Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO...

25
MESYUARAT PEMBUKAAN AUDIT DALAM ISO 9001:2015 TAKLIMAT WAKIL PENGURUSAN 17 September 2017 Bilik Mesyuarat, Perpustakaan UTM (Bangunan Perpustakaan Sultanah Zanariah)

Transcript of Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO...

Page 1: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

MESYUARAT PEMBUKAAN AUDIT DALAM ISO 9001:2015

TAKLIMAT WAKIL PENGURUSAN

17 September 2017Bilik Mesyuarat,

Perpustakaan UTM(Bangunan Perpustakaan Sultanah

Zanariah)

Page 2: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

1.0 FOKUS AUDIT DALAM 2017

1. Menyemak kepatuhan SPK Perpustakaan UTM menepati elemen dalam versi baru ISO 9001:2015 sebagai persediaan audit ‘Surveillance SIRIM padaNovember 2017.

2. Menyemak tindakan NCR dan OFI Audit Dalam 2016 termasuk Audit SIRIM

3. Elemen dalam versi baru ISO 9001:2015 yang ditekankan iaitu pengurusan risiko.

4. Penambahbaikan berterusan dalam proses kerjayang telah dibuat

Page 3: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

3.1. DOKUMENTASI INDUK 1 Manual Kualiti37 Prosedur - (6 Mendiri, 31 Aktiviti)• Prosedur Maklumat Berdokumen - P(MD)/7.5.3• Prosedur Kawalan Produk Tidak Memenuhi Keperluan -

P(PTMK)/8.7• Prosedur Pembekalan Luar Perpustakaan - P(PL)/8.4• Prosedur Audit Dalam - P(AD)/92.2• Prosedur Tindakan Pembetulan - P(TPB)/10.1• Prosedur Pengurusan Risiko - P(PR)/6.1

2.0 DOKUMENTASI ISO 9001:2015

Page 4: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

3.0 DOKUMENTASI ISO 9001:2015

3.2 BAHAGIAN PENTADBIRAN & KEWANGAN1. Prosedur Latihan - P(L)/7.1.22. Prosedur Mengurus Perolehan Bekalan dan Perkhidmatan - AKT(P)/8.43. Prosedur Pengurusan Bangunan - AKT(PB)/7.1.3

3.3 BAHAGIAN PEMBANGUNAN SUMBER1. Prosedur Mengurus Perolehan Jurnal dan Media Elektronik - AKT(JME)/8.42. Prosedur Mengurus Perolehan Buku dan Bahan Pandang Dengar -

AKT(BPD)/8.43. Prosedur Penyenggaraan dan Pemuliharaan Bahan dan Alat Media -

AKT(PPP)/7.1.3

3.4 BAHAGIAN KATALOG, HADIAH & PERTUKARAN1. Prosedur Mengkatalog dan Memproses Bahan - AKT(MB)/8.5.22. Prosedur Mengurus Perolehan Bahan Hadiah - AKT(BH)/8.4

Page 5: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

3.0 DOKUMENTASI ISO 9001:2015

3.5 BAHAGIAN PERKHIDMATAN MAKLUMAT & PENYELIDIKAN1. Prosedur Pengendalian Maklumbalas Perkhidmatan

Perpustakaan - AKT(MP)/8.2.12. Prosedur Penerbitan Buletin dan Buku Panduan Perpustakaan -

AKT(PBPP)/8.23. Prosedur Pengurusan Permohonan dan Pembekalan

Perkhidmatan Inter Library Loan (ILL) - AKT(ILL)/8.5.14. Prosedur Pengendalian Insentif Penerbitan Universiti -

AKT(PIP)/8.5.15. Prosedur Perkhidmatan Pangkalan Data Langganan -

AKT(PD)/8.5.16. Prosedur Program Pendidikan Pengguna - AKT(PP)/8.5.1

Page 6: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

3.6 BAHAGIAN PENGURUSAN KOLEKSI1. Prosedur Menguruskan Peminjaman dan Pemulangan Bahan -

AKT(PPB)/8.5.12. Prosedur Mengurus Penyusunan Bahan - AKT(PEN)/8.5.13. Prosedur Penjilidan Bahan Perpustakaan - AKT(PBP)/8.5

3.0 DOKUMENTASI ISO 9001:2015

Page 7: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

3.7 PENTADBIRAN PRZS

1. Prosedur Pengurusan Bangunan - AKT(PBRZS)/7.1.33.8 BAHAGIAN PERKHIDMATAN MAKLUMAT DAN SIRKULASI

1. Prosedur Pengendalian Maklumbalas PerkhidmatanPerpustakaan - AKT(MPRZS)/8.2.1

3.9 BAHAGIAN REPOSITORI METADATA

1. Prosedur Mendeposit Bahan UTM-IR - AKT(IR)/8.5.22. Prosedur Mengurus Perolehan Bahan Khas -

AKT(BK)/8.4

3.0 DOKUMENTASI ISO 9001:2015

Page 8: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

3.10 BAHAGIAN AUTOMASI1. Prosedur Mengurus dan Mengendali Penyelenggaraan ICT -

AKT(PMMP)/7.1.32. Prosedur Penyelenggaraan dan Membaikpulih Perkakasan

Perkomputeran - AKT(PMPP)/7.1.3

3.0 DOKUMENTASI ISO 9001:2015

Page 9: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

3.11 PSZ Kuala Lumpur1. Prosedur Pengurusan Permohonan dan Pembekalan Perkhidmatan

Inter Library Loan (ILL) - AKT(ILLKL)/8.5.12. Prosedur Pengendalian Maklumbalas Perkhidmatan Perpustakaan -

AKT(MPKL)/8.2.13. Prosedur Mengurus Peminjaman dan Pemulangan Bahan -

AKT(PPBKL)/8.5.1

4. Prosedur Mengurus Penyusunan Bahan - AKT(PENKL)/8.5.15. Prosedur Mangkatalog dan Memproses Bahan - AKT(MBKL)/8.5.26. Prosedur Mengurus Perolehan Buku dan Bahan Pandang Dengar -

AKT(BKL)/8.47. Prosedur Pengurusan Bangunan - AKT(PBKL)/7.1.38. Prosedur Program Pendidikan Pengguna - AKT(PPKL)/8.5.1

3.0 DOKUMENTASI ISO 9001:2015

Page 10: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

4. PERANCANGAN AUDIT DALAM DAN AUDIT SURVEILLANCE SIRIM 2017

Page 11: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

4.1 PENDEKATAN AUDIT DALAM

1. Fokus kepada Pengurusan Risiko Proses dan Peluang yangboleh diambil (Opportunities)

2. Menyemak semua cadangan tindakan pengurusan risikoyang didaftarkan di Dashboard Pengurusan Risiko bagitiap proses dan memberi maklumbalas dimanaberkenaan.

3. Menggunakan pendekatan Proses dengan melihat kepadakeseluruhan proses berkaitan.

4. Tidak menghadkan skop audit kepada proses yangmempunyai prosedur sahaja.

5. Hasil audit melibatkan proses lain terlibat denganmerujuk clause berkenaan dan diberikan tanggungjawabkepada Ketua Bahagian dimana proses berlaku.

6

Page 12: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

4.2 LAPORAN STATUS AUDIT PENSIJILAN SEMULA ISO 9001:2015

1. NON-CONFORMITY (MINOR) - 1Melibatkan clause :

- 4.1 (understanding the organization and its context)- 4.2 (understanding the needs and expectations of interested parties)

Tindakan WP:Keperluan kepada clause ini telah dibuat pembetulan dandilaporkan kepada pihak juruaudit SIRIM pada 16 November 2016.STATUS : SELESAI

Page 13: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

2. OPPORTUNITIES FOR IMPROVEMENT (OFI) – 7Clause terlibat :

6.1 - Actions to address risks and opportunities6.2.2 - Quality objectives and planning to achieve them6.3/8.2.4/8.5.6 - Planning of changes/Changes to requirements for products and services/Control of changes7.1.3 - Infrastructure7.1.6 - Organizational knowledge8.4/8.4.2 - Control of externally provided processes, products and services/Type and extent of control9.3.2/9.3.3 - Management review inputs/review outputs

4.2 LAPORAN STATUS AUDIT PENSIJILAN SEMULA ISO 9001:2015

Page 14: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

6.1 Actions To Address Risks And Opportunities•The organization has identified risks at respective processes, however opportunities at respective processes has yet to be identified, wherever applicable. Tindakan : Semua KB dan Pemilik Proses perlu melihat semulaJadual Pengurusan risiko dan tambahbaik dimana Opportunities boleh dikenalpasti.STATUS : DALAM TINDAKAN BERTERUSAN

• Risks and issues referring to Organisation context (clause 4.1) has not been identified clearly-refer to non-conformity MMZ-01

Tindakan WP : Perincian telah dibuat dan didokumenkan dandilapor semula kepada SIRIM.STATUS : SELESAI.

4.2 LAPORAN STATUS AUDIT PENSIJILAN SEMULA ISO 9001:2015

Page 15: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

6.2.2 ( c ) : Quality objectives and planning to achieve them

• Organisation has not clearly determine who will be responsible on the quality objectives.Tindakan MR : Penanggungjawab bagi tiap Objektif Kualiti telahdimasukkan dalam Lampiran 1: Objektif Kualiti di Manual Kualitidimana Ketua Bahagian dan Pemilik Proses adalahbertanggungjawab dalam pencapaian objektif tiap proses. STATUS : TERBUKA DAN BERTERUSAN

4.2 LAPORAN STATUS AUDIT PENSIJILAN SEMULA ISO 9001:2015

Page 16: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

6.3/8.2.4/8.5.6 : Planning of Changes/Changes to requirements for products and services/Control of changes• The Organisation has yet to demonstrate the ‘changes’ are

made in a planned manner and changes are reviewed and controlled.

Tindakan WP : KAI Perpustakaan yang disemak dari masa kesemasa akan mengenalpasti sebarang keperluan perubahanmembabitkan produk dan perkhidmatan Perpustakaan.STATUS : TERBUKA DAN BERTERUSAN

4.2 LAPORAN STATUS AUDIT PENSIJILAN SEMULA ISO 9001:2015

Page 17: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

7.1.3 : Infrastucture

• Fire extinguishers in Perpustakaan Raja Zarith Sofiah found last services date on 23/06/2015. However, organisation has requested the external service provider. i.e. Pejabat HartaBina to attend to this matter.

• Pest control activities are yet to be implemented in all Libraries (eg: Fumigation, pests eg termites, rats).

Tindakan KTK : Tindakan susulan bersama pihak PHB telah dibuatdan tindakan pemantauan perlu dibuat untuk memastikan tindakandiambil.Fire extinguishers telah diganti pada Ogos 2017 oleh PejabatHartabina.STATUS : SELESAI

4.2 LAPORAN STATUS AUDIT PENSIJILAN SEMULA ISO 9001:2015

Page 18: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

7.1.6 : Organisational Knowledge

• The documented information (Manual Kualiti) of organisation has not clearly determine, identify and maintained the knowledge and be made available to the extent necessary.

Tindakan WP : Organizational knowledge telah dikenalpastidan disenaraikan (dokumentasi) di Manual Kualiti.STATUS : SELESAI

4.2 LAPORAN STATUS AUDIT PENSIJILAN SEMULA ISO 9001:2015

Page 19: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

8.4/8.4.2 : Control of externally provided processes, products and services/ Type and extent of control• There was no clear signing off/or time out of contractors

retained in ‘Buku kehadiran kontraktor’ at Perpustakaan.

Tindakan KTK : Catatan Rekod keluar di Buku Rekod kehadiranKontraktor telah dilaksanakan.STATUS : SELESAI

4.2 LAPORAN STATUS AUDIT PENSIJILAN SEMULA ISO 9001:2015

Page 20: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

9.3.2/9.3.3 : Management review inputs/review outputs

• Mesyuarat Semakan Pengurusan Bil 2/2016 of organization has yet to be aligned and reported as per clauses 9.3.2 and 9.3.3

Tindakan WP : Keperluan mesyuarat telahdiselaraskan mengikut keperluan clause berkenaan. (input dan output)STATUS : SELESAI

4.2 LAPORAN STATUS AUDIT PENSIJILAN SEMULA ISO 9001:2015

Page 21: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

4.3 PERINGATAN BAGI AUDITOR DAN AUDITEE BAGI AUDIT DALAM

1. Bersedia untuk diaudit.2. Ambil serius proses audit yang dijalankan3. Berbincang untuk penambahbaikan4. Memaklumkan sebarang isu berbangkit supaya jelas semasa

dijatuhkan NCR/OFI5. Cadangan tidak perlu dimasukkan dalam Borang Audit. Memadai

direkodkan dalam catatan sahaja dan auditee boleh berbincangdengan Ketua Bahagian masing-masing untuk tindakan lanjut.

6. Menyemak semua Dashboard Pengurusan Risiko pada tiap proses dan menilai keberkesanan kawalan risiko sediada.

Page 22: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

Persiapan Audit Surveillance 20177. Mengenalpasti sebarang peluang dari risiko yang timbul.

Contoh : Kekurangan bajet latihan memberi risiko staf tiadapeluang menjalani latihan.Peluang yang dikenalpasti adalah kepakaran stafdalaman dapat diketengahkan dengan mengadakan‘inhouse training’.

8. Menyemak Tindakan Kawalan Risiko yang melebihi 9 bulanuntuk membangunkan pelan kawalan dan pelaksanaanmitigasi dengan menyediakan pelan tindakan (contoh, carta perbatuan) – Jika berkenaan.

4.3 PERINGATAN BAGI AUDITOR DAN AUDITEE BAGI AUDIT DALAM

Page 23: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

• Pelaporan audit perlu jelas dan difahami oleh auditee serta dengan Clause yang berkenaan. Perbincangan awalantara auditor dan auditee mengenai isu yang dibangkitkan boleh membantu.

• Ambil tindakan susulan mengikut jangkamasa yang ditetapkan. Boleh berunding dengan auditor jangkamasayang sesuai.

• Pantau tindakan susulan dan tutup jka telah selesai.

• Laksanakan audit dengan berhemah. Ikuti praktik olehJuruaudit SIRIM.

4.3 PERINGATAN BAGI AUDITOR DAN AUDITEE BAGI AUDIT DALAM

Page 24: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan

5.0 AUDIT SURVEILLANCE SIRIM 2017

PENGESAHAN SIRIM BAGI AUDIT SURVEILLANCE 2017 MELALUI MEL.RE: SURVEILLANCE AUDIT : ISO 9001 : 2015 Please be informed that the SURVEILLANCE Audit of your organization's management system has been scheduled as follows :

Date : 14/11/2017 TO 15/11/2017 Audit Team Leader : MARIAM MOHAMED ZIN – JOHOR BAHRUAuditor : SITI RAHMAH (DAY 2) – KUALA LUMPUR

Audit akan berlangsung selama dua (2) hari termasuk di PerpustakaanUTM Kuala Lumpur.

Page 25: Taklimat WP di Mesyuarat Pembukaan Audit Dalam ISO 2017portal.psz.utm.my/quality/images/stories/kualiti/dokumentasi/laporan/auditdlm/2017...Prosedur Penerbitan Buletin dan Buku Panduan