheoveralloperationsandmanagementoftheCompanyespecially insitemanagement,financialmanagement,humanresourcemanagement, propertydevelopment,etc.Currently,shealsositsonthe boardofseveralprivatelimited companieswithintheGroup.
Executive Chairman
ExecutiveDirector
DATO' DR. RICKSON ONGManagingDirector
Since hisappointmenttotheBoardofPKHandtheCompany,hisin-depthknowledge of theconstructionindustryhas contributed s ignificantlyto thegrowthand theexpansion of P L B Group. Dato' Dr. R ickson Ongoversees the operations management, corporatedevelopmentand marketingforthePLBGroup.
Dato' Dr. Rickson Ong is the Chairman o f theCorporate GovernanceCommitteeand Chairmanofvarious w orking committees in the Group. H e i s aMajor(Associate Officer)ofthe Departmentof CivilDefence Malaysia (Ministryof Internal Security),aMember of the B oard o f Engineers of Malaysia,aGraduate Member of the Institute of Engineers,Malaysia,VicePresident ofPenangChineseChamberof Commerce, represent PKH as an AlternateCommittee Member of Penang Master Builders &Building MaterialsDealersAssociation andDirectorof Penang HanChiangAssociatedChineseSchoolsAssociation and Honorary Director of JemaahPengurusSMJKHengEe.
aged45,actsasafor PLB-KH Bina Sdn. Bhd. He is a registeredmember of The InstitutionOf Engineers,Malaysiaandregisteredprofessionalengineerwiththe BoardOfEngineersMalaysia. HeholdsaBachelorDegreein Civil Engineering from University TechnologyMalaysia in1987.Hehasinvolvedonbothtechnicalandmanagementofvarioustypesofprojectrangingfrom industrial, residential, commercial, mix-development and high-r i se building andinfrastructure projects in his 2 0 years of workingexperienceinconstructionindustry.
, aged 43 i sa. He h olds a Bachelor ofScience
degree in Civil Engineering from University ofSouthwesternLouisiana,USAin1988.Hehasmorethan 18 years of working experience in theconstructionindustryandinvolvedin manybuildingandinfrastructureprojects.HejoinedPLB-KH Binain2006.
HAPPY NG,aged48, isan . HegraduatedfromTunkuAbdulRahmanCollegewithaDiploma in Technology (Building) in 1982. HejoinedtheCompanyin1989asQuantitySurveyorandwas then promotedtoGeneral ManagerofContractDepartmentin1997and tothe boardin 1999. Withmore than 23 years of experience in contractadministration, contract management, businessdevelopment and property management, he isresponsible to leadthe Project Administration andQualitySystemManagementDepartment.
Executive Director
IR.TIUJONHUI,
IDERUS BINMATIBRAHIM
ProjectAdvisor
SeniorProject Manager
CorporateProfile 7
MSISO9001:2000REG.NO.AR2341
Management Team (cont’d)
NANCESOONTETSIM , aged 55, is the. ShegraduatedinMaster of
Business Administration from Southern PacificUniversity, United States o f America in2003. In1999, she joined the Company to head theProcurement Departmentin theareasofPurchasing,Store and Facilities, which consist of a fleet of
. Under hersupervision, the Department expanded to includeTrading of
Shehasover27 years of experience in procurement in bothIndustrialandConstructionfield.
SeniorProcurement Manager
Machineries / Plant and Equipment
construction material and Rental /ServicesofPlant/Equipmentin2000.
, aged 47 is an.HeholdsaDiplomaInArchitectural
Draughtmanship from Federal Institute OfTechnology in 1983. He has more than25yearsofworking experience inthe construction industryandinvolved in many mix-development and high-riseprojects.HejoinedPLB-KHBinain1999.
, aged45,isthe .HejoinedtheCompanyonyear1990andwassubsequentpromoted to thecurrentpositionin year 2000.Withmore than 20 years working experience inconstruction field, he has been involved in varioustypesofprojects.
, aged 39, is the. Hejoined the
Companysince1993andwaspromotedtothecurrentposition.Hehasover15yearsofworkingexperiencein construction field especially in handling themaintenance and repair of defect work for variousprojects.
,aged48isanforPLB-KHBina Sdn.Bhd. He joined the
Companysinceyear1993andhasinvolvedinvarioustypes of project including high-rise and mix-developmentinhis16yearsofworkingexperienceinconstructionindustry.
, aged30,is the . He graduatedfromPoliteknikSultanHalimMu'adzamShahwithaCertificate in QuantitySurveying inyear 2002. HejoinedPLB-KHBinaSdn.Bhd.inyear2003andhasbeen involved in the preandpostcontractjob forvarious projects ranging from factory, mix-development,infrastructureandhigh-risebuilding.
, aged38,isthe .HeisholdingaCertificateinIntermediateElectrical(DomesticandIndustrial).HejoinedtheCompany in1997andhasbeenresponsiblefor thewiringandelectricalworkforvariousprojectsranging from industrial building, commercialbuilding,mix-developmentandhigh-riseproject.
,aged33isthefor the Company. He is
responsibletoperformsiteadministrationmattersuchas preparation of Project Quality Plan & documentcontract and play a vital role in site activities andplanning.He has beeninvolvedinthesupervisionofvarious projects such as high-rise building, housingandinfrastructureproject.HejoinedtheCompanyinyear2006.
, is the oftheCompany.Aged 27, he is holdingaBachelorofCivil EngineeringwithHonoursfromtheUniversityTechnology Mara. As a Site Engineer, he isresponsible forassistingthe projecthead in ensuringsmoothadministrationofsiteoperationinaccordancewith theConsultant s’requirements andensuresworkprogressisonschedule.HejoinedPLB-KHBinaSdn.Bhd.inyear2009.
CHEW POH CHIEW
ONGOOIBOON
GOBINATHANA/LKRISHNAN
ALAGUA/LAYASAMY
SYAHRIN SAZWAN BIN MOHD ISHAK
PARAMESVARANA/LNARAYANAN
MOHDNAZRIBINMATRASHID
SHARILIMRIBINSHUIB
AssistantProjectManager
SiteManager
Assistant Quality Control Manager
AssistantSiteManager
Assistant QuantitySurveyor
M&ECoordinator
QA/QC Coordinator
SiteEngineer
He isalso a certified personnel byMalaysianWaterAssociationforconfinedspaceentrance.
, aged40isthe fortheCompany since September 2009. Heisresponsibleforland surveyingworkto ensure smooth executionofproject assigned.He started hiscareerin constructionfieldasanAssistantLandSurveyorandgroomeduptillasenior personnelto-date.He has involved in the landsurveying work of many multimillion infrastructureprojectsforthepast20years.
, aged 41 is holding t h epositionof .ShegraduatedfromtheGreenwichUniversitywith a B a chelorofScience i nConstructionMa nagement,inyear2002after obtainingher HigherNational Diplomain QuantitySurveying atNottinghamTrentUniversityin year1999.Shehasbeeninvolved in the pre and postcontract jobsforvariouskinds of projects throughout h e r 1 5 y e a r s o f workingexperience;shejoinedtheCompanyinyear2009.
, aged32,isholdingtheposition ofinProjectDepartment.She holds a
Bachelor of SciencewithhonoursinHousing, Buildingand Planning,majoring in Construction ManagementfromUniversity ScienceMalaysia.Shehasover7yearsofworkingexperienceinhandlingthequantitysurveyingworkofvariousprojects.
M O H D Z A H U D I B I N A B D H A M I D @SHAMSUDIN
YEOH CHWEE PHENG
ONGSOONYIN
SeniorLandSurveyor
Asst.ContractsManager
Quantity Surveyor
CorporateProfile 8
MSISO9001:2000REG.NO.AR2341
Management Team (cont’d)
SITIRUBIAHBINTIMATSAAD
NURHIDAYAHBINTIABDRAZAK
, i s theof the Company.SheisholdingaBachelorof
Science with Honours in Housing, Building andPlanning,majoringinconstructionmanagementfromtheUniversitiSainsMalaysia.AsaSiteQuantitySurveyor,sheisresponsiblefor handlingthe quantity surveyingworkoftheprojectassigned.Agedat29,shehasinvolvedinbothpre and post contract job for various types ofproject includinghighway and mix development. ShejoinedtheCompanyinyear2009.
,aged23actsasthe of the Company. Shegraduated f r o m University Technology Mara w ith aBachelor of Science with Honours inEnvironmentalTechnology. She i s responsible in handling all theenvironmentalissuesonthe project assigned.She joinedtheCompanyinyear2008.
HejoinedtheCompanysince1997andwas promoted tothecurrentposition in2001. Hehasmorethan15yearsofworkingexperience. Prior tothecurrent position,he waswithaninternationalauditingfirm with the last held position as Assistant AuditManager. HeisamemberoftheMalaysianInstituteofCertified Public Accountants,amember of MalaysianInstitute of Accountants, an associate member ofCharteredTaxInstituteOfMalaysia(formerlykno wnasMalaysianInstitute of Taxation)andacertifiedmemberofFinancialPlanningAssociationofMalaysia.
SiteQuantitySurveyor
Environmental Officer
MARDZUKHIBIN ABU BAKAR SIVARAJKUPPUSAMY, aged 52,isanand oversees the business
developmentoftheGroup. HeobtainedaCertificateinBuildingStructuralDraughtsmanshipfromMARAInstitute in 1979 and subsequently, a Diploma inBusiness Administration from the Institute ofBusiness Administration and Management in2002.Besidesthat, heisalsoacertifiedSafetyandHealthOfficerbyNationalInstituteOfOccupationalSafetyAnd Health (NIOSH).He has been involved in theconstructionindustryformorethan28years. PriortojoiningPLB-KHin1997,hewasaProjectManagerofGurunCorporationSdn.Bhd.from1990to1992. HewasappointedasaCouncillortoMajlisPerbandaranSeberangPeraifrom1989to1990. OnApril2008,hehas further obtained his fellowship from TheInternational Management Association, London ie.F.I.M.A(UK).Currently, he overseesthe SafetyandSecurityDepartmentoftheCompanyandalsositsontheboardofseveralprivatelimitedcompanieswithintheGroup.
,aged32,hasanExecutiveDiplomainOccupationalSafetyandHealth.He is aregistered Safety and Health Officer certified byDOSH. HejoinedPLBEngineeringBerhadonNov2005.Heis alsoaregisteredscaffolderfor frame andtube and certified by DOSH. Before he joined theCompany,hewasaSafe tyandHeal thOff icerforamultinationalcompany.
Executive Director
Support ing Departments f rom PLBENGINEERINGBERHAD
CH'NG HEAN LAY, aged 43, is the. HegraduatedfromTunkuAbdulRahman
Collegein1992.
FinancialController
CorporateProfile 9
MSISO9001:2000REG.NO.AR2341
FinancialHighlights
Financial Highlights
Turnover:2004 -2008 ProfitBeforeTaxation:2004-2008
Shareholders’Funds:2004 - 2008 TotalAssets:2004-2008
CorporateProfile 10
MSISO9001:2000REG.NO.AR2341
*:Restated
2004 2005 2006 2007 2008RM RM RM RM RM
('000) ('000) ('000) ('000) ('000)Turnover 110,865 155,497 111,649 127,597 144,328Profit/(Loss) Before Taxation 469 5,593 3,392 594 (1,535)Shareholders' Funds 26,280 48,885 52,289 53,155 37,644Total Assets 128,171 93,733 105,152 112,710 91,408
0
2 0 , 0 0 0
4 0 , 0 0 0
6 0 , 0 0 0
8 0 , 0 0 0
1 0 0 , 0 0 0
1 2 0 , 0 0 0
1 4 0 , 0 0 0
1 6 0 , 0 0 0
2 0 0 4 2005 2 0 0 6 2007 2 0 0 8(2 ,000 )
(1 ,000 )
0
1 , 0 0 0
2 , 0 0 0
3 , 0 0 0
4 , 0 0 0
5 , 0 0 0
6 , 0 0 0
2004 2 0 0 5 2 0 0 6 2 0 0 7 2008
0
20 ,000
40 ,000
60 ,000
80 ,000
100,000
120,000
140,000
2004 2005 2006 2007 20080
10,000
20,000
30,000
40,000
50,000
60,000
2004 2005 2006 2007 2008
List of Assets
- Heavy Machinery& Equipment
List of Assets- Heavy Machinery & Equipment
CorporateProfile 11
MSISO9001:2000REG.NO.AR2341
ITEMS DESCRIPTION QUANTITY
Static Pump Putzmeister concrete pump 2
Passenger Hoist EUROLIFT DH 10 1WICKHAM GP 1500 HS 1
Tower Crane BKT BN135 1BKT BN140 1
Crane 25 tonne P & H T250M 1
Backhoe Loader Loader JCB-3D 2Loader John Deere 310C 1JCB 3CX 1
Forklift Toyota 2.5 tonnes (w/o registration card) 1
1 Tonner Truck Toyota Dyna Hi-Ace LY100-TBMBS3 1
6 - 8 Tonner Truck Mitsubishi Fuso FM15LRDGI 1Hino FF174A 2Nissan CPB15NE 2
10 Tonner Truck Nissan CW45HD Dump Truck 1Hino ZM500 1
Cargo Truck Nissan CK31 1
Pick-up Van Daihatsu S70T 1Daihatsu Hijet S89R-LPR 1
ProjectInformation
- Valueof ContractsfortheLast5Years
- List ofPrestigiousProjects
- List ofOn-GoingProjects- List ofCompletedProjects
Project Information
Value Of Contract SecuredForPast5Years (2004 to 2008)
CorporateProfile 12
MSISO9001:2000REG.NO.AR2341
Year Contract Value (RM)2004 105,861,138.272005 112,974,799.002006 113,759,043.782007 125,771,604.132008 188,135,064.93
Total ContractValue for the past 5 years 646,501,650.11
105,861,138.27
112,974,799.00
113,759,043.78125,771,604.13
188,135,064.93
2004 2005 2006 2007 2008
List of Prestigious Projects
Industrial Projects
Manufacturing plant, warehouse, officeblock, 2 storey new factory, renovation toexisting warehouse, sport complex andcanteenatSeberangJayaIndustrialParkforAcerTechnologiesSdn.Bhd.
3storeyfactoryinPraiIndustrialEstatefor(nowoccupied
byFuji-XeroxCorporationMalaysia)
Reconstruction ofPlant,Substation,SportsComplex, Canteen and Drumming Shed,NewWorkshop,Laboratory,ChemicalStore,Warehouses, Beading Plant, Soap Plant,Guard House, Open Drum Shed, 3 StoreyO f f i c e B l o c k , Tank F o u n d a t i o n ,Refurbishmentworks,PilingworksandNewFatSplittingPlant&HydrogenationPlantinPrai Industrial Estate for
CAMPrecisionSdnBhd
Acidchem (M)Sdn.Bhd.
CorporateProfile 13
MSISO9001:2000REG.NO.AR2341
List of Prestigious Projects (cont’d)
Commercial Projects
Complet ion ofuncompleted 27-storey office withmazzanine floora n d 2 l e v e l sbasement carparkon Lot 1406,Section 46, JalanRaja Laut, KualaL u m p u r f o r
Mixeddevelopment (Ipoh Parade Phase 2)inIpoh,PerakDarulRidzuanfor
HypermarketonLots197,207,208,209&4466andpart oflots 4485& 340,Mukim 1,Seberang PeraiTengah, Pulau Pinang for
12storeyofficebuildingwitha3storeypodium,9storeyofficetowerandcarparkingfacilityatLotPT3858 Mk. 1, Daerah Seberang Perai (T) for
Hypermarket at Lots 3066 & 3067,JalanSkudai,Mukim Tebrau,Daerah Johor Bahru, JohorDarulTakzimfor
P e r m o d a l a nNasional Bhd.
SeritawanSdn.Bhd.
Magnificient DiagraphSdn.Bhd.(CarrefourSeberangJaya)
KumpulanWangSimpananPekerja(KWSP)
MsCheKiangRealtySdnBhd
C o m m e r c i a lcomplex with 6-storeyofficeand1-storey basementcarpark on Lot1436&261,Mk4,S.P.T., Penang forS.J. DevelopmentSdn.Bhd.
CorporateProfile 14
MSISO9001:2000REG.NO.AR2341
List of Prestigious Projects (cont’d)
CorporateProfile
ResidentialProjects
11StoreyapartmentonLot-lot2315&2332,Section2,BandarButterworth, S.P.U.for
2 blocks of 5 storey medium-costapartment whichconsist of 200residential units onLot301,Mk14,SeberangPeraiTengah,ProvinceWellesleyfor
Siram PermaiSdn.Bhd.
ZhengDeMaiEnterpriseSdn.Bhd.
Low and mediumcosthousing development onLot953,MukimSidamKanan,DaerahKulim, Kedah for
Constructionandcompletionof 69 units of doublestorey terrace house and 44 units of double storeysemi-detachedhouseonLot599,Mukim13,BukitMinyak,SeberangPeraiTengahfor
Mixeddevelopmentonpartof Lot816,824,825,1410and 1518, Mk. 12, Dearah Barat Daya, JalanPermatang Damar Laut, Penang for
MsAndalasDevelopmentSdnBhd
MsDNPLandSdn.Bhd.
ArchlawDevelopmentSdnBhd
MsPLBLandSdnBhd
12Unitsof ShopOffice,79UnitsofD/STerrace,10Units ofS/STerrace,18Unitsof D/S Semi-D & 2UnitsofDetachedHouseonLot867,Mk.13,S.P.T.,JlnTokKangar,Juru,Penangfor
.
CorporateProfile 15
MSISO9001:2000REG.NO.AR2341
TurnkeyProjects/Govt.Projects
Turnkey project for low and medium-low incomegroupmixeddevelopmentonapartofLot945Section.9W, Georgetown, Pulau Pinang for
2 storeyfactoryand4storeyofficeinBayanLepas,Penangfor
4storeyoffice&warehouseinPraiIndustrialEstatefor
FactoryinPhaseIV,PraiIndustrialEstatefor
1129unitsofapartmentsandshoplotsinGeorgetown,Penangfor
Construction of Marine Police Base in Batu Uban,Penangfor
MajlisPerbandaranPulauPinang(MPPP)
BagudaSdnBhd
FuHaoManufacturing(M)SdnBhd
Molex(M)SdnBhd
PembinaanKasporatSdnBhd
KementrianDalamNegeri
List of Prestigious Projects (cont’d)
CorporateProfileCorporateProfile 16
MSISO9001:2000REG.NO.AR2341
FactoryinPhaseIV,PraiIndustrialEstatefor
List of On-Going Industrial Projects
Description of Projects Consultants Contract Period & Amount (RM)
1 Construction & Completion Of Pig Iron Caster Buildings, Pakatan Runding Yusoff Sdn. Bhd 15/10/2009 - 24/02/2010Water Treatment Plant, Control Room, Machine Juru Ukur Bahan Malaysia RM 1,881,705.00 Foundations & Ancillary Works forM/s Ann Joo Integrated Steel Sdn. Bhd
2 Construction & Completion Of Water Treatment Plants, Pakatan Runding Yusoff Sdn. Bhd 15/10/2009 - 10/02/2010Cast House Deduster, Blower Room And Boiler Room for Juru Ukur Bahan Malaysia RM 3,520,699.00M/s Ann Joo Integrated Steel Sdn. Bhd
3 Construction & Completion Of Transfer Station 12 & Pakatan Runding Yusoff Sdn. Bhd 15/10/2009 - 10/02/2010Deducting, BF Air Compressor Room, Central Laboratory, Juru Ukur Bahan Malaysia RM2,497,596.00Weighbridge Control Room & Foundation And TL 14, 15 & 16 Conveyors forM/s Ann Joo Integrated Steel Sdn. Bhd
ON-GOING INDUSTRIAL PROJECTS
PLB-KH Bina Sdn Bhd Corporate Profile
List of On-Going Residential Projects
Description of Projects Consultants Contract Period & Amount (RM)
1 Cadangan Skim Perumahan Di Atas Lot 517, Mukim 11, Ng Kweng Sim Architect 08/09/2008 - 07/01/2010Jalan Teluk Kumbar, D.B.D., Pulau Pinang Chrison Konsultant Sdn. Bhd. (16 Months)(A) 1 Unit Rumah Banglo 3 Tingkat (BB1) H C Toh Perunding RM 31,511,000.00(B) 14 Unit Rumah Berkembar 3 Tingkat (B1 - B14)(C) 22 Unit Rumah Teres 3 Tingkat (TA1 - TA22)(D) 60 Unit Rumah Teres 2 Tingkat (TB1 - TB60)(E) 14 Unit Kedai/Pejabat 2 Tingkat (S1 - S14) untukM/s Sebadi Corporation Sdn Bhd
ON-GOING RESIDENTIAL PROJECTS
PLB-KH Bina Sdn Bhd Corporate Profile
List of On-Going Mixed Development Schemes
Description of Projects Consultants Contract Period & Amount (RM)
1 Cadangan Pembangunan Yang Terdiri Daripada 2 Blok Pangsapuri Perunding Alam Bina Sdn. Bhd. 15/06/2006 - 14/03/2008Servis 17 Tingkat (Blok A - 136 Unit) Dan 31 Tingkat (Blok B - 290 Unit), Arup Jururunding Sdn. Bhd. (21 Months)1 Blok Bangunan Pejabat 15 Tingkat Dengan 1 Blok Bangunan Podium Jurutera Perunding Valdun Sdn. Bhd. RM 97,630,000.001 Tingkat Dan 5 Tingkat Basemen Di Atas Lot 692, Seksyen 57, Baharuddin Ali & Low Sdn. Bhd.Jalan Nagasari, Kuala Lumpur untukTetuan Visionwell Sdn. Bhd.
2 Basement Construction To Proposed Mixed Development On Lots 39, BYG Architecture Sdn. Bhd. 14/01/2008 - 13/07/2008296, 1237, 1238, 2347, 2349, 2348 & 2350, Section1, Persiaran Gurney, Arup Jururunding Sdn. Bhd. (6 Months)Bandar Georgetown, D.T.L., Pulau Pinang for PEN Konsult Sdn. Bhd. RM 30,408,000.00M/s Hunza Properties (Penang) Sdn. Bhd. & Hunza Properties Kuantibina Sdn. Bhd.(Gurney) Sdn. Bhd.
ON-GOING MIXED DEVELOPMENT SCHEMES
PLB-KH Bina Sdn Bhd Corporate Profile
List of On-Going TPM Projects
Description of Projects Consultants Contract Period & Amount (RM)
1 Proposed Development Consisting Of 4 Units Double Storey Utama Cipta Architects 25/02/2008 - 24/05/2010Terrace House Type 'A', 62 Units Double Storey Terrace House Design Pro Consult Sdn. Bhd. (27 months)Type 'B', 48 Units Double Storey Terrace House Type 'C', ABA Jurutera Perunding RM 32,441,000.004 Units Double Storey Semi-Detached House, 1 Unit Double Perunding BE Sdn. Bhd.Storey Bungalow House, 10 Units Double Storey Shop Office Type 'A', 8 Units Double Storey Shop Office Type 'B' And 7 Units Three Storey Shop Office On Lot 1602, Lot 1605 And Lot3680, Seksyen 4, Bandar Butterworth, Seberang Perai Utara, Pulau Pinang Based On Design And Build Concept for M/s Syarikat Perumahan Negara Berhad
ON-GOING TURNKEY PROJECT MANAGEMENT PROJECTS
PLB-KH Bina Sdn Bhd Corporate Profile
List of On-Going Civil Engineering Projects
Description of Projects Consultants Contract Period & Amount (RM)
1 Cadangan Menaiktaraf Jalan Persiaran Kuala Selangor, Mohd Asbi & Associates 04/02/2008 - 03/02/2010Shah Alam, Selangor Untuk (24 Months)Jabatan Kerja Raya Malaysia RM 82,775,064.93
2 Cadangan Membina Dan Menyiapkan 1 Blok Rumah Perunding JPNS Sdn. Bhd. 15/02/2008 - 15/05/2008Pangsa Kos Rendah 10 Tingkat 235 Unit (Fasa 1), Di JUB Ikatan Sepakat Sdn. Bhd. (3 Months)Atas Sebahagian Lot 638, Mukim 11, Daerah Barat Daya, RM 1,295,000.00Jalan Teluk Kumbar, Pulau Pinang (Earthworks) untukM/s Pantas Alam Sdn. Bhd.
ON-GOING CIVIL ENGINEERING PROJECTS
PLB-KH Bina Sdn Bhd Corporate Profile
List of Completed Industrial Projects
Description of Projects Consultants Contract Period & Amount (RM)
1 Factory on Plot 535 & 539, Jalan Perusahaan Baru, GNK Management Sdn Bhd 1990 (6 months)Kawasan Perusahaan Prai, 13600 Prai, Penang for Jurutera Jaya Usaha RM 8,135,000-00Ms Teco Industry (M) Sdn Bhd Konsultant S/ B
2 Acetylene and oxygen cylinder factory at Plot 75, Tebrau Juru Reka Konsult Johor Baru 1990 (3½ months)Industrial Estate, Johor Baru, Johor Darul Takzim for RM 598,818-00Ms Sri Oxygen Sdn Bhd
3 Extension to existing factory at Lot 2806, 683 and Juantara Konsultant Sdn Bhd 1990 (3½ months)692, Mk 1, Kawasan Perusahaan Prai, Penang for RM 525,000-00Ms Loytape Industries Sdn Bhd and Central Industrial Corporation Berhad
4 Renovation and extension to existing godown building Jurutera Konsultant (S.E.A.) S/B 1990 (5 months)and toilet block at Lot 287, Mk CID Prai, Penang for RM 1,453,690-00Ms Malayan Sugar Manufacturing Co Berhad
5 Factory on Lot 73 & 74 (part of Lot 004005) GTP Jurutera Perunding Sdn Bhd 1990 (3 months)Mk Naga Daerah Kubang Pasu, Kedah Darul Aman for RM 1,674,530-00Ms Centape (M) Sdn Bhd
6 Factory on Lot 85 Bakar Arang Estate, Sungai WNG Jurutera Perunding Sdn Bhd 1990 (3 months)Petani, Kedah Darul Aman for RM 2,840,000-00Ms Echo Electronics (M) Sdn Bhd
7 Factory on Plot 100 (i) Mk 1, Kaw. Perindustrian Akitek Ketika 1990 (4 months)Prai, Penang for Jurutera Perunding Utara Sdn Bhd RM 1,710,000-00Ms Howezen Industry Sdn Bhd
8 Factory on Plot 552, Kaw. Perusahaan Prai, GTP Jurutera Perunding Sdn Bhd 1990 (4 months)Seberang Prai (Block A), Penang for RM 995,000-00Ms Tehdex (M) Sdn Bhd
9 Extension (Factory D) to existing factory on Plot Derrick David & Associates 1990 (4 months)67, Kulim Industrial Estate, Kulim, Kedah Darul Aman for Ooi Teik Boon Consulting Engineer RM 1,500,000-00Ms Miyao Toki (M) Sdn Bhd
10 Extension to existing factory on Plot 521, Prai, Penang GTP Jurutera Perunding Sdn Bhd 1990 (4 months)Industrial Estate, S.P.T. for RM 1,190,000-00Ms Phoenix Press Sdn Bhd
11 Factory on Plot 383, Kaw. Perindustrian Prai, WNG Jurutera Perunding Sdn Bhd 1991 (6 months)Seberang Prai, Penang for RM 3,125,173-00Ms Oriental-Hitachi Construction Machinery Sdn Bhd
12 Single storey Warehouse with Mezzanine Floor Akitek Antara Sdn Bhd 1991 (4 months)on Lot 692, Mk 1, Kawasan Perusahaan Prai Juantara Konsultant Sdn Bhd RM 1,890,000-00Seberang Prai, Penang for Ms Loytape Industries Sdn Bhd
13 Kilang dan pejabat 2 tingkat di atas Plot 1433, WNG Jurutera Perunding Sdn Bhd 1991 (5 months)Persimpangan Tingkat Perusahaan 6 & Lorong RM 3,670,000-00Perusahaan 8, Kaw. Perindustrian Prai, Penang untukTetuan Teo Guan Lee Packaging Sdn Bhd
14 New factory on Plot 2 (P2) Phase IV , Prai Akitek Ketika 1991 (6 months) Industrial Estate, Prai, Penang for Jurutera Perunding Utara RM 3,096,634-00Ms Lucky-Palmco Sdn Bhd Sdn Bhd
15 New factory on Plot 6 Prai Industrial Estate GTP Jurutera Perunding Sdn Bhd 1991 (5 months)Fasa IV S.P.T. , Penang for RM 1,130,000-00Ms Western Manufacturing (M) Sdn Bhd
16 Single storey factory complex & 2 storey office Ismail Dan Rakan-Rakan 1991 (6 months)building on Lot 35A, Kaw. Perusahaan Kulim, RM 3,763,939-00 Kulim, Kedah Darul Aman forMs Inter-Pacific Cycles Sdn Bhd
COMPLETED INDUSTRIAL PROJECTS
PLB-KH Bina Sdn Bhd Corporate Profile
List of Completed Industrial Projects
Description of Projects Consultants Contract Period & Amount (RM)
17 Factory on Lot 1159 Mk 15, Daerah Seberang GTP Jurutera Perunding Sdn Bhd 1991 (5 months)Prai Tengah, Penang for RM 3,172,288-00Ms New Starlight Garment Factory (M) Sdn Bhd
18 Sebuah kilang dua (2) tingkat diatas Plot 70, Loh & Loh Architects 1991 (14 weeks)Bandar Seberang Jaya Fasa IV, Prai Industrial Perunding Sdn Bhd RM 1,760,000-00Estate, Pulau Pinang untukMs Utsui Consumer Plastics Sdn Bhd
19 Godown on Plot 399, Lorong Perusahaan Lapan, GTP Jurutera Perunding Sdn Bhd 1991 (3½ months) Prai Industrial Estate, S.P.T., Penang for RM 510,000-00Ms San Yong Enterprise Sdn Bhd
20 Extension & alterations to existing factory on Lot C. Slaun Consultants 1991 (17 weeks)682, 2806, 683 & 692, Prai Industrial Estate, RM 1,050,000-00Prai, Penang for Ms Loytape Industries Sdn Bhd
21 Factory cum office block on Lot 1244, Mk 12, Kawasan Chrison Konsultant Sdn Bhd 1992 (5 months)Perusahaan Valdor, Sbg. Prai Selatan, Penang for RM 3,240,000-00Ms Taigene Metal (M) Sdn Bhd
22 Factory on Lot 74, Phase IV, Seberang Prai GTP Jurutera Perunding Sdn Bhd 1992 (6 months)Tengah, Penang for RM 5,870,000-00Ms Amalgamated Containers Sdn Bhd
23 New Factory on Plot 20A & 20B, Prai Akitek Ketika 1992 (6 months)Industrial Estate, Penang for Jurutera Perunding Utara Sdn. Bhd. RM 6,506,600-00 Ms Linear Corporation Manufacturing Sdn Bhd& Ko Lim Sdn Bhd
24 Factory (Phase III) on Plot 521, Kaw. Perindustrian GTP Jurutera Perunding Sdn Bhd 1992 (5 months)Prai, Penang for RM 1,903,863-00Ms Phoenix Press Sdn Bhd
25 New Canteen Block and Conversion of existing Derrick David & Associates 1992 (6 months)Canteen to new General Office at Prai Industrial Estate Ooi Teik Boon Consulting Eng RM 1,145,492-60Estate Seberang Prai, Penang for Ms Viking - Askim Sdn Bhd
26 Double storey Office / Factory complex on Lot 391, Perunding AJZ Sdn Bhd 1992 (5½ months)Seberang Prai, Penang for RM 6,701,910-86Ms VDO Components Sdn Bhd
27 Factory on Plot 53, Prai Industrial Estate IV, Jurutera Perunding O.S. 1992 (4 months)Seberang Prai, Penang for RM 2,870,000-00Ms Medal Star (M) Sdn Bhd
28 4-storey & 1-storey factory on Plot 14, Bayan Teh Theam Seng 1992 (4 months) Lepas Industrial Estate, F.T.Z. Phase IV, Jurutera Jayausaha Konsultant S/B RM 2,437,000-00Bayan Lepas, Penang for Ms Zentron Sdn Bhd
29 Factory on Plot 262, Tingkat Perusahaan 5, GTP Jurutera Perunding Sdn Bhd 1992 (5 months)Prai Industrial Estate, S.P.T. , Penang for RM 1,800,243-80Ms Heap Seng Huat Sdn Bhd
30 Extension to the existing factory on Plot 104 & 198, GTP Jurutera Perunding Sdn Bhd 1992 (4 months)Tingkat Perusahaan 2 'A' Prai Industrial Estate, RM 2,062,000-00Seberang Prai Tengah, Penang for Ms Century Chemical Works Sdn Bhd
31 Factory on Plot 69, Prai Industrial Estate, Phase Chrison Konsultant Sdn Bhd 1992 (4½ months)IV, Seberang Prai, Penang for RM 3,732,400-00 Ms Malayan Fibre Containers Sdn Bhd
32 Extension to existing factory complex on Plot 5, MWA Jurutera Perunding 1993(3 months)Prai Industrial Estate, Prai, Penang for RM 832,146-00Ms Keat Radio Co. Sdn Bhd
33 Factory & 2-storey office on Lot 1664 & 1671, GTP Jurutera Perunding Sdn Bhd 1993 (4½ months)Lrg Mak Mandin 7, Mak Mandin Industrial Estate, RM 1,082,618-70Seberang Prai Utara, Penang for Ms Khong Guan Vegetable Oil Sdn Bhd
PLB-KH Bina Sdn Bhd Corporate Profile
List of Completed Industrial Projects
Description of Projects Consultants Contract Period & Amount (RM)
34 Extension to existing factory on Plot 2 (P2) Akitek Ketika 1993 (22 weeks)Phase IV, Prai Industrial Estate, Prai, Penang for Jurutera Perunding Utara Sdn Bhd RM 1,810,000-00Ms Lucky-Palmco Sdn Bhd
35 Manufacturing plant warehouse, office block, Loh & Loh Architects 1993 - 1995 (14 months)2 storey new factory & renovation to existing Jurutera Perunding L.O.T. Sdn Bhd RM 20,682,400-00warehouse and canteen at SeberangJaya Industrial Park, Penang forMs Acer Technologies Sdn Bhd 1993 (4 ½ months)
36 Factory on Plot 37, Bayan Lepas Industrial C. Slaun Consultants RM 2,027,017-00Estate IV, Penang forMs Sun Loong Onn Jewellery Enterprise Sdn Bhd
37 Three storey extension to existing factory on Plot Akitek Ketika 1993 - 1994100(i), Mk 1, Prai Industrial Estate, S.P.T., Prai, Penang for Jurutera Perunding Utara Sdn Bhd (8 months)Ms Howezen Industry Sdn Bhd RM 1,855,000-00
38 Reconstruction of plant 8,, sub-station 2 & 3, part of Akitek Ketika 1994 - 1995sports complex, repairing works for the canteen Jurutera Perunding Utara Sdn Bhd (12½ months)building, reconstruction of the drumming shed, workshop RM 10,184,274-00laboratory, chemical store, warehouse 2, beading plant soap plant, new guard house extension and open drum shed on lot 346 (ii), Prai Industrial Estate, Penang forMs Acidchem (M) Bhd
39 Factory on Plot 3, Kaw Perindustrian Bayan Lepas East Design Architect 1994 (6 months)(Bayan Lepas Technoplex), Penang for Chrison Konsultant Sdn Bhd RM 4,398,000-00Ms Leader Optic Fibre Cable Sdn Bhd
40 Additions to existing factory on plot 399, Lorong Derrick David & Associates 1994 (4 months)Perusahaan 8C, Kawasan Perusahaan Prai, Penang for Ooi Teik Boon Consulting Eng RM 1,207,205-24Ms San Yong Enterprise Sdn Bhd
41 Warehouse on plot 255 IV, Jalan Mak Mandin, Kaw. Loh & Loh Architects 1994 (3 months)Perusahaan Mak Mandin, Seberang Prai Utara, Penang for Jurutera Perunding L.O.T. Sdn Bhd RM 746,000-00Ms Dupasar Sdn Bhd
42 Tambahan 1 Block gudang / kantin kepada kilang Jurutera Jaya-Usaha Konsultant S/B 1994 (5 months)sediada diatas Plot No. 461 A, Tingkat Perusahaan 6, RM 1,742,000-00Kaw. Perusahaan Prai (KPB), 13600 Prai, Penang for Ms Action Industries (M) Sdn Bhd
43 Factory extension (Phase 2) on part of Plot 383, Prai WNG Jurutera Perunding Sdn Bhd 1994 (16 weeks)Industrial Estate, Seberang PraiTengah, Penang for RM 1,340,000-00Ms Oriental-Hitachi Construction Machinery Sdn Bhd
44 28 buah perusahaan servis 1 ½ Tingkat diatas Plot 3281 GTP Jurutera Perunding Sdn Bhd 1994& 3282, Section 4, Town of Butterworth, S.P.U., Penang for RM 3,872,367-00Ms Gainbliss Sdn Bhd
45 Tambahan setor diatas Plot 51, Jalan Perusahaan Baru, CBS Jurutera Konsultant 1994 (3 months)Zon Kompleks Perusahaan Prai, Seberang Prai, Penang untuk RM 315,000-00Tetuan Canon Electronics (M) Sdn Bhd
46 New guard house, boilder bouse, new 250T Fat Splitting Akitek Ketika 1995 (6 months)Plant/Fatty Acid Plant new control room pump house / Jurutera Perunding Utara Sdn Bhd RM 2,653,923-00switchgear room on Lot 346 (iii) Prai Ind. Estate, Penang for Ms Palmchem (M) Sdn Bhd
47 New warehouse, guard house, laboratory & office Akitek Ketika 1994 - 1995 block external works on Plot P.T. 51, Prai Industrial Jurutera Perunding Utara Sdn Bhd (4½ months)Complex, Prai, Penang for RM 2,793,391-00 Ms Stabilchem (M) Sdn Bhd
48 Sebuah kilang 3 tingkat (pemasangan precisi) diatas Akitek Antara Sdn Bhd 1995 - 1996 Plot 14, Kaw. Perusahaan Prai IV, Prai, Penang untuk Juantara Konsultant Sdn Bhd (10½ months)Tetuan CAM Precision Components Sdn Bhd RM 21,100,000-00
49 Tambahan dan ubahsuai kpd kilang tayer sedia ada Beh & Associate 1995 (5 months)di Plot 223 dan sebahagian plot 416, Lrg. Perusahaan 8, Jurutera T & T Konsultant Sdn Bhd RM 1,385,000-00Kaw. Perusahaan Prai (Non) Free Trade Zone), Penang forMs Kayel Retreads S/B
50 Double storey factory with 2 storey office on Plot P98, Loh & Loh Architects 1995 (33 weeks)Taman Industri Bukit Tengah, Mk 11, S. P. T., Penang for Jurutera Perunding L.O.T. Sdn Bhd RM 5,533,400-00Ms Pensia Electronic Sdn Bhd
PLB-KH Bina Sdn Bhd Corporate Profile
List of Completed Industrial Projects
Description of Projects Consultants Contract Period & Amount (RM)
51 Formaldehyde / resin plant expansion in the Borden Petareka Perunding (M) Sdn Bhd 1995 (6 months)Chemical plant at Lot 2823 (101) Mk 1, Lorong Perusahaan RM 2,584,481-982, Kaw. Perindustrian Prai, 13600 Prai, Penang forMs Borden Chemical (M) Sdn Bhd
52 Sebuah kilang membuat komputer diatas Plot 574, Lee Architectural Consultancy 1995 (4 months)Lorong Perusahaan 4, Zon Perindustrian Bebas, Jurutera Jayausaha Konsultant S/B RM 13,777,736-00Prai, Mk 1 Daerah Tengah, Seberang Prai,Pulau Pinang for Ms Unico Technology Sdn Bhd
53 1 block 3 tingkat pusat latihan di atas Lot H.S. (D) 27, Akitek Antara Sdn Bhd 1995 - 1996 (No.P.T.149) Mk 12, D.B.D., Bayan Lepas FTZ Juantara Konsultant Sdn Bhd (10½ months)Pulau Pinang untuk RM 2,980,000-00 Tetuan Hitachi Semiconductor (M) Sdn Bhd
54 19 units 1 ½ storey light industries on Lot 1228, Mk 12, Akitek Permata 1995 - 1996 Seberang Prai Selatan, Penang for GTP Jurutera Perunding Sdn Bhd (9 months)Ms Kok Hoon Sdn Bhd RM 4,742,162-73
55 Single storey terrace house, semi-detach, 1 ½ storey Fang & Associates 1994 - 1997
light industrial on Lot 130, 131 Mk of Lunas Daerah Arkitek T.Y. Che (30 months)Daerah Kulim, Lot 2798, Mk Tawar Daerah Baling, Arkitek Narabina RM 60,922,492-55Lot 669 Mk 13, SPT., Lot 1745, 1765, 1774 Mk 14, Arkitek Rekabina Sdn BhdBukit Minyak, Seberang Prai Tengah, Penang for Khoo Dan Rakan-RakanKok Hoon Development Sdn Bhd Jurutera Pakatan (Kedah) Sdn Bhd
GTP Jurutera Perunding Sdn Bhd Chrison Konsultant Sdn Bhd
56 Pindaan dan tambahan kepada sediada diatas Plot 258, Jurutera Perunding Cahaya S/B 1996 (26 weeks)Lorong Perusahaan 10, Kaw. Perindustrian Prai, RM 3,512,248-00Prai, Seberang Prai Tengah, Pulau Pinang untuk Tetuan Kilang Rantai S.A. Sdn Bhd
57 Industries on Plot 1, 2, 3, 4 & 6, (Old 3196, 3295, 3187, Nathan-Jones Architect 28/06/96 - 06/12/965002-5005) Mk Sungai Petani, Daerah Kuala Muda, CBS Jurutera Konsultant (5.5 months)Kedah Darul Aman for RM 17,621,392-68Ms PJS Industries Sdn Bhd
58 1 1/2 tingkat kilang di atas Plot 40, Kaw. Perindustrian Jurutera Tang & Rakan Rakan 01/08/96 - 14/11/96Bukit Minyak, Mk 14, SPT, Pulau Pinang untuk (15 weeks)Tetuan Amazing Technology (M) Sdn Bhd RM 900,000-00
59 Pusat pemeriksaan kenderaan berkomputer diatas Arkitek ATMA 26/07/96 - 12/08/96sebahagian Lot 14263, Mk durian sebatang, Daerah Hilir Perunding Insan (2.4 weeks)Perak, Teluk Intan, Perak Darul Ridzuan, di Teluk Kumbar, RM 656,420-25Pulau Pinang & di Alor Setar, Kedah Darul Aman untukTetuan Imatex Berhad
60 Construction of Modenas 11 warehouse building at Arkitek ATMA 01/06/96 - 03/07/96National Motorcycle Plant on Lot 7416 (P.T. 1273), Mk Perunding Insan (1 month)Gurun, Daerah Kuala Kedah, Kedah Darul Aman for RM 255,678-20Ms Imatex Berhad
61 Mendirikan sebuah bangunan pemeriksaan kenderaan Arkitek ATMA 03/08/96 - 04/10/96dagangan diatas Lot 74, Mk Mergong, Daerah Kota Perunding Insan (9 weeks)Setar, Bandar Alor Setar, Kedah Darul Aman untuk RM 2,900,000-00Tetuan Imatex Berhad
62 3 storey factory on Lot PT. 3604 (Plot 51), Hilir Sg. G & A Architectural Consultancy 1996 (30 weeks)Keluang 14, Mk 12, Daerah Baratdaya, FTZ, Phase 4, Jurutera Jayausaha Konsultant S/B RM 5,000,000-00Bayan Lepas, Penang forMs Sanmatech Sdn Bhd
17/10/96 - 20/02/9763 New spray cooling plant cum warehouse & short Akitek Ketika (18 weeks)
path distillation plant on part of Lot 51 Mk 1 Prai Jurutera Perunding Utara Sdn Bhd RM 1,900,000-00Industrial Complex, Penang for Ms Stabilchem (M) Sdn Bhd
64 Sebuah bangunan pemeriksaan kenderaan dagangan Arkitek ATMA 15/10/96 - 16/12/96diatas Lot-Lot 979 & 981, Mk 9, Daerah Barat Daya, Perunding Insan (9 weeks)Jln. Ginting, Pekan Teluk Kumbar, Pulau Pinang untuk RM 2,900,000-00Ms Imatex Berhad
65 One pack of new stabilizer plant cum packing area on Akitek Ketika 17/01/97-20/03/97part of Lot P.T. 51 Prai Industrial Complex, Prai, Penang for Jurutera Perunding Utara S/B (2 months)Ms Stabilchem (M) Sdn Bhd RM 388,000-00
PLB-KH Bina Sdn Bhd Corporate Profile
List of Completed Industrial Projects
Description of Projects Consultants Contract Period & Amount (RM)
66 Concrete support foundation & Grd. Floor for the Jurutera Perunding Utara S/B 01/03/97 - 31/05/97physical refining & fractionation plant, oil receiving (3 months)bay for the existing warehouse, cooling tower foundations RM 1,230,000-00and weighbridge foundation at Kawasan PerusahaanMak Mandin, Penang for Ms Golden Agricultural Oils Sdn Bhd
67 Tambahan dan perubahan (Base Store Phasell Extension) Y. Wong & Sekutu 10/05/97 - 10/10/97 kepada kilang sediada di Kawasan Perusahaan Mergong, (5 months)Alor Setar, Kedah Darul Aman untuk RM 610,000-00Tetuan Sime Tyres International (M) Sdn Bhd
68 Single storey factory and canteen, double storey Jurutera Perunding Cahaya 1997 (16 weeks)guard house on lot 1218 Mk 12, Daerah Seberang Sdn Bhd RM 7,500,000-00Prai Selatan, Pulau Pinang for, Ms Lion Containers Sdn Bhd
69 Garment factory on plot 142 Bukit Tengah, Kaw. MWA Jurutera Perunding 01/08/97 - 31/12/97Perusahaan Bukit Minyak Seberang Prai Tengah, (5 months)Penang for RM 2,520,800-00Ms Dart Garment Industries Sdn Bhd
70 Factory on Plot 1147 & 1148, Mk. 14, Bukit Minyak, GTP Jurutera Perunding Sdn Bhd 15/11/97 - 15/05/98Seberang Prai Tengah, Penang for TA Perunding (25.9 weeks)Ms Chung Yih Steel Sdn Bhd & RM 5,950,000-00Ms Shiuh Dong Industrials Sdn Bhd
71 Sebuah kilang dan pejabat 2 tingkat diatas Plot 8, GTP Jurutera Perunding Sdn Bhd 27/11/97 - 11/06/98Kawasan Perusahaan Technoplex, Bayan Lepas, S.G. Wong Perunding Sdn Bhd (28.0 weeks)Fasa IV, Mukim 12, S.W.D., Pulau Pinang untuk RM 12,910,000-00Ms Dynacraft Industries Sdn Bhd
72 1 unit single storey godown with 5 storey office on Plot Keoh Lam Chai Consultant Engineer 07/05/98 - 03/09/98155, Bkt. Minyak Ind. Estate, Mk 13, SPT, Penang for C.H. Ong & Associates (17.0 weeks)Ms Mega Wijaya Sdn Bhd RM 709,977-52
73 Sebuah pejabat / kilang / gudang diatas Pelot 18 Lee Architectural Consultancy 08/06/98 - 21/10/98(P.T. 474), Mk. 6, H.S. (D) 578 di Lrg. Perusahaan Chrison Konsultant Sdn Bhd (4.4 months)Maju 1, Kawasan Perusahaan Bukit Tengah, RM 4,070,113-28Seberang Prai Tengah, Pulau Pinang untukTetuan Alu Paste & Pigments Sdn Bhd
74 Tambahan 1 blok pejabat sediada diatas No. PT 31 K. H. Tan Architect 08/06/98 - 21/10/98(No. (D) 1173), Lrg. Perusahaan 1, Prai Industrial Jurutera Perunding Utara Sdn Bhd (4.4 months)Estate, Mukim 1, Daerah Tengah, Seberang Prai, RM 1,088,000-00Pulau Pinang untuk Tetuan Acidchem Industrial Sdn Bhd
75 One unit 2 storey office block complete with one unit Perundingan Jurucita 26/03/99-24/9/991 storey factory, and complete with civil & structure (26 weeks)infrastructure works on plot PT62, Lrg. Perusahaan 8, RM 3,500,000-00Prai II, Mukim I, Seberang Prai Tengah, Penang forMs Crystal Dignity Sdn Bhd
76 Extension to the existing factory on Lot 2367, Mk 12, GTP Consultant Sdn Bhd 04/03/99-10/05/99D.B.D. Bayan Lepas FTZ., Penang for (9 weeks)Ms Dynacraft Industries Sdn Bhd RM 285,748-00
77 Construction of factory on Lot 8, Industrial Zone Ikatan Cipta Bina 22/06/99 - 28/07/99Phase 2, Kulim Hi-Tech Industrial Park, Mukim Padang Ranhill Bersekutu Sdn. Bhd. (5.1 weeks)Cina, Daerah Kulim, Kedah Darul Aman for RM 6,417,781-00 Ms Wafer Technology (M) Sdn Bhd
78 Construction of factory on Lot 8, Industrial Ikatan Cipta Bina 08/10/99 - 23/02/00Zone Phase 2, Kulim Hi-Tech Industrial Park, Ranhill Bersekutu Sdn. Bhd. (4.5 months)Mukim Padang Cina, Daerah Kulim, Kedah Darul Aman for RM 4,611,500-00 Ms Wafer Technology (M) Sdn Bhd - Office Building
79 Construction of factory on Lot 8, Industrial Ikatan Cipta Bina 25/10/99 - 30/11/99Zone Phase 2, Kulim Hi-Tech Industrial Park, Ranhill Bersekutu Sdn. Bhd. (5.1 weeks)Mukim Padang Cina, Daerah Kulim, Kedah Darul Aman for RM 160,000-00 Ms Wafer Technology (M) Sdn Bhd - NUR Building
80 Membina tambahan kepada LRC (HP) Pilot Jurutera Sepakat 24/01/00-31/08/00Plant di atas Plot 1A & 1B, di Kawasan TA Perunding (7 months)Perindustrian Kulim, Kedah Darul Aman for RM 11,526,288-90 Ms LRC Hospital Products Sdn. Bhd.
PLB-KH Bina Sdn Bhd Corporate Profile
List of Completed Industrial Projects
Description of Projects Consultants Contract Period & Amount (RM)
81 Membina satu unit K33KV pencawang letrik Y. Wong dan Sekutu 30/10/00- 29/01/01dan satu unit pencawang letrik untuk mixerline (3 months)No. 1, Jalan Tunku Abdul Rahman, Mergong, Alor Setar, RM 726,712-00
Alor Setar, Kedah Darul Aman untuk Tetuan Sime Tyres International (M) Sdn Bhd
82 Tank foundations for fatty acid plant on Plot 6241 Jurutera Perunding Utara 25/04/01 – 30/07/01
& 6245, Prai Industrial Complex, Prai, Penang for Sdn Bhd (10.7 weeks)Ms Acidchem International Sdn Bhd (“Acidchem”) RM 2,060,000-00
83 The proposed refurbishing of existing laboratory, Jurutera Perunding Utara Sdn Bhd 01/07/01 – 31/10/01canteen, workshop, boilers house, weighbridge, (4 months)loading bay, warehouse extension, new guard RM 3,050,000-00house, pump house and sub-station on Plot 6241 & 6245, Prai Industrial Complex, Lrg. PerusahaanSatu, Prai, Seberang Prai Utara, Penang forMs Acidchem International Sdn Bhd
84 Proposed new fat splitting, fatty acid & glycerine Jurutera Perunding Utara Sdn. Bhd. 31/07/2001 - 28/02/2002plant, hydrogenation plant, boiler house, loading bay, (7 months)tank foundations and cooling tower foundations on Plot RM 7,300,000.006241 & 6245 and 346 (ii) & (iii), Prai Industrial Complex, Lorong Perusahaan Satu, Prai, Seberang Prai Utara, Penang forM/s Acidchem International Sdn Bhd
85 Proposed Extension To Existing Palm Oil Unloading Platform Jurutera Perunding Utara Sdn. Bhd. 17/06/2002 - 03/11/2002 At Butterworth Port And 4 Nos Of Storage Tank Foundations (20 weeks) At Site 2 Acidchem Site On Plot 6241 & 6245, Lorong RM 5,269,782.05Perusahaan Satu, Prai Industrial Complex, Prai, Penang forM/s Palmco Oil Mill Sdn Bhd
86 Proposed M.S. Platform Extension And Raised Roof Of Wong Ying & San Consultants 16/06/2003 - 16/11/2003 Existing Banbury At Existing Factory At No. 1 Jalan Tunku Sdn. Bhd. (20 weeks) Abdul Rahman, Mergong, Alor Setar, Kedah Darul Aman for RM 1,030,803.36M/s Sime Tyres Internatinal (M) Sdn. Bhd.
87 Proposed 600 TPD De-Gumming & Bleaching Plant Jurutera Perunding Utara Sdn. Bhd. 29/11/2004 - 26/02/2005And Bulk Silo At Acidchem International On Plot (13 Weeks)6241 & 6446 At Prai Industrial Complex, SPT, RM 850,000.00Pulau Pinang forM/s Acidchem International Sdn Bhd
88 Proposed Extension Of Building For New Works Division Wong Ying & San Consultants Sdn Bhd 12/05/2005 - 06/10/2005 Office; Proposed Civil Works Demolition, Machine (21 weeks) Foundation And Associated Works At No. 1, Jalan RM 3,790,000.00Tunku Abdul Rahman, Mergong, Alor Setar, Kedah Darulaman for M/s Sime Tyres International (M) Sdn. Bhd.
89 Strucrural Steel For Daybins And Ancillary Works Wong Ying & San Consultants Sdn Bhd 19/10/2005 - 18/04/2006 No. 1, Jalan Tunku Abdul Rahman, Mergong, Alor (10 weeks) Setar, Kedah Darul Aman for RM 519,800.00M/s Sime Tyres International (M) Sdn. Bhd.
90 Cadangan Tambahan Kilang, Pejabat Dan Stor Kepada Wong Ying & San Consultants Sdn Bhd 01/12/2005 - 30/04/2006 Kilang Yang Sediada Di No.1, Jalan Tunku Abdul Rahman, (5 months) Mergong, Alor Setar, Kedah Darul Aman for RM 2,365,000.00M/s Continental Sime Tyre AS Sdn. Bhd.
91 Upgrading Of Mixer Line 1 And Ancillary Works At No.1, Wong Ying & San Consultants Sdn Bhd 16/11/2006 - 20/02/2007Jalan Tunku Abdul Rahman, Mergong, Alor Setar, (3 months) Kedah Darulaman for RM300,000.00M/s Continental Sime Tyre AS Sdn. Bhd.
92 Proposed Construction And Completion Of Cadangan Arkitek ATMA Sdn. Bhd. 01/02/2008 - 31/08/2008Tambahan Gudang Setingkat, Ruang Memperbaiki, Alkay Consultancy (6 Months)Bangsal Letak Kereta, Pejabat & Bengkel Kerja Serta RM 11,000,000.00Testing Track Kepada Kilang Dan Pejabat Sediada Di Atas Sebahagian Lot 38 & 833, Mukim Padang Meha, DaerahKulim, Kedah Darul Aman forM/s Inokom Corporation Sdn. Bhd.
PLB-KH Bina Sdn Bhd Corporate Profile
List of Completed Commercial Projects
Description of Projects Consultants Contract Period & Amount (RM)
1 Superstructure works to mixed development on Lot Akitek MAA Sdn Bhd 1993 - 1994 10488, 11129, and 11116, Jalan Abdul Jalil / Sultan Zaidun-Leeng Sdn Bhd (40 weeks)Idris Shah, Ipoh, Perak Darul Ridzuan for RM 17,950,000-00Ms Seritawan Sdn Bhd
2 Construction of 12 storey office complex and 11 storey Akitek Permata 1994 - 1995 apartment on Lot-Lot 2315 & 2332, Section 2, Bandar GTP Jurutera Perunding Sdn Bhd (18 months)Butterworth, S.P.U., Penang for RM 10,051,669-00 Ms Siram Permai Sdn Bhd
3 1 blok kompleks perniagaan 5 Tingkat dengan basement Wan Shahreman Dan Rakan 2 1995 (52 weeks)tempat letak kereta di atas Lot 396, Seksyen 2, Bandar Jurutera Jayausaha Konsultant RM 7,950,000-00Butterworth, Seberang Prai Utara, Pulau Pinang untuk Tetuan Sumbumas Sdn Bhd
4 Commercial complex with 6-storey office & 1-storey H'D Architect 1995 - 1997basement carpark on Lots 1436 & 261, Mk 4, Jimmy Khoo Consulting Engineers (15 months)Seberang Prai Tengah, Penang for RM 12,375,829-09 Ms S.J. Development Sdn Bhd
5 1 block 4/5 tingkat pejabat dan kedai dgn. 1 tingkat Akitek K. E. Koay 1997 – 2000bawah tanah dan 1 block 2 tingkat 42 unit kedai Perunding Rekabina (67.0 weeks)“Lock-Up” di atas Lot 1553, Sek.2, Jalan Fettes, H.P. Beh & Associates Sdn Bhd RM 25,610,573-51Bandar Tanjung Tokong, D. T. L. Penang forMs Supreme Enterprise Sdn Bhd
6 Main building works for hypermarket on Lot 197, East Design Architect Sdn Bhd 27/03/98 - 18/09/98 207, 208, 209 & 446, Mk. 1, Seberang Prai Tengah Jurutera Perunding L.O.T. Sdn Bhd (25.0 weeks)Penang for EAB Consulting Engineers Sdn Bhd RM 22,691,000-00Ms Magnificient Diagraph Sdn Bhd
7 Two units of coldroom and a double storey shop E.H. Low Architect 21/01/99-20/06/99office on existing premises nos. 4503-L, 4503-M Perundingan Timor (Pg) Sdn Bhd (5 months)and 4503-N, Jalan Kerapu, , Section 3, Butterworth, RM 420,000-00Seberang Prai, Penang forMs Chop Tong Guan Sdn Bhd
8 Pembangunan 12 tingkat bangunan pejabat KWSP Bernas Konsultant Arkitek 01/11/99-30/04/01yang mengandungi 3 tingkat podium, 9 tingkat Yusof & Hoe Associates Sdn Bhd (17.9 months)Menara pejabat & ruang letak kereta di atas Lot Perunding Teras Sdn Bhd RM 27,885,881-29PT 3858 Mk. 1, Daerah Seberang Prai (T) untuk Five-H Associates Sdn BhdTetuan Kumpulan Wang Simpanan Pekerja
9 Partially completed lowest basement slab and site Perunding Alam Bina 23/3/2000-22/9/2000works for the development on Lot 692, Section 57, Arup Jururunding Sdn Bhd (6 months)Jalan Nagasari, Kuala Lumpur for J. Perunding Valdun Sdn Bhd RM 2,250,000-00Ms Visionwell Sdn Bhd Baharuddin Ali & Low Sdn Bhd
10 Completion of uncompleted proposed 27-storey office GDP Architect Sdn Bhd 25/4/2001 – 24/10/2002with mezzanine floor and 2 levels basement carpark on Hashim & NEH Sdn Bhd (18 months)Lot 1406, Section 46, Jalan Raja Laut, Kuala Lumpur for RM 62,874,884-26Ms Permodalan Nasional Berhad
11 Construction of columns and beams for Block A & B Perunding Alam Bina 16/04/02-15/08/02basement for the proposed development on Lot 692 Arup Perunding Sdn Bhd (4 months)Section 57, Jalan Nagasari, Kuala Lumpur for Jurutera Perunding Valdun S/B RM 2,857,350.65Ms Visionwell Sdn Bhd Baharuddin Ali & Low Sdn Bhd
12 Cadangan Pembinaan sebuah Hypermarket Yang John Kok Chartered Architects 30/04/2004 - 30/10/2004Mengandungi 1 Tingkat Ruang Perniagaan Dan 1 Jurutera JRK Sdn. Bhd. (6 Months)Tingkat Ruang Letak Kereta Separa Bawah Tanah Di BES Perunding Sdn. Bhd. RM 18,311,905.27Atas Sebahagian Lot 3066 & 3067, Jalan Skudai, JUBM Sdn. Bhd.Mukim Tebrau, Daerah Johor Bahru, Johor DarulTakzim untukTetuan Che Kiang Realty Sdn. Bhd.
13 Cadangan Pembinaan Sebuah Bangunan Terminal Bas Veritas Architects Sdn. Bhd. 18/09/2007 - 17/12/2007Sementara Di Atas Lot-Lot 235-238, 389-391, 776-789, Adept Engineering Consultant Sdn. Bhd. (3 Months) 1020, 2011 & 2627, Seksyen 4, Bandar Butterworth, Jurutera Teras Bistari Sdn. Bhd. RM 1,588,439.20Seberang Perai Utara, Pulau Pinang (the "Project") JUBM Sdn. Bhd.Building Works ( Structural, Architectural And Plumbing Works ) for M/s MRCB Engineering Sdn. Bhd.
COMPLETED COMMERCIAL PROJECTS
PLB-KH Bina Sdn Bhd Corporate Profile
List of Completed Commercial Projects
Description of Projects Consultants Contract Period & Amount (RM)
14 The Proposed Construction And Completion One (1) Unit L.A Architect 12/06/2006 - 11/08/2007Single Storey Clubhouse, Ancillary Works And External Jurutera Perunding Tegap Sdn. Bhd. (14 Months)Infrastructure On Part Of Lot 22, 607, 776, 618 To 634, APT-Tech Consulting Sdn. Bhd. RM5,829,043.78Mukim Beranang, Daerah Hulu Langar, Selangor Darul Zaidun-Leeng Sdn. Bhd.Ehsan for Kumpulan KuantikonsultM/s Araprop Development Sdn. Bhd.
PLB-KH Bina Sdn Bhd Corporate Profile
List of Completed Residential Projects
Description of Projects Consultants Contract Period & Amount (RM)
1 2 blocks of 6 storey flats (Block D & E) for Phase II Chong Kum Kwan 1993 (15 months)Development, Tmn. Ayer Itam on Lot 688, Seksyen 2, Jurutera T & T Konsultant Sdn Bhd RM 10,500,000-00George Town D.T.L. at Rifle Range Road, Penang forMs Urban Resources Sdn Bhd
2 Perumahan kos rendah dan sederhana di atas Lot 19, A.S.A.S. Architects Sdn. Bhd. 1994-1995Mk Karangan, Kulim, Kedah Darul Aman untuk Chrison Konsultant Sdn Bhd (90 weeks)Tetuan Vestingold Sdn Bhd RM 5,703,788-00
3 Construction of 11 storey apartment on Lot-lot 2315 & Akitek Permata 1994 - 19952332, Section 2, Bandar Butterworth, S.P.U., Penang for GTP Jurutera Perunding Sdn Bhd (18 months)Ms Siram Permai Sdn Bhd RM 9,200,000-00
4 2 Blok 5 Tingkat Rumah Pangsa harga sederhana Arkitek PN Loh 1995 (10 months) mengandungi 200 yunit kediaman di atas Lot 301, Perunding Jurucita RM24,400,000-001483 Mk 14, S.P.T., Province Wellesley, Pulau Pinang untukMs Zheng De Mai Enterprise Sdn Bhd
5 13 storeys 96 units 1250 sq.ft. Apartment, 30 units 3 Nil 01/11/96 - 01/11/2001storeys shoplots, 16 storeys 120 units 880 with Podium (60 months)at Mk. of Kuah, Daerah Langkawi, Kedah Darul Aman for RM 140,000,000-00Ms SBD Corporation (M) Sdn Bhd
6 Building works for 1 Block of 9-storey low cost flats, Loh & Loh Architects 29/5/96 - 10/12/971 Block of 9-storey Apartments & 1 block of 10 storey Jurutera Tang & Rakan Rakan (78 weeks)Apartment on part of Lots 950 & 338, Mk 6, S.P.T., RM 16,152,700-00Pulau Pinang for Ms Piala Mutiara Sdn Bhd
7 External works for housing development on Lot 130 Fang & Associates 01/05/96 - 01/08/97& 131 Mk of Lunas, Daerah Kedah Darul Aman for Khoo Dan Rakan-Rakan (15 months)Ms Kok Hoon Development Sdn Bhd RM 2,144,902-00
8 86 units of 1 ½ storey terrace house on plot 105-156, Arkitek TY Chew 15/07/99 - 13/07/2000180-185, 186-189, 235-242 & 256-271, Taman Desa Jurutera Pakatan (Kedah) S/B (12 months)Jaya, (Phase III B), Mk. Sungai Petani, Daerah Kuala RM 4,251,294-00Muda, Kedah Darul Aman forMs Kok Hoon Development Sdn Bhd
9 34 units single storey terrace houses, 33 units double Fang & Associates 15/06/99 - 14/06/00storey terrace houses & 8 units double storey semi-d Kuantibina Sdn Bhd (12 months)houses on Lot 599, Mk 13, Bkt. Minyak, S.P.T., Penang for Chrison Konsultant Sdn Bhd RM 6,400,000-00Ms DNP Land Sdn Bhd HC Toh Perunding Sdn Bhd
10 Construction and completion of 69 units of double Fang & Associates 16/5/2000 - 14/5/2001storey terrace house and 44 units of double storey Kuantibina Sdn Bhd (52 weeks)semi-detached house on Lot 599, Mukim 13, Chrison Konsultant Sdn Bhd RM 10,649,646-00Bukit Minyak, Seberang Perai Tengah, Penang for HC Toh Perunding Sdn BhdMs DNP Land Sdn Bhd
11 Construction 1 block of 5-storey low cost flat on Lot 599, Fang & Associates 10/7/2000 - 14/5/2001Mukim 13, Bukit Minyak, Seberang Perai Tengah, Penang for Kuantibina Sdn Bhd (44 weeks)Ms DNP Land Sdn Bhd Chrison Konsultant Sdn Bhd RM 2,999,999-00
HC Toh Perunding Sdn Bhd
12 Proposed low and medium cost housing development Andalas Dev. Sdn Bhd 20/05/00 – 10/09/03on Lot 953, Mukim Sidam Kanan, Daerah Kulim, OKS Consulting Engineer (39.6 months)Kedah Darulaman for Juru Ukur Bahan Malaysia RM 40,500,000-00Ms Andalas Development Sdn Bhd
13 Proposed construction and completion of 70 units of Arkitek TY Chew 16/4/2001 – 15/4/20022 storey terrace house on Plot 512-517 and 520-583, Jurutera Pakatan (Kedah) S/B (12 months)Taman Desa Jaya (Phase IV), Mk. Sg. Petani, RM 2,500,000-00Daerah Kuala Muda, Kedah Darul Aman forMs Kok Hoon Development Sdn Bhd
14 Construction And Completion Of 178 Units Single Storey L. A. Architect 01/02/2002 - 13/03/2003 Terrace, 164 Units Double Storey Terrace House (20' x 60'), Jurutera Perunding Tegap Sdn Bhd (58 Weeks)78 Units Double Storey Terrace House (22' x 75') & 102 Units APT-Tech Consulting Sdn Bhd RM 31,500,000,00Single Storey Semi Detached House (Phase 8) on Part Of Lot Zaidun-Leeng Sdn Bhd 22, 607, 776, 618 To 634 At Mukim Beranang, Daerah Hulu Kumpulan Kuantikonsult Sdn BhdLangat, Selangor Darul Ehsan for M/s Araprop Development Sdn. Bhd.
COMPLETED RESIDENTIAL PROJECTS
PLB-KH Bina Sdn Bhd Corporate Profile
List of Completed Residential Projects
Description of Projects Consultants Contract Period & Amount (RM)
15 Construction And Completion Of Two (2) Units Double L. A. Architect 02/01/2003 - 26/03/2003Storey Cluster Semi Detached Show House And One (1) Unit Jurutera Perunding Tegap Sdn Bhd (12 Weeks)Of Double Storey Bungalow Show House On Part Of Lot 22, APT-Tech Consulting Sdn Bhd RM 395,000,00607, 776, 618 To 634 At Mukim Beranang, Daerah Hulu Langat, Zaidun-Leeng Sdn BhdSelangor Darul Ehsan for Kumpulan Kuantikonsult Sdn BhdM/s Araprop Development Sdn Bhd
16 Proposed Construction And Completion Of 2 Units John Kok Chartered Architects 15/04/2004 - 30/06/2004 Temporary Sample House, One Unit Corner Each For Type Jurutera JRK Sdn. Bhd. (2 1/2 Months)18' x 65' And 20' x 65' On Part Of Lot 3066 & 3067, Jalan BES Perunding Sdn. Bhd. RM 170,000.00Skudai, Mukim Tebrau, Daerah Johor Bahru, Johor Darul JUBM Sdn. Bhd.Takzim forM/s Che Kiang Realty Sdn. Bhd.
17 Cadangan Sekim Perumahan Terdiri Daripada Rumah Altinum PMC Sdn. Bhd. 14/10/2003 - 13/10/2005Sesebuah 2 Tingkat (3 unit), Rumah Berkembar 2 Tingkat Loh & Loh Architects (24 Monhs)(28 Unit) & Rumah Teres 2 Tingkat (28 Unit) Di Atas Perunding YAA Sdn. Bhd. RM 26,000,000.00Lot 6216 (PT 1541) Dan Sebahagian Lot 5772 & Lot 5731, H. C. Toh PerundingMukim 13, DTL, Lintang Pantai Jerejak 3, Pulau Pinang untukTetuan Talian Selasih Development Sdn. Bhd.
18 Cadangan Pembangunan 140 Unit Apartmen Di Atas PTD Y Architects 01/04/2003 - 30/03/200657837, Mukim Tebrau, Daerah Johor Bahru, Johor Darul TY Lin (SEA) Sdn Bhd (156 Weeks)Takzim untuk Perunding Brightech RM 23,935,000.00Tetuan Builtonlands Palm Sdn. Bhd. Escape Landscape Consultants(structure works practically completed on 28/12/2005; Total QS Services Sdn Bhdarchitectural and m&e works practically completed on 30/09/06)
19 The Construction And Completion Of 369 Units Double L. A. Architect 22/12/2003 - 24/10/2005Storey Cluster House, Two Units Substation and External Jurutera Perunding Tegap Sdn Bhd (95 Weeks)Infrastructure Works (Phase 5), 52 Units Single Storey APT-Tech Consulting Sdn Bhd RM46,136,077.00Semi Detached House and External Infrastructure Works Zaidun-Leeng Sdn Bhd (Phase 8A), 41 Units Double Storey Bungalow House Kumpulan Kuantikonsult Sdn Bhdand External Infrastructure Works (Phase 8A) on Part Of Lot 22, 607, 776, 618 To 634 At Mukim Beranang, DaerahHulu Langat, Selangor Darul Ehsan for M/s Araprop Development Sdn. Bhd. (52 Units Single Storey Semi Detached House & 41 Units Double Storey Bungalow House practically completed on 11/04/2005)(Parcel 1: 157 Units & Parcel 2: 76 Units Double Storey Cluster House practically completed on 10/06/2005, Parcel 3: 72 Units practically completed on 16/01/2007, Parcel 3: 64 Units practically completed on 22/03/2007)
20 The Construction And Completion Of 171 Units Double Storey L. A. Architect 01/07/2004 - 25/12/2005Bungalow House, 1 Unit TNB Substation and External Jurutera Perunding Tegap Sdn Bhd (60 Weeks)Infrastructure Works At Phase 5 on Part Of Lot 22, 607, 776, APT-Tech Consulting Sdn Bhd RM31,835,000.00618 To 634 At Mukim Beranang, Daerah Hulu Langat, Selangor Zaidun-Leeng Sdn Bhd Darul Ehsan for Kumpulan Kuantikonsult Sdn BhdM/s Araprop Development Sdn. Bhd.
21 Cadangan Sekim Perumahan Di Atas Lot 2845, Jalan Hashim Rosli Architect 01/11/2006 - 30/10/2007 Awang, Mukim 12, Tasek Gelugor, Seberang Perai Utara: Perunding YAA Sdn Bhd (12 Months) (a) 41 Unit Kedai/Pejabat 2 Tingkat (Plot 1 - 41), (b) 24 Unit H C Toh Perunding RM 10,000,000.00Rumah Teres 2 Tingkat (Plot 42 - 65), (c) 6 Unit Rumah Berkembar 2 Tingkat (Plot 66 - 71), (d) 1 Unit Rumah Banglo 2 Tingkat (Plot 72) untukM/s Imbas Kaya Sdn. Bhd.
22 Cadangan skim perumahan kos sederhana rendah B.L. Tay Architect 15/05/02-14/09/03mengandungi Blok A satu blok 16 tingkat 165 unit Jurutera T & T Sdn Bhd (16 months)rumah pangsa kos sederhana rendah dan 6 unit lot kedai TA Perunding RM 15,550,000.00dan Blok B satu blok 18 tingkat 322 unit rumah pangsa HKH Jurukur Bahankos sederhana rendah dan 10 unit lot kedai serta 4paras podium tempat letak kereta di atas Lot 18, Mukim 13,Jalan Bukit Kukus (off Lebuhraya Thean Teik), DTL,Pulau Pinang untukTetuan Eternal Eight Property Sdn Bhd
PLB-KH Bina Sdn Bhd Corporate Profile
List of Completed & Hospital Projects
Description of Projects Consultants Contract Period & Amount (RM)
1 Alteration, extension & addition to existing 12 storey Jurutera Nasional 15/10/96 - 15/01/98108 roomed hotel cum 3 storey split level carpark at (60 weeks)premises No. 5, Penang Road on Lot 23 & 24, T. S. 19 RM 20,854,500-00N. E. D., for Ms Hotel Continental Sdn. Bhd.
COMPLETED HOTEL & HOSPITAL PROJECTS
PLB-KH Bina Sdn Bhd Corporate Profile
List of Completed Mixed Development Schemes
Description of Projects Consultants Contract Period & Amount (RM)
1 26 units semi-detached factory and 78 units double storey Fang & Associates 1990 terrace factory including infrastructure works at Taman Nagasari GTP Jurutera Perunding Sdn Bhd (12 months)on Lot 1509 & 1510, 1515-1527,1612, 1615 & 1616, 872, 874, 876 RM 13,128,888-98Mk 6, Central District, Province Wellesley, Penang for Ms Grand Eastern Realty & Development Sdn Bhd
2 Light industrial (Technical back-up industries), market, Akitek Permata 1992 - 1993 hawker centre and supply, repair and complete the Chrison Konsultant Sdn Bhd (8½ months)existing Imhoff Tank on Lot 2223,2224 and 2225, RM 6,808,005-37Sec. 1, Bandar Butterworth, Seberang Prai, Penang forMs Qiwess Sdn Bhd
3 Light industrial development on Lot 450,452, Akitek Permata 1992 (12 months)452, 453 & 453, Mk 15, Seberang Prai Utara, Penang for GTP Jurutera Perunding Sdn Bhd RM 9,200,000-00Ms Siram Permai Sdn Bhd
4 Building and Infrastructural works of light industrial Akitek Permata 1993 - 1994 factories on Lot 1286 Mk 14, Seberang Prai, Penang for Chrison Konsultant Sdn Bhd (8 months)Ms Kelana Baiduri Sdn Bhd RM 12,200,757-53
5 Pembinaan 27 yunit rumah kedai 2 tingkat & 63 unit rumah teres Akitek Ketika 1993 - 1994dua tingkat di atas Lot 1537, Mk 15, Seberang Prai Selatan, GTP Jurutera Perunding Sdn Bhd (14 months)Pulau Pinang untukMs Fattigold Sdn Bhd
6 51 units 3-storey commercial building, 94 units terrace factory, Fang & Associates 1994 - 1996 12 units semi-detached factory, earthworks, sanitary and plumbing GTP Jurutera Perunding Sdn Bhd (24 months) installation, 3 units sub-station, 1 unit refuse depot and 27 nos. RM 29,800,469-45 refuse bin on Lot 1509-1510, 1515-1527, 1612 & 1616, 872-874, 875 & 876, Mk 6, Central District Province Wellesley, Penang forMs Grand Eastern Realty and Development Sdn Bhd
7 145 units of mixed light industrial factories on Lots Akitek Melati 1994 - 1995 2927, 2928, 2929 and 2930, Mk 16, S.P.U., Penang for Jurutera T&T Konsultant S/B (14 months)Ms Southtech Development Sdn Bhd RM 12,000,000-00
8 Projek perniagaan dan membina serta menyiapkan Arkitek Cahaya 1995infrastruktur dan bangunan di Parcel A, Sektor 6, Arkitek Farid H. Kamal (16 months)Bandar Amanjaya, Mk Sungai Petani, Daerah BNK Consultant Sdn Bhd RM 52,763,077-81Kuala Muda, Kedah Darul Aman untuk Perunding Timur (K) Sdn BhdTetuan Kejora Harta Berhad
9 34 unit 3 1/2 tingkat kilang perusahaan ringan on HD Architect (9 months)Lot 977, 1067, 1068 & 1069, Mk 14, S.P.U., Penang for Perunding Yaa Sdn Bhd RM 7,510,738-80Ms GCH Development Sdn Bhd
10 Mixed development on Lot 183 & 184 at Tawar, Loh & Loh Architects 02/01/97 - 02/06/2001Baling, Negeri Kedah Darul Aman for Jurutera Jayausaha Konsultant (53 months)Ms Khai Hoon Sdn Bhd RM 78,616,070-00
11 Taman Yew Lean on Lots 663 & 664, Section 2, Architect OA 20/11/98 - 17/12/99Town of Jelutong, Ned., Perak Road, Penang for Jurutera T & T Konsultant Sdn Bhd (56.0 weeks)Ms Yew Lean Development (M) Sdn Bhd RM 9,130,007-78
12 Pembangunan bercampur di atas sebahagian Lot 816, M.K. Teoh Architect 02/11/2000 - 02/11/2002824, 825, 1410 dan 1518, Mk 12, Daerah Barat Daya, Jimmy Khoo Consulting Engineers (24 months)Jalan Permatang Damar Laut, Penang untuk RM15,000,000-00Tetuan Archlaw Development Sdn Bhd
13 Cadangan mendirikan rumah kedai 2 tingkat jenis B Ng Kweng Sim Architects 18/01/2003 - 17/07/2004(39 unit), rumah teres 1 tingkat jenis C1 (87 unit) dan Chrison Konsultant Sdn. Bhd (18 months)rumah pangsa kos rendah 5 tingkat jenis E (120 unit) H.C. Toh Perunding RM 15,678,222.45di atas Lot 1636, Mk. 4, SPS, Pulau Pinang untuk Unitech QS ConsultancyTetuan Pelangi Sehati Development Sdn Bhd
14 Cadangan mendirikan rumah teres 2 tingkat jenis C Ng Kweng Sim Architects 18/01/2003 - 17/07/2004(200 unit) dan rumah berkembar 2 tingkat jenis D Chrison Konsultant Sdn. Bhd (18 months)(30 unit) di atas Lot 1636, Mk. 4, SPS, Pulau Pinang untuk H.C. Toh Perunding RM 14,729,345.10Tetuan Pelangi Sehati Development Sdn Bhd Unitech QS Consultancy
15 Cadangan projek pembinaan pengkalan Polis Marin Zon East Design Architect Sdn. Bhd 15/06/2003 - 14/06/2005 Pulau Pinang, Batu Uban, Pulau Pinang Untuk Jurutera T & T Sdn. Bhd (24 months)Tetuan Kementerian Dalam Negeri (Malaysia) GH Consultants RM 35,000,000.00
Unitech QS Consultancy
16 Proposed Sales Office And Show Apartments For BEP Akitek Sdn. Bhd. 15/07/2005 - 7/10/2005Cadangan Pembangunan 2 Blok Pangsapuri Servis 20 Tahir Wong Sdn. Bhd. (12 Weeks)Tingkat Di Atas 2 Tingkat Podium Kedai & Kemudahan Norman Disney & Young Sdn. Bhd. RM 1,500,000.00Awam Dengan Tempat Letak Kereta Dan 2 Paras Tempat Baharuddin Ali & Low Sdn. Bhd.Letak Kereta Bawah Tanah Di Atas Lot PT 12586, Mukim Damansara, Daerah Petaling, Selangor Darul Ehsan for M/s Saujana Heights Sdn. Bhd.
COMPLETED MIXED DEVELOPMENT SCHEMES
PLB-KH Bina Sdn Bhd Corporate Profile
List of Completed Mixed Development Schemes
Description of Projects Consultants Contract Period & Amount (RM)
17 Cadangan Pembangunan Perdagangan & Perumahan 32 John Kok Chartered Architects 26/08/2004 - 25/11/2006Unit Kedai Pejabat (22' x 70'), 16 Unit Kedai Pejabat (22' x 75'), Jurutera JRK Sdn. Bhd. (27 Months)88 Unit Rumah Teres Dua Tingkat (20' x 65'), 92 Unit Rumah BES Perunding Sdn. Bhd. RM 23,180,000.00Teres Dua Tingkat (18' x 65') (Fasa 2) Di Atas Lot 3066 & JUBM Sdn. Bhd.3067, Jalan Skudai, Mukim Tebrau, Daerah Johor Bahru, Johor Darul Takzim untukTetuan Che Kiang Realty Sdn. Bhd.
PLB-KH Bina Sdn Bhd Corporate Profile
List of Completed TPM Projects
Description of Projects Consultants Contract Period & Amount (RM)
1 Factory on Plot 59 at Kawasan Perindustrian GTP Jurutera Perunding Sdn Bhd 1990 (6 months)Senai (Fasa 2) Mk Senai, Kulai, Daerah Johor RM 2,300,000-00Baru, Johor Darul Takzim for Ms CP Industrial Product Sdn Bhd
2 Factory on Plot 75, Jalan Perusahaan Kulim Chrison Konsultant Sdn Bhd 1990 (3 months)Industrial Estate, Kulim, Kedah Darul Aman for RM 1,067,430-00Ms Penbox Sdn Bhd
3 Factory on Plot 3, Fasa IV, Kawasan Perusahaan GTP Jurutera Perunding Sdn Bhd 1991 (7 ½ months)Perai Seberang Perai Tengah, Penang for RM 7,000,000-00Ms Molex (M) Sdn Bhd
4 Pembinaan 2 block Pangsapuri 9 tingkat dan Arkitek Haluan Reka 01/11/96 - 01/05/99sebuah rumah Kelab 2 tingkat serta lain-lain Perunding Aras (30 months)kemudahan rekreasi diatas Lot 1992 dan 1993, RM 18,500,000-00Mk Kuah, Daerah Langkawi, Kedah Darul Aman untukTetuan SBD Corporation (M) Sdn Bhd
5 Sebuah kilang 2 tingkat dan pejabat 4 tingkat diatas Loh & Loh Architect 07/07/97-31/12/97Plot 16, Kawasan Perindustrian Bayan Lepas, Jurutera Jayausaha Konsultant S/B (7 months)Fasa IV, Mk.12 D.B.D., Pulau Pinang untuk RM 4,606,066-34Tetuan Baguda Sdn Bhd
6 4-storey office & warehouse at Kawasan Loh & Loh Architect 23/10/97 - 15/03/98
Perusahaan Prai, Penang for Jurutera Jayausaha Konsultant S/B (6 months)Ms Fu Hao Manufacturing (M) Sdn Bhd TA Perunding RM 2,700,000-00
7 Project “Turnkey” bagi Cadangan pembangunan Asas Architect Sdn Bhd 17/07/99-16/07/2001bercampur untuk golongan berpendapatan rendah Chrison Konsultant Sdn Bhd (24 months)dan sederhana rendah di atas sebahagian Lot 945 RM 65,641,860-41Sek. 9W, Georgetown, Pulau Pinang untukTetuan Majlis Perbandaran Pulau Pinang
8 Cadangan Skim Perumahan Di Atas Lot-Lot 8, 22, 24, 25 & Loh & Loh Architects 01/06/2005 - 30/11/2007Sebahagian Tanah Tebus Guna Di Hilir Sungai Pinang, Reliacon Project Consultancy Services (30 weeks)Seksyen 9E, Bandar Georgetown, D.T.L., Pulau Pinang untuk Jurutera Perunding LOT Sdn. Bhd. RM 102,000,000.00Tetuan Pembinaan Kasporat Sdn. Bhd. H. C. Toh Perunding
Unitech QS Consultancy Sdn. Bhd.
COMPLETED TURNKEY PROJECT MANAGEMENT PROJECTS
PLB-KH Bina Sdn Bhd Corporate Profile
List of Completed Civil Engineering Projects
Description of Projects Consultants Contract Period & Amount (RM)
1 Earthworks for the Proposed Development on GTP Jurutera Perunding Sdn Bhd 1990 (4 months)Lot 1219, 1220, 1243, 1765, 1774, 1745 & 1746, RM 2,585,507-00Mk 12, Permatang Tinggi, Seberang Prai, Penang for Ms Gunung GTS Development Sdn Bhd
2 Earthworks on part of Lot 1244, Mk 12, Kawasan Chrison Konsultant Sdn Bhd 1991 (2 months)Perusahaan Valdor, Seberang Prai Selatan, Penang for RM 256,800-00Ms Taigene Metal (M) Sdn Bhd
3 Earthworks for the Proposed extension to the GTP Jurutera Perunding Sdn Bhd 1992 (2 weeks)existing factory on Plot 52, Lorong Perusahaan 4, RM 40,000-00Prai Industrial Estate, S.P.T., Penang for Ms Tehdex (M) Sdn Bhd
4 Earthworks on Plot 6 & part of Plot 4, Mk 1, Loh & Loh Architects 1992 (1 ½ months)Daerah Tengah Seberang Prai, Penang for RM 210,185-00Ms Pan International Wire & Cable (M) Sdn Bhd
5 Earthworks for the proposed development on Lot 450, GTP Jurutera Perunding Sdn Bhd 1992 (1 month)452-1, 452-11, 453-1 & 453-11 Mk 15, S.P.U., Penang for RM 57,741-60Ms Siram Permai Sdn Bhd
6 Earthworks (Phase 1) on part of Lot 1286, Mk 14, Akitek Permata 1993 (3 months)Seberang Prai Utara, Penang for Chrison Konsultant Sdn Bhd RM 763,209-00Ms MKDV Sdn Bhd
7 Earthworks (Phase 1), Mk 14, Seberang Prai WNG Jurutera Perunding Sdn Bhd 1993 (1½ months)Utara, Penang for Ms Evermak (M) Sdn Bhd RM 258,096-50
8 Mixed development on Lot 10488, 11129, & 11116, Akitek MAA Sdn Bhd 1994 (4 months)Jalan Abdul Jalil / Sultan Idris Shah, Ipoh, Perak Zaidun-Leeng Sdn Bhd RM 555,000-00Darul Ridzuan for Ms Seritawan Sdn Bhd (Aluminium & Glazing Works)
9 Main access road and RC box culverts for GTP Jurutera Perunding Sdn Bhd 1994-1995 (3 months)Ms Gunung GTS Development Sdn Bhd RM 469,340-00
10 Road and car park along Lorong Perusahaan Prai Jurutera Perunding Utara Sdn Bhd 1995 (1 month)
Satu, Prai Industrial Complex, Prai, Penang for RM 157,000-00Ms Palmco Holdings Berhad
11 Remedial works for Jurutera Perunding Utara Sdn Bhd 1995 - 1996 (3 months)Ms Conner Peripherals (M) Sdn Bhd RM 600,000-00
12 Air separation unit project at Prai II, Penang for GTP Jurutera Perunding Sdn Bhd 16/08/96 - 29/09/96Ms Sitt Tatt Industrial Gases Sdn Bhd (1.4 months)
RM 448,177-00
13 Site Clearance and fencing for development on Lot Akitek Akiprima Sdn Bhd 24/12/96 - 10/03/971184, 1155, 1743, 1744, 1294, 1618, 564, 1166, Pakatan Cergas (Pg) Sdn Bhd (2.5 months)1187, 1188, 1133, 1130 & 1255 at Alma , Bukit RM 147,273-07Mertajam, Penang for Ms DNP Land Sdn Bhd
14 Pembinaan sebuah masjid di atas Lot 5388, Kampong Perunding Insan 01/02/97 - 01/04/97Rhu Rendang, Daerah Marang, Terengganu Darul (2 months)Iman for the supply, deliver and erect steel structure RM 50,000-00work untuk Ms Imatex Berhad
15 Road, Drainage & Sewerage Reticulation Sub-Package H. S. Liao Sdn. Bhd. 01/12/2001 - 31/07/20022 (SP2) For Proposed Mixed Development On (8 months) Plot 6026 (Lot 5094 CT 14498) Lenggeng Estate, RM 11,800,000.00Mukim Lenggeng, District Of Seremban, Negeri Sembilan Darul Khusus for Ms Akurjaya Sdn Bhd
16 Road, Drainage & Sewerage Reticulation Phase 3B H. S. Liao Sdn. Bhd. 16/12/2002 - 30/04/2003 For Proposed Mixed Development On Plot 6026 (4.5 months) (Lot 5094 CT 14498) Lenggeng Estate, Mukim RM 3,850,000.00Lenggeng, District Of Seremban, Negeri SembilanDarul Khusus for Ms Akurjaya Sdn Bhd
17 Construction And Completion Of Proposed Sludge Treatment Facility At Mukim Assam Kumbang, Daerah Larut Matang, Taiping, Perak Darul Ridzuan for Ms Indah Water Konsortium Sdn Bhd
Shakti Engineering Consultants Sdn. Bhd. 28/10/2002 - 27/07/2003 (10 months)
RM 2,673,332.41
COMPLETED CIVIL ENGINEERING PROJECTS
PLB-KH Bina Sdn Bhd Corporate Profile
List of Completed Civil Engineering Projects
Description of Projects Consultants Contract Period & Amount (RM)
18 Road, Drainage & Sewerage Reticulation Works For H. S. Liao Sdn. Bhd. 03/03/2004 - 02/08/2004Zone 2 - Phase 5A For Proposed Mixed Development (5 months) On Plot 6026 (Lot 5094 CT 14498) Lenggeng Estate, RM 5,480,000.00Mukim Lenggeng, District Of Seremban, Negeri Sembilan Darul Khusus for Ms Akurjaya Sdn Bhd
19 Road, Drainage & Sewerage Reticulation Works For H. S. Liao Sdn. Bhd. 13/10/2004 - 12/03/2005Zone 2- Phase 6 For Proposed Mixed Development (5 months) On Plot 6026 (Lot 5094 CT 14498) Lenggeng Estate, RM 4,998,000.00Mukim Lenggeng, District Of Seremban, Negeri Sembilan Darul Khusus forMs Akurjaya Sdn Bhd
PLB-KH Bina Sdn Bhd Corporate Profile
List of Completed Piling Projects
Description of Projects Consultants Contract Period & Amount (RM)
1 Sebuah bangunan sekolah 3 tingkat di J.K.R. 1982 (1 month)Sekolah Rendah Kebangsaan Mergong, RM 104,400-00Alor Setar, Kedah Darul Aman
2 New mooring structures besides existing jetty for Jurutera Konsultant (S.E.A) S/B 1982 (20 days)Ms Malayan Sugar Manufacturing Co Bhd RM 191,000-00
3 Packing station extension at Prai for Jurutera Konsultant (S.E.A) S/B 1982 (1 month)Ms Malayan Sugar Manufacturing Co Bhd RM 337,641-00- Board Building,Weld Quay,Pg.
4 Perumahan kos rendah (4 blok 6 tingkat) di J.K.R. 1982 (2 months)Mak Mandin Rumah Hijau, Seberang Prai, Penang RM 1,188,070-00
5 8-storey apartment building (42 units) with ground Lee & Tay Associate 1983 (1 month)floor recreational facilities and car parks on Lot RM 269,179-001307, 1306, 1758 and part of Lot 142 Section 1,Georgetown, NED, Jln Berjaya, Penang for Ms Bina Nusa Sdn Bhd
6 12-storey commercial building with basement carpark Lee & Tay Associate 1984 (2 months)on Lot 113, TS 12 at the junction of Anson Road / RM 784,214-00Dunlop Road N.E.D., Penang for Ms Fop Corporation Sdn Bhd
7 12-storey commercial building with basement carpark Lee & Tay Associate 1984 (1 month)on Lot 1354, TS at the junction of Anson / Dunlop RM 741,625-00Road, N.E.D., Penang for Ms Komplek Mutiara Sdn Bhd
8 Jitra - Butterworth toll expressway for Ret-Ser Engineering Agency 1984 (1 month)Ms Ret – Set Engineering Agency RM 515,860-00
9 Vocational School for J.K.R. 1984 (1 month)Ms Kulim Shiah Brother Trading Sdn Bhd RM 350,900-00
10 Dinding water project at Bota Kiri, Setiawan, Perak Binie & Rakan 1983 (2 months)Darul Ridzuan for RM 765,600-00Ms Japan Development Construction Sdn Bhd
11 12" x 12" r.c. piles and foundation for microwave Telekom 1985 (12 months)tower station at Seberang Jaya, Sungai Bakap, RM 578,981-00Selama, Pendang, Alor Setar and Jitra forTelekom
12 Piling works on Plot 27 Mak Mandin, Town of GTP Jurutera Perunding S/B 1986 (3 weeks)Butterworth, Province Wellesley, Penang for RM 53,974-00Ms Aik Joo Can Factory Sdn Bhd
13 6" x 6" r.c. piles for Proposed factory on Lot 444, GTP Jurutera Perunding S/B 1987 (2 months)Prai Ind. Estate, Penang for RM 82,873-00Ms B. H. Limela Industries Sdn Bhd
14 Piling for 6" x 6" r.c. pile and 4"f bakau pile for GTP Jurutera Perunding S/B 1988 (1 month)proposed factory Prai, Penang for RM 99,682-50Ms Aik Poh Rubber Sdn Bhd
15 Piling work on Plot 521, Prai Industrial Estate, GTP Jurutera Perunding S/B 1989 (1 month)N.E.D., Seberang Prai Tengah, Penang for RM 422,505-90Ms Phoenix Press Sdn Bhd
COMPLETED PILING PROJECTS
PLB-KH Bina Sdn Bhd Corporate Profile
List of Completed Piling Projects
Description of Projects Consultants Contract Period & Amount (RM)
16 Piling work for Proposed factory on Plot 20A & 20B, Jurutera Perunding Utara S/B 1991 (1 month)Prai Industrial Estate, Phase 4, Prai, Penang for RM 521,225-00Ms Linear Corp. Mfg. Sdn Bhd & Ms Ko Lim Sdn Bhd
17 Office / factory complex on Lot 391, Seberang Prai, Perunding AJZ Sdn Bhd 1992 (1 ½ months)Penang (foundation work) for RM 594,585-24Ms VDO Instruments Sdn Bhd
18 Piling work for factory on Plot 87, Prai Industrial Arup Jururunding Sdn Bhd 1992 (3 weeks)Estate IV, Penang for RM 121,994-82Ms Leader Steel Sdn Bhd
19 Piling works for light industrial 1 ½ storey shophouses Akitek Permata 1992 (2 months)(46 units) on Lot 2223 – 2225, Sec. 1, Raja Uda Chrison Konsultant Sdn Bhd RM 357,197-50Seberang Prai, Penang for Ms Qiwess Sdn Bhd
20 Piling, earthworks and external works forKompleks Derrick David & Associates 1992 (4 months)Sembahyang dan Dewan Pelbagaiguan setingkat Ooi Teik Boon Konsulting Eng RM 355,000-00diatas Lot 2234 (No. H.S.6) 1681, Mk 1, Taman ChaiLeng, Seberang Prai Tengah, Penang forThe Titular R.C. Bishop of Penang
21 Piling for new extension to existing factory on Plot 2 Akitek Ketika 1993 (5 weeks)(P2) fasa IV, Kws Perindustrian Prai, Prai, Penang for Jurutera Perunding Utara S/B RM 500,174-00Ms Lucky-Palmco Sdn Bhd
22 Piling & pilecap and column stump to Light Industrial Akitek Permata 1993 (3 months)Development (phase 1) on Lot 809, 820, 281, 174, Chrison Konsultant Sdn Bhd RM 1,806,523-181406 & 1407 Mk. 12, Pmtg. Damar Laut, Penang for Ms MKDV Sdn Bhd
23 2 storey factory at Lot 4681A, Plot 501, Mk 1, Central Prime Consultants Sdn Bhd 1993 (8 weeks)District, Prai Penang for Prima Runding and Rakan-Rakan RM 1,662,710-13Ms NatSteel Electronics (M) Sdn Bhd
24 5 storey office and single storey factory in Bayan Akitek Antara Sdn Bhd 1993 - 1994
Lepas, Pulau Pinang for Jurutera Hosepakat Sdn Bhd (10 weeks)Ms Lenser Automatik System Sdn Bhd RM 707,776-84
25 Test pile and load pile on Plot 255 & 295, Bayan Akitek Ketika 1994 (3 weeks)Lepas Free Trade Zone, Penang for Jurutera Perunding Utara S/B RM 25,425-68Ms Hewlett-Packard, Penang
26 Piling works for building 5 to existing factory on Akitek Ketika 1995 (10 weeks)Plot 255 & 295, Jln. Kampung Jawa, Sg. Kluang Jurutera Perunding Utara S/B RM 1,755,344-93Phase 3, FTZ., Bayan Lepas, Penang forMs Hewlett-Packard Storage Products Sdn Bhd
27 Piling works for sebuah kilang membuat komputer Lee Architectural Consultancy 1995 (1 month)diatas Plot 574, Lrg. Perusahaan 4, Zon Perindustrian GNK Management Sdn Bhd RM 1,251,410-86Bebas, Prai, Mk1 Daerah Tengah, Seberang Prai, Pulau Pinang for Ms Unico Technology Sdn Bhd
28 Piling works for 6 units of 4-storey shop / office, 119 Arkitek Melati 1995 (4 months)units 3-storey shop/office and 58 units of 2-storey Kuantibina Sdn Bhd RM 2,187,640-76shop / office on Lot 885, Mk 15, Central District of Province Wellesley, Penang for Ms Par-Advance Sdn Bhd
29 Piling works for 1 Block of 10-storey Apartments, Loh & Loh Architects 1995 (8 weeks)1 Block of 9-storey Apartments and 1 Block of Jurutera Tang & Rakan Rakan RM 1,483,847-629-storey low cost flats on part of Lots 950 & 338, Mk 6, Seberang Prai Tengah, Penang for Ms Piala Mutiara Sdn Bhd
PLB-KH Bina Sdn Bhd Corporate Profile
List of Completed Piling Projects
Description of Projects Consultants Contract Period & Amount (RM)
30 Concrete flat slab & piling at Lot 2367, Mk. 12 GTP Jurutera Perunding Sdn Bhd 20/04/98 - 10/05/98DBD Zon Bebas, Bayan Lepas, Pulau Pinang for (2.9 weeks)Ms Dynacraft Industries Sdn Bhd RM 47,500-00
31 Piling and pile caps for Cadangan Pejabat KWSP Bernas Konsultant Arkitek 29/04/99-28/09/99yang mengandungi 3 tingkat podium, 9 tingkat Perundingan Teras Sdn Bhd (5 months)ruang pejabat dan 5 tingkat ruang letak kereta RM 5,170,765-22diatas Lot PT3858, Mukim 1, Daerah Seberang Prai Tengah, Pulau Pinang untuk Tetuan Kumpulan Wang Simpanan Pekerja
32 The supply and installation of 150m x 150m Jurutera Perunding Utara Sdn Bhd 15/06/01 – 28/07/01and 250mm x 250mm reinforced concrete (6 weeks)piling work to : RM 1,339,142-26The proposed refurbishing of existing laboratory,canteen, workshop, boilers house, weighbridge, loading bay, warehouse extension, new guardhouse, pump house and substationThe proposed new fat splitting fatty acid and glycerine plant, hydrogenation plant, boiler house,loading bay, tank foundations and cooling tower foundations on Plot 6241 & 6245 and 346(ii) & (iii) Prai Industrial Complex, Lorong Perusahaan Satu,Prai, S.P.U., Penang forMs Acidchem International Sdn Bhd
PLB-KH Bina Sdn Bhd Corporate Profile
List of Completed Government Projects
Description of Projects Consultants Contract Period & Amount (RM)
1 Replacement of perimeter fencing at Lembaga Letrik Negara 1981 (3 months)Lembaga Letrik Negara, Prai, Penang (5908 linear feet) RM 212,688-00
2 8” A/C emergency water supply piping for Lembaga Letrik Negara 1982 (1 ½ month)Lembaga Letrik Negara, Prai, Penang RM 89,000-00
3 Kerja-kerja yang tertinggal di projek 25 units 2 bilik Pejabat Pengarah 1982 (2½ months)rumah-rumah papan di Kuala Muda Pejabat Jurutera Daerah RM 158,718-00Mk 1, S.P.U. (Phase 2) di bawah Kontrak Bil S/P & PW 272/79
4 Kerja-kerja yang ditinggalkan bagi sebuah bangunan Pejabat Pengarah 1982 (10 months)sekolah 3 tingkat dan lain-lain kerja yang berkait Pejabat Jurutera Daerah RM 545,174-21dengannya di Sekolah Rendah Kebangsaan Mergong, Alor Setar, Kedah Darul Aman
5 2 buah bangunan sekolah 2 tingkat serta kerja-kerja Jabatan Kerja Raya 1982 (9 months)berkaitan di RM 668,898-00Sekolah Rendah Jenis Kebangsaan (Tamil) LadangKuala Ketil, Baling, Kedah Darul Aman
6 Sambungan ban batu dengan ban batu yang sediada Jabatan Parit & Taliair 1982untuk pencegahan hakisan tebing di RM 450,000-00Kuala Sungai Pinang, Pulau Pinang
7 Kerja-kerja yang belum siap bagi sebuah bangunan Jabatan Kerja Raya 19823 tingkat kantin serta kerja-kerja yang berkaitan RM 399,755-00dengannya di Sekolah Rendah Kebangsaan Kuala Kupang, Kupang, Baling, Kedah Darul Aman
8 Terusan konkrit bagi taliair barat dari rantaian Jabatan Parit & Taliair 1983 (26 weeks)O' hingga 3311' Mk 1 RM 209,389-50Kawasan Pengairan Sungai Muda, S.P.T., Penang
9 Perumahan kos rendah (4 blok 6 tingkat) di Jabatan Kerja Raya 1982 (2 years)Mak Mandin Rumah Hijau, Seberang Perai, Penang RM 6,788,060-00(Sub-contractor)
10 Rehabilitation works for Jabatan Parit & Taliair 1985 (1 year)Seberang Perai Pilot Scheme (Jarak-Padang Jurutera Projek RM 1,150,000-00Menora) Scheme
11 Kontrak JPT. PP. no. 7-1985. Membaiki hakisan Jabatan Parit & Taliair 1985 (2 months)Sg. Tembus, S.P.T. , Penang untuk RM 169,909-60Jabatan Parit and Taliair
12 Laying of 12" cement lined steel pipe on Lot 2916, Penang Development Corp. 1985 (5 months)Mk 13 NED, Bukit Jambul, Penang for RM 264,599-00Penang Development Corporation
13 275 unit rumah klaster bersambung diatas sebahagian Penang Development Corp. 1986 (9 months)Lot 340, Mk 1, S.P.T., Pulau Pinang untuk RM 2,993,126-91Kontrak :PPPP/ARCH/286Perbadanan Pembangunan Pulau Pinang
14 Surau, dewan dan stor Ibu Pejabat Polis, Daerah Polis DiRaja Malaysia (PDRM) 25/4/2001 – 22/8/2001Jalan Patani, Pulau Pinang (4 months)
RM474,289.36
COMPLETED GOVERNMENT PROJECTS
PLB-KH Bina Sdn Bhd Corporate Profile
Formoreinformation,pleasecontact:
1320,JalanBaru,Taman ChaiLeng,13700Prai,Penang,Malaysia.
Tel:604-3905737 Fax:604-3998323E-mail: r ickson@plbgroup.com.my
R