PERMOHONAN PENUTUPAN JALAN ANTARA PERSIMPANGAN LEBUHRAYA KG JAWA DAN PERSIMPANGAN HILIR SG KLUANG BAGI

PEMBINAAN ‘SPECIAL SPAN’

08 JULAI 2015

MENAIKTARAF LEBUHRAYA BAYAN LEPAS (BLE)

DARI BATU MAUNG KE SG. NIBONG (QUEENSBAY)

PULAU PINANG

TAKLIMAT KEPADA EXCO KERAJAAN NEGERI PULAU PINANG

SG TIRAM

QUEENSBAY

BLE PROJECT

1

STANDARD SPAN PROGRESS

PHOTO

2

3

ELEVATED

BRIDGE FOR

STANDARD SPAN

SPECIAL SPAN PROGRESS

PHOTO

4

5

6

7

SECTION ELEVATION

PIER 19 PIER 20

Balance_Cantilever_Method.mp4

8

Special Span

Elevated Bridge Crossing Sg Kluang

Method of Construction

Cast In-Situ Balanced Cantilever Segmental Box Girder

(SBG)

Scope of works

Installation of Form Traveller (4 nos). (Status of work -

Completed)

Construction of Segmental Box Girder (96 segments +

3 stitching segments). ( Status of work - in progress)

9

Special Span

Elevated Bridge Crossing Sg Kluang

Main Activities – must be carried out during

road closure

1) Concreting of SBG.

2) Self Launching of Form Traveller.

3) Stressing cable

Other activities

Rebar works, installation of PT duct & anchorage, FT

PVC pipe, hyrib, cable strand and etc.

10

Info of Special Span

Total Length : 390 m.

Total Span : 3 span.

Total Segment : 96 nos + 3 nos (stitching)

Total Load : 14,000 tonne

Mid Span : 170 m.

Span Width : 18.2 m

Mid Span Load: 6,400 tonne.

11

12

Penang 2nd Bridge Ramp Collapse

TRAFFIC MANAGEMENT

PLAN (TMP)

13

SG TIRAM

QUEENSBAY

BLE PROJECT

14

SG KLUANG

15

UTILIZATION PLAN AND TMP FOR SPECIAL SPAN

18

Info of Lane Closure

LOCATION

Lebuhraya Tun Dr Lim Chong Eu from junction

Lebuhraya Kg Jawa to Hilir Sg Kluang 1.

DURATION

7 months from the gazetted date by the Minister

(Ministry of Works)

19

OPTION 1

TOTAL ROAD CLOSURE (24 hours)

Advantage

Eliminate risk to road users

Disadvantage

Cause massive jam to road user during

peak hour

20

OPTION 2

ROAD CLOSURES BY A SCHEDULED BASIS

Approved by Exco on 12 June 2015

Open to Traffic

Monday to Thursday

Morning: 5.30 am to 10.00 am,

Evening: 4.00 pm to 9.00 pm

Friday

From 5.30 am to 9.00 pm

21

OPTION 2

Closed to Traffic

Monday to Thursday

From 10.00 am to 4.00 pm &

9.00 pm to 5.30 am

Friday to Sunday

From 9.00 pm (Friday) to 5.30 am (Monday)

22

OPTION 2

Advantage

Reduces traffic jam during peak hour

Disadvantage

Exposed risk to road users

23

24