LAMPIRAN
VOLUME PEKERJAANJENIS PEKERJAANLPTpekerjaanVolume
1234
APEKERJAAN TANAH
1GALIAN PILECAP
-P20,91,6512638,61
2GALIAN SLOOF
-AS E0,4511,55115,1975
-AS F0,4513,8116,21
-AS G0,4515,225116,85125
-AS H0,4512,3115,535
-AS I0,4512,3115,535
-AS J0,4512,3115,535
-AS 70,4516,75117,5375
-AS 80,4517,875118,04375
-AS 90,4516,75117,5375
-AS 100,4516,75117,5375
-AS 110,453,35111,5075
3GALIAN TANGGA
-TANGGA0,51,30,5710,3705
BPEKERJAAN STRUKTUR
1PILECAP
-P20,71,450,52613,195
2SLOOF
-AS E0,2512,150,511,51875
-AS F0,2514,60,511,825
-AS G0,2516,2250,512,028125
-AS H0,2512,90,511,6125
-AS I0,2513,30,511,6625
-AS J0,2513,30,511,6625
-AS 70,2517,750,512,21875
-AS 80,2518,8750,512,359375
-AS 90,2517,750,512,21875
-AS 100,2517,750,512,21875
-AS 110,253,550,510,44375
3KOLOM
-K1 LANTAI DASAR0,30,34,45249,612
-K1 LANTAI ATAS0,30,34,45166,408
-K20,150,254,4520,33375
-K30,20,24,4510,178
-K4 LANTAI DASAR0,20,554,4520,979
-K4 LANTAI ATAS0,20,554,4520,979
4BALOK
-B10,254,750,52011,875
-B20,2515,250,5815,25
-B30,250,7750,5131,259375
-B40,254,750,45158,015625
-B50,25,250,510,525
5BALOK CANOPY
-C20,255,30,510,6625
-C30,154,70,5134,5825
-C40,550,210,5
6RING BALOK
-RB10,2550,5127,5
-RB20,31,5250,12201,098
-RB30,250,521
-RB40,350,543
7PELAT
-S1550,121648
-S22,254,750,133041,68125
-S31,5254,70,121916,3419
8TANGGA
-TANGGA 11,33,90,211,014
-TANGGA 21,33,60,210,936
CPEKERJAAN ARSITEKTUR
1LANTAI
-O1 (R. KERJA 1)5,816,8-197,44
-O1 (R. KERJA 2)1015-1150
-O1 (R. TAMU, R. MEETING, R. RECEPTIONIST, TERAS)518,05-190,25
-O2 (TOILET, PANTRY, JANITOR)5,65,9-266,08
-O2 (R. PANEL)2,555,9-230,09
-O4 (R. KERJA 1)5,816,8-197,44
-O4 (R. KERJA 2)1015-1150
-O4 (R. TAMU, R. MEETING)512,15-160,75
2KUSEN
-PJ1-4,653113,95
-PD1-1,893211,34
-PD2-1,82,25416,2
-P1-0,952,25612,825
-P2-0,852,25611,475
-J1-4,652,85226,505
-J2-3,752,85221,375
-J3-1,082,32664,584
-J4-1,92,85421,66
-J5-0,882,348,096
-J6-4,653113,95
-J7-4,653,25230,225
-J8-3,753,25224,375
-G1-1,73315,3
-G2-1,3327,8
3DINDING
>LANTAI DASAR
-PJ1-54,4518,3
-PD1-54,45116,58
-PD2-54,45236,4
-G1-54,45234,3
-G2-2,54,4517,225
-P1 (PANTRY)-2,54,4518,9875
-P1 (R. PANEL)-2,754,45220,2
-P2 (JANITOR)-1,24,4513,4275
-P2 (TOILET)-2,94,4528,935
-J1-54,45217,995
-J2-54,45223,125
-J3 1 KUSEN-5,94,45247,542
-J3 2 KUSEN -5,84,45362,526
-J3 5 KUSEN -16,84,45162,34
-J4-3,154,45217,205
-J5-2,94,4528,712
-D1-54,455111,25
-D2-4,74,45120,915
-D3-2,54,45222,25
-D4-5,94,45126,255
>LANTAI ATAS
-PD1-54,95119,08
-PD2-54,95241,4
-G1-54,95119,65
-G2-2,54,9518,475
-P1 (PANTRY)-2,54,95110,2375
-P1 (R. PANEL)-2,754,95222,95
-P2 (JANITOR)-1,24,9514,0275
-P2 (TOILET)-2,94,95211,835
-J3 1 KUSEN-5,93,5236,332
-J3 2 KUSEN -5,83,5345,996
-J3 5 KUSEN -16,83,5146,38
-J4-3,154,95220,355
-J5-2,93,523,202
-J6-54,95110,8
-J7-54,95219,275
-J8-54,95225,125
-D1-54,955123,75
-D2-4,74,95123,265
-D3-2,54,95224,75
-D4-5,94,95129,205
4PLAFON
>LANTAI DASAR
-R.KERJA 15,816,8-197,44
-R.KERJA 21015-1150
-TOILET DAN JANITOR5,85,9-134,22
-PANTRY DAN FOYER55-125
-R. PANEL 12,753,15-18,6625
-R. PANEL 22,752,75-17,5625
-R. TAMU DROP CEILING 133-19
-R. TAMU DROP CEILING 23,63,6-13,96
-R. TAMU 55-112,04
-R. MEETING DROP CEILING 136-118
-R. MEETING DROP CEILING 23,56,5-14,75
-R. MEETING 58,15-118
>LANTAI ATAS
-R. KERJA 15,816,8-197,44
-R. KERJA 2510-2100
-R. KERJA 3 DROP CEILING 13,54-228
-R. KERJA 3 DROP CEILING 244,5-28
-R. KERJA 3 55,5-219
-TOILET DAN JANITOR5,85,9-134,22
-PANTRY DAN FOYER55-125
-R. PANEL 12,753,15-18,6625
-R. PANEL 22,752,75-17,5625
-R. TAMU DROP CEILING 133-218
-R. TAMU DROP CEILING 23,63,6-27,92
-R. TAMU 55-224,08
-R. MEETING DROP CEILING 136-118
-R. MEETING DROP CEILING 23,56,5-14,75
-R. MEETING 58,15-118
5ATAP
-ATAP SEGITIGA0,516,810,2562172,308
-ATAP TRAPESIUM0,536,610,2562375,385
6FINISHING
aCAT DINDING
>LANTAI DASAR
-PJ1-54212,1
-PD1-54228,66
-PD2-54458,4
-G1-54459,6
-G2-2,54212,2
-P1 (PANTRY)-2,54215,725
-P1 (R. PANEL)-2,754435,45
-P2 (JANITOR)-1,2425,775
-P2 (TOILET)-2,94425,7
-J1-54213,495
-J2-54218,625
-J3 1 KUSEN-5,94484,464
-J3 2 KUSEN -5,846124,296
-J3 5 KUSEN -16,842129,432
-J4-3,154428,74
-J5-2,94425,254
-D1-5410193,475
-D2-4,74224,55
-D3-2,54440
-D4-5,94247,2
>LANTAI ATAS
-PD1-54228,66
-PD2-54458,4
-G1-54219,6
-G2-2,54212,2
-P1 (PANTRY)-2,54215,725
-P1 (R. PANEL)-2,754435,45
-P2 (JANITOR)-1,2425,775
-P2 (TOILET)-2,94425,7
-J3 1 KUSEN-5,93,5472,664
-J3 2 KUSEN -5,83,56106,896
-J3 5 KUSEN -16,83,52112,632
-J4-3,154428,74
-J5-2,93,5419,454
-J6-54212,1
-J7-54419,55
-J8-54431,25
-D1-5410193,475
-D2-4,74224,55
-D3-2,54440
-D4-5,94247,2
bCAT KUSEN
-PD1-1,89349,1896
-P1-0,852,25611,475
-P2-0,852,25611,475
-G1-1,73315,3
-G2-1,3327,8
cCAT PLAFON
>LANTAI DASAR
-R.KERJA 15,816,8-197,44
-R.KERJA 21015-1150
-TOILET DAN JANITOR5,85,9-134,22
-PANTRY DAN FOYER55-125
-R. PANEL 12,753,15-18,6625
-R. PANEL 22,752,75-17,5625
-R. TAMU DROP CEILING 133-19
-R. TAMU DROP CEILING 23,63,6-13,96
-R. TAMU 55-112,04
-R. MEETING DROP CEILING 136-118
-R. MEETING DROP CEILING 23,56,5-14,75
-R. MEETING 58,15-118
>LANTAI ATAS
-R. KERJA 15,816,8-197,44
-R. KERJA 2510-2100
-R. KERJA 3 DROP CEILING 13,54-228
-R. KERJA 3 DROP CEILING 244,5-28
-R. KERJA 3 55,5-219
-TOILET DAN JANITOR5,85,9-134,22
-PANTRY DAN FOYER55-125
-R. PANEL 12,753,15-18,6625
-R. PANEL 22,752,75-17,5625
-R. TAMU DROP CEILING 133-218
-R. TAMU DROP CEILING 23,63,6-27,92
-R. TAMU 55-224,08
-R. MEETING DROP CEILING 136-118
-R. MEETING DROP CEILING 23,56,5-14,75
-R. MEETING 58,15-118
DPEKERJAAN M&E
1MEKANIKAL
-PLUMBING-50-150
2ELEKTRIKAL
-SAKLAR TUNGGAL---21-
-SAKLAR GANDA---19-
-STOP KONTAK---27-
EPEKERJAAN SANITASI
-SEPTIC TANK1,51,5214,5