4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

20
Page 1 of 20 BUKU PANDUAN PERANCANGAN STRUKTUR LEPAS PANTAI DINAMIS (TRB III) Semester Gasal 2015 - 2016 JURUSAN TEKNIK KELAUTAN FAKULTAS TEKNOLOGI KELAUTAN INSTITUT TEKNOLOGI SEPULUH NOPEMBER SURABAYA 2015

description

Kelompok TRB 3

Transcript of 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

Page 1: 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

7/18/2019 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

http://slidepdf.com/reader/full/4250-handayanu-oe-buku-panduan-trb-iii-gasal-2015-2016 1/20

Page 1 of 20 

BUKU PANDUANPERANCANGAN STRUKTUR LEPAS PANTAI DINAMIS

(TRB III)

Semester Gasal 2015 - 2016 

JURUSAN TEKNIK KELAUTAN

FAKULTAS TEKNOLOGI KELAUTANINSTITUT TEKNOLOGI SEPULUH NOPEMBER

SURABAYA

2015

Page 2: 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

7/18/2019 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

http://slidepdf.com/reader/full/4250-handayanu-oe-buku-panduan-trb-iii-gasal-2015-2016 2/20

Page 2 of 20 

1.Dasar Teori dan Pengertian Dasar

UMUM

Bangunan lepas pantai tipe jacket adalah bangunan dengan pondasi tiang pancang (pile) sehingga dalamperhitungannya dianggap bahwa kaki struktur jacket adalah jepit dengan memperhatikan kekakuan/dukungan

tanah yang menyangganya.

Lingkungan lepas pantai adalah lingkungan dengan kondisi beban dinamis, sehingga penyelesaian perhitungan

analisa struktur jacket adalah penyelesaian dinamis.

Analisa dinamis memperhitungkan faktor dinamis yang terdiri dari distribusi massa dan kekakuan struktur yang

ditunjukkan oleh eigenvalue (periode alami struktur), dan beban dinamis itu sendiri (besarnya beban dan

periodenya). Pengaruh faktor dinamis ini ditunjukkan oleh dynamic amplification factor (DAF) yang

didefinisikan sebagai perbandingan defomasi analisa dinamis terhadap deformasi analisa statis.

Pada kondisi tertentu analisa statis diijinkan untuk digunakan mengacu pada API RP2A WSD 21th edition, 2000,

Bab 5 sub bab 5.1, bahwa:

a.  Pada kedalaman perairan yang lebih dangkal dari 400 ft (122 m)

b.  Tebuat dari baja ductile

c.  Mempunyai struktur frame redundant (API RP2A WSD, C2.3.6d)

d.  Mempunyai periode alami lebih kecil dari 3 detik

ANALISA SEISMIC

Analisa seismic adalah analisa dinamis, dinama massa struktur dan beban, kekakuan, damping dari stuktur dan

 jenis tanah pendukung struktur jacket diperhitungkan dalam perhitungan analisa seismic. Faktor beban berupa

percepatan seismic pada dasar struktur yang telah ditetapkan besaran desainnya dalam API RP2A WSD 21th

ed., C2.3.6c) sesuai karakteristik periode alami struktur jacket. Dalam analisa sesmic perlu melakukan cek

kekuatan struktur yang meliputi: Unity check (UC), Punching shear check, cek kapasitas dukung piles, cek UC

pada pile dan cek tegangan geser pada piles. Cek ratio harus memenuhi kriteria yang telah ditetapkan dalam

API RP2A WSD 21th ed.

ANALISA FATIGUE

Analisa kelelahan (fatigue) adalah analisa ketahanan struktur akibat beban dinamis, yang dipengaruhi oleh

faktor dinamis struktur dan karakteristik beban dnamis seperti yang telah disebutkan sebelumnya. Hasil analisa

fatigue berupa lama waktu (tahun) struktur mampu menerima/tahan terhadap beban dinamis yang bekerja

dilingkungan dimana struktur berada. Analisa fatigue adalah analisa dinamis karena sifat beban lingkungan laut

Page 3: 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

7/18/2019 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

http://slidepdf.com/reader/full/4250-handayanu-oe-buku-panduan-trb-iii-gasal-2015-2016 3/20

Page 3 of 20 

yaitu beban gelombang yang setiap saat menerpa struktur. Namun pada kondisi tertentu dapat diselesaikan

dengan analisa statis dengan ketentuan seperti disebutkan sebelumnya.

ANALISA LOAD OUT

Analisa Load out meliputi analisa struktur pada kondisi struktur jacket saat dilakukan laod out pada barge yang

mengangkut jacket kelokasi penempatannya ditengah laut, dan analisa desain skid shoe. Kondisi struktur jacket

saat load out adalah kondisi ‘tidur’. Struktur penyangga saat proses load out adalah skid shoe sebagai sepatu

pada sejumlah tumpuan yang direncanakan untuk menyangga struktur jacket saat meluncur dijalur loadout

menuju barge. Analisa strutur pada kondisi ‘tidur’ harus memenuhi syarat desain yang meliputi: UC, punching

shear. Bila perlu ditambahkan struktur penyangga sementara agar syarat desain terpenuhi.

Perlu dipastikan kapasitas barge: daya angkut dan stabilitas barge yang cukup untuk mengangkut struktur

 jacket.

Dalam analisa load-out perlu dilakukan tahapan analisa stabilitas statis berkaitan dengan ballast saat proses

naiknya jacket pada barge. Untuk tahapannya bisa membagi 7 sd 10 tahapan dari saat pertama jacket naik ke

barge hingga posisi akhirnya di barge.

Perlu juga memperhitungkan seafastening system untuk struktur jacket.

Page 4: 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

7/18/2019 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

http://slidepdf.com/reader/full/4250-handayanu-oe-buku-panduan-trb-iii-gasal-2015-2016 4/20

Page 4 of 20 

2. SISTEMATIKA DAN MUATAN STANDAR LAPORAN PERANCANGAN STRUKTUR LEPAS

PANTAI DINAMIS (TRB III)

Executive Summary

Berisi deskripsi singkat: jenis struktur jacket (well head, production, acomodation, kombinasi), kondisi struktur

(jumlah kaki), kondisi lingkungan (kedalaman perairan, orientasi arah, koordinat), permasalahan (analisaseismic, analisa fatigue, dan load out), rules yang dipakai (API RP2A WSD, API RP2A LRFD, AISC), asumsi dan

batasan perancangan, serta hasil/kesimpulan analisa/perancangan.

BAB I Pendahuluan

Berisi rumusan permasalahan perancangan, tujuan perancangan, deskripsi platform: nama, lokasi servis,

kedalaman perairan, orientasi/arah platform, latitude dan longitude, struktur deck, apurtenance (dari TRB II),

dan ruanglingkup serta asumsi dalam analisa/perancangan.

BAB II Ringkasan dan Kesimpulan

Ringkasan

1.  Analisa Seismic pada bagian struktur: Deck, Jacket, Piles

a.  Member stress check (unity check)

b.  Joint Punching shear check

c.  Pile capacity check

d.  Pile member strength check

2.  Analisa Fatigue

a.  Daftar Fatigue life dari critical members

3.  Analisa Load Out

1.  Analisa struktur jacket kondisi ‘tidur’: 

a.  Member stress check (UC check)

b.  Joint Punching shear check

2.  Analisa/perancangan skid shoe

3.  Analisa Stabilitas balasting proses Load-out

Kesimpulan

Page 5: 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

7/18/2019 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

http://slidepdf.com/reader/full/4250-handayanu-oe-buku-panduan-trb-iii-gasal-2015-2016 5/20

Page 5 of 20 

BAB III Kriteria Desain

1.  Beban-beban (Loadings)

a.  Beban struktur (structure dead load)

b.  Beban Apurtenance

c.  Beban Lingkungan

d.  Beban Topside

e.  Beban Kombinasi

2.  Kriteria Lingkungana.  Kedalaman perairan

b.  Angin

c.  Kriteria gelombang untuk analisa fatigue

d.  Profil Arus

e.  Blackage factor arus

f.  Wave kinematic factor

g.  Marine growth

h.  Koefisien hidrodinamik

3.  Kriteria Gempa

4.  Data tanah

5.  Steel material6.  Allowable stress

7.  Corrosion allowance

8.  Scouring

BAB IV CODES, STANDARDS, SPECIFICATIONS, REFERENCES

API-RP2A WSD/LRFD, API RP2L, AISC,

BAB V MODEL KOMPUTER

Model 3D, Model 2D Jacket (tampak setiap baris dan kolom, tampak setap level jacket)

BAB VI ANALISA SEISMIC

UMUM

BEBAN (loading)

METODE ANALISA

PEMBEBANAN (load case)

a.  Percepatan seismic (PGA)

b.  Massa

c.  Beban statis

d.  Periode alami struktur dan frekuensi (min. 20 modes)

e.  Member stress check (UC check)

f.  Joint punching shear stress check

g.  Piles capacity check dan piles stress check

Page 6: 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

7/18/2019 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

http://slidepdf.com/reader/full/4250-handayanu-oe-buku-panduan-trb-iii-gasal-2015-2016 6/20

Page 6 of 20 

Gambar model dengan lokasi member kritis, joint kritis

BAB VII ANALISA FATIGUE

UMUM

METODE ANALISA

1.  Model FEM

2.  Pembebanan Fatigue dan Kombinasi Pembebanan

3.  S-N curve material

4.  Stress concentration factor (SCF)

5.  Dynamic Amplification factor (DAF) (bila pelu, khususnya untuk platform dengan T 3 detik)

6.  Fatigue life member kritis

Gambar model dengan lokasi member kritis dengan fatigue life terkecil (min 5 lokasi kritis/life terkecil)

BAB VIII ANALISA LOAD-OUT

1.  Analisa struktur jacket kondisi ‘tidur’: 

a.  Member stress check (UC check)

b.  Joint Punching shear check

2.  Analisa/perancangan skid shoe

3.  Analisa Stabilitas balasting proses Load-out

Gambar model dengan lokasi member kritis dengan fatigue life terkecil (min 5 lokasi kritis/life terkecil)

LAMPIRAN A MODEL KOMPUTER

LAMPIRAN B INPUT DAN OUTPUT KOMPUTER

INPUT: yang menunjukkan input penting (kombinasi pembebanan, data seismic, data spektrum gempa,

data fatigue, dan load out)

-  OUTPUT: yang menunjukkan beberapa hasil kritis

LAMPIRAN C GAMBAR STRUKTUR (pada kertas A3)

Lay-out tiap dek, gambar konfigurasi balok girder tiap dek, gambar 2d jacket (tiap baris dan kolom/arah x dan y,

tiap elevasi jacket)

LAMPIRAN D DATA AWAL DARI HASIL TRB II

LAMPIRAN E LEMBAR ASISTENSI

Page 7: 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

7/18/2019 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

http://slidepdf.com/reader/full/4250-handayanu-oe-buku-panduan-trb-iii-gasal-2015-2016 7/20

Page 7 of 20 

3.ATURAN KELOMPOK DAN ANGGOTA DALAM PENGERJAAN TUGAS TRB III

1.  Kelompok harus sudah lulus TRB II untuk bisa mengambil TRB III.

2.  Seluruh anggota kelompok harus mengambil TRB III pada FRS semester tsb.

4.ATURAN KEMAJUAN PRESTASI DALAM PENGERJAAN TUGAS TRB III

1.  Pada akhir kuliah/sebelum Ujian Akhir Semester, kemajuan/prestasi pengerjaan

Tugas harus sudah mencapai 80% untuk bisa lanjut asistensi hingga akhir

semester, yaitu:

a.  Dua bagian utama: Analisa Seismic dan Analisa Fatigue sudah selesai 100%

ditambah 50% bagian Analisa Load Out, atau

b.  Dua bagian utama: Analisa Seismic dan Analisa Load Out sudah selesai

100% ditambah 50% bagian Analisa Load Fatigue, atau

c.  Dua bagian utama: Analisa Fatigue dan Analisa Load Out sudah selesai

100% ditambah 50% bagian Analisa Seismic.

2.  Kelompok yang belum mencapai 80%, bisa melanjutkan pada semester

berikutnya.

3.  Asistensi kepada kedua dosen pembimbing wajib dilakukan.

5. ATURAN PENILAIAN DALAM PENGERJAAN TUGAS TRB III

1. Penilaian didapatkan dari kedua dosen pembimbing. Nilai akhir/final didapat

dengan merata-rata nilai keduanya.

Page 8: 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

7/18/2019 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

http://slidepdf.com/reader/full/4250-handayanu-oe-buku-panduan-trb-iii-gasal-2015-2016 8/20

Page 8 of 20 

5.DAFTAR KELOMPOK TRB III SEMESTER GASAL 2015 – 2016

NRP Nama Status 1 2

No.

Kelompok

No. Data

Seismic

Anggota Kelompok Dosen Pembimbing

 4311100010 ROZY YUWAFI HASAN LAMA

4311100070 CHOIRUL OTO CAHYA NUGRAHA LAMA

4311100106 FERDINANDUS DIDIT PRAKOSO LAMA

4311100072 FAJAR VIRA BAHRAYN LAMA

4311100005 DIMAS WAHYU ARIE CANDRA LAMA

4311100035 MUHAMMAD KHAIRUR RIZKY LAMA

4309100015 IRVIANTO YUDHO WICAKSONO LAMA

4310100085 M.IBNU ATHOILLAH LAMA

4311100087 FARIS RASYADI LAMA

4311100075 URFAN HIDAYAT LAMA

4312100089 NOVIA NOOR AZKIA BARU

4312100099 NABILA ARIFANNISA BARU

4312100072 ANDRIE WURDIANTO BARU

4312100063 NOVI ANANDA QURROTA AKYUN BARU

4312100076 ENGGARTYASTO HARYOYUDHANTO BARU

4312100129 FADHILA RIZKY FINDASARI BARU

4312100028 WINDA AMALIA HERDIANTI BARU

4312100032 ACHMAD AFIF WIJAYANTO BARU

4312100079 DYAH SETYO NUGRAHENI BARU

4312100069 MARIA PUTRI ROSARI BARU

4312100136 CAROLUS TRIJATMIKO NUGROHO BARU

4312100060 RIZAL AZIZ PERDANA BARU

4312100118 RIZKIYAH RAMADANI BARU

4312100041 SATRIO MUHAMMAD BARU

4312100086 ARDI PRASETIA YANUAR BARU

4312100078 BIMA ARIF WIBOWO BARU

4312100122 NONI NABILA ULFAH BARU

4312100124 SAFIRA DWI ANGGRAENI BARU

4312100121 RIFQI BINTARI NURHAYATI BARU

4312100074 SALOMO PARTOGI BARU

4312100082 ANGGI APRILIA PANGESTI BARU

4312100050 HARISH WIRAYUHANTO BARU

4312100083 ADAM WISNU WARDANA BARU

4312100131 DEDY OMPU SUNGGU BARU

4312100012 FATIH AZMI BARU

4312100057 RIZKI KRESNA WIBOWO BARU

4312100090 JULIO IMAN NUGROHO BARU

4312100021 USTAZAH AULIA BARU

4312100023 DEWI MASITAH BARU

4312100042 AYU SARI PURWANTI BARU

4312100009 DYAH AYU PUSPITORINI BARU

4312100098 INTAN SUKMA BELLA PRATIWI BARU

4312100133 ANNISA NURBAITY BARU

14 11 Wisnu Wardhana Handayanu

12 9 Wisnu Wardhana Handayanu

13 10 Wisnu Wardhana Handayanu

10 7 Joswan J. Sudjono Nur Syahroni

11 8 Joswan J. Sudjono Nur Syahroni

8 5 Joswan J. Sudjono Nur Syahroni

9 6 Joswan J. Sudjono Nur Syahroni

7 4 Joswan J. Sudjono Nur Syahroni

6 3 Yeyes Mulyadi Yoyok Setyo H

5 2 Yeyes Mulyadi Yoyok Setyo H

4 1 Yeyes Mulyadi Yoyok Setyo H

3 OK Yeyes Mulyadi Yoyok Setyo H

2 OK Joswan J. Sudjono Handayanu

1 OK Yeyes Mulyadi Yoyok Setyo H

 

Page 9: 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

7/18/2019 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

http://slidepdf.com/reader/full/4250-handayanu-oe-buku-panduan-trb-iii-gasal-2015-2016 9/20

Page 9 of 20 

NRP Nama Status 1 2

No.

Kelompok

No. Data

Seismic

Anggota Kelompok Dosen Pembimbing

4312100056 MEGA AYU NURFITRIANA BARU

4312100030 REZHA EKA FIRMANSYAH BARU

4312100026 MOCH. ARDIANSYAH BARU

4312100031 DANNY SATRIA WIBAWANTO BARU

4312100127 MUKTI UTAMI BARU

4312100034 ROMI IBRAHIM BARU

4312100070 BENEDICTUS JOHANES BELALAWE BARU

4312100116 SATRIO AGI NUGRAHA BARU

4312100125 ZAKWAN HILMY BARU

4312100091 AGUSTINUS DADDY SIBU BARU

4312100115 CLINTON SIBUEA BARU

4312100143 EVAN EGA RIZKIARSA BARU

4312100049 MUHAMMAD FATHUROZI BARU

4312100040 YULIA KURNIA PUTRI BARU

4312100120 WENNY EKA PUTRI BARU

4312100011 YUSRON ABDILLAH BARU

4312100016 Muhammad Fauzi BARU

4312100101 TITIS JULAIKHA ATIKASARI BARU

4312100046 FAISAL SISWANTO BARU

4312100044 DODDY NOVRIANTO BARU

4312100061 VIKRY CENDEKIAWAN BARU

4312100135 BAYU MAHARDIKA BARU

4312100080 IQBAL GAYUH RAHARJANING M.S BARU

4312100055 SANDY RAMADHAN BARU

4312100109 THEOLEVI RAHMAN DAFFA BARU

4312100130 PANDU DAMAY PUTRA BARU

4312100128 IMRAN AHMAD BARU

4312100064 AHMAD AZHAR FANANY BARU

4312100071 HIKMAH SUSETYO BARU

4312100112 MUHAMMAD AULIYA ALDI BARU

4312100103 NURLITA ADISTY BARU

4312100087 ISMOYO ADI PRADANA BARU

4312100095 PRADIPTA MUHAMAD BARU

4312100065 BAITUL OBBI BACHRI WIBISONO BARU

4312100066 BAYU SUSATYO BARU

4312100081 ALMUTAHIR BARU

4312100029 GALUH YULHAM NIFAR BARU

4312100111 RIZKY WAHYU SATRIA BARU

4312100113 RAINHART GABRIEL BARU

4312100002 YONNY AHMAD ISMAIL BARU

4312100006 NUR LAILY LATHIFATUL AZIZAH BARU

4312100008 HANGGAR HADI PUTRA BARU

28 25 Dirta Marina C. Rudi Waluyo P.

26 23 Yeyes Mulyadi Yoyok Setyo H

27 24 Dirta Marina C. Rudi Waluyo P.

24 21 Yeyes Mulyadi Yoyok Setyo H

25 22 Yeyes Mulyadi Yoyok Setyo H

22 19 Yeyes Mulyadi Yoyok Setyo H

23 20 Yeyes Mulyadi Yoyok Setyo H

20 17 Agro wisudawan Murdjito

21 18 Agro wisudawan Murdjito

18 15 Agro wisudawan Murdjito

19 16 Agro wisudawan Murdjito

16 13 Wisnu Wardhana Handayanu

17 14 Agro wisudawan Murdjito

15 12 Wisnu Wardhana Handayanu

 

Page 10: 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

7/18/2019 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

http://slidepdf.com/reader/full/4250-handayanu-oe-buku-panduan-trb-iii-gasal-2015-2016 10/20

Page 10 of 20 

NRP Nama Status 1 2

No.

Kelompok

No. Data

Seismic

Anggota Kelompok Dosen Pembimbing

4309100035 MUHAMAD BIJAK PRIHANTONO BARU

4309100017 DOMAS WILADATU PRADITYA BARU

4309100029 RUTO YOUWISKI BARU

4312100017 MOHAMAD LUKMAN NUR KHAKIM BARU

4312100024 CAHYANINGTYAS SRIANDINI BARU

4312100039 LIESTIA BUDIARTI BARU

4312100058 ALFINO RIFQI FAHMI BARU

4312100073 KRESNA HADI DWIPAYANA BARU

4312100077 BAGAS PUMBARINO BARU

4312100059 MUHAMMAD YULI PRADANA BARU

4312100054 SEPTIAN FAJAR UTOMO BARU

4312100119 MUHAMMAD YUSUF JAMIL BARU

4312100052 HERLAN BARU

4312100105 RADEN VIDI TRYSATRIA BARU

4312100144 FADLY AKBAR NASHER BARU

4312100137 YOFFAN RAMADHAN BARU

4312100123 SAPRIZAL BARU

4312100020 ACHMAD ARI BUDIARSO BARU

4312100015 PUSPA DEVITA MAHDIKA PUTRI BARU

4312100045 RIZAL YUNIAR MALAWI BARU

4312100048 MINATI PEBRIANTINA BARU

4311100026 ACH RONIE SANTOSO BARU

4311100048 HAFIZHUDDIN R. A. BARU

4311100086 AGRIPINA HERASPATTY BARU

4311100097 LULI BANGKIT SUGITO BARU

Eko Budi Djatmiko Daniel M. Rosyid3336

34 31 Eko Budi Djatmiko Daniel M. Rosyid

35 32 Eko Budi Djatmiko Daniel M. Rosyid

29

30

31

32 29

33 30

Eko Budi Djatmiko Daniel M. Rosyid

Eko Budi Djatmiko Daniel M. Rosyid

27 Dirta Marina C. Rudi Waluyo P.

28 Dirta Marina C. Rudi Waluyo P.

26 Dirta Marina C. Rudi Waluyo P.

 

Catatan:

a.  Hanya kelompok TRB III dalam daftar ini yang dapat asistensi pada dosen pembimbingnya pada

semester ini.

b.  Untuk kelompok yang mengulang, data dan dosen pembimbingnya tetap.

c.  Data struktur dan data lainnya: data lingkungan, data struktur, data peralatan, dst., didapat dari data

TRB II.

Page 11: 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

7/18/2019 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

http://slidepdf.com/reader/full/4250-handayanu-oe-buku-panduan-trb-iii-gasal-2015-2016 11/20

Page 11 of 20 

6.DATA TUGAS PERANCANGAN BANGUNAN LEPAS PANTAI DINAMIS (TRB III)

1.  Analisa Seismik/Gempa

 No. Kelompok Asumsi

Tipe

Tanah

SLE (100 th) DLE (800 th)

PGA

(g)

Damping

ratio (%)

Cx,Cy,Cz PGA

(g)

Damping

ratio (%)

Cx,Cy,Cz

1 4 C 0.060 5 1.0, 1.0, 0.5

2 5 B 0.055 4 1.0, 1.0, 0.5

3 6 A 0.056 6 1.0, 1.0, 0.5

4 7 C 0.065 5 1.0, 1.0, 0.5

5 8 B 0.057 5 1.0, 1.0, 0.5

6 9 A 0.056 4 1.0, 1.0, 0.5

7 10 A 0.057 6 1.0, 1.0, 0.5

8 11 C 0.058 4 1.0, 1.0, 0.5

9 12 B 0.068 7 1.0, 1.0, 0.5

10 13 C 0.070 5 1.0, 1.0, 0.5

11 14 B 0.065 4 1.0, 1.0, 0.5

12 15 B 0.066 5 1.0, 1.0, 0.5

13 16 C 0.062 5 1.0, 1.0, 0.5

14 17 A 0.058 5 1.0, 1.0, 0.5

15 18 B 0.055 4 1.0, 1.0, 0.5

16 19 B 0.066 5 1.0, 1.0, 0.5

17 20 C 0.062 5 1.0, 1.0, 0.5

18 21 A 0.065 5 1.0, 1.0, 0.5

19 22 B 0.065 4 1.0, 1.0, 0.5

20 23 B 0.066 5 1.0, 1.0, 0.5

21 24 C 0.062 5 1.0, 1.0, 0.5

22 25 A 0.065 5 1.0, 1.0, 0.5

Keterangan:

SLE: Strength Level Earthquake Cx, Cy, Cz: factor gempa arah sumbu x, y, z.

DLE:Ductility Level Earthquake PGA: Peak Ground Acceleration

Arah sumbu z adalah arah vertikal

Page 12: 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

7/18/2019 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

http://slidepdf.com/reader/full/4250-handayanu-oe-buku-panduan-trb-iii-gasal-2015-2016 12/20

Page 12 of 20 

 No. Kelompok Asumsi

Tipe

Tanah

SLE (100 th) DLE (800 th)

PGA

(g)

Damping

ratio (%)

Cx,Cy,Cz PGA

(g)

Damping

ratio (%)

Cx,Cy,Cz

23 26 C 0.064 5 1.0, 1.0, 0.5

24 27 B 0.062 4 1.0, 1.0, 0.5

25 28 A 0.054 6 1.0, 1.0, 0.5

26 29 C 0.056 5 1.0, 1.0, 0.5

27 30 B 0.065 5 1.0, 1.0, 0.5

28 31 A 0.062 4 1.0, 1.0, 0.5

29 32 A 0.065 6 1.0, 1.0, 0.5

30 33 C 0.066 4 1.0, 1.0, 0.5

31 34 B 0.058 7 1.0, 1.0, 0.5

32 35 C 0.062 5 1.0, 1.0, 0.5

33 36 B 0.065 4 1.0, 1.0, 0.5

34 B 0.066 5 1.0, 1.0, 0.5

35 C 0.062 5 1.0, 1.0, 0.5

36 A 0.065 5 1.0, 1.0, 0.5

37 B 0.065 4 1.0, 1.0, 0.5

38 B 0.056 5 1.0, 1.0, 0.5

39 C 0.062 5 1.0, 1.0, 0.5

40 A 0.065 5 1.0, 1.0, 0.5

41 B 0.065 4 1.0, 1.0, 0.5

42 B 0.066 5 1.0, 1.0, 0.5

43 C 0.062 5 1.0, 1.0, 0.5

44 A 0.065 5 1.0, 1.0, 0.5

Page 13: 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

7/18/2019 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

http://slidepdf.com/reader/full/4250-handayanu-oe-buku-panduan-trb-iii-gasal-2015-2016 13/20

Page 13 of 20 

2.  Analisa Kelelahan/Fafigue

DATA TANAH, DATA ARUS, DATA KEDALAMAN PERAIRAN, MARINE GROWTH, CORROSION ALLOWANCE dari data TRB II.

1 1 LAMA 23 23 2 atau 3

2 2 LAMA 24 24 2 atau 3

3 3 LAMA 25 25 2 atau 3

4 4 2 atau 3 26 26 1 atau 3

5 5 2 atau 3 27 27 1 atau 3

6 6 2 atau 3 28 28 1 atau 3

7 7 1 atau 3 29 29 2 atau 3

8 8 1 atau 3 30 30 2 atau 3

9 9 1 atau 3 31 31 2 atau 3

10 10 2 atau 3 32 32 1 atau 3

11 11 2 atau 3 33 33 1 atau 3

12 12 2 atau 3 34 34 1 atau 3

13 13 1 atau 3 35 35 2 atau 3

14 14 1 atau 3 36 36 2 atau 3

15 15 1 atau 3

16 16 2 atau 3

17 17 2 atau 3

18 18 2 atau 3

19 19 1 atau 3

20 20 1 atau 3

21 21 1 atau 3

22 22 2 atau 3

Semua Jacket Tipe Tripod menggunakan

data 3 gelombang fatigue

No. KelompokData Gelombang

FatigueNo. Kelompok

Data Gelombang

Fatigue

 

Semua Jacket Tipe Tripod menggunakan data 3

gelombang fatigue

Page 14: 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

7/18/2019 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

http://slidepdf.com/reader/full/4250-handayanu-oe-buku-panduan-trb-iii-gasal-2015-2016 14/20

Page 14 of 20 

Data 1 Gelombang Analisa Fatigue:

Tinggi

Gelombang

(ft)

Periode

gelombang

(dtk)

Kejadian selama 10 th

0o  45o  90o  135o  180o  225o  270o  315o  Total

0.0 – 3.9 4.6 8083600 19296200 8996200 6714600 8996200 9713300 1546600 1825300 65172000

4.0 – 7.9 6.4 276740 660750 308050 229880 308050 332600 54490 63640 2234200

8.0 –

 11.9 6.8 9336 22270 10390 7752 10390 11212 910 1060 73320

12.0 – 15.9 7.2 314 754 348 260 348 375 0 0 2399

16.0 – 19.9 7.5 10 25 11 8 11 13 0 0 78

20.0 – 23.9 7.8 0 1 1 0 1 0 0 0 3

Total 67482000

Arah sudut berlawanan jarum jam dari sumbu X.

Data Gelombang analisa fatigue untuk semua kelompok sama.

Data Angin gunakan data dari TRB II.

X

0o 

45o 

Page 15: 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

7/18/2019 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

http://slidepdf.com/reader/full/4250-handayanu-oe-buku-panduan-trb-iii-gasal-2015-2016 15/20

Page 15 of 20 

Data 2 Gelombang Analisa Fatigue:

E (45o) NE (90

o) N (135

o) NW (180

o)

0.0 - 3.9 4.6 21.803.900  10.614.200  12.916.100  18.606.800 63.941.000

4.0 - 7.9 6.4 1.151.950  560.790  682.370  983.090  3.378.200 

8.1 - 11.9 6.9 58.776  28.216  34.222  50.396  171.610 

12.1 - 15.9 7.4 2.738  1.679  2.147  259  6.823 

16.0 - 19.9 7.8 133  107  148  55  443 20.0 - 23.9 8.1 3  8  12  23 

24.0 - 27.9 8.4 1  1 

Total 23.017.500  11.205.000  13.635.000  19.640.600 67.498.100

Arah sudut berlawanan jarum jam terhadap sumbu X (horisontal kekakan)

Arah gelombang direduksi dan merupakan jumlahan dariarah berlawanannya

misal: 180 dengan 0 derajat; 135 dengan 330 derajat; 90 dengan 270 derajat; 45 dengan 225 derajat

Tinggi

Gelombang

(ft)

Periode

Gelombang

(s)

Total

Kejadian gelombang selama 10 th

 

Page 16: 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

7/18/2019 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

http://slidepdf.com/reader/full/4250-handayanu-oe-buku-panduan-trb-iii-gasal-2015-2016 16/20

Page 16 of 20 

Data 3 Gelombang Analisa Fatigue:

16 - 45 46 - 75 76 - 105 106 - 135 136 - 165 166 - 195 196 - 225 226 - 255 256 - 285 286 - 315 316 - 345 346 - 15

0.0 - 2.0 3.3 189.084.160  56.022.715  6.834.416  3.826.891  6.206.268  40.716.595 260.918.682 66.885.361 13.994.646 4.298.346 2.390.425 3.961.485

2.1 - 4.0 4.0 120.821.198  40.300.581  2.483.592  1.056.426  530.560  4.083.626  37.905.232  12.461.026 3.014.674  529.517  528.473  1.427.686

4.1 - 6.0 6.4 48.303.347  15.639.981  629.167  143.837  71.918  844.924  7.478.589  2.929.513  701.086  71.918  71.918  485.329 

6.1 - 10.0 6.8 26.080.398  7.846.554  96.137  1.794  897  98.828  799.610  609.289  97.034  897  897  94.342 

> 10 7.0 3.444.154  1.323.340  287  -  -  287  2.299  13.368  287  -  -  287 

Total 387.733.257  121.133.171  10.043.599  5.028.948  6.809.643  45.744.260 307.104.412 82.898.557 17.807.727 4.900.678 2.991.713 5.969.129

Arah sudut searah jarum jam terhadap sumbu X (horisontal kekakan)

Kejadian gelombang selama 10 th pada pias sudut terhadap True NorthTinggi

Gelombang

(ft)

Periode

Gelombang

(s)

 

X

Arah sudut

Page 17: 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

7/18/2019 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

http://slidepdf.com/reader/full/4250-handayanu-oe-buku-panduan-trb-iii-gasal-2015-2016 17/20

Page 17 of 20 

3.  Analisa Load Out

Data Barge untuk analisa load out:

Data lengkap pada website personal dosen: Dr.Ir.Handayanu,M.Sc

 No. Nama LOA (m) DWT (Ton) Deck Strength (t/m2) Keterangan Detil

1 BB29 124 17478 Lihat data lengkap Lihat data lengkap

2 BB30/35/36 124 17500 Lihat data lengkap Lihat data lengkap

3 BB31/32/41/42 65 2790 Lihat data lengkap Lihat data lengkap

4 BB7 122 15000 Lihat data lengkap Lihat data lengkap5 BB17/18 79.2 5191 Lihat data lengkap Lihat data lengkap

6 BB15 33.8 940 12 Lihat data lengkap

7 BB21/22 92 11178 20 Lihat data lengkap

8 Viking Barge 1-8 91.44 9700 25 Lihat data lengkap

9

10

11

12

13

14

a. 

Tentukan barge yang akan digunakan dengan memperhatikan factor ekonomis dan kesesuaian ukuran jacket, serta dimensi barge, kapasitas pompa, daya

angkut, deck strength, stabilitas, dst.

b. 

Tentukan Desain skid shoe untuk jacket struktur pada skidway menuju barge saat proses load out

c. 

Analisa stabilitas barge dan balasting saat proses load-out

d. 

Desain padeye dan sling wire rope untuk pengangkatan bagian/modul platform ke barge (contoh: modul deck, dst.)

Page 18: 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

7/18/2019 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

http://slidepdf.com/reader/full/4250-handayanu-oe-buku-panduan-trb-iii-gasal-2015-2016 18/20

Page 18 of 20 

TUGAS RANCANG

STRUKTUR LEPAS PANTAI DINAMIS SEMESTER GASAL 2015 – 2016Jurusan Teknik Kelautan, Fakultas Teknologi Kelautan, ITS

LEMBAR ASISTENSI

POKOK MATERI: ANALISA SEISMIK

DOSEN PEMBIMBING: 1. 2.

NO. GRUP :

ANGGOTA 1: .......................................................................... NRP: ..........................................................

ANGGOTA 2: .......................................................................... NRP: ........................... ...............................

ANGGOTA 3: .......................................................................... NRP: ..........................................................

ANGGOTA 4: .......................................................................... NRP: ..........................................................

NO. MATERI ASISTENSI PENUGASAN BERIKUTNYATTD

DOSEN/TANGGAL

Menimbang, memperhatikan dan berdasarkan asistensi pekerjaan tugas yang telah dilakukan

sebagaimana tertera diatas, maka grp tugas ini saya nyatakan Belum/ Sudah * mencukupi

persyaratan pekerjaan perancangan pokok materi.

Surabaya, ................................2015

Dosen Pembimbing,

 ____________________________

Page 19: 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

7/18/2019 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

http://slidepdf.com/reader/full/4250-handayanu-oe-buku-panduan-trb-iii-gasal-2015-2016 19/20

Page 19 of 20 

TUGAS RANCANG

STRUKTUR LEPAS PANTAI DINAMIS SEMESTER GASAL 2015 – 2016Jurusan Teknik Kelautan, Fakultas Teknologi Kelautan, ITS

LEMBAR ASISTENSI

POKOK MATERI: ANALISA FATIGUE

DOSEN PEMBIMBING: 1. 2.

NO. GRUP :

ANGGOTA 1: .......................................................................... NRP: ..........................................................

ANGGOTA 2: .......................................................................... NRP: ................... .......................................

ANGGOTA 3: .......................................................................... NRP: ........................... ...............................

ANGGOTA 4: .......................................................................... NRP: ..........................................................

NO. MATERI ASISTENSI PENUGASAN BERIKUTNYATTD

DOSEN/TANGGAL

Menimbang, memperhatikan dan berdasarkan asistensi pekerjaan tugas yang telah dilakukan

sebagaimana tertera diatas, maka grup tugas ini saya nyatakan Belum/ Sudah * mencukupi

persyaratan pekerjaan perancangan pokok materi.

Surabaya, ................................2015

Dosen Pembimbing,

 ____________________________

Page 20: 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

7/18/2019 4250-Handayanu-oe-buku Panduan Trb III Gasal 2015-2016

http://slidepdf.com/reader/full/4250-handayanu-oe-buku-panduan-trb-iii-gasal-2015-2016 20/20

TUGAS RANCANG

STRUKTUR LEPAS PANTAI DINAMIS SEMESTER GASAL 2015 – 2016Jurusan Teknik Kelautan, Fakultas Teknologi Kelautan, ITS

LEMBAR ASISTENSI

POKOK MATERI: ANALISA LOAD OUT

DOSEN PEMBIMBING: 1. 2.

NO. GRUP :

ANGGOTA 1: .......................................................................... NRP: ........................... ...............................

ANGGOTA 2: .......................................................................... NRP: ..........................................................

ANGGOTA 3: .......................................................................... NRP: ........................... ...............................

ANGGOTA 4: .......................................................................... NRP: ..........................................................

NO. MATERI ASISTENSI PENUGASAN BERIKUTNYATTD

DOSEN/TANGGAL

Menimbang, memperhatikan dan berdasarkan asistensi pekerjaan tugas yang telah dilakukan

sebagaimana tertera diatas, maka grup tugas ini saya nyatakan Belum/ Sudah * mencukupi

persyaratan pekerjaan perancangan pokok materi.

Surabaya, ................................2015

Dosen Pembimbing,

 ____________________________