Post on 15-Apr-2017
CV ADEEL JUNAID HAIDER 1). Name Adeel Junaid Haider2). Father’s Name Ghulam Haider
3). Religion Islam
4). Nationality Pakistani
5) Work Permit Eligible Malaysian Work
Permit
6). Date of Birth 18-01-1991
7). Residential Address No. 18-3 Block D Jalan PJS 3/46
Taman Sri Manja 46000 Petaling Jaya Selangor MALAYSIA
8). Mobie No. 0060163757040
9). E-mail chadeelhaider@gmail.com
1O). Academic Qualification
Degree Subject University/Board Year Marks obtained
Percentage Division
Matric Science Rawalpindi 2006 636/1050 60.57 First
11). Professional Qualification
Degree Discipline University/Board Year Marks obtained
Percentage Division
3 years Mech. DAE
Mechanical PBTE, Lahore 2007-09 2536/3350 75.70 First
B. Tech Pass.
Mechanical Preston University, Isb
2010-12 2.7/4.0 CGPA
2.7 CGPA First
B. Tech Hons.
Mechanical Preston University, Isb
2012-14 3.0/4.0 CGPA
3. 0CGPA First
12).Experience: Pakistan Aeronautical complex kamra JF-17 Thunder
Aircraft / F-16 Aircraft Seven years experience as Charge Hand (Aero Technician) JF-17 Thunder Aircraft/F-16
FTS (Flight Test station) I already worked in hydraulic system, fuel system, pneumatic system, ECS system,
Flight control system and Landing Gear system.
FUEL SYSTEM: Fuel cleaning, fuel feeding transfer sequence check and fuel system indication check,
fuel Air tightness checks, pressure refueling gravity refueling and defueling drop tank removal and
installation.
HYDRAULIC SYSTEM: Hydraulic system1&2 tightness check, Hydraulic pumps pressure check and
removal & Installion, EMG Hydraulic pump pressure check, Hydraulic break pressure(Auto break parking
break normal break anti skidding break) adjustment and removal& installation resiviour charging,
accumulator charging
FLIGHT CONTROL SYS:( aileron, trailing edge flaps, horizontal tail and rudder) adjustment and
degree checks and extension & retraction timing check
PNEUMATIC SYS: Main & EMG sys tightness check, canopy tightness, sys charging, accumulator
charging, emergency landing gear lowering, emergency break check canopy sealing check and drag chute
check
LANDING GEAR SYS: landing gear extension& retraction timing check, landing gear leg charging
tyre charging and nose wheel steering degree check and speed break check, wheel removal & installion
ECS SYS: ECS compensator water separator turbo cooler oil charging |& removal & installion, canopy
safety vale check
We done schedule unshedule aircraft maintenance work, AO(Assembly order) , aircraft maintenance work
card, preparation for ground run, preparation for flight card, post flight card.aircraft refuelling/defuelling
hydraulic charging, pneumatic charging, landing gears leg charging, wheel removal/installation, tyre
charging, accumulator charging, hydraulic pumps removal/installation
FTS(Flight test station) process include Aos Flight test work card and special maintenance works card.FTS
related schedule/unshedule maintenance. schedule/unschedule maintenance of FTS related tester/ground
equipment special tools and towing.
I can operat tester such as HTS, Vehical HTS, Habit/GPU(Ground power supply), Hydraulic charging cart
nitrogen charging trolly, fuel cleaning truck, fuel seauence track, fuel pressurization tester, jacks, ground
supports, fuel tanks pressure mearsurement unit and cockpit air tightness tester.