List Tenaga Ahli
1
1. Tenaga Ahli No BIDANG KEAHLIAN URAIAN VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp) 1 Team Leader (Ahli Elektro/Teknik Mesin), S-1, Sertifikat, (5-8 th) - 2 Ahli Sipil, S-1, (4 s.d 8th) , Non SKA - 3 Ahli Mesin , S-1, (1 s.d 4th) , Non SKA - 4 Ahli Elektro, S-1, (1 s.d 4th) , Non SKA - 5 Ahli Geodesi (GIS),S-1, (1 s.d 4th) , Non SKA - 6 Ahli Ekonomi, S-1, (1 s.d 4th) , Non SKA - - 2. Tenaga Pendukung 1 Operator Komputer - 2 Surveyor - 3 Sekretaris - 4 CAD Operator - KEGIATAN : Pengembangan Pemanfaatan Energi Baru Terbarukan di Jawa Barat PEKERJAAN : Inventarisasi/Survey Potensi Energi Baru Terbarukan di Jawa Barat T.A. : 2014 A A. BIAYA PERSONIL TENAGA AHLI DAN TENAGA PENDUKUNG
-
Upload
dedy-setyo-oetomo -
Category
Documents
-
view
29 -
download
0
Transcript of List Tenaga Ahli
![Page 1: List Tenaga Ahli](https://reader035.fdokumen.site/reader035/viewer/2022081803/55cf9685550346d0338c04b7/html5/thumbnails/1.jpg)
1. Tenaga Ahli
No
BIDANG KEAHLIAN
URAIAN VOLUME HARGA SATUAN
(Rp)
JUMLAH HARGA (Rp)
1 Team Leader (Ahli Elektro/Teknik Mesin),
S-1, Sertifikat, (5-8 th) -
2
Ahli Sipil, S-1, (4 s.d 8th) , Non SKA
- 3 Ahli Mesin , S-1, (1 s.d 4th) , Non SKA - 4 Ahli Elektro, S-1, (1 s.d 4th) , Non SKA - 5 Ahli Geodesi (GIS),S-1, (1 s.d 4th) , Non
SKA
-
6 Ahli Ekonomi, S-1, (1 s.d 4th) , Non SKA -
-
2. Tenaga Pendukung 1 Operator Komputer - 2 Surveyor - 3 Sekretaris - 4 CAD Operator -
KEGIATAN : Pengembangan Pemanfaatan Energi Baru Terbarukan di Jawa Barat
PEKERJAAN
: Inventarisasi/Survey Potensi Energi Baru Terbarukan di Jawa Barat
T.A. : 2014
A A. BIAYA PERSONIL TENAGA AHLI DAN TENAGA PENDUKUNG