kawasan siap bangun

15
Build Area Zone AND Build Environment Zone Oleh : Wina Chartika (1203155) Ghivar Aulia I. (1204143) PENDIDIKAN TEKNIK BANGUNAN DEPARTEMEN PENDIDIKAN TEKNIK SIPIL UNIVERSITAS PENDIDIKAN INDONESIA

Transcript of kawasan siap bangun

Build Area Zone AND Build Environment Zone

Oleh : Wina Chartika

(1203155) Ghivar Aulia I.

(1204143)

PENDIDIKAN TEKNIK BANGUNANDEPARTEMEN PENDIDIKAN TEKNIK SIPIL

UNIVERSITAS PENDIDIKAN INDONESIA

Build Area Zone DefinitionBuild Area Zone is field of land that its

physical had to be prepared to development regency and settlement scale big that shared in one environment ready wake up or more that its execution be done according to phase .

Its execution more formerly to be completed with network primary and secondary infrastructure environment according to with plan order space environment that to be decided by head area , and to fulfill rules and regulations freezing service infrastructure and tool environment .

Special to DKI Jakarta, to be decided by Governor DKI Jakarta

Figure 1. Build Area Zone

Build Environment Zone Definition

Build Environment Zone is field of land (that resemble like Build Area Zone or stand self ) that had to be prepared and to be completed with infrastructure environment and according to with rules and regulations , standard order environment place stay or occupying and service environment to form ripe land kaveling

Purpose of Build Area Zone - Build Environment Zone

Tool to local economy development and tool for development city

Tool for supplying infrastructure and tool who fulfill service standard also according to with plan order space area

Tool to kavling's supplying ripe of land to espouse house with the occupying pattern that to balance, planned and reached for entire overlaying society

Tool to of land price controller

Courtesy PlanBuild Area Zone - Build

Environment Zone

First Approach

Second Approach

Space Component Connection Build Area Zone - Build Environment Zone

OCCUPATION

INTSRUMENT AND INFRA STRUCTURE

LAND USE

TOPAZ - URBAN

Topaz is instrument to maximize it economy machine and to repair ecology conservation, propering/ quality of life environment and work.

Topaz simulate it land usage current clan component/ network in system city, also social interaction

Bigging of Standard to Environment Planning Tool

A. Occupying Tool

Occupying tool can to be determined widely of land map it to house. To reach wide minimum average from map it of land must to weight it the factors of human life nature factor, and place development regulation.

B. Education FasilityThe Plan of education

facility-need also the the other economy social-facility to be based to the standard of tool need-planning city with the guidancy widing standard to citizen solid level.

Tabel 1. Standar Luas Tanah Sarana Pendidikan

No Environment Unit (Soul)

Wide (m2)

Information

1 1000 2400 TK2 1600 7200 SD3 4800 5400 SLTP4 4800 5400 SMA

C. Healthing FacilityTo be hooked with the standard of settlement environment-planning city, so the healthing quality that must to be provided to to serve the mentioned citizen is puskesmas, to disater curing, place practice doctor and drugstore also other facility like place parkir and park.

Figure 2. Clinic

D. Public Service Facility

The Analysical of service facility-need public use service to society according to macro, like administration office, post office, public telephone, to disater meeting, WC and parkir public. According to with city function and the need of city citizen-development, so the facility that to be needed : Parkir public + WC as wide as 200 m 2 ,

every serving unit 2.500 soul. To disater meeting widely it ising 600 m 2 ,

every unit serve citizen around 2.500 soul. gkgChief of a district's Office widely it ising

2.000 m 2 . Village chief's Office widely it ising 1.000 m

2 . Assistance post Office widely it ising 200 m

2 . Police's Post widely it ising 400 m 2 . Koramil's Office widely it ising 400 m 2 .

E. Tool of culture and recreation these Tools is the building that to be used culture activities and or recreation like meeting building, building completely use, movie theater, building of artistry, and etc.

F. Worshiping The Counter of worshiping

facility-need in planning area to be according toed with the number of religion follower-citizen that exist

G. Facility of sport and the opened area

To join in the standard of settlement environment-planning city, facility need process body and the opened space planning area is :

  Park to service 250 soul, this tool is

functiony as city green space, wide every unit 500 m 2 .

Place Park To play to service 2.500 the functiony soul as the opened space and playing place. this Tool is be needed with as wide as it ising 2.500 m 2 .

Field of Sport widely it ising 18.000 m 2 .