3A5-SKang

10
 The views expressed in this paper/presentation are the views of  the author and do not necessarily reflect  the views or policies  of  the Asian Development Bank (ADB), or its Board of  Governors,  or the governments they represent.  ADB does not guarantee the accuracy of  the data included in this paper and accepts no responsibility for any consequence of  their use. Terminology used may not necessarily be consistent with ADB official  terms.  

Transcript of 3A5-SKang

8/6/2019 3A5-SKang

http://slidepdf.com/reader/full/3a5-skang 1/10

 

The views expressed in this paper/presentation are the views of  the author and do not necessarily reflect the views or policies of  the Asian Development Bank (ADB), or its Board of  Governors, or the governments they represent. ADB does not guarantee the accuracy of  the data included in this paper and accepts no responsibility for any consequence of  their use. Terminology used may not necessarily be consistent with ADB official terms. 

8/6/2019 3A5-SKang

http://slidepdf.com/reader/full/3a5-skang 2/10

 Water & Wastewater Treatment Research Center,

K-water Research Institute

August 21, 2009

Dr. Sukhyung Kang

8/6/2019 3A5-SKang

http://slidepdf.com/reader/full/3a5-skang 3/10

K-water Research Institute

Research Planning &Management Team

Water ResourceResearch Center 

Policy & EconomyResearch Center 

• 140 Researchers• Research Fields : Water Resources, Water Supply,

Green Energy, Environment, etc.

Water Analysis Center 

Water & Wastewater 

Treatment Research Center  Dam SafetyResearch Center 

Green TechnologyResearch Center 

Water Treatment( 8 Researcher)

Distribution Systems( 5 Researcher)

Total 26 Researchers

Wastewater Treatment( 5 Researcher)

Groundwater Research( 3 Researcher)

 Next Generation Water Supply System Planning

( 5 Researcher)

8/6/2019 3A5-SKang

http://slidepdf.com/reader/full/3a5-skang 4/10

Research Projects & Fund (2009)

Self-investment 9($1 mil)

Trust 5(0.2 mil)

Joint 4

($0.3 mil)

Government 2($0.8 mil)

Support for new growth engines through development of the future core technology

of water and wastewater sectors

Retrofitting conventional water treatment system for the cost-effective production

of high-quality tap water

Desalination, wastewater reuse, industrial water supply, bank filtration etc.

Upgrading water service through the comprehensive evaluation and optimum management

Total 20projects

($2.3 mil)

Research AreaResearch Area

Intellectualproperty

right33

Practical use16

Technicalsupport

114

Other9

(Year ’06~’08)

Total 172

Major research results

8/6/2019 3A5-SKang

http://slidepdf.com/reader/full/3a5-skang 5/10

Demonstration Plant

8/6/2019 3A5-SKang

http://slidepdf.com/reader/full/3a5-skang 6/10

Overall,Overall,

-- To develop the design and operation technology of advanced wateTo develop the design and operation technology of advanced water treatmentr treatment

-- To support education and training for general public and waterTo support education and training for general public and water utility employeesutility employees

Specifically,Specifically,

-- Scale up test for practical useScale up test for practical use

-- Verification and assessment of water treatment related equipmenVerification and assessment of water treatment related equipmentt

-- Assessment of system performanceAssessment of system performance

-- Retrofitting conventional water treatment systemRetrofitting conventional water treatment system

Goal

To establish an advanced water treatment researchTo establish an advanced water treatment research

and training facilityand training facility

Objectives

Goal & Objectives

8/6/2019 3A5-SKang

http://slidepdf.com/reader/full/3a5-skang 7/10

Design capacity : Total 2,000Design capacity : Total 2,000 /day/day

(2 Treatment process trains w(2 Treatment process trains with 1,000ith 1,000 /day each)/day each)

Train A : Advanced treatment process (Ozone, BAC) + ConventionalTrain A : Advanced treatment process (Ozone, BAC) + Conventional processprocess

Train B : Advanced treatment process (PAC, GAC) + Conventional pTrain B : Advanced treatment process (PAC, GAC) + Conventional processrocess

Operation with process selection and combination of each unitOperation with process selection and combination of each unit

Other Alternative equipments for coagulation & sedimentation :Other Alternative equipments for coagulation & sedimentation :

Dissolved Air FlotationDissolved Air Flotation

Low energy package process (built in one equipment)Low energy package process (built in one equipment)

Pilot plants:Pilot plants:

SedimentationSedimentation--filtration processfiltration process

Advanced treatment process (Advanced treatment process (OzonationOzonation, GAC, Membrane Process (MF/UF/NF/RO), UV ), GAC, Membrane Process (MF/UF/NF/RO), UV )

Wastewater treatment systemWastewater treatment system

Water supply and distribution systemWater supply and distribution system

02  Plant Configuration

8/6/2019 3A5-SKang

http://slidepdf.com/reader/full/3a5-skang 8/10

03  Plant Schematic

Train ATrain A

Train BTrain B

8/6/2019 3A5-SKang

http://slidepdf.com/reader/full/3a5-skang 9/10

05  Lay - out

8/6/2019 3A5-SKang

http://slidepdf.com/reader/full/3a5-skang 10/10

Safety Tips :Safety Tips :

Use caution during the conduct of the tour to avoid injuryUse caution during the conduct of the tour to avoid injury

Use the handrails when climbing and descending any stepsUse the handrails when climbing and descending any steps

for your own safety and the safety of othersfor your own safety and the safety of others

Watch for tripping hazards that may be present in some ofWatch for tripping hazards that may be present in some of

the locations on the tourthe locations on the tour