KEPUTUSAN SEBUTHARGA : BULAN MAC 2017 cadangan jadual kadar harga menyelenggara pokok-pokok dan...
Transcript of KEPUTUSAN SEBUTHARGA : BULAN MAC 2017 cadangan jadual kadar harga menyelenggara pokok-pokok dan...
BIL TAJUK KERJA NO. PETENDER /
PETENDER BERJAYA
HARGA
TAWARAN
KONTRAK
(RM)
6% GST
(RM)
JUMLAH
KESELURUHAN
TERMASUK GST
(RM)
TEMPOH
SIAP
1 CADANGAN KERJA-KERJA
MENYELENGGARA PERALATAN, ALAT-
ALAT PERMAINAN, PERABOT TAMAN,
GELANGGANG SERTA LAIN-LAIN KERJA
PEMBAIKAN DI KAWASAN LAPANG
MENGIKUT KEUTAMAAN UNTUK MAJLIS
BANDARAYA PETALING JAYA BAGI
TEMPOH 2 TAHUN (PANEL 1)
30 DARI 51
PELANGI INDAH NIAGA
HARGA
SILING
500,000.00 /
2 TAHUN
(-20.00%)
30,000.00 HARGA SILING
530,000.00 /
2 TAHUN
(-20.00%)
2 TAHUN
2 CADANGAN KERJA-KERJA
MENYELENGGARA PERALATAN, ALAT-
ALAT PERMAINAN, PERABOT TAMAN,
GELANGGANG SERTA LAIN-LAIN KERJA
PEMBAIKAN DI KAWASAN LAPANG
MENGIKUT KEUTAMAAN UNTUK MAJLIS
BANDARAYA PETALING JAYA BAGI
TEMPOH 2 TAHUN (PANEL 2)
25 DARI 52
PERAWAN CORPORATION
SDN BHD
HARGA
SILING
500,000.00 /
2 TAHUN
(-20.00%)
30,000.00 HARGA SILING
530,000.00 /
2 TAHUN
(-20.00%)
2 TAHUN
3 CADANGAN KERJA-KERJA
MENYELENGGARA PERALATAN, ALAT-
ALAT PERMAINAN, PERABOT TAMAN,
GELANGGANG SERTA LAIN-LAIN KERJA
PEMBAIKAN DI KAWASAN LAPANG
MENGIKUT KEUTAMAAN UNTUK MAJLIS
BANDARAYA PETALING JAYA BAGI
TEMPOH 2 TAHUN (PANEL 3)
19 DARI 54
AL ENTERPRISE
HARGA
SILING
500,000.00 /
2 TAHUN
(-20.00%)
30,000.00 HARGA SILING
530,000.00 /
2 TAHUN
(-20.00%)
2 TAHUN
4 CADANGAN KERJA-KERJA
MENYELENGGARA PERALATAN, ALAT-
ALAT PERMAINAN, PERABOT TAMAN,
GELANGGANG SERTA LAIN-LAIN KERJA
PEMBAIKAN DI KAWASAN LAPANG
MENGIKUT KEUTAMAAN UNTUK MAJLIS
BANDARAYA PETALING JAYA BAGI
TEMPOH 2 TAHUN (PANEL 4)
24 DARI 52
HANDY CONSTRUCTION
HARGA
SILING
500,000.00 /
2 TAHUN
(-20.00%)
30,000.00 HARGA SILING
530,000.00 /
2 TAHUN
(-20.00%)
2 TAHUN
5 CADANGAN KERJA-KERJA
MENYELENGGARA PERALATAN, ALAT-
ALAT PERMAINAN, PERABOT TAMAN,
GELANGGANG SERTA LAIN-LAIN KERJA
PEMBAIKAN DI KAWASAN LAPANG
MENGIKUT KEUTAMAAN UNTUK MAJLIS
BANDARAYA PETALING JAYA BAGI
TEMPOH 2 TAHUN (PANEL 5)
22 DARI 52
EDOL BINA SDN BHD
HARGA
SILING
500,000.00 /
2 TAHUN
(-20.00%)
30,000.00 HARGA SILING
530,000.00 /
2 TAHUN
(-20.00%)
2 TAHUN
6 CADANGAN KERJA-KERJA
MENYELENGGARA PERALATAN, ALAT-
ALAT PERMAINAN, PERABOT TAMAN,
GELANGGANG SERTA LAIN-LAIN KERJA
PEMBAIKAN DI KAWASAN LAPANG
MENGIKUT KEUTAMAAN UNTUK MAJLIS
BANDARAYA PETALING JAYA BAGI
TEMPOH 2 TAHUN (PANEL 6)
30 DARI 51
RAMIAN SDN BHD
HARGA
SILING
500,000.00 /
2 TAHUN
(-20.00%)
30,000.00 HARGA SILING
530,000.00 /
2 TAHUN
(-20.00%)
2 TAHUN
KEPUTUSAN SEBUTHARGA : BULAN MAC 2017
BIL TAJUK KERJA NO. PETENDER /
PETENDER BERJAYA
HARGA
TAWARAN
KONTRAK
(RM)
6% GST
(RM)
JUMLAH
KESELURUHAN
TERMASUK GST
(RM)
TEMPOH
SIAP
7 CADANGAN KERJA-KERJA
MENYELENGGARA PERALATAN, ALAT-
ALAT PERMAINAN, PERABOT TAMAN,
GELANGGANG SERTA LAIN-LAIN KERJA
PEMBAIKAN DI KAWASAN LAPANG
MENGIKUT KEUTAMAAN UNTUK MAJLIS
BANDARAYA PETALING JAYA BAGI
TEMPOH 2 TAHUN (PANEL 7)
21 DARI 52
ANS VENTURE RESOURCES
HARGA
SILING
500,000.00 /
2 TAHUN
(-20.00%)
TIDAK
BERDAFTAR
SEMAKAN
07.03.2017
HARGA SILING
500,000.00 /
2 TAHUN
(-20.00%)
2 TAHUN
8 CADANGAN KERJA-KERJA
MENYELENGGARA PERALATAN, ALAT-
ALAT PERMAINAN, PERABOT TAMAN,
GELANGGANG SERTA LAIN-LAIN KERJA
PEMBAIKAN DI KAWASAN LAPANG
MENGIKUT KEUTAMAAN UNTUK MAJLIS
BANDARAYA PETALING JAYA BAGI
TEMPOH 2 TAHUN (PANEL 9)
20 DARI 51
AZHOOD SERVICES
HARGA
SILING
500,000.00 /
2 TAHUN
(-20.00%)
TIDAK
BERDAFTAR
SEMAKAN
07.03.2017
HARGA SILING
500,000.00 /
2 TAHUN
(-20.00%)
2 TAHUN
9 CADANGAN KERJA-KERJA
MENYELENGGARA PERALATAN, ALAT-
ALAT PERMAINAN, PERABOT TAMAN,
GELANGGANG SERTA LAIN-LAIN KERJA
PEMBAIKAN DI KAWASAN LAPANG
MENGIKUT KEUTAMAAN UNTUK MAJLIS
BANDARAYA PETALING JAYA BAGI
TEMPOH 2 TAHUN (PANEL 10)
25 DARI 51
GEMBES ILHAM ENTERPRISE
HARGA
SILING
500,000.00 /
2 TAHUN
(-20.00%)
30,000.00 HARGA SILING
530,000.00 /
2 TAHUN
(-20.00%)
2 TAHUN
10 CADANGAN KERJA-KERJA
MENYELENGGARA PERALATAN, ALAT-
ALAT PERMAINAN, PERABOT TAMAN,
GELANGGANG SERTA LAIN-LAIN KERJA
PEMBAIKAN DI KAWASAN LAPANG
MENGIKUT KEUTAMAAN UNTUK MAJLIS
BANDARAYA PETALING JAYA BAGI
TEMPOH 2 TAHUN (PANEL 11)
22 DARI 50
MDN CONSTRUCTION SDN
BHD
HARGA
SILING
500,000.00 /
2 TAHUN
(-20.00%)
30,000.00 HARGA SILING
530,000.00 /
2 TAHUN
(-20.00%)
2 TAHUN
11 CADANGAN JADUAL KADAR HARGA
MENYELENGGARA POKOK-POKOK DAN
MENGEMAS REZAB HIJAU DISEPANJANG
JALAN-JALAN : JALAN SS 21/13, JALAN
SS 21/32, JALAN SS 21/42A, JALAN SS
21/46, JALAN SS 21/35, JALAN DAHLIA,
JALAN CEMPAKA, JALAN MASJID, JALAN
TERATAI, JALAN KEKWA DAN JALAN
KENANGA PETALING JAYA UNTUK
MAJLIS BANDARAYA PETALING JAYA
29 DARI 65
AIN TEGUH ENTERPRISE
HARGA
SILING
500,000.00 /
8 BULAN
(-20.00%)
30,000.00 HARGA SILING
530,000.00 /
8 BULAN
(-20.00%)
8 BULAN
12 CADANGAN JADUAL KADAR HARGA
MENYELENGGARA POKOK-POKOK DAN
MENGEMAS REZAB HIJAU DISEPANJANG
JALAN-JALAN : JALAN TROPICANA
UTARA, JALAN TROPICANA SELATAN 2,
JALAN PJU 3/32, JALAN PJU 1A/5, JALAN
MUTIARA TROPICANA DAN JALAN
TANJUNG PETALING JAYA UNTUK
MAJLIS BANDARAYA PETALING JAYA
29 DARI 67
BUMI SEPANG ENTERPRISE
HARGA
SILING
500,000.00 /
8 BULAN
(-20.00%)
30,000.00 HARGA SILING
530,000.00 /
8 BULAN
(-20.00%)
8 BULAN
BIL TAJUK KERJA NO. PETENDER /
PETENDER BERJAYA
HARGA
TAWARAN
KONTRAK
(RM)
6% GST
(RM)
JUMLAH
KESELURUHAN
TERMASUK GST
(RM)
TEMPOH
SIAP
13 CADANGAN JADUAL KADAR HARGA
MENYELENGGARA POKOK-POKOK DAN
MENGEMAS REZAB HIJAU DISEPANJANG
JALAN-JALAN : JALAN CAMAR 4/5,
JALAN SEPAH PUTRI 5/19, JALAN PJU
5/21, JALAN PEKAKA 8/9A, JALAN
SEKSYEN 11/6A, KOTA DAMANSARA
PETALING JAYA UNTUK MAJLIS
BANDARAYA PETALING JAYA
34 DARI 67
EL NOUR ENTERPRISE
HARGA
SILING
500,000.00 /
8 BULAN
(-20.00%)
30,000.00 HARGA SILING
530,000.00 /
8 BULAN
(-20.00%)
8 BULAN
14 CADANGAN JADUAL KADAR HARGA
MENYELENGGARA POKOK-POKOK DAN
MENGEMAS REZAB HIJAU DISEPANJANG
JALAN-JALAN : JALAN SS 7/2, JALAN SS
9/2, JALAN SS 9A/19, JALAN 51A/221,
JALAN 11/8E, JALAN KLANG LAMA,
JALAN 8/18, JALAN PERSIARAN BARAT,
JALAN 5/39, JALAN GASING, JALAN
10/10H, JALAN 51/205 PETALING JAYA
UNTUK MAJLIS BANDARAYA PETALING
JAYA
29 DARI 63
EWANA BINA RESOURCES
HARGA
SILING
500,000.00 /
8 BULAN
(-20.00%)
30,000.00 HARGA SILING
530,000.00 /
8 BULAN
(-20.00%)
8 BULAN
15 CADANGAN PERKHIDMATAN
PEMBERSIHAN / PENCUCIAN DAN
PENYELENGGARAAN BANGUNAN
DEWAN SIVIK, MAJLIS BANDARAYA
PETALING JAYA BAGI TEMPOH 24
BULAN + 12 BULAN
73 DARI 113
ANS DYNAMIC RESOURCES
247,910.40 /
24 BULAN
@
10,329.60 /
BULAN
14,874.62 /
24 BULAN
@
619.77 /
BULAN
262,784.88 /
24 BULAN
@
10,949.37 /
BULAN
24 BULAN
+
12 BULAN
16 CADANGAN PERKHIDMATAN
PEMBERSIHAN / PENCUCIAN DAN
PENYELENGGARAAN KOMPLEKS SUKAN
ARENA DAN KUARTERS MBPJ, JALAN
4/46 KAWASAN ZON PJ TENGAH 4,
MAJLIS BANDARAYA PETALING JAYA
BAGI TEMPOH 24 BULAN + 12 BULAN
81 DARI 116
AMD CREATIVE ENTERPRISE
230,630.40 /
24 BULAN
@
9,609.60 /
BULAN
13,837.82 /
24 BULAN
@
576.57 /
BULAN
244,468.08 /
24 BULAN
@
10,186.17 /
BULAN
24 BULAN
+
12 BULAN
17 CADANGAN PERKHIDMATAN
PEMBERSIHAN / PENCUCIAN DAN
PENYELENGGARAAN BANGUNAN
DEWAN SERBAGUNA, DAN PADANG
BOLA SEPAK KAWASAN ZON PJ UTARA
1A, MAJLIS BANDARAYA PETALING JAYA
BAGI TEMPOH 24 BULAN + 12 BULAN
75 DARI 112
KERJAYA ILHAM
ENTERPRISE
210,355.20 /
24 BULAN
@
8,764.80 /
BULAN
12,621.31 /
24 BULAN
@
525.88 /
BULAN
222,976.32 /
24 BULAN
@
9,290.68 /
BULAN
24 BULAN
+
12 BULAN
18 CADANGAN KERJA-KERJA
MENYELENGGARA PERALATAN, ALAT-
ALAT PERMAINAN, PERABOT TAMAN,
GELANGGANG SERTA LAIN-LAIN KERJA
PEMBAIKAN DI KAWASAN LAPANG
MENGIKUT KEUTAMAAN UNTUK MAJLIS
BANDARAYA PETALING JAYA BAGI
TEMPOH 2 TAHUN (PANEL 8)
27 DARI 48
NUR DELIMA ENTERPRISE
HARGA
SILING
500,000.00 /
2 TAHUN
(-20.00%)
30,000.00 HARGA SILING
530,000.00 /
2 TAHUN
(-20.00%)
2 TAHUN
19 CADANGAN KERJA-KERJA MEMBINA
DAN MENYIAPKAN PEJALAN KAKI DAN
LAIN-LAIN KERJA BERKAITAN DI
SEBAHAGIAN JALAN 17/22, KAWASAN
SEKSYEN 17, PETALING JAYA
17 DARI 62
AEBBA ENGINEERING SDN
BHD
341,700.00 - 341,700.00 24 MINGGU
BIL TAJUK KERJA NO. PETENDER /
PETENDER BERJAYA
HARGA
TAWARAN
KONTRAK
(RM)
6% GST
(RM)
JUMLAH
KESELURUHAN
TERMASUK GST
(RM)
TEMPOH
SIAP
20 CADANGAN MENAIKTARAF TANGKI AIR
SISTEM PENCEGAH KEBAKARAN SERTA
KERJA-KERJA YANG BERKAITAN DI
MENARA MBPJ UNTUK TETUAN MAJLIS
BANDARAYA PETALING JAYA
20 DARI 32
STRATEGIC SUCCESS
CONSTRUCTION & SUPPLY
402,000.00 - 402,000.00 12 MINGGU
21 KERJA-KERJA MEMBEKAL DAN
MEMASANG PERABOT DAN
KELENGKAPAN BILIK DARJAH DI 12
BUAH SEKOLAH BAGI PEMBINAAN
KELAS ABAD 21 DI PETALING JAYA
12 DARI 22
DYNAMIC VISION
ENTERPRISE
373,248.00 - 373,248.00 30 HARI
22 KERJA-KERJA MEMBEKAL DAN
MEMASANG PERABOT DAN
KELENGKAPAN BILIK DARJAH DI 8 BUAH
SEKOLAH BAGI PEMBINAAN KELAS
ABAD 21 DI PETALING JAYA
7 DARI 21
SZ DAYA ENTERPRISE
248,652.80 14,919.16 263,571.96 30 HARI
23 CADANGAN KERJA-KERJA MEMBEKAL,
MEMASANG DAN MENGUJILARI UNIT
BAHARU WATER COOLED PACKAGE
UNIT (WCPU) SERTA MEMBUNGKAI
UNIT LAMA WATER COOLED PACKAGE
UNIT (WCPU) BAGI KEGUNAAN RUANG
LEGAR (LOBBY) MENARA MAJLIS
BANDARAYA PETALING JAYA
3 DARI 11
ELAMAN ENTERPRISE
145,600.00 8,736.00 154,336.00 4 MINGGU
24 CADANGAN MENAIKTARAF LANDSKAP
DI MEDIAN JALAN PJS 3/4 BAGI PROJEK-
PROJEK DI BAWAH "LIVABLE CITY @
PJS 2" PETALING JAYA UNTUK TETUAN
MAJLIS BANDARAYA PETALING JAYA
9 DARI 21
SNZ JITU ENTERPRISE
196,196.00 11,771.76 207,967.76 20 MINGGU
25 CADANGAN KERJA-KERJA MEMBEKAL,
MEMASANG DAN MENGUJILARI SISTEM
PENGHAWA DINGIN DI SMK (P) SRI
AMAN PETALING JAYA BAGI PIHAK
MAJLIS BANDARAYA PETALING JAYA
10 DARI 17
JOMAN ENTERPRISE
200,100.00 12,006.00 212,106.00 10 MINGGU
26 CADANGAN PERKHIDMATAN
PEMBERSIHAN / PENCUCIAN DAN
PENYELENGGARAAN BANGUNAN
DEWAN SERBAGUNA, GELANGGANG
SQUASH DAN PADANG BOLA SEPAK
KAWASAN ZON PJ UTARA 1B, MAJLIS
BANDARAYA PETALING JAYA BAGI
TEMPOH 24 BULAN + 12 BULAN
79 DARI 103
ROZA NIAGA
217,045.40 /
24 BULAN
@
9,043.56 /
BULAN
13,022.72 /
24 BULAN
@
542.61 /
BULAN
230,068.08 /
24 BULAN
@
9,586.17 /
BULAN
24 BULAN
+
12 BULAN
27 CADANGAN PERKHIDMATAN
PEMBERSIHAN / PENCUCIAN DAN
PENYELENGGARAAN KOMPLEKS SUKAN
DAN KOMPLEKS KOLAM RENANG
KELANA JAYA, MAJLIS BANDARAYA
PETALING JAYA BAGI TEMPOH 24
BULAN + 12 BULAN
78 DARI 118
KASTAJU ENTERPRISE
340,992.00 /
24 BULAN
@
14,208.00 /
BULAN
20,459.52 /
24 BULAN
@
852.48 /
BULAN
361,451.52 /
24 BULAN
@
15,060.48 /
BULAN
24 BULAN
+
12 BULAN
28 CADANGAN KERJA-KERJA MEMBEKAL
DAN MEMASANG ALAT HAWA DINGIN
DI BANGUNAN DAN DEWAN MAJLIS
BANDARAYA PETALING JAYA
3 DARI 15
ANZ BUMI INDAH SDN BHD
271,500.00 16,290.00 287,790.00 12 MINGGU