CONTOH KPI PROJEK

7
CONTOH KPI PROJEK TERNAKAN BIL . KPI LEMBU KAMBING AYAM 1. TUMBESARAN (KG/BULAN) FIDLOT: 22 OPEN GRAZING : 6.6 3 KG 2 2. PENCAPAIAN BERAT JUALAN PURATA KG/PUSINGAN 250 KG 38 KG 2 3. KELAHIRAN (EKOR/TAHUN 1.2 1.5 - 4. TEMPOH TERNAKAN FIDLOT : 3-6 BLN OPEN : 2.5 THN FIDLOT : 6 BLN OPEN : 1-2.5 THN 40 HARI 5. FCR 1 : 0.6 KG 1 : 0.25 KG 1 : 1.7 KG 6. KEMATIAN (%) ANAK : 5 % IBU : 3 % ANAK : 5 % IBU : 10 % 3 % 7. KAPASITI 12 EKOR/KANDANG 30 EKOR/KANDANG 10,000/ REBAN 8. KOS PENGELUARAN/KG RM 9. KOS PENGELUARAN/EKOR RM 10 HARGA JUALAN (LADANG) RM 11. HARGA JUALAN PASARAN RM 12. PURATA PENDAPATAN SEBULAN RM

description

KPI PROJEK TERNAKAN MAKANAN

Transcript of CONTOH KPI PROJEK

Page 1: CONTOH KPI PROJEK

CONTOH KPI PROJEK TERNAKAN

BIL. KPI LEMBU KAMBING AYAM

1.TUMBESARAN (KG/BULAN)

FIDLOT: 22OPEN

GRAZING : 6.63 KG 2

2.

PENCAPAIAN BERAT JUALANPURATA KG/PUSINGAN

250 KG 38 KG 2

3.KELAHIRAN (EKOR/TAHUN

1.2 1.5 -

4. TEMPOH TERNAKANFIDLOT : 3-6

BLNOPEN : 2.5 THN

FIDLOT : 6 BLNOPEN : 1-2.5

THN40 HARI

5. FCR 1 : 0.6 KG 1 : 0.25 KG 1 : 1.7 KG

6. KEMATIAN (%)ANAK : 5 %IBU : 3 %

ANAK : 5 %IBU : 10 %

3 %

7. KAPASITI12

EKOR/KANDANG

30 EKOR/KANDAN

G

10,000/REBAN

8.KOS PENGELUARAN/KG

RM

9.KOS PENGELUARAN/EKOR

RM

10HARGA JUALAN (LADANG)

RM

11.HARGA JUALAN PASARAN

RM

12.PURATA PENDAPATAN SEBULAN

RM

Page 2: CONTOH KPI PROJEK

CONTOH KPI PROJEK TANAMAN

BIL. KPI PISANG NENAS SERAI

1. TUMBESARAN(HASIL) 10-15 KG/POKOK

2 KG/BIJI 50-60 BATANG

2. KEPADATAN POKOK 1,111 POKOK/HEKTAR

62,000 POKOK/HEKTAR

10,000 RUMPUN /HEKTAR

3. TEMPOH TANAMAN 9 BULAN 18 BULAN 9 BULAN

4. KEMATIAN (%) 10 % 10 % 20 %

5. KOS PENGELUARAN RM RM RM

6. HARGA JUALAN (LADANG)

RM RM RM

7. HARGA JUALAN (PASARAN)

RM RM RM

Page 3: CONTOH KPI PROJEK

8. PURATA PENDAPATAN SEBULAN

CONTOH KPI PROJEK MAKANAN

BIL. KPI PETUNJUK

1. PREMIS MESTI BERASINGAN DENGAN RUMAH DAN REKABENTUK IKUT ALIRAN KERJA, ADA BEKALAN AIR DAN LETRIK

2. KEBERSIHAN MENGIKUT PERATURAN MAKANAN 1985

3. PEMBUNGKUSAN MENGIKUT PERATURAN MAKANAN 1985

4. MUTU PRODUK MENGIKUT PERATURAN MAKANAN 1985

5. FOOD ADDITIVES & PEWARNA MENGIKUT PERATURAN MAKANAN 1985

6. PENINGKATAN NILAI TAMBAH SEKURANGNYA 200 %

7. PENINGKATAN JUALAN SEKURANGNYA 10 % SETAHUN

8. REKOD PROJEK ADA REKOD STOK, JUALAN DAN PERBELANJAAN

9. PRODUKTIVITI SEKURANGNYA 10 % SETAHUN

10. KOS PENGELUARAN

Page 4: CONTOH KPI PROJEK

DI BAWAH KOS KAWALAN

11. PURATA PENDAPATAN SEBULAN SEKURANGNYA RM800 SEBULAN

CONTOH KPI PROJEK KRAF DAUN GETAH

BIL.

KPI PETUNJUK

1. PREMIS - REKABENTUK BERASINGAN DENGAN RUMAH DAN REKABENTUK MENGIKUT ALIRAN KERJA, ADA BEKALAN AIR DAN LETRIK

2. MESIN DAN PERALATAN IKUT SPESIFIKASI

3. BAHAN MENTAH/INPUT BERTERUSAN DAN MENCUKUPI

4. MUTU PRODUK IKUT SPESIFIKASI PELANGGAN

5. KREATIVITI SENTIASA UPGRADE

6. KOS PENGELUARAN BAWAH KOS KAWALAN

Page 5: CONTOH KPI PROJEK

7. PENINGKATAN JUALAN SEKURANGNYA 10 % SETAHUN

8. REKOD PROJEK ADA BUKU REKOD STOK, JUALAN DAN PERBELANJAAN

9. PENINGKATAN PRODUKTIVITI SEKURANGNYA 10 % SETAHUN

10. PURATA PENDAPATAN SEBULAN

SEKURANGNYA RM800 SEBULAN

CONTOH KPI PROJEK PERUSAHAAN LAIN

BIL.

KPI PETUNJUK

1. PREMIS - REKABENTUK BERASINGAN DENGAN RUMAH DAN REKABENTUK MENGIKUT ALIRAN KERJA,

Page 6: CONTOH KPI PROJEK

ADA BEKALAN AIR DAN LETRIK

2. MESIN DAN PERALATAN IKUT SPESIFIKASI

3. BAHAN MENTAH/INPUT BERTERUSAN DAN MENCUKUPI

4. MUTU PRODUK IKUT SPESIFIKASI PELANGGAN

5. KREATIVITI SENTIASA UPGRADE

6. KOS PENGELUARAN BAWAH KOS KAWALAN

7. PENINGKATAN JUALAN

SEKURANGNYA 10 % SETAHUN

8. REKOD PROJEK ADA BUKU REKOD STOK, JUALAN DAN PERBELANJAAN

9. PENINGKATAN PRODUKTIVITI SEKURANGNYA 10 % SETAHUN

10. PURATA PENDAPATAN SEBULAN

SEKURANGNYA RM800 SEBULAN