g Tower Report

22
Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 1 [G TOWER] a sustainable tower Architect: BEP Akitek Sdn Bhd The Architectural Network Project: GTower Location: 199 Jalan Tun Razak, 50400 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur, Malaysia Client: Goldis Tower Sdn Bhd PropertyType: Office & Hotel Date Completed: June 2006

description

b science

Transcript of g Tower Report

  • Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies1

    [G TOWER]a sustainable tower

    Architect :BEP Akitek Sdn BhdThe Architectural Network

    Project :GTower

    Location :199 Jalan Tun Razak, 50400 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur, Malaysia

    Client :Goldis Tower Sdn Bhd

    Property Type :Office & Hotel

    Date Completed:June 2006

  • IntroductionThe G Tower, is a new working concept incorporating an office space, a members-only

    private club and a hotel called aptly, The G City Club Hotel, is the first fully certified green

    building. Given the Green Mark Gold Rating by standards of the Singapores Building and

    Construction Authority(BCA).

    Being strategically located at the crossroads of Jalan Tun Razak and Jalan Ampang in Kuala

    Lumpur, this 30-storey building with a total land area of 2000m encompasses a 180-room

    5 star hotel, 112 CEO duplex office suites and a club was designed by BEP Akitek under

    Goldis Tower and was completed in June 2009.

    Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies2

    Site Plan

  • Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies3

  • Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies4

  • Concept & Ideas

    GTower is Malaysias first green and smart building which implemented the idea of

    environment sustainability, RETHINK, REDUCE, REUSE and RECYCLE.

    Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies5

    Concepts Application

    Rethink Not restricted in the building only. Site orientation is considered

    to reduce usage of energy.

    Sustainable green building technologies and systems are added.

    Rethink Reduce energy consumption:

    -Usage of double glazed low-emission glass. (Allow maximum

    light, minimum heat transmission)

    Chilled water centralised air-conditioning chillers are used.

    Low energy LED lighting which will reduce energy consumption

    by 80-90%

    Cleaning agents that are eco-friendly are used in the hotel.

    Eco-friendly infinity pool on the rooftop is conditioned by salt

    instead of chlorine. The pool is also heated by the heat waste

    from the air-con units.

    Reuse Harvest of rainwater in the water catchment areas to provide

    enough water for the green roof and the vertical green walls.

    Crawling plants on the faade wall and in the interior walls

    helps purified air in a natural way.

    Heat waste from air-con is also reuse for heating the water in

    bathrooms.

    Recycle The staffs in the hotel learned to separate recyclable waste.

    The furnishing of the interior of hotel are made of recycled

    materials.

    Even the paint that is used is made of organic compound.

  • Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies6

    Energy Efficiency

    To increase the overall energy efficiency, the air conditioning which consumes the largest

    amount of energy has been replaced to operate at low system efficiency. Included are

    motion and photo sensors which reduces energy consumption from lighting. The use of

    greenery in landscaping, green roof can assist in alleviating urban heat islands through

    shading and evaporative cooling.

    Water Efficiency

    As an initiative to reduce water consumption, water efficient fittings were installed so that

    facility staff can monitor daily water usage and detect any leakage occurring in the building.

    Rain water harvesting system has also been implemented for irrigating the landscape and

    vertical greening areas.

    Sustainability

  • Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies7

    Provisions for Carbon Monoxide (CO) and Carbon Dioxide (CO) monitoring systems which

    BMS to circulate air inside the building to provide better indoor air quality. The use of low

    VOC paint helps prevents from getting exposed to chemical particles.

    Project Management

    An estimate of more than 30% of construction materials such as carpets, landscape draining

    cells, external wood decking, and kitchen cabinets are of recycled contents as an

    environmentally friendly approach.

    Indoor Environmental Quality & Protection

  • Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies8

    Malaysia is located in the equatorial region and has a tropical rainforest climate which is

    causes it to remain hot and humid throughout the year. It experiences two types of climates

    which are rainy season (mid- November to March) and dry season (May to September).

    However, the temperature in Malaysia varies a little from season to season since it is close to

    the equator.

    The average annual temperature of Malaysia ranges between 24C to 33C. During the rainy

    season, the average rainfall throughout the year is 217.5mm and November is the highest

    rainfall month. The humidity in Malaysia is very high. The relative humidity varies from a low

    80% in January to a high of 85% in October. For the average daily sunshine hours in Malaysia,

    the daily sunshine hours is about eight hours in the dry season and range from six to seven

    hours throughout the rainy season.

    Temperature & Climate Data

  • Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies9

    0

    10

    20

    30

    40

    50

    60

    70

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Average High Temperature(C)

    Average Low Temperature(C)

    Average Temperature (C) - Kuala Lumpur

    77

    78

    79

    80

    81

    82

    83

    84

    85

    86

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Average Humidity (%)

    Average Humidity (%) - Kuala Lumpur

  • Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies10

    0

    1

    2

    3

    4

    5

    6

    7

    8

    9

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Average Daily SunshineHours

    Average Daily Sunshine Hours - Kuala Lumpur

    0

    50

    100

    150

    200

    250

    300

    350

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Average Rainfall (mm)

    Average Rain Days

    Average Rainfall (mm) - Kuala Lumpur

  • Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies11

    Wind Direction Analysis

    Northeast Monsoon (November March)

  • Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies12

    Southwest Monsoon (May September)

  • Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies13

    Sun Path Analysis

    9am

    12pm

  • Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies14

    4pm

    6pm

  • Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies15

    Passive Design

    The orientation is important to maintain the building indoor temperature within the thermal

    comfort range. According to ASHRAE Standard, the thermal comfort range Is stated around 24

    to 26 Degree Celsius. In order to achieve thermal comfort, there are a few criteria should be

    noted.

    The orientation of building plays important role in manipulating indoor temperature. The

    front faade of G Tower is defined by the site and main road access. According to the map

    above, the main entrance of G tower is supposed to face to south-east direction. However,

    the building orientation has been adjusted to east of northeast by adding a path to allow the

    car access.

  • Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies16

    According to the ecotect diagram, there are most sun radiation from 10 a.m to 1 p.m. As to

    avoid the raise of temperature in the building, a few design moderation have been made.

    The front faade of G tower has lesser surface area compare to other elevations. As when

    the surface area increases, more sunlight is allow to penetrate into the building, causing

    indoor temperature roses. As the location of G Tower is in the city, limited area can be used to

    do planting as sun shading and temperature cooler. Hence, the changes are made on the

    building itself.

  • Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies17

    The front faade of G Tower is substrated as shown in diagram above to

    minimize the total amount of morning sunlight penetrate into the building. Besides, it

    also provides shadings to the users and achieve thermal comfort.

    The front faade has replaced with vertical garden. Vertical garden has similar

    function as green roof. It undergoes photosynthesis, which required sunlight, and releases

    oxygen to cooler the surrounding temperature. Hence, the heat energy does not transfer

    into the interior spaces of G Tower.

  • Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies18

    Sunlight radiation is most received on North East Faade from 10 am to 1pm

    Differential in pressure of clouds causes clear skies by late evening after 2pm onwards

  • Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies19

    Since the main of the facades of the GTower consist of glass, there is a large area of the exterior

    will be shined with direct sunlight. The cons to this is that glazed faade allows solar radiation to

    go through the glass facades into the building and then trap the heat energy indoor causing the

    interior to be heated up.

    GTower uses low-e glasses for the glass facades because the solar rays passes through the

    glasses as short wave (radiation) and goes through the glass to be absorbed by the interior of

    the building. Most of the longer wave heat energy is reflected back into the surrounding by the

    low-e glass filtering out most of the heat wave and reduce the increased of heat indoors.

  • Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies20

    The glass facades of GTower are also double glazed. Double glazed glass consists of two panes of

    glass with a gap in the middle which enable sunlight to me reflected back to the surroundings.

    The two pieces of glass and an insulated frame are sealed together as one unit. The gap in the

    middle is usually vacuum and sealed tight. Nowadays a certain amount of Argon gas, which is a

    naturally occurring inert gas, is inserted between the panes of glass. Argon gas has a density

    higher than the surrounding air and this reduce heat energy to be transmitted into the interior

    spaces. The gas acts as a barrier reducing heat loss as well as heat absorption in the building.

    The combination of both of low-e glass and double glazed glass can ensure a better heat

    insulation for the building improving the thermal comfort of GTower. The glass can reduce heat

    loss up to 50% of the heat radiation that passes through the double glazed glass. The double

    layers of glass helps to reduce noises from the external too. This type of glass increases security

    and protection for building because there are double layers which means double protection.

    .

  • Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies21

    Sustainable Design System

  • Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design

    Strategies22

    Reference http://www.goldis.com/media/doc/Architecture%20Malaysia%20G%20Tower%20a%20S

    ustainable%20Tower.pdf

    http://gtowerhotel.com/index.php