UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

28
UNIVERSITI MALAYSIA SABAH BORANG PENGESAHAN STATUS TESIS lADUAL IlAZAH MEMBASMI PEMBAZIRAN MELALUI PENGGUNAAN VSM BAGI MEMPERBAIKI PRODUKTIVrn DALAM KILANG MASTER OF BUSINESS ADMINISTRATION SESI PENGAlIAN 2008 - 2010 Saya, Tay Kwai Fui mengaku membenarkan tesis sarjana ini di simpan di perpustakaan Universiti Malaysia Sabah dengan syarat-syarat kegunaan berikut: 1. Tesis adalah hak milik Universiti Malaysia Sabah. 2. Perpustakaan Universiti Malaysia Sabah dibenarkan membuat salinan untuk tujuan pengajian sahaja. 3. Perpustakaan dibenarkan membuat salinan tesis ini sebagai bahan pertukaran institusi pengajian tinggi. 4. TIDAK TERHAD Alamat: Block A, Lot 13, 4th Floor, Ramin Court, Penampang, 88300 Kota Kinabalu, Sabah. PROF. MADYA OR. NOORHAYATI MANSOR Pengarah Pusat Perakaunan Penyelia: Prof. Madya Dr. Noorhayati Mansor Universitl Malaysia Sabah Tarikh: 28 July 2010 Catatan: Tesis dimaksudkan SEBAGAI TESIS ijazah Doktor Falsafah dan Sarjana secara penyelidikan atau disertasi bagi pengajian secara kerja kursus dan penyelidikan atau laporan Projek Sarjana Muda (LPSM)

Transcript of UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

Page 1: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

UNIVERSITI MALAYSIA SABAH

BORANG PENGESAHAN STATUS TESIS

lADUAL

IlAZAH

MEMBASMI PEMBAZIRAN MELALUI PENGGUNAAN VSM BAGI MEMPERBAIKI PRODUKTIVrn DALAM KILANG

MASTER OF BUSINESS ADMINISTRATION SESI PENGAlIAN 2008 - 2010

Saya, Tay Kwai Fui mengaku membenarkan tesis sarjana ini di simpan di perpustakaan Universiti Malaysia Sabah dengan syarat-syarat kegunaan berikut:

1. Tesis adalah hak milik Universiti Malaysia Sabah. 2. Perpustakaan Universiti Malaysia Sabah dibenarkan membuat salinan untuk

tujuan pengajian sahaja. 3. Perpustakaan dibenarkan membuat salinan tesis ini sebagai bahan

pertukaran institusi pengajian tinggi. 4. TIDAK TERHAD

Alamat: Block A, Lot 13, 4th Floor, Ramin Court, Penampang, 88300 Kota Kinabalu, Sabah.

PROF. MADYA OR. NOORHAYATI MANSOR Pengarah

Pusat Perakaunan

Penyelia: Prof. Madya Dr. Noorhayati Mansor Universitl Malaysia Sabah

Tarikh: 28 July 2010

Catatan: Tesis dimaksudkan SEBAGAI TESIS ijazah Doktor Falsafah dan Sarjana secara penyelidikan atau disertasi bagi pengajian secara kerja kursus dan penyelidikan atau laporan Projek Sarjana Muda (LPSM)

Page 2: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

WASTE ELIMINATION TO IMPROVE PRODUCTIVITY BY USING

VALUE STREAM MAPPING (VSM) IN THE FACTORY

TAY KWAI FUI

PE PUSTAKAAN UM¥tNSITI MAlAYSIA SABAH

THESIS SUBMITTED IN FULFILLMENT FOR THE DEGREE OF MASTER OF BUSINESS

ADMINISTRATION

SCHOOL OF BUSINESS AND ECONOMICS UNIVERSITI MALAYSIA SABAH

2010

Page 3: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

DECLARATION

I hereby declare that the material in this dissertation is my own and original work except for quotations, excerpts, summaries and references, which have been duly acknowledged.

ii

Tay Kwai Fui PE-2008-8268-C

21 July 2010

Page 4: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

ACKNOWLEDGEM ENT

First and foremost, I would like to express my gratitude and appreciation to my supervisor, Prof. Madya Dr. Noorhayati Mansor for her kind support and help, the advice and guidance provided by her were extremely beneficial to accomplish my dissertation. I thank also for her unwavering patience and sincerity along the journey until I completed my dissertation.

Besides that, I would like to express my heartfelt gratitude to my parents for their constant support and understanding. Not forget also to express my grateful appreciation to all my MBA coursemates for their support and inputs which eventually led to the betterment of my research.

Special thanks to all the individuals and SEC's factory employees that have partiCipated in the survey. Your value contribution is greatly appreciated.

iii

Page 5: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

ABSTRAK

Kajian ini menerangkan kepelbagaian proses bukan tambah nilai (iaitu, pembaziran) yang akan menyebabkan kemerosotan produktiviti dalam industri pengeluaran elevator. Oleh kerana persaingan global dan permintaan para pengguna berubah dari masa ke semasa, pengeluar perlu mengambil tindakan untuk mengubah strategi perniagaan dan pengurusan kifang agar dapat membuat penyesuaian selaras dengan perubahan yang berlaku secara pantas. Pengeluar juga perlu kekal kompetetif dalam era ini. Walau bagaimanapun, adalah tidak mudah bagi pengeluar untuk mencapai tahap ini kerana wujud pelbagai faktor luaran dan dalaman yang berupaya menyebabkan kemerosotan produktiviti dan memberi kesan terhadap daya saing organisasi dan seterunya menyebabkan kelewatan dalam proses kerja dan penghasilan produk yang berkuafiti rendah. Sehubungan itu, adalah penting bagi pengeluar untuk memiliki strategi berkesan yang dapat menjamin atau sekurang-kurangnya dapat mengurangkan atau meminimumkan kos operasi dengan mengenal pasti dan membasmi proses bukan tambah nilai (iaitu, pembaziran) dalam kifang. Hal ini bertujuan untuk memperbaiki kualiti dalam setiap bidang value streams, iaitu satu koleksi aktiviti yang memberikan hasif kepada pengguna. Salah satu bidang yang dikenal pasti ialah pengurusan kifang. Kajian ini juga menerangkan keberkesanan penggunaan Value Stream Mapping (VSM) sebagai satu kaedah untuk membendung impak daripada pembaziran terhadap produktiviti kifang. Oapatan tinjauan fiteratur yang diguna pakai untuk mengenal pasti amalan perkilangan dan VSM turut ditunjukkan dalam kajian ini. Oi samping itu, satu current state map yang menunjukkan aliran proses dalam kifang Sabah Elevator Company (SEC) juga ditunjukkan dalam kajian ini. Justeru, dapatan literatur menjadi medium untuk memperoleh data berkenaan tahap pembaziran dan produktiviti dalam kilang ini. Kajian ini berbentuk eksploratori dan hasil analisis soal selidik menunjukkan masa menunggu dan kecacatan memberi impak negetif terhadap produktiviti kifang SEC. Penggunaan VSM pula membantu mengurangkan impak daripada masa menunggu terhadap produktiviti kilang. Kajian ini dapat menyumbang kepada pengetahuan ten tang bagaimana proses bukan tambah nilai (iaitu, pembaziran) boleh menyebabkan kemerosotan produktiviti dalam kilang ini. Justeru, para pengeluar boleh mendapat pemahaman yang lebih jelas ten tang masalah ini. Implikasi daripada setiap angkubah, termasuk implikasi pengurusan mencadangkan supaya diadakan state map masa depan serta cadangan untuk kajian lanjutan bagi tujuan penambahbaikkan.

iv

Page 6: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

ABSTRACT

WASTE ELIMINATION TO IMPROVE PRODUCTIVITY BY USING VALUE STREAM MAPPING (VSM) IN THE FACTORY

This research describes the various types of non-value added processes (i.e. waste) that will downgrade the productivity of the elevator manufacturing factory in the industry. As the international competition and customers' demanqs are changing from time to time, manufacturer has to change their business strategy and factory management in order for them to adapt and accommodate to these kinds of rapid changes. Not only that, it is also crucial for the manufacturer to remain competitive in the industry, however this is not easy to achieve for most of the manufacturer as there are many internal and external factors that will downgrade the productivity and affect the competitiveness of the firm, thereafter deliver poor quality of products and delay the work processes in the factory. Therefore it is important for the manufacturer to have an effective strategy that will guarantee, or at least help to reduce or minimize the operation cost by identify and eradicate non-value added processes (i.e. waste) in the factory, hence to improve the quality in every area of the value streams, this shall inclusive of factory management. Furthermore, the research also describes the effectiveness of the Value Stream Mapping (VSM) in moderating the impacts of the waste towards the factory productivity. Results of the literature review, which was used to identify both manufacturing an9 VSM practises, are presented. Current state map of the SEC's factory processes flow also being documented and discussed in this research. The findings of this literature review were synthesized to adapt its instrument to assess both the waste and productivity level in this factory. This is an exploratory study and the analysis of the survey results had shown that waiting time and defect has negative impact on factory productivity in the Sabah Elevator Company (SEC). VSM does show the moderating effect towards the waiting time on the factory productivity. The major contribution of this research enables the manufacturer to gain better understanding on how the non-value added processes (Le. waste) can downgrade the productivity in this factory. The implication of each variable as well as managerial implications, proposed future state map, and further suggestions for future research were identified and proposed.

v

Page 7: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

TABLE OF CONTENTS

TOPIC

DECLARATION

ACKNOWLEDGEMENT

ABSTRAK

ABSTRACT

TABLE OF CONTENTS

LIST OF FIGURES

LIST OF TABLES

LIST OF APPENDICES

CHAPTER 1: INTRODUCTION

1.1 Introduction

1.2 Research Problem

1.3 Research Objectives

1.4 Scope of Study

1.5 Significance of Study

1.6 Organization of the Dissertation

CHAPTER 2: LITERATURE REVIEW

2.1 Introduction

2.2 Definition of Productivity (Dependent Variable)

2.3 Definition of Waste (Independent Variable) and

Hypotheses Development

2.3.1 Overproduction

vi

PAGE

ii

iii

iv

v

vi

ix

x

xi

1

3

3

4

5

5

6

6

10

11

Page 8: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

2.3.2 Waiting Time

2.3.3 Transportation

2.3.4 Processing

2.3.5 Inventory

2.3.6 Motion

2.3.7 Defects

2.4 Definition of Value Stream Mapping (Moderating Variable)

2.5 VSM - Current State Map of SEC's Factory

2.6 Previous Studies on the Adoption of VSM to Eliminate Waste

In order to Improve Factory Productivity

2.7 Summary of Research Hypotheses

2.8 Summary

CHAPTER 3: RESEARCH FRAMEWORK AND METHODOLOGY

3.1 Introduction

3.2 Explanatory Case Study

3.3 Research Framework

3.4 Nature of Study

3.5 Instrument

3.6 Population of Sample

3.7 Data Collection Method

3.8 Data Analysis

3.8.1 Factor Analysis

3.8.2 Reliability Test

3.8.3 Correlation Analysis

3.8.4 Regression Analysis

3.9 Summary

CHAPTER 4: RESEARCH FINDINGS

4.1 Introduction

4.2 Factory Analysis

vii

13

14

14

17

18

19

20

24

28

31

32

33

33

34

35

35

36

36

37

37

37

38

38

39

39

Page 9: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

4.3 Descriptive Statistics of Respondents Profile 40

4.4 Reliability Test 44

4.5 Correlation Analysis 45

4.6 Regression Analysis 46

4.6.1 Multiple Regression 47

4.6.2 Hierarchical Regression 50

4.7 Summary of Findings 52

CHAPTER 5: DISCUSSION AND CONCLUSION

5.1 Introduction 53

5.2 Recapitulations of Study 53

5.3 Discussion and Implications of Study 53

5.3.1 The impact of Overproduction on Productivity 54

5.3.2 The impact of Waiting Time on Productivity 54

5.3.3 The impact of Inappropriate Transportation on

Productivity 55

5.3.4 The impact of Inappropriate Processing on

Productivity 56

5.3.5 The impact of Excess Inventory on Productivity 56

5.3.6 The impact of Inappropriate Motion on Productivity 57

5.3.7 The impact of Defect on Productivity 57

5.3.8 The impact of VSM as Moderator on Productivity 58

5.3.9 Managerial Implications 59

5.4 VSM - Proposed Future State Map 62

5.5 Limitations of Study 64

5.6 Suggestions for Future Research 65

5.7 Conclusion 66

REFERENCES 67

APPENDICES 71

viii

Page 10: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

LIST OF FIGURES

Figure 2.1 VSM - Current State Map of SEes Factory

Figure 3.1 Research Framework

Figure 5.1 VSM - Proposed Future State Map

ix

PAGE

27

34

61

Page 11: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

LIST OF TABLES

PAGE

Table 4.1 Summary of Fdctor Analysis KMO and Bartlett's Test 40

Table 4.2 Summary of Respondents Profile 42

Table 4.3 Summary of Descriptive Statistics for Variables 43

Table 4.4 Summary of Cronbach's Alpha of Variables 45

Table 4.5 Summary of Correlation Analysis between Variables 46

Table 4.6 Multiple Regression of Waste 47

Table 4.7 Analysis of Variance of Waste 47

Table 4.8 Variables in Equation of Waste 47

Table 4.9 Model Summary of llierarchical Analysis 50

Table 4.10 Hierarchical Regression with Moderating Variable - VSM 51

Table 4.11 Summary of the Hypotheses 52

x

Page 12: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

LIST OF APPENDICES

APPENDIX A: Instrument (Questionnaire)

xi

PAGE

71

Page 13: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

CHAPTER 1

INTRODUCTION

1.1 Introduction

International competition and customers' demands are changing from time to time.

Manufacturers have to change their business strategy and factory management in

order for them to adapt and accommodate to these kinds of rapid changes. In

relation to this, it forces a drastic change for most of the manufacturing. As a

result, manufacturers are aggressively searching for an appropriate and effective

operational strategy in order to increase their competitiveness in the global market

(Rawabdeh, 2005).

As the international competition is growing intensely, this has caused the

traditional types of manufacturing paradigms are being opposed and forced the

new manufacturing concepts are being developed (Hines & Rich, 1997), such

development and invention are crucial for the firm to remain competitive in the

global market. In order to increase the competitiveness over the competition in the

industry, manufacturers have been putting a lot of effort to deliver the quality

products in order to faster respond and achieve the quality requirements that are

demanded by the customers. However, this is not easy to achieve for most of the

manufacturers as there are many internal and external factors that will downgrade

the productivity and affect the competitiveness of the firm, thereafter deliver poor

quality of products and delay the work processes in the factory. For instance,

inappropriate segregation of works, inappropriate of the machine used, employee

delay the works in the organizations, waiting for the instruction to be given from

management and others, over processing, excessive of inventory, inefficient of

supply chain and defects of the products, are amongst the most critical factors that

need to be resolved.

Nowadays, as there are many manufacturers struggle in the global

markets, the attention has been diverted to reduce the operation costs and

1

Page 14: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

eliminate waste in the factory, thereafter to increase the competitiveness in the

industry. In relation to this, organizations and academic institutions have adopted

the concept of benchmarking as an ideal approach to identify and detect the inter­

company performance gaps, thereafter to seek for alternative strategies in order to

be implemented in the organizations.

Benchmarking is actually a concept in which the organizations will

continually study, observe and review the operation and production line, thus

identify the ways to improve the manufacturing processes in order to produce a

better output in the organizations (Holloway et al., 1998). In many organizations,

benchmarking is accomplished by comparing the outputs for the months

throughout the year. However, a general drawback for this type of traditional

benchmarking concept is that, it shows only little guidance of how to close the

gaps although its primary purpose is to highlight and raise awareness of the inter­

company performance gaps (Hines & Rich, 1997).

In relation to this, early work in this area suggests that it is difficult to

standardize and benchmark processes in different organizations. This is because

different organizations are implementing different strategies and processes in

managing the operation and production line (Hines et al., 1999). That is,

organizations will have their own methodologies to be adopted in the factory. As a

result, a new type of benchmarking tool called Value Stream Mapping (VSM) has

been developed (Hines and Rich, 1997). The rationale behind the effectiveness of

this VSM is that, it is not comparing a firm's work processes with others, but

oppositely, it internally compares how good the process itself could be in relation

to increasing and improving the overall factory productivity (Hines et al., 1999).

Specifically, the VSM compares the value adding processes and wasteful activities

in the factory. Not only that, VSM also provides guideline and a clear picture of

how to improve the processes flow by removing a realistic percentage of the non­

value added processes (i.e. waste) in the current factory system.

Adopting VSM could be an essential step as it promises to reduce costs,

. improve quality and productivity by eliminating non-value added processes (i.e.

2

Page 15: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

waste) in every area of the value streams in the factory. This shall be inclusive of

factory management and supplier networks. According to Abdulmalek and Rajgopal

(2007), the concept of VSM is crucial and vital for most of the firms especially in

this difficult economic time as its goal is to eliminate, or at least reduce the non­

value added processes (i.e. waste) in the factory, thus enabling less inventory, less

space, less time, less cost and less resource to produce more, or alternatively to

produce the same output with less resources.

Therefore, this study examines various types of wastes that are occurred in

the Sabah Elevator Company (SEC). The author will study and document the

current processes flow in the SEC's factory, thereafter to propose the adoption of

VSM in order to improve its productivity and efficiency of the factory.

1.2 Research Problem

According to Seth et al. (2008), most activities in the factory create waste,

therefore attention needs to be given to improve the productivity in the factory,

and immediate actions need to be taken for the firm to remain competitive in the

global market. In relation to this, removal of non-value added processes (i.e.

waste) from the factory is essential to improve the factory productivity (Conner,

2001). Therefore, this study examines the impacts of non-value added processes

(Le. waste) towards productivity in the SEC's factory. From the review of the

literature, studies which focus directly on waste elimination in improving factory

productivity by using VSM is rather lacking. Therefore, the research problem shall

focus on identifying the non-value added processes (Le. waste) which reduce the

factory productivity, and determining how would the VSM assists in eliminating the

non-value added processes, hence improving the factory productivity and

efficiency.

1.3 Research Objectives

The main objective of this study is to demonstrate how the VSM tool when used

appropriately, can help in eliminating waste, reducing factory throughput time,

improving product quality, achieving better overall financial and operational

control, thus improving productivity and efficiency of the factory.

3

Page 16: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

An elevator factory is used to illustrate the approach in order to identify

and eliminate the types of wastes in this factory, thereafter to increase its

productivity and efficiency within the manufacturing transformation processes.

Since some of the information is confidential, the company is referred to as Sabah

Elevator Company (SEC) throughout this study. The specific research objectives for

this study are listed below:

i) To identify major types of non-value added processes (i.e. waste) in the

existing system.

ii) To document the current flow of the sales orders (current state map) in the

SEC's factory.

iii) To apply VSM to determine the improved flow of sales order.

iv) To determine the total reduction of time (in hours) associated with the

elimination of non-value added processes in the factory.

v) To propose a new flow (future state map) of the processes that will help to

improve the factory productivity.

1.4 Scope of Study

Factory productivity is a major concern for most of the manufacturers because it is

the important criteria to determine the competitiveness of the factory in the

industry. Therefore, waste elimination and reduction of factory throughput time

can be a daunting task due to their complex interactions in the factory processes.

Besides that, many internal and external factors will also influence and affect the

factory productivity. However, there are basic principles such as adoption of VSM,

if applied correctly, can be adopted to identify and eliminate various types of non­

value added processes in the factory. Therefore, the scope of this study is to focus

on productivity and efficiency of the SEC's factory processes from the point of sales

order to final delivery to customers. In between the .factory processes, there are

ma~y wastes which can be identified and eliminated in order to improve the flow

and thus, productivity and the efficiency of the sales order processes in the

factory.

4

Page 17: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

1.5 Significance of Study

This study contributes to improving factory productivity by eliminating waste using

VSM. The outcome of the elimination process will reduce operational and

production costs, thus reducing the final price to the end consumers. This will

increase the competitiveness and SEC's sustainability in a long run and promote

steady growth stream for the factory.

1.6 Organization of the Dissertation

This study contains of 5 chapters. Chapter 1 consisted of a description and

introduction of the study, research problem, objectives of study, scope of study,

significance of study and overview of the dissertation of organization of this study.

Chapter 2 is all about the review of the literature which is related to this study, the

definition of the variables and the proposed hypotheses will be discussed. This

chapter is mainly focused on the review of "productivity", "waste" and the adoption

of "value stream mapping" in the factory. The intention of this chapter is to

provide the history and common methods of measuring the variables as mentioned

above. Besides that, the current flow of sales order in the SEC's factory is being

documented and discussed in this chapter. Chapter 3 is an explanation and

discussion pertaining to the research framework and methodology that is used in

this study. Chapter 4 discusses the finding of this study. Chapter 5 consisted of the

discussion on the implications (both theoretical and practical). A proposed future

state map also being documented and discussed in this chapter. Furthermore,

research limitations, suggestions for future research and conclusion for the study

also included in this chapter.

5

Page 18: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

CHAPTER 2

LITERATURE REVIEW

2.1 Introduction

From the review of the literature, there are indeed not many studies directly

addressing the issues and impacts of the waste towards the productivity in the

factory. In this chapter, the literature review will focus on providing an overview of

various types of wastes, and will describe how VSM can be adopted and used as a

fundamental component in eliminating waste in order to improve the productivity

in the SEC's factory.

2.2 Definition of Productivity (Dependent Variable)

Quesnay (1766) first introduced the term of "productivity" in the Journal de

l'Agriculture. Since then, the word "productivity" has been widely applied in many

different circumstances in the different industries, mostly in relation to the

organization economic systems (Tangen, 2002). Furthermore, it has been strongly

argued that productivity is one of the most important criteria that should not be

neglected in improving the overall financial and productivity controls in the factory

(Singh et al., 2000). Specifically, manufacturers should focus and concentrate on

how to improve the productivity in order to remain competitive in the global

market. Grossman (1993) also discusses that manufacturers should perceive the

productivity improvement as one of the key competitive task in the factory. In

order to remain competitive in the industry, it is necessary for the manufacturers

to improve the productivity and efficiency as this will lead to greater cost reduction

in the operation and production line.

In spite of the fact that productivity is perceived as the most important

factors that affect the manufacturing competitiveness (Porter, 2000), however,

many researchers state that, productivity is always being neglected and ignored by

manufacturers who do not realize the importance of improving productivity in the

factory (e.g. Sink & Tuttle, 1989; Singh et al., 2000; Broman, Z004).

6

Page 19: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

Chew (1988) also states that, even though the concept and theory of the

productivity has already existed for a long time, surprisingly management may still

do not know how to answer the simple question of what productivity is all about.

According to Forrester (1993), this is because there is no common agreement and

aligned objective from the management on what the term "productivity" actually

represents in the organization.

Tangen (2005) suggests that the definitions of productivity are based on

individual opinions instead of a shared and common perception that are perceived

by the others. In the industrial engineering field, productivity is being defined as

the relation of output (which is the goods produced) to input (which is the

resource consumed) in the factory transformation process (Sumanth, 1994).

Furthermore, according to Moseng and Rolstadas (2001), productivity can be

described as the ability to fulfil the customers' demands with a minimum

consumption of the resources. That is, with the minimum consumption of the

resources, it is able to produce quality goods and increase the output.

Bernolak (1997) provides an explanation in which productivity is highly

associated with manufacturing. According to this researcher, productivity means

how much and how well the production line can produce the goods from the

resources consumed. The researcher also claims that, if the firm is able to produce

more and quality goods from the same resources, it is to be known as increased in

productivity. On the other hand, if the firm produce the same goods with lesser

resources, factory productivity is considered to be increased as well. The

researcher also provides the meaningful explanation for the term resources. "By

resources, it means all human and physical resources, which are the people who

produce the goods or service providers, and the assets with which the people can

produce the goods or provide the services. The resources that people use include

the land and buildings, fixed and moving machines and equipment, tools, raw

materials, inventories and other current asset." (Bernolak, 1997, p.206).

According to Tangen (2005), the above definitions given by Bernolak

confine two important descriptions. First, the productivity is very much related to

7

Page 20: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

the availability and consumption of the resources. That is, the firm's productivity is

said to be downgraded if the resources are not properly being utilized. On the

other hand, if there is often a lack of resources in the factory, this will downgrade

the firm's productivity as well. Second, productivity is closely related to the value

creation for the manufacturers. That is, high productivity can be achieved if

resources and activities in the factory transformation processes create value to the

goods that are produced. Hence, it is important for the manufacturers to eliminate

non-value added processes (i.e. waste) in order to improve factory productivity

and efficiency. This is because waste is considered to be opposite of what

productivity denoted (Tangen, 2005).

In general, productivity means how well the workers can perform in the

factory. It is also covers the investment of the tools and machines in the factory.

Besides that, the employee education and training of human resources shall also

be taken into consideration when defining the terms of productivity in the factory

(Helms, 1996). Employee (or to be known as operator in the factory) who

performs a job in the factory is a producer, they are responsible for and contribute

to the improvement of the productivity. When comparing the total time spent by

the workers and total materials consumed in producing a goods, it is important to

have a measurement for the productivity in order to benchmark the processes,

which means if the workers can perform their jobs better, with the same total time

spent and materials consumed, they are able to produce more goods, therefore

the firm is considered having an overall increase in productivity and efficiency.

Throughout the review of the literature, productivity has been defined as the key

to economic prosperity for an organization (e.g.: Tangen, 2005; Helms, 1996).

As being argued by Stainer (1997) and Bernolak (1996), most of the

manufacturers assume that the definition of productivity is similar with production.

Manufacturers always make a wrong assumption that increased in production

represents increased in productivity. This is not necessary true as productivity

cannot be said to increase or decrease unless an actual comparison is made in the

factory by comparing the outputs for the consecutive months throughout the year.

Manufacturers have to compare the production volume and numbers of outputs

8

Page 21: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

produced by the operators before the judgement is made to the increase or

decrease of the firm's productivity.

Moreover, as stated by Misterek et al. (1992), improvements in productivity

can be caused by five different relationships, which can be summarized as below:

i) Increased in output faster than the increased in input. The increase in input

is proportionately less than the increase in output (managed growth);

ii) With the same input, more output is produced (working smarter);

iii) With the reduction in input, more output is produced (the ideal);

iv) With the reduction in input, same output is produced (greater efficiency);

and

vi) Decreased in input more than decrease in output. The decrease in input is

proportionately greater than the decrease in output (managed decline).

In a nutshell, productivity is a multidimensional term, according to Tangen

(2005). The definition and concept of the term productivity are different depending

of what context it is placed in. For instance, productivity measured for

management staffs is usually different from the productivity measured for the

operators or technicians of an assembly line. The variance and reasoning of this

indicates that, productivity must be perceived from a different perspective and

view from a different angle at each level. The precise definition shall therefore

depending on which context it is applied for.

9

Page 22: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

2.3 Definitions of Waste (Independent Variables) and Hypotheses

Development

A fundamental approach to improve the factory productivity and efficiency is the

ability to identify the non-value added processes (Le. waste), thus eliminate or at

least reduce all forms of waste within the value streams in the factory. The

rationale behind this rectification and elimination of waste in the factory need to be

understood by the manufacturers in order to effectively identify and adopt the

waste elimination tool to improve productivity and efficiency in the factory.

According to Hicks (2007), there are few techniques that can be adopted in

order to identify and eliminate the various types of waste that is a burden and

barrier to the productivity improvement in the factory. The techniques include the

five "S"s (Warwood & Knowles, 2004), Kaizen (Imai, 1986), Six Sigma (Pyzdek,

2003), Single Minute Exchange of Die - SMED (Shingo, 1985), and Value Stream

Mapping (Hines and Rich, 1997).

Often in practise, most activities in the factory create wastes (Seth et al.,

2008). Within the context of manufacturing system, there always exist seven types

of waste. These are the commonly identified and accepted wastes in the Toyota

Production System (TPS) as introduced by Ohno (1988) of Toyota and thereafter

reported by Womack and Jones (1996). The seven types of wastes include

overproduction, waiting, transportation, processing, inventory, motion, and defect.

According to Ohno (1988), wasteful activities do not add value to a product. For

instance, products sit in the storage, products being moved around from one

location to another location, raw materials are queuing and waiting to be

processed, all. these activities indeed add no value to the products, hence

downgrade the productivity and efficiency of the factory.

Explanation is further explored and discussed by Rawabdeh (2005), in

which the researcher states that the seven types of wastes can be eventually

categorized into four main groups. These are man, machine, material and method.

Each category of these represents the different types of wastes that occur in the

traditional manufacturing processes in the factory. In short, the man category

10

Page 23: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

contains the type of waste for overproduction, waiting and motion; the machine

category contains the type of waste for over-processing; whereas the material

category shall contain the type of waste for transportation, inventory and defects;

and the method shall inclusive of all types of the wastes, as improper

methodologies being implemented in the factory will downgrade the productivity of

the factory.

2.3.1 Overproduction

Overproduction is said to occur when operations in the factory continue after they

should have to be ceased (Hicks, 2007). In other words, overproduction is the

production of material in which it is not needed now by the manufacturers and

customers. This is often occurs in the large batches production, products being

made too early and faster than the speed at which they are needed by the

customers. Manufacturers found that it is difficult to estimate precisely the actual

numbers of goods that they should have to produce.

As discussed by Nielsen (2008) in his research, overproduction means

working on something before it is required by the next step in the process flow, or

before it is required by the customers. As a result, product sits in work in process

queues or in a finished goods stock, and it is indeed not needed now. This kind of

phenomenon is considered non-value added processes (Le. waste) for the

manufacturers that will downgrade the productivity and efficiency in the factory.

Generally, overproduction can be caused by a few factors in the factory, such as

poor quality and design of the factory layout, long setups, over complexity of

interactions and unreliability of the machine used within the manufacturing

environments. To rectify and resolve this type of waste, the manufacturers should

avoid using the complicated and long setups in the factory in order to make the

production line run effectively and efficiently. Furthermore, manufacturer should

also avoid running the production line with inappropriate type of machine as this

will lead to overproduction that in turn cause the increase of the operation cost,

thereafter downgrade the productivity and efficiency of the factory.

11

Page 24: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

Overproduction will also cause an excess of products, products being

produced too early and thereafter increased the unnecessary inventory. Always,

overproduction happens when the manufacturer over purchase resources than

they are needed to be delivered to the customers. Manufacturers found that it is

difficult to estimate the actual amount of products that need to be purchased and

produced. For example, because of the long change over time in the large batch

production, it is often to exceed the quantity that are ordered and needed by the

customers, thereafter lead to increase in the inventory.

In Ohno (1988) view, overproduction is the worst amongst all these seven

types of waste in the factory. This is because this type of waste usually generates

all the other forms of waste, especially inventory. Rationally, overproduction

causes the increase of the amount of the space to store the raw materials as well

as overly produced goods. By keeping large batches of finished goods in the store,

this is often being referred to as non-productive cost, and this is the cost that

increases the operational cost. Furthermore, the waste from overproduction will

lead to not only excess in inventory, but also tonnes of unnecessary paperwork,

double handling cost, extra space, extra storage, interest finance charges,

machinery, defects and poor quality of goods, human resources and overhead

cost. All of these are initially downgraded the productivity of the factory.

Generally, overproduction is being viewed as the most serious waste as it

discourages a smooth flow of the production in the manufacturing environments. It

is expected to restrain quality and productivity in the factory as well. The

statement is supported by Hines and Rich (1997) that, such overproduction tends

to lead to excessive storage times in the factory. As a result, defects may not be

detected early as problems hide in the inventory, products may deteriorate in its

quality and pressures on work rate from the factory staff may be generated. Ohno

(1988) also states that, overproduction causes the excessive work-in-progress

stocks which result in the physical disturbance of operations that lead to poor

communication that downgrade the productivity and efficiency of the factory. This

kind of phenomenon is indeed having a negative impact on the productivity.

12

Page 25: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

REFERENCES

Abdulmalek, Fawas, A., & Rajgopal, J. (2007). Analyzing the benefits of lean manufacturing and Value Stream Mapping via simulation: A process sector case study. International Journal of Production Economics, 107, 223-236.

Bernolak, 1. (1996). Productivity gain sharing. Working Paper on International Labour Organisation, Geneva. Retrieved from http://oracle02.ilo.org/dyn/empentidocs/F111PUB9801/PUB9801.htm

Bernolak, 1. (1997). Effective measurement and successful elements of company productivity: the basis of competitiveness and world prosperity. International Journal of Production Economics, 52 (1-2), 203-213.

Broman, M. (2004). Assessing productivity in assembly systems. Licentiate thesis, Department of Production Engineering, The Royal Institute of Technology, Stockholm.

Browning, T. (1998). Modelling and analyzing cost, schedule and performance in complex system product development. Unpublished PhD's thesis, Massachusetts Institute of Technology, Cambridge, MA.

Brunt, D. (2000). From the current state to the future state: Mapping the steel to component supply chain. International Journal of Logistics: Research and Applications 3 (3), 259-271.

Chew, W. (1988). No-nonsense guide to measure productivity. Harvard Business Review, 66 (1), 110-118.

Coakes. SJ, Steed. Land Ong. C. (1998). Multivariate Data Analysis (3rd edition). New York: Macmillan

Coakes. SJ, Steed. Land Ong. C. (2009). SPSS for Windows (Version 16.0). Australia: John Wiley & Sons Australia Ltd.

Conner, G. (2001). Lean Manufacturing for the Small Shop. Society of Manufacturing Engineers (SME), Dearborn, M1.

Djumin, Sadono, c., Wibowo, Yuri, Irani & Shahrukh, (2004). Value Stream Mapping from an Industrial Engineering Viewpoint. Retrieved from http://www­iwse.eng.ohiostate.edu/ISEFaculty/irani/lndustrial%20Engineering%20Studies/V alue%20Stream%20Mapping%20from%20an%20Industrial%20Engineering%2 OViewpoi nt. htm

Duggan, K. J. (2002). Creating Mixed Model Value Streams: Practical Techniques for Building to Demand. Productivity Press, New York, NY.

67

Page 26: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

Forres~er, J. W. (1993). Low Productivity: is it a problem or merely a symptom? In Christopher, W. & Thor, C (Eds.). Handbook for Productivity Measurement and Improvement. Productivity Press, Cambridge, MA.

Grossman,.~. (1993). How to Measure Company Productivity: Handbook for ProductIVIty Measurement and Improvement. Productivity Press Cambridge MA. ' ,

Helms, M. M. (1996). Perspectives on quality and productivity for competitive advantage. The TQM Magazine, 8, 5-10. MCB University Press.

Hicks, B. J. (2007). Lean information management: Understanding and eliminating waste. International Journal of Information Management, 27, 233-249.

Hines, P., & Rich, N. (1997). The seven value stream mapping tools. International Journal of Operations & Production Management, 17 (1), 46-64.

Hines, P., Rich, N., & Esain, A. (1999). Value stream mapping: A distribution industry application. An International Journal, 8 (1), 60-77.

Hines, P., Rich, N., & Hittmeyer, M. (1998). Competing against ignorance: Advantage through knowledge. International Journal of Physical Distribution & Logistics Management, 28(1), 18-43.

Holloway, J., Francis, G., Hinton, M. and Mayle, D. (1998). Making the Case for Benchmarking. Performance Management Research Unit, Open University Business School, Working Paper 95-98.

Imai, M. (1986). Kaizen: (Ky'zen), the key to Japan's competitive success. New York, London: McGraw-HilI.

Jones, D., Womack, J. (2003). Seeing the Whole: Mapping the Extended Value Stream. The Lean Enterprise Institute, Inc., Brookline, MA.

King, .5., G. (2004). Using Value Stream Mapping to Improve Forging Processes. Unpublished master's thesis, Massachusetts Institute of Technology, Cambridge,

MA.

McDonald, T., Vanaken, E.M., & Rentes, A.F. (2002). Utilizing simulation to enhance Value Stream Mapping: A manufacturing case application. International Journal of Logistics: Research and Applications 5 (2), 213-232.

Misterek, 5., Dooley, K., & Anderson, J. (1992). Productivity as a performance measure. International Journal of Operations & Production Management, 12 (1), 29-45.

Moseng, B., & Rolstadas, A. (2001). Suc~ess factors in the productivity process, 10th World Productivity Congress. Retrieved from http://www.catriona.napier.ac.uk/resource/wpc10th/moseng.htm

68

Page 27: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

Nielsen, A. (2008). Getting Started with Value Stream Mapping. Gardiner Nielsen Associates Inc.

Nunally, J.e. (1978). Psychometric Theory, New York, NY, McGraw-Hili.

Ohno, T. (1988). The Toyota production system: Beyond large-scale production. Portland: Productivity Press.

Porter, M.E. (2000). Location, Competition and Economic Development: Local Clusters in a Global Economy. Economic Development Quarterly, 14 (1), 15-34.

Pyzdek, T. (2003). The Six Sigma Handbook: The complete guide for greenbelts, blackbelts and managers at all levels (2nd revised ed.). New York: McGraw-Hili.

Quensnay, F. (1766). Analyse de la formule arithmetique du tableau economique de la distribution des depenses annuelles d'une nation agricole. Journal de l'Agriculture, du Commerce & des Finances, 11-41.

Rawabdeh, A. 1. (2005). A model for the assessment of waste in job shop environments. International Journal of Operations & Production Management, 25 (8), 800-822.

Rother, M. (2004). What we are learning since we started learning to see, NAMonline. Retrieved from http://www.nam.org/tertiarv.asp?TrackID=&CategoryID=253&DocumentID=24 567

Rother, M., & Shook, J., (1999). Learning to See: Value Stream Mapping to Add Value and Eliminate Muda. The Lean Enterprise Institute, Inc., Brookline, MA.

Salzman, R. A. (2002). Manufacturing System Design: Flexible Manufacturing Systems and Value Stream Mapping. Unpublished master's thesis, MIT, Cambridge.

Seth, D., Seth, N., & Goel, D. (2008). Application of Value Stream Mapping (VSM) for minimization of wastes in the processing side of supply chain of cottonseed oil industry in Indian context. Journal of Manufacturing Technology Management, 19 (4), 529-550.

Shingo, S. (1985). A revolution in manufacturing: The SMED system. USA: Productivity Press.

Singh, H., Motwani, J. & Kumar, A. (2000). A review and analysis of the state-of­the-art research on productivity measurement. Journal of Industrial Management & Data Systems, 100 (5), 234-241.

Sink, D.5. & Tuttle, T.e. (1998). Planning and Measurement in your Organisation of the Future. Industrial Engineering and Management Press, Norcross, GA.

69

Page 28: UNIVERSITI MALAYSIA SABAH MEMBASMI PEMBAZIRAN …

Stainer, A. (1997). Capital input and total productivity management. Journal of Management Decision, 35 (3), 224-232.

Sumanth, D. (1994). Productivity Engineering and Management. McGraw-Hili, New York, NY.

Tangen, S. (2002). A theoretic foundation for productivity measurement and improvement of automatic assembly systems. Licentiate thesis, The Koyal Institute of Technology, Stockholm.

Tangen, S. (2005). Professional Practise: Demystifying productivity and performance. International Journal of Productivity Petformance Management, 54 (i), 34-46.

Warwood, S. J., & Knowles, G. (2004). An investigation into Japanese 5-S practice in UK industry. The TQM Magazine, 16 (5).

Womack, J. P., & Jones, D. T. (1996). Lean thinking: Banish waste and create wealth in your corporation, 1996. London: Simon and Schuster.

70