VOLUME PEKERJAANJENIS PEKERJAANLPTpekerjaanVolume

1234

APEKERJAAN TANAH

1GALIAN PILECAP

-P20,91,6512638,61

2GALIAN SLOOF

-AS E0,4511,55115,1975

-AS F0,4513,8116,21

-AS G0,4515,225116,85125

-AS H0,4512,3115,535

-AS I0,4512,3115,535

-AS J0,4512,3115,535

-AS 70,4516,75117,5375

-AS 80,4517,875118,04375

-AS 90,4516,75117,5375

-AS 100,4516,75117,5375

-AS 110,453,35111,5075

3GALIAN TANGGA

-TANGGA0,51,30,5710,3705

BPEKERJAAN STRUKTUR

1PILECAP

-P20,71,450,52613,195

2SLOOF

-AS E0,2512,150,511,51875

-AS F0,2514,60,511,825

-AS G0,2516,2250,512,028125

-AS H0,2512,90,511,6125

-AS I0,2513,30,511,6625

-AS J0,2513,30,511,6625

-AS 70,2517,750,512,21875

-AS 80,2518,8750,512,359375

-AS 90,2517,750,512,21875

-AS 100,2517,750,512,21875

-AS 110,253,550,510,44375

3KOLOM

-K1 LANTAI DASAR0,30,34,45249,612

-K1 LANTAI ATAS0,30,34,45166,408

-K20,150,254,4520,33375

-K30,20,24,4510,178

-K4 LANTAI DASAR0,20,554,4520,979

-K4 LANTAI ATAS0,20,554,4520,979

4BALOK

-B10,254,750,52011,875

-B20,2515,250,5815,25

-B30,250,7750,5131,259375

-B40,254,750,45158,015625

-B50,25,250,510,525

5BALOK CANOPY

-C20,255,30,510,6625

-C30,154,70,5134,5825

-C40,550,210,5

6RING BALOK

-RB10,2550,5127,5

-RB20,31,5250,12201,098

-RB30,250,521

-RB40,350,543

7PELAT

-S1550,121648

-S22,254,750,133041,68125

-S31,5254,70,121916,3419

8TANGGA

-TANGGA 11,33,90,211,014

-TANGGA 21,33,60,210,936

CPEKERJAAN ARSITEKTUR

1LANTAI

-O1 (R. KERJA 1)5,816,8-197,44

-O1 (R. KERJA 2)1015-1150

-O1 (R. TAMU, R. MEETING, R. RECEPTIONIST, TERAS)518,05-190,25

-O2 (TOILET, PANTRY, JANITOR)5,65,9-266,08

-O2 (R. PANEL)2,555,9-230,09

-O4 (R. KERJA 1)5,816,8-197,44

-O4 (R. KERJA 2)1015-1150

-O4 (R. TAMU, R. MEETING)512,15-160,75

2KUSEN

-PJ1-4,653113,95

-PD1-1,893211,34

-PD2-1,82,25416,2

-P1-0,952,25612,825

-P2-0,852,25611,475

-J1-4,652,85226,505

-J2-3,752,85221,375

-J3-1,082,32664,584

-J4-1,92,85421,66

-J5-0,882,348,096

-J6-4,653113,95

-J7-4,653,25230,225

-J8-3,753,25224,375

-G1-1,73315,3

-G2-1,3327,8

3DINDING

>LANTAI DASAR

-PJ1-54,4518,3

-PD1-54,45116,58

-PD2-54,45236,4

-G1-54,45234,3

-G2-2,54,4517,225

-P1 (PANTRY)-2,54,4518,9875

-P1 (R. PANEL)-2,754,45220,2

-P2 (JANITOR)-1,24,4513,4275

-P2 (TOILET)-2,94,4528,935

-J1-54,45217,995

-J2-54,45223,125

-J3 1 KUSEN-5,94,45247,542

-J3 2 KUSEN -5,84,45362,526

-J3 5 KUSEN -16,84,45162,34

-J4-3,154,45217,205

-J5-2,94,4528,712

-D1-54,455111,25

-D2-4,74,45120,915

-D3-2,54,45222,25

-D4-5,94,45126,255

>LANTAI ATAS

-PD1-54,95119,08

-PD2-54,95241,4

-G1-54,95119,65

-G2-2,54,9518,475

-P1 (PANTRY)-2,54,95110,2375

-P1 (R. PANEL)-2,754,95222,95

-P2 (JANITOR)-1,24,9514,0275

-P2 (TOILET)-2,94,95211,835

-J3 1 KUSEN-5,93,5236,332

-J3 2 KUSEN -5,83,5345,996

-J3 5 KUSEN -16,83,5146,38

-J4-3,154,95220,355

-J5-2,93,523,202

-J6-54,95110,8

-J7-54,95219,275

-J8-54,95225,125

-D1-54,955123,75

-D2-4,74,95123,265

-D3-2,54,95224,75

-D4-5,94,95129,205

4PLAFON

>LANTAI DASAR

-R.KERJA 15,816,8-197,44

-R.KERJA 21015-1150

-TOILET DAN JANITOR5,85,9-134,22

-PANTRY DAN FOYER55-125

-R. PANEL 12,753,15-18,6625

-R. PANEL 22,752,75-17,5625

-R. TAMU DROP CEILING 133-19

-R. TAMU DROP CEILING 23,63,6-13,96

-R. TAMU 55-112,04

-R. MEETING DROP CEILING 136-118

-R. MEETING DROP CEILING 23,56,5-14,75

-R. MEETING 58,15-118

>LANTAI ATAS

-R. KERJA 15,816,8-197,44

-R. KERJA 2510-2100

-R. KERJA 3 DROP CEILING 13,54-228

-R. KERJA 3 DROP CEILING 244,5-28

-R. KERJA 3 55,5-219

-TOILET DAN JANITOR5,85,9-134,22

-PANTRY DAN FOYER55-125

-R. PANEL 12,753,15-18,6625

-R. PANEL 22,752,75-17,5625

-R. TAMU DROP CEILING 133-218

-R. TAMU DROP CEILING 23,63,6-27,92

-R. TAMU 55-224,08

-R. MEETING DROP CEILING 136-118

-R. MEETING DROP CEILING 23,56,5-14,75

-R. MEETING 58,15-118

5ATAP

-ATAP SEGITIGA0,516,810,2562172,308

-ATAP TRAPESIUM0,536,610,2562375,385

6FINISHING

aCAT DINDING

>LANTAI DASAR

-PJ1-54212,1

-PD1-54228,66

-PD2-54458,4

-G1-54459,6

-G2-2,54212,2

-P1 (PANTRY)-2,54215,725

-P1 (R. PANEL)-2,754435,45

-P2 (JANITOR)-1,2425,775

-P2 (TOILET)-2,94425,7

-J1-54213,495

-J2-54218,625

-J3 1 KUSEN-5,94484,464

-J3 2 KUSEN -5,846124,296

-J3 5 KUSEN -16,842129,432

-J4-3,154428,74

-J5-2,94425,254

-D1-5410193,475

-D2-4,74224,55

-D3-2,54440

-D4-5,94247,2

>LANTAI ATAS

-PD1-54228,66

-PD2-54458,4

-G1-54219,6

-G2-2,54212,2

-P1 (PANTRY)-2,54215,725

-P1 (R. PANEL)-2,754435,45

-P2 (JANITOR)-1,2425,775

-P2 (TOILET)-2,94425,7

-J3 1 KUSEN-5,93,5472,664

-J3 2 KUSEN -5,83,56106,896

-J3 5 KUSEN -16,83,52112,632

-J4-3,154428,74

-J5-2,93,5419,454

-J6-54212,1

-J7-54419,55

-J8-54431,25

-D1-5410193,475

-D2-4,74224,55

-D3-2,54440

-D4-5,94247,2

bCAT KUSEN

-PD1-1,89349,1896

-P1-0,852,25611,475

-P2-0,852,25611,475

-G1-1,73315,3

-G2-1,3327,8

cCAT PLAFON

>LANTAI DASAR

-R.KERJA 15,816,8-197,44

-R.KERJA 21015-1150

-TOILET DAN JANITOR5,85,9-134,22

-PANTRY DAN FOYER55-125

-R. PANEL 12,753,15-18,6625

-R. PANEL 22,752,75-17,5625

-R. TAMU DROP CEILING 133-19

-R. TAMU DROP CEILING 23,63,6-13,96

-R. TAMU 55-112,04

-R. MEETING DROP CEILING 136-118

-R. MEETING DROP CEILING 23,56,5-14,75

-R. MEETING 58,15-118

>LANTAI ATAS

-R. KERJA 15,816,8-197,44

-R. KERJA 2510-2100

-R. KERJA 3 DROP CEILING 13,54-228

-R. KERJA 3 DROP CEILING 244,5-28

-R. KERJA 3 55,5-219

-TOILET DAN JANITOR5,85,9-134,22

-PANTRY DAN FOYER55-125

-R. PANEL 12,753,15-18,6625

-R. PANEL 22,752,75-17,5625

-R. TAMU DROP CEILING 133-218

-R. TAMU DROP CEILING 23,63,6-27,92

-R. TAMU 55-224,08

-R. MEETING DROP CEILING 136-118

-R. MEETING DROP CEILING 23,56,5-14,75

-R. MEETING 58,15-118

DPEKERJAAN M&E

1MEKANIKAL

-PLUMBING-50-150

2ELEKTRIKAL

-SAKLAR TUNGGAL---21-

-SAKLAR GANDA---19-

-STOP KONTAK---27-

EPEKERJAAN SANITASI

-SEPTIC TANK1,51,5214,5