CERTIFIED ENVIRONMENTAL PROFESSIONAL IN … fileTREATMENT PLANT OPERATION (CePSTPO) LAPORAN LATIHAN...
Transcript of CERTIFIED ENVIRONMENTAL PROFESSIONAL IN … fileTREATMENT PLANT OPERATION (CePSTPO) LAPORAN LATIHAN...
CERTIFIED ENVIRONMENTAL PROFESSIONAL IN SEWERAGE
TREATMENT PLANT OPERATION (CePSTPO)
LAPORAN LATIHAN DI LAPANGAN
DIKEMUKAKAN KEPADA: INSTITUT ALAM SEKITAR MALAYSIA
(EiMAS)
OLEH: MOHD RAMZAN BIN JOHARI
850618-01-6479
Bagi memenuhi sebahagian daripada syarat untuk pengiktirafan sebagai
“Certified Environmental Professional In Sewerage Treatment Plant Operation”
2
Isi Kandungan MAKLUMAT CALON ........................................................................................................ 4
MAKLUMAT AM MENGENAI CALON ........................................................................ 5
PENGESAHAN ................................................................................................................. 6
PENGESAHAN ............................................................................................................. 7
DEKLARASI ...................................................................................................................... 8
DEKLARASI .................................................................................................................. 9
BAB 1: ..............................................................................................................................10
DATA LOJI RAWATAN KUMBAHAN ............................................................................10
BAB 1 : DATA LOJI RAWATAN KUMBAHAN ..........................................................11
MAKLUMAT LOJI KUMBAHAN .............................................................................11
CARTA ORGANISASI: ............................................................................................12
LAKARAN ALIRAN PROSES LOJI RAWATAN KUMBAHAN: ................................14
CARTA ALIRAN: ......................................................................................................14
DRAWING ........................................................................................................................15
DRAWING: ...............................................................................................................16
SUSUNATUR LOJI RAWATAN KUMBAHAN ...........................................................16
GAMBAR LOJI.................................................................................................................17
FOTO: LOJI RAWATAN KUMBAHAN .......................................................................18
BAB 2: ..............................................................................................................................28
PEMANTAUAN PRESTASI LOJI RAWATAN KUMBAHAN ........................................28
BAB 2: PEMANTAUAN PRESTASI LOJI RAWATAN KUMBAHAN ...........................29
KEPUTUSAN PERSAMPELAN EFFLUENT.............................................................29
Minggu 1 hingga minggu 20: ..................................................................................29
KEPUTUSAN PERSAMPELAN EFFLUENT.............................................................30
Minggu 21 hingga minggu 40: ................................................................................30
KEPUTUSAN PERSAMPELAN EFFLUENT.............................................................31
Minggu 41 hingga minggu 52: ................................................................................31
GRAF PEMERHATIAN TAHUN 2013 .......................................................................32
Graf pH Influent dan Effluent ..................................................................................32
Graf BOD Influent dan Effluent ...............................................................................34
Graf Suspended Solid Influent dan Effluent ..........................................................35
Graf Oil and Grease Influent and Effluent: ............................................................36
3
BAB 3: PERBINCANGAN DAN KESIMPULAN ............................................................38
Latar Belakang .............................................................................................................38
Proses Pemantauan Prestasi Loji Rawatan Kumbahan ..........................................47
KAJIAN KES .....................................................................................................................50
Kajian Kes: 1 ............................................................................................................51
Kajian Kes: 2 ............................................................................................................53
Kajian Kes: 3 ............................................................................................................55
Kajian Kes: 4 ............................................................................................................56
LAMPIRAN: ......................................................................................................................58
LAMPIRAN 1 : ............................................................................................................59
Check Sheet.................................................................................................................59
LAMPIRAN 2 : ............................................................................................................63
Management Plan .......................................................................................................63
LAMPIRAN 3 : ............................................................................................................65
Keputusan Peperiksaan ..............................................................................................65
LAMPIRAN 4 : ............................................................................................................68
Contoh Laporan Makmal.............................................................................................68
4
MAKLUMAT CALON
5
MAKLUMAT AM MENGENAI CALON Nama : Mohd Ramzan Bin Johari Nombor kad pengenalan : 850618-01-6479 Alamat : No 43 Jalan Juragan 3,
Desa Paya Mengkuang, Gelang Patah, Nusajaya, 81560, Johor Bahru, Johor
Jawatan : Eksekutif Tarikh menghadiri kursus : 28 September 2012 Nama dan alamat syarikat : Pelabuhan Tanjung Pelepas Sdn Bhd
Blok A Wisma PTP, Jalan Pelabuhan Tanjung Pelepas, TST 507, 81560 Gelang Patah, Johor Bahru, Johor Darul Takzim, Malaysia.
Tempoh latihan di lapangan untuk laporan ini: Januari 2013 – Oktober 2013 Pegawai untuk pengesahan:
Nama : Musa Bin Abdul Wahab Jawatan : Pengurus Bahagian Zon Bebas No Telefon : +607 – 504 2222 Ext: 6650
Email : [email protected]
6
PENGESAHAN
7
PENGESAHAN Dengan ini, saya mengesahkan bahawa Mohd Ramzan Bin Johari telah menjalani latihan di lapangan sebagaimana yang diperlukan dan maklumat yang dikemukakan di dalam laporan ini adalah benar sepanjang pengetahuan saya. Nama : Musa Bin Abdul Wahab Nombor kad pengenalan : 680603-01-5589 Jawatan : Pengurus, Seksyen Zon Bebas Bahagian Penyelenggaraan Fasiliti Jabatan Fasiliti No Telefon : +607 504 2222 Ext 6650 Alamat e-mail : [email protected] Tandatangan : __________________________ Tarikh :
8
DEKLARASI
9
DEKLARASI
Saya mengakui bahawa laporan ini keseluruhannya adalah hasil usaha saya sendiri dan semua fakta yang terkandung di dalamnya serta maklumat yang disertakan adalah betul dan benar dan saya tidak menyembunyikan atau memanipulasikan mana-mana fakta.
Nama : Mohd Ramzan Bin Johari Nombor kad pengenalan : 850618-01-6479 Jawatan : Eksekutif, Seksyen Zon Bebas. Bahagian Penyelenggaraan Fasiliti. Jabatan Fasiliti. Tandatangan : __________________________ Tarikh :
10
BAB 1:
DATA LOJI RAWATAN
KUMBAHAN
11
BAB 1 : DATA LOJI RAWATAN KUMBAHAN
MAKLUMAT LOJI KUMBAHAN
PE : 35,000 PE (Module 1 : 17,500 PE) JENIS LOJI : Suspended Growth (Extended Aeration) ALIRAN PROSES:
o Rawatan Preliminari: Primary Screen : 2 units Mechanical Screen
: 1 unit screw compactor
Pump Station : 3 Raw Sewage Pumps Secondary Screen : 2 Unit Fine Mechanical Screen
: 1 Unit screw compactor Grit removal : 2 unit submersible pump
: Aerated chamber Grease removal : Aerated chamber
: Air lift type o Rawatan Primari:
Balancing Tank : Tiada Primary clarifier : Tiada
o Rawatan Sekondari :Extended Aeration Anoxic Tank Aeration Tank Clarifier Tank
o Rawatan Enapcemar: Sludge Return Tank Gravity Sludge Thickener Sludge Holding Tank Sludge Drying Bed
12
CARTA ORGANISASI: Carta Organisasi Bahagian Pengurusan Fasiliti:
Carta organisasi
13
Carta Organisasi Free Zone Section:
MUSA ABD WAHABMANAGER
WASTE MANAGEMENT
Ramzan/ShahirExecutive/Technician
Term contract
Sewerage System (STP, pump sump,
individual septic tank)
FZ Tenants
Manage issues on waste water
if any
INFRASTRUCTURE
Ramzan/ShahirExecutive/Technician
Term Contract
External Infrastructure (Road, drainage, PTP Warehouses,
Fencing, Pipelines, Signages, Storage Area)
One-off
Installation of Inverter System at STP
Installation of Flow Meter at STP
RCTS Maintenance
Water Reticulation Inspection & Leakage Study
Raise up paving block at CFS 2
Upgrade Dock Leveller at CFS 2
Relocate Drain Pipe Sprinkler System
Upgrade Barrier System at PTP Warehouses
Repainting of PTP Warehouses Steel Structure
Proposed Upgrading Existing toilet at Contractor Cabin Area
Replacement of RWDP Hooper at CFS 1
Replace water pump at CFS 1
Dzulhuzmi/RazaliEngineer/Assistant
Term Contract
Building Architecture
(Custom, Maingate, Gate A,
Gate B, PTP Warehouses,
Contractor Cabin Area)
One Off
Upgrade CICC Drainage System
Replace Rain Gutter at Warehouse 4
Proposed Additional Car parks at Wisma B car
parking area
Inspection and Assessment of Phase 1 and Phase 2 Wharves
Installation Freezone Fencing And Auto Swing Gate Across Railway Track at Distripark A
Phase 1 under wharf Repair Work
Refurbishment Workshop flooring
14
LAKARAN ALIRAN PROSES LOJI RAWATAN KUMBAHAN: CARTA ALIRAN:
Flow Chart: Treatment Process
15
DRAWING
16
DRAWING:
SUSUNATUR LOJI RAWATAN KUMBAHAN
Drawing: Layout STP PTP