HOSPITAL PENAWAR
DEVELOPMENT & IMPROVEMENT
10 JANUARY 2012
OPS PULIH – M & E
Pending Job
INI ADALAH KERJA -KERJA MAINTENANCE DEPT SAHAJAUNTUK BULAN NOV YANG BELUM DAPAT DISELESAIKAN :
15 NOV 20111.HOSTEL A (suiz problem) = not done
20 NOV 20111.Tambah lampu papan tanda OHC Clinic = Done
2. Pasang lampu at HK dept = Done
21 NOV 20112.Pintu utama A&E goyang teruk = Dlm proses
22 NOV 20111. Aircond server room = Dlm Proses (staff baru masuk)
27 NOV 20112.Tambah lampu redspot hawker at cafe = lampu dah beli
Picture A&E
Lighting Classic
LIFT ' B ' IMPROVEMENT
TARGET BUAT : 10 JANUARY 2012
IN PROGRESS
BUMBUNG BOCOR
IN PROGRESS
target date : January 2012work order date : 31 DEC 2011masalah : investigate period ~ waiting the raining day (belum dapat apa-apa feedback sehingga 10 JAN 2012)
ROOM 305 REFURBISHMENT
IN PROGRESS
TINTED ~ DONE (4/1/2012)WALLPAPER ~ 12 JANUARY 2012TRACK CURTAIN ~ 11 JANUARY 2012CURTAIN ~ 11 JANUARY 2012
* CEILING YANG BOCOR BELUM DAPAT DIPERBAIKI ALTERNATIVE * TUKAR PAPAN CEILING SAHAJA UNTUK TIDAK NAMPAK KOTOR DAN BERKULAT
WORK DONE - TINTED
ASSEMBLY COVERED AREA
IN PROGRESS
target date ~ 2nd Januarywork order date ~ 31 DEC 2011 masalah ~ RUNGATE belum memberi feedback untuk tetapkan tarikh buat
Rungate : waiting for approval
CURRENT AND PROPOSE IMAGE
MRI
DEMOLISH EXISTING WALL
CLEARANCE
TRANSIT WARD 3
overall all done accept wall lighting, tv installation and call bell
lighting and painting wall not decide yet...
RECEPTIONIST COUNTER REFURBISHMENT
CURRENT
PROPOSAL
DR ADNAN APPROVED FOR 3RD DESIGN
1 2
3
OPS SUCI
ON JOB
Training on 4-5 January 2012
1. Siti Nurain Hamzah
IT DEVELOPMENT
OT CLINICAL SYSTEM – 80% -TARGET NEXT WEEK RUN
NURSING REPORT – RECENT UPDATE – TRAINING
TROLLEY CHINA – ON THE WAY
PENAWAR CORNER LANDSCAPE
IN PROGRESS
KERJA - KERJA MEMBUAT PLAN MINI PADANG GOLF SEDANG GIAT DIJALANKANDAN KERJA - KERJA PEMBERSIHAN RUMPUT DAN PEMOTONGAN JUGA DIJALANKAN.
IN PROGRESS
NURSING - ROSTER MX & TRAINING
TRAINING
Meeting with Ina & Matron Marziah
*Schedule / Content of Labour room Mx
a) Antenatal care - Stages of labourb) Post Natal Carec) Observation - Vital sign, Pad chart, contraction, Feotal Heart, VE.d) Epidural Caree) Medication f) Compicationg) Emergency Rescueh) Spritual Supporti) Education for pt's & family
will e-mail slide A.S.A.P.
CAFE IMPROVEMENT
PENAMBAHAN SIMEN
FOOD DISPLAY NASI CAMPUR
HAWKERS AREA
SINKI
DAPUR
WORKING TABLE
SINKI
KAKI
LIMA
ROTI
DONUT DISPLAY
CHILLER
AISKRIM
MEJAMAKAN
CAFÉ & KITCHEN DEVELOPMENTNEW PLAN LAYOUT
PETI SEJUK
ROTICANAI
MEJA BUAT AIR
CASHEIR COUNTER
BUDGET FOR NEW EQUIPMENT
QUOTATION / BUDGET (RM) DECISSION
1. FOOD DISPLAY 5 @ 6 HOLD STAINLESS STEEL
– 6 HOLE/1 RACK RM 2030, 5 HOLES/2 RACK RM 2080, 6 HOLE/2 RACK RM 2150
APPROVED - 5 HOLES/2 RACK RM 2080, TO PROCEED PO
2. DAPUR 2 @ 3 TUNGKU STAINLESS STEEL NASI AYAM STAINLESS STEEL STALL
– 2 TUNGKU RM 950, 3 TUNGKU RM 1050– RM 1250
APPROVED - 3 TUNGKU RM 1250TO PROCEED PORM 1230 TO PROCEED PO
3. COUNTER AIR STAINESS STEEL
– 2 RACK RM 1330, 2 RACK & SINK RM 1660
TO DESIGN BY RUNGATE – EN KENT
4. COUNTER CASHEIR
– BUDGET RM 1500 (TO FIND QUOTATION)
TO DESIGN BY RUNGATE – EN KENT
5. MENU LIGHT BOX - 10 BOX
– RM 1000 (EXCLUDE PICTURE)
WAITING HAWKERS & KOUNTER AIR RENOVATION DONE
6. MEJA MAKAN + KERUSI EMPAT SEGI @ BULAT 10 - 12 SET
– BUDGET RM 300/SET = 3000 (TO FIND QUOTATION)
PENDING
7. NEW PINGAN MAKAN HIJAU (50 PCS) BERALAS KERTAS TOTAL BUDGET RM 10,510
– BUDGET RM 150 (TO FIND QUOTATION)
TOTAL BUDGET APPROVEDRM 4560
IN PROGRESS – PO ISSUE
ORHER THING / MATTERS PROPOSE DECISSION
1. PROPOSE KITCHEN HELPER CUM CHEF
– PROPOSE MENU ALA THAI DAN LAUK NASI CAMPUR - ADA CANDIDATE
APPROVED
2. WATER FILTER FOR DRINK TO REDUCE COST EXPENSES
– TO REDUCE COST WATER SUPPLY FROM DR SUKIDA RM 70/WEEK @ RM280/MTH
APPROVED BUDGET RM 1000
CAFÉ RENOVATION WORK BUDGET (RM) DECISSION
1. KERJA MENYEMIN DEPAN HAWKERS 2. KERJA PEMECAHAN BILIK BUAT AIR SEKARANG TOTAL BUDGET RM 4000
– RM 500 – RM 3500
JOBS ORDER: REQUEST FOR PLAN AND DESIGN FORWARD TO RUNGATE – DONE
PENAWAR BUS
IN PROGRESS
BUS DESIGN APPROVAL
Target :
Date send letter : 11 January 2012 - SPAD MuarDate to get approval : within 1 week.
AMBULANCE JER - NEW DESIGN & PUSPAKOM
IN PROGESS
PROJEK: 1. NEW DESIGN EXTERNAL FOR AMBULAN JER 95942. NEW DESIGN FOR INTERNAL (PESSENGER AREA)3. UPGRADING EQUIPMENT / MACHINE 4. PENGHANTARAN AMBULAN KE PUSPAKOM UNTUK PEMERIKSAAN BERKALA
PLANNING THIS WEEK:1.1 - MEMBUAT LAKARAN CADANGAN DESIGN AMBULAN (STICKER BAHAGIAN LUAR)1.2 - CONFORMATION STICKER1.3 - MENGHANTGAR LAKARAN STICKER KE SYARIKAT PEMBUAT STICKER DAN DAPATKAN QUOTATION1.4 - CONFORMATION STICKER DAN HANTAR AMBULAN UNTUK PENAMPALAN1.5 - PENGHANTARAN PEMERIKSAAN KE PUSPAKOM.
GAMBARAN LAKARAN KOSONG AMBULAN
PROPOSAL NEW DESIGN
NEW LOOK
NEW UNIFORM – HOSPITAL BLOCK
Total staff involved:-
No Department Total Staff
1 Billing 4
2 Cashier/Dispensary 7
3 Imaging 7
4 Medical Record 5
5 Physio 5
6 Clinic 6
7 Reception 4
Total 38
1st stage - distribution to Medical Record & Receptionist Staff - distribute by Thursday 12.1.12
- Staff list -* Samsilawati said* Norwahidah Rahmat* Mohd Nizwan* Premela* Siti Aminah* Siti Syafiqa* Siti NUrain Hamzah* Zulaiha Nordin* Noorpazilah Tukiman
NEUROSURGERY
UPDATE
- Infrastructure for ICU - ICP Monitor - pending and sourcing by Ahmad (Post Craniotomy)
- Appointment with Dr Johari (visiting consultant ) - 19.01.2012
HEALTHY WORK POLICY FOR STAFFS
CATEGORY
Pre employment medical check up - By category - male & female - Type of test - * Medical History * BMI * Urine Drug * UPT * Blood Pressure * height * Fasting Blood Sugar
* Proposed date - 15th January 2012
THANK YOU