KE PELABUHAN RATU · ke pelabuhan ratu land use 001 1 : 28000 jalan sawah / tanah kosong rumah...

8
X = 659850.00 Y = 9232250.00 X = 660350.00 X = 660850.00 X = 661350.00 X = 661850.00 X = 662350.00 X = 662600.00 Y = 9231750.00 Y = 9231250.00 Y = 9230750.00 Y = 9230250.00 X = 660650.000 Y = 9231055.000 T.2 X = 660100.00 X = 660600.00 X = 661100.00 X = 661600.00 X = 662100.00 Y = 9230500.00 Y = 9230000.00 Y = 9231000.00 Y = 9231500.00 Y = 9232000.00 X = 660594.000 Y = 9231046.000 T.3 X = 660055.050 Y = 9231713.459 T.5 X = 662269.056 Y = 9230643.049 T.1 LAUT LAUT LAUT LAUT 0 000 0 100 0 200 0 300 0 400 0 500 0 600 0 700 0 800 0 900 1 000 1 100 1 200 1 300 1 400 1 500 1 600 1 700 1 800 1 900 2 000 2 100 2 200 2 300 2 400 2 500 2 600 2 700 2 800 2 900 2 975 Sawah Tanah Kosong Tanah Kosong Tanah Kosong Sawah Sawah Sawah Sawah Sawah Sawah Pemukiman Warga Pemukiman Warga Pemukiman Warga Tanah Kosong Tanah Kosong Tanah Kosong Zebra Cross Zebra Cross Zebra Cross Zebra Cross Sawah LOKASI HOTEL D'AARU KARANG HAWU LAUT LAUT KE PELABUHAN RATU LAND USE 001 1 : 28000 JALAN SAWAH / TANAH KOSONG RUMAH WARGA UKURAN DALAM SATUAN METER (m) LAUT SCALE 1 : 10000 0 0 2 200 4 cm 400 m B T S U KETERANGAN PEMBANGUN : JUDUL PROYEK : JUDUL GAMBAR : NO GAMBAR : TANGGAL : A3 KONSULTAN PERENCANA : ANALISIS DAMPAK LALU LINTAS HOTEL D'AARU KARANG HAWU KAB. SUKABUMI SKALA UKURAN PT. INA ARTA UTAMA PT. BINA INSAN MANDIRI

Transcript of KE PELABUHAN RATU · ke pelabuhan ratu land use 001 1 : 28000 jalan sawah / tanah kosong rumah...

X =

659850.00

Y = 9232250.00

X =

660350.00

X =

660850.00

X =

661350.00

X =

661850.00

X =

662350.00

X =

662600.00

Y = 9231750.00

Y = 9231250.00

Y = 9230750.00

Y = 9230250.00

X = 660650.000

Y = 9231055.000

T.2

X =

660100.00

X =

660600.00

X =

661100.00

X =

661600.00

X =

662100.00

Y = 9230500.00

Y = 9230000.00

Y = 9231000.00

Y = 9231500.00

Y = 9232000.00

X = 660594.000

Y = 9231046.000

T.3

X = 660055.050

Y = 9231713.459

T.5

X = 662269.056

Y = 9230643.049

T.1

LAUT

LAUT

LAUT

LAUT

00000

100

020

0

030

0040

0

050

0

060

0

070

00800

090

0

100

0

1100

120

0

1300

140

0

150

0

16001

7001

800

190

0

200

0

2100

220

0

230

0

240

0

2500

2 600

2 700

2 800

2 900

2975

Sawah

Tanah Kosong

Tanah KosongTanah Kosong

Sawah

SawahSawah

Sawah

Sawah

Sawah

Pemukiman Warga

Pemukiman WargaPemukiman Warga

Tanah Kosong

Tanah Kosong

Tanah Kosong

Zebra Cross

Zebra Cross

ZebraCross

Zebra Cross

Sawah

LOKASI

HOTEL D'AARU KARANG HAWU

LAUT

LAUT

K

E

P

E

L

A

B

U

H

A

N

R

A

T

U

LAND USE

001

1 : 28000

JALAN

SAWAH / TANAH KOSONG

RUMAH WARGA

UKURAN DALAM SATUAN METER (m)

LAUT

SCALE 1 : 10000

0

0

2

200

4 cm

400 m

B T

S

U

KETERANGAN

PEMBANGUN :

JUDUL PROYEK :

JUDUL GAMBAR :

NO GAMBAR :

TANGGAL :

A3

KONSULTAN PERENCANA :

ANALISIS DAMPAK LALU LINTAS

HOTEL D'AARU KARANG HAWU

KAB. SUKABUMI

SKALA

UKURAN

PT. INA ARTA UTAMA

PT. BINA INSAN MANDIRI

X = 660650.000

Y = 9231055.000

T.2

X = 660594.000

Y = 9231046.000

T.3

Tanah Kosong

Sawah

Lebar Lahan

54.50

Y = 9231250.00

Y = 9231150.00

Y = 9231050.00

Y = 9230950.00

Y = 9231200.00

Y = 9231100.00

Y = 9231000.00

Y = 9231300.00

X =

660350.00

X =

660550.00

X =

660650.00

X =

660750.00

X =

660450.00

X =

660500.00

X =

660600.00

X =

660700.00

X =

660400.00

R

RR

RR

R

R

CAMP DAVID

RR

R

R

R

R

R

R

R

R

R

R

R

R

RSawah

Tanah Kosong

LAUT

LAUT

LAUT

R

Tanah Kosong

LOKASI

HOTEL D'AARU KARANG HAWU

Tanah Kosong

Tanah KosongBatas Area Hotel

Batas Area Hotel

SEKOLAH MENENGAHPERTAMA

Sungai

K

E

P

E

L

A

B

U

H

A

N

R

A

T

U

6.00

6.00

Zebra Cross

Zebra Cross

LAYOUT EKSISTING

002

1 : 1500

JALAN

SAWAH / TANAH KOSONG

RUMAH WARGA

UKURAN DALAM SATUAN METER (m)

LAUT

KETERANGAN

PEMBANGUN :

JUDUL PROYEK :

JUDUL GAMBAR :

NO GAMBAR :

TANGGAL :

A3

KONSULTAN PERENCANA :

ANALISIS DAMPAK LALU LINTAS

HOTEL D'AARU KARANG HAWU

KAB. SUKABUMI

SKALA

UKURAN

PT. INA ARTA UTAMA

PT. BINA INSAN MANDIRI

SCALE 1 : 1500

0

0

2

30

4 cm

60 m

B T

S

U

X = 660650.000

Y = 9231055.000

T.2

X = 660594.000

Y = 9231046.000

T.3

18.00

Lebar Lahan

54.50

Y = 9231250.00

Y = 9231150.00

Y = 9231050.00

Y = 9230950.00

Y = 9231200.00

Y = 9231100.00

Y = 9231000.00

Y = 9231300.00

X =

660350.00

X =

660550.00

X =

660650.00

X =

660750.00

X =

660450.00

X =

660500.00

X =

660600.00

X =

660700.00

X =

660400.00

CAMP DAVID

LAUT

LAUT

LAUT

SEKOLAH MENENGAHPERTAMA

3.00

Sungai

K

E

P

E

L

A

B

U

H

A

N

R

A

T

U

6.00

6.00

SITE PLAN

003

1 : 1500

SCALE 1 : 1500

0

0

2

30

4 cm

60 m

B T

S

U

KETERANGAN

PEMBANGUN :

JUDUL PROYEK :

JUDUL GAMBAR :

NO GAMBAR :

TANGGAL :

A3

KONSULTAN PERENCANA :

ANALISIS DAMPAK LALU LINTAS

HOTEL D'AARU KARANG HAWU

KAB. SUKABUMI

SKALA

UKURAN

PT. INA ARTA UTAMA

PT. BINA INSAN MANDIRI

X = 660594.000

Y = 9231046.000

T.3

18.00

Lebar Lahan

54.50

Y = 9231250.00

Y = 9231150.00

Y = 9231050.00

Y = 9230950.00

Y = 9231200.00

Y = 9231100.00

Y = 9231000.00

Y = 9231300.00

X =

660350.00

X =

660550.00

X =

660650.00

X =

660750.00

X =

660450.00

X =

660500.00

X =

660600.00

X =

660700.00

X =

660400.00

CAMP DAVID

LAUT

LAUT

LAUT

K

E

P

E

L

A

B

U

H

A

N

R

A

T

U

SEKOLAH MENENGAHPERTAMA

Sungai

X = 660650.000

Y = 9231055.000

T.2

6.00

6.00

6.00R3.75

REKOMENDASI

SITE PLAN

004

1 : 1500

KETERANGAN

PEMBANGUN :

JUDUL PROYEK :

JUDUL GAMBAR :

NO GAMBAR :

TANGGAL :

A3

KONSULTAN PERENCANA :

ANALISIS DAMPAK LALU LINTAS

HOTEL D'AARU KARANG HAWU

KAB. SUKABUMI

SKALA

UKURAN

PT. INA ARTA UTAMA

PT. BINA INSAN MANDIRI

SCALE 1 : 1500

0

0

2

30

4 cm

60 m

B T

S

U

X = 660594.000

Y = 9231046.000

T.3

18.00

Lebar Lahan

54.50

Y = 9231250.00

Y = 9231150.00

Y = 9231050.00

Y = 9230950.00

Y = 9231200.00

Y = 9231100.00

Y = 9231000.00

Y = 9231300.00

X =

660350.00

X =

660550.00

X =

660650.00

X =

660750.00

X =

660450.00

X =

660500.00

X =

660600.00

X =

660700.00

X =

660400.00

CAMP DAVID

LAUT

LAUT

LAUT

K

E

P

E

L

A

B

U

H

A

N

R

A

T

U

SEKOLAH MENENGAHPERTAMA

Sungai

X = 660650.000

Y = 9231055.000

T.2

6.00

6.00

6.00R3.75

REKOMENDASI

RAMBU SAAT KONSTRUKSI

005

1 : 1500

KETERANGAN

PEMBANGUN :

JUDUL PROYEK :

JUDUL GAMBAR :

NO GAMBAR :

TANGGAL :

A3

KONSULTAN PERENCANA :

ANALISIS DAMPAK LALU LINTAS

HOTEL D'AARU KARANG HAWU

KAB. SUKABUMI

SKALA

UKURAN

PT. INA ARTA UTAMA

PT. BINA INSAN MANDIRI

SCALE 1 : 1500

0

0

2

30

4 cm

60 m

B T

S

U

Rotary Lamp

HATI-HATI !!!

ADA PEMBANGUNAN

HOTEL

Rotary Lamp

HATI-HATI !!!

ADA PEMBANGUNAN

HOTEL

X = 660594.000

Y = 9231046.000

T.3

18.00

Lebar Lahan

54.50

Y = 9231250.00

Y = 9231150.00

Y = 9231050.00

Y = 9230950.00

Y = 9231200.00

Y = 9231100.00

Y = 9231000.00

Y = 9231300.00

X =

660350.00

X =

660550.00

X =

660650.00

X =

660750.00

X =

660450.00

X =

660500.00

X =

660600.00

X =

660700.00

X =

660400.00

CAMP DAVID

LAUT

LAUT

LAUT

K

E

P

E

L

A

B

U

H

A

N

R

A

T

U

SEKOLAH MENENGAHPERTAMA

Sungai

X = 660650.000

Y = 9231055.000

T.2

6.00

6.00

6.00R3.75

ALUR SIRKULASI KENDARAAN DAN

SIRKULASI PEJALAN KAKI

006

1 : 1500

KETERANGAN

PEMBANGUN :

JUDUL PROYEK :

JUDUL GAMBAR :

NO GAMBAR :

TANGGAL :

A3

KONSULTAN PERENCANA :

ANALISIS DAMPAK LALU LINTAS

HOTEL D'AARU KARANG HAWU

KAB. SUKABUMI

SKALA

UKURAN

PT. INA ARTA UTAMA

PT. BINA INSAN MANDIRI

SCALE 1 : 1500

0

0

2

30

4 cm

60 m

B T

S

U

ALUR SIRKULASI PEJALAN KAKI

ALUR SIRKULASI KENDARAAN

X = 660594.000

Y = 9231046.000

T.3

18.00

Lebar Lahan

54.50

Y = 9231250.00

Y = 9231150.00

Y = 9231050.00

Y = 9230950.00

Y = 9231200.00

Y = 9231100.00

Y = 9231000.00

Y = 9231300.00

X =

660350.00

X =

660550.00

X =

660650.00

X =

660750.00

X =

660450.00

X =

660500.00

X =

660600.00

X =

660700.00

X =

660400.00

CAMP DAVID

LAUT

LAUT

LAUT

K

E

P

E

L

A

B

U

H

A

N

R

A

T

U

SEKOLAH MENENGAHPERTAMA

Sungai

X = 660650.000

Y = 9231055.000

T.2

6.00

6.00

6.00R3.75

REKOMENDASI

RAMBU INTERNAL

007

1 : 1500

KETERANGAN

PEMBANGUN :

JUDUL PROYEK :

JUDUL GAMBAR :

NO GAMBAR :

TANGGAL :

A3

KONSULTAN PERENCANA :

ANALISIS DAMPAK LALU LINTAS

HOTEL D'AARU KARANG HAWU

KAB. SUKABUMI

SKALA

UKURAN

PT. INA ARTA UTAMA

PT. BINA INSAN MANDIRI

SCALE 1 : 1500

0

0

2

30

4 cm

60 m

B T

S

U

18.00

6.00

5.49

6.00

3.00

R3.75

T. Parkir Bus

T. Parkir Motor

T. Parkir Mobil

T. Parkir Keamanan

6.00

Lebar Lahan54.50

6.00

30.40

REKOMENDASI

DETAIL BUKAAN ENTRANCE

008

1 : 250

SCALE 1 : 250

0

0

2

5

4 cm

10 m

KETERANGAN

PEMBANGUN :

JUDUL PROYEK :

JUDUL GAMBAR :

NO GAMBAR :

TANGGAL :

A3

KONSULTAN PERENCANA :

ANALISIS DAMPAK LALU LINTAS

HOTEL D'AARU KARANG HAWU

KAB. SUKABUMI

SKALA

UKURAN

PT. INA ARTA UTAMA

PT. BINA INSAN MANDIRI